Records from 2004 to 2023. Most recent: inspection, 24 October 2023.
Communications › Radio Communications › EPIRB
Issued 10 May 2018
Resolved
Provide Hydrostatic release on EPIRB
Action required: 17 - Rectify deficiencies prior to departure
Due 10 May 2018
Resolved 10 May 2018
Resolution: Master installed hydrostatic release prior to the departure of the CG.
Lifesaving › Lifefloat › Paddle
Issued 10 May 2018
Resolved
Provide proper outfit of survival craft (Paddles)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2018
Resolved 14 May 2018
Electrical › Lighting (emergency) › Lighting Fixture
Issued 10 May 2018
Resolved
Prove proper operation of emergency lighting in mess deck
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2018
Resolved 16 May 2018
Communications › Alarms/Indicators › Steering Failure Alarm System
Issued 10 May 2018
Resolved
Prove proper operation of hydraulic low level visual indicator.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2018
Resolved 15 May 2018
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 10 May 2018
Resolved
Properly attach port forward generator to vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2018
Resolved 14 May 2018
Deck/Cargo › Cargo Transfer (solid) › General
Issued 7 April 2017
Resolved
Inspect and repair/replace worn pins and bushings in way of crane boom hydraulic ram in accordance with API RP 2D and manufacturer's instructions. NVIC 8-91/ CG-543 Policy Letter 07-02/ 46 CFR 107.259.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2017
Resolved 24 April 2017
Resolution: Replaced pin and bushing.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 7 April 2017
Resolved
Conduct five(5)-year crane load test in accordance with 46 CFR 107.259 and 46 CFR 107.260. CG-543 Policy Letter 07-02
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2017
Resolved 24 April 2017
Resolution: Conducted satisfactory crane load test in presence of USCG MI.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 7 April 2017
Resolved
Re-install mast head light prior to conducting night operations. 46 CFR 183.420.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 April 2017
Resolved 24 April 2017
Resolution: Re-installed masthead light and proved operation.
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 7 April 2017
Resolved
Seal failed on forward starboard leg hydraulic jacking system when breaking pads loose from mud to get underway. Repair forward starboard leg hydraulic system and prove operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2017
Resolved 24 April 2017
Resolution: Third party repair of hydraulic seal.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 April 2017
Resolved
Remove dead-end wiring in engine room or properly terminate in a junction box.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2017
Resolved 24 April 2017
Resolution: Properly terminated dead-end wiring.
Engineering › Bilge Water Management System › Piping
Issued 7 April 2017
Resolved
Replace wasted valve in port engine room bilge discharge line.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2017
Resolved 24 April 2017
Resolution: Replaced valve and wasted piping.
Stability › Watertight Integrity › General
Issued 7 April 2017
Resolved
Repair hole in house deck in way of washer and dryer.
Action required: 705 - Other - as specified
Due 24 April 2017
Resolved 24 April 2017
Resolution: Repaired.
Stability › Weathertight Integrity › General
Issued 7 April 2017
Resolved
Closing devices on weathertight doors painted over and do not move. Exercise all dogs on weathertight doors and prove doors are weathertight.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2017
Resolved 24 April 2017
Resolution: Freed all WTD dogs and proved weathertight.
Operations/Management › Drills/Instruction › Fire
Issued 7 April 2017
Resolved
Conduct satisfactory drills, to include fire drill at maximum air gap to prove fire pump operation, in the presence of a USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2017
Resolved 24 April 2017
Resolution: Conducted satisfactory drills.
Communications › Radio Communications › EPIRB
Issued 7 June 2016
Resolved
Hydrostatic release for EPIRB expired.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 June 2016
Resolved 30 June 2016
Resolution: Hydrostatic release replaced. Verified and cleared 07Apr2017, Activity 6119829.
Electrical › Electrical Distribution System (service) › Cable
Issued 7 June 2016
Resolved
Gauge power cable under pilothouse console found with insulation waste thru exposing wire.
Action required: 705 - Other - as specified
Due 22 June 2016
Resolved 30 June 2016
Resolution: Verified and cleared 07Apr2017, Activity 6119829.