Records from 1985 to 2025. Most recent: inspection, 20 June 2025.
Documentation record
Registered dimensions (L × B × D)118.7 ft × 34.0 ft × 14.6 ft
Registered tonnagegross 198 / net 134
ITC dimensions (L × B × D)120.2 ft × 34.0 ft × 16.0 ft
ITC tonnagegross 424 / net 127
BuilderMCDERMOTT SHIPYARDS · PORT OF NEW IBERIA, LA, UNITED STATES · built 1976
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portKETCHIKAN, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 12 December 2025 · expires 31 January 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it127 - Convention (Subpart B), Net Ton
198 - Regulatory (Subpart C or D), Gross Ton
134 - Regulatory (Subpart C or D), Net Ton
424 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 37
20 June 2025
Initial Certification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8153048
24 June 2022
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7486299
4 March 2020
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6920560
21 December 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6877878
25 December 2018
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6618399
3 March 2017
Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6099653
3 March 2017
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6104175
24 March 2016
Administration
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5842246
28 January 2016
Administration
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5816984
25 September 2014
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5000728
31 August 2014
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 4979806
10 February 2014
Administration
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4806297
4 November 2010
Industry Initiated Exam · MTSA/ISPS Verification
Physical examination · Marine Safety Detachment Ketchikan · USCG Arctic District (CGD-A) · Activity 3885676
31 August 2006
MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2765013
2 August 2006
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2735116
8 March 2005
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2324089
26 August 2003
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1887505
22 August 2003
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1887469
22 August 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1667682
24 June 2002
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1664414
18 June 2001
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 20839
22 March 2001
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 223816
1 March 1999
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 113839
20 April 1997
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 69224
5 August 1996
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 101054
13 July 1996
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 57923
12 November 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 147694
12 April 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 199540
12 April 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 755778
7 March 1995
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 20823
26 February 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 175813
6 January 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 25027
28 March 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 189109
5 August 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 467158
12 October 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 509870
10 October 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 474998
2 May 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 495197
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 July 2025
Resolved
The fire main must have a sufficient number of fire hydrants with attached hose to allow a stream of water to reach any part of the machinery space using a single length of fire hose. The hose must be a lined commercial fire hose 50 feet in length.
Current fire main arrangement with 2 hydrants on the second deck does not adequately reach all parts of the machinery space, even with 75 foot hose. Provide an additional fire hydrant and fire hose near the fidley as discussed.
Action required: 705 - Other - as specified
Due 1 December 2025
Resolved 2 July 2026
Resolution: An additional fire station was installed outside the fidley with accompanying 50 foot UL 19 hose. Attending MI observed operational test of this new station and that the new hose can reach into the engine room.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 11 July 2025
Resolved
Means must be provided for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings into machinery spaces.
Provide a means for closing off the ventilation ducting between the engine room and lazarette that does not require a crewmember to go into the engine room (current
closure devices must be closed from inside engine room).
Action required: 705 - Other - as specified
Due 1 December 2025
Resolved 2 July 2026
Resolution: Manual valves were installed in the duct piping outside the engine room (forawrd bosun stores and lazarette, respectively) to the satisfaction of the attending MI. This allows the space to be sealed up without going into the engine room.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 11 July 2025
Resolved
Survival craft must be stowed in accordance with the requirements of 199.130 of this chapter, as far as is practicable on existing towing vessels. Each survival craft must be stowed so as to not require lifting from its stowed position in order to launch, except that a survival craft that weights 185 kg (407.8 pounds) or less may be lifted not more than 1 foot in order to launch. Each liferaft must be arranged to permit it to drop into the water from the deck on which it is stowed.
Replace fixed railings with safety chains (or similar arrangement) so that the 10 person liferaft stored on the second deck can be more readily deployed into the water from its stowed position.
Action required: 705 - Other - as specified
Due 1 December 2025
Resolved 2 July 2026
Resolution: A section of the fixed railing was cropped out and replaced with safety chains to the satisfaction of the attending Marine Inspector.
14 - Pollution Prevention › N/A - No Subsystem › VGP: Notice of Intent (NOI)
Issued 11 July 2025
No resolution recorded
A VGP NOI is required for all vessels over 300 gross tons or with a ballast tank capacity of over 8 m3 (2,113 gallons).
Subject vessel is 424 GT ITC (ITC tonnage must be used for the purposes of VGP applicability, if assigned). Provide proof of NOI and implementation of VGP requirements onboard.
Action required: 705 - Other - as specified
Due 1 December 2025 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 July 2025
No resolution recorded
Verification of compliance with construction and arrangement design standards of this part must be performed according to the following table: for a vessel on which a new installation that is not a “replacement in kind” is made, then the applicable requirements must be met before the new installation is performed. Verification of compliance with design standards, when required by 144.135, must be performed by an individual or entity who meets the requirements of 144.140.
The interior and outfittings of the vessel has been significantly gutted and rebuilt since being purchased by the current owner, which includes various alterations and not in kind replacements. Work with the OCMI to identify all items that still require verification of design standards (verification of design standards for stability has been completed by RINA as of 7/10/25), and complete verification of design standards to the satisfaction of the local OCMI.
Action required: 705 - Other - as specified
Due 1 December 2025 — due date passed with no resolution recorded
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 4 March 2020
Resolved
This vessel has received a CG-835V due to the owner or managing operator’s failure to meet the requirements of the Certificate of Inspection phase-in period per 46 CFR §136.202(a).
Action required: 705 - Other - as specified
Due 4 June 2020
Resolved 10 July 2020
Resolution: Owner requested an initial certification for the HENRY FOSS ON 650272 instead of the BARBARA FOSS to meet the requirements of the Certificate of Inspection 50% phase-in period per 46 CFR §136.202(a).
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 December 2019
Resolved
Propulsion machinery, including main engines, must have suitable propulsion controls to provide operator full control at each operating station. Vessel reported an air leak on the control air system that resulted in a loss of propulsion. Make permanent repairs to control air system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 December 2019
Resolution: Vessel replaced No.1 air compressor motor and port main engine clutch. Completed sat operational test of air compressor and propulsion machinery.
Engineering › Diesel Engine (propulsion-reduction gear) › Bearing
Issued 3 March 2017
Resolved
STBD reduction gear box was found to have a damaged bearing making STBD propulsion INOP. Vessel to make perm repairs to satisfaction of the attending CG Marine Inspector prior to engaging in commercial towing ops.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 2 May 2017
Resolution: All repairs to STBD gear box were found sat. Completed Operational testing all items found sat.