Records from 2016 to 2026. Most recent: inspection, 21 July 2026.
Documentation record
Registered dimensions (L × B × D)78.0 ft × 34.0 ft × 11.0 ft
Registered tonnagegross 195 / net 156
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMASTER MARINE INC · BAYOU LA BATRE, AL, UNITED STATES · built 2016
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 5 February 2026 · expires 31 March 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it156 - Simplified, Net Ton
195 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
21 July 2026
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8443095
28 May 2026
Vessel Attendance · Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8382961
30 November 2025
Deficiency Check · Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8275594
29 August 2024
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7991739
31 July 2024
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7971959
31 July 2024
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7980245
27 November 2023
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7829861
11 November 2023
TPO Audit
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7838489
8 March 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7407868
18 November 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7119367
3 July 2020
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6994301
30 June 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6998238
10 March 2020
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 6927347
3 June 2019
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6710604
8 May 2019
Initial Certification · Administrative Inspection · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6679899
11 February 2019
TPO Audit
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6624089
2 April 2018
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 6384648
27 February 2018
Type not recorded
No type recorded · Station Lake Charles · USCG Heartland District (CGD-H) · Activity 6363258
14 July 2017
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6209242
21 January 2017
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6075485
17 December 2016
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6060017
28 June 2016
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 5922277
22 June 2016
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 5937821
26 February 2016
Industry Initiated Exam · MTSA Verification · MARPOL
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5822795
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 July 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
The Port main diesel engine suffered loss of RPM and tech discovered metal shavings in the oil. Troubleshoot and repair the issue and clear to the satisfaction of an attending TPO Surveyor (Sabine).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2026
Resolution: Repaired and tested sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 May 2026
Resolved
Each towing vessel must be maintained and operated so as to minimize fire hazards and to ensure the following:(a) All bilges and void spaces are kept free from accumulation of combustible and flammable materials and liquids insofar as practicable.
Vessel reported fuel leaking into the bilge via a compromised fuel supply line to the MDE. Vessel is to repair the fuel line to the satisfaction of the TPO prior to movement.
46 CFR 142.220(a)
Action required: 60 - Rectify deficiencies prior to movement
Due 28 May 2026
Resolved 29 May 2026
Resolution: Installation of new fittings and associated piping along with a properly installed support bracket. See documents
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 November 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Vessel's port z-drive lost propulsion. Vessel authorized to transit in tow with the QUINTON CRAIG HARRIS to Wickliffe, KY for repair. Make repairs to the satisfaction of the vessel's Third Party Organization (TPO), Sabine Surveyors. TPO to provide close out report to USCG Sector LMR within 72 hours of vessel being cleared for operations.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 December 2025
Resolution: Replace faulty power supply to drive's selector valve. See report in documents tab.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 July 2024
Resolved
Machinery must be designed and maintained to provide safe operation of the towing vessel under normal and emergency conditions. Vessel experienced above Starboard Generator. Have technician verify any damage and ensure all machinery is operating as designed to the satisfaction of TPO (Sabine Surveyors)
In accordance with CVC Policy Letter 17-10, the above deficiencies may be cleared by the operating company's TPO. TPO must submit a report to the cognizant OCMI within 72 hours of clearing the deficiencies.
The vessel is authorized to be towed, deadship, from the casualty location at LMR MM 244 to TT Barge at LMR MM 237 to conduct repairs.
Amendment - 8/1/2024 - Action code updated to "60" - Rectify deficiencies prior to movement. Any movement of the vessel from its location at TT Barge Shipyard, LMR MM 237, must be approved by the U.S. Coast Guard.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 31 July 2024
Resolved 29 August 2024
Resolution: TPO submitted report of deficiency correction. See docs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 June 2020
Resolved
Propulsion machinery must be maintained to ensure proper operation. Vessel experienced a loss of the starboard and port main diesel engine due to unknown causes while in transit resulting in a marine casualty. Prior to movement from current location, provide TPO report attesting to cause and satisfactory repair to attending CG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2020
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Injector (fuel injection)
Issued 14 July 2017
Resolved
Load clunking noise and white smoke was emanating from the STBD MDE. Make final repairs, test and provide tech report attesting to fully functional main engine.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 July 2017
Resolved 14 July 2017
Resolution: Received, reviewed and accepted tech report from (MSI) attesting to a properly repaired broken #5 fuel injector and a satisfactorily functioning stbd MDE. Copy scanned into vsl file.