MAURY USCG vessel records
← All vessels

CAPE COD

CAPE COD is a 2019 towing vessel. The Coast Guard has recorded 23 inspections since 2017, most recently in May 2026, along with 19 deficiencies, 2 operational controls, 1 with no removal date recorded and 3 casualty investigations between 2022 and 2026.

Records from 2017 to 2026. Most recent: inspection, 11 May 2026.

Built
2019
Last inspected
11 May 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
1 with no removal date recorded

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.

Inspection record

Last inspected 11 May 2026
…with no type recorded4
Operational controls 1 with no removal date recorded
Years with a record 9 calendar years (2017–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9840805
WDR3732
1478029
Flag
UNITED STATES
Maury page id
psix-1478029

Documentation record

Registered dimensions (L × B × D)105.8 ft × 34.9 ft × 17.2 ft
Registered tonnagegross 195 / net 133
ITC dimensions (L × B × D)105.8 ft × 34.9 ft × 17.2 ft
ITC tonnagegross 434 / net 130
BuilderVT HALTER MARINE INC · PASCAGOULA, MS, UNITED STATES · built 2019
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 1 July 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it309 - Dead Weight, Gross Ton
569 - Displacement, Gross Ton
434 - Convention (Subpart B), Gross Ton
195 - Regulatory (Subpart C or D), Gross Ton
130 - Convention (Subpart B), Net Ton
133 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

23 inspections, each with its date, unit and type; 19 deficiencies with the resolution recorded against each; 2 operational controls with the dates imposed and removed; 2 vessels inspected with it, by name and date; 1 other recorded name, with years; 3 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1980 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

ELLEN MCALLISTER Towing Vessel · MISLE 510190 · 11 May 2026 · activity 8370753DOUBLE SKIN 552 Tank Barge · MISLE 1472841 · 11 May 2026 · activity 8370753

Inspection history · 23

11 May 2026 Damage Survey · Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8370703
11 May 2026 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8370753
30 April 2026 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8358632
27 January 2026 COI Inspection · MTSA Verification · MSP Additional Oversight - Risk Assessment
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8304817
30 October 2025 Administrative Inspection · VRP Review · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8260152
31 October 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8027823
21 May 2024 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7916789
21 May 2024 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7917105
18 August 2022 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7547033
24 May 2022 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7457989
12 May 2022 COI Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7449179
4 March 2022 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7405679
28 September 2021 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7321999
5 February 2021 Examination of Repairs · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7136563
2 June 2020 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6966153
10 February 2020 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6909255
30 January 2020 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6899115
27 January 2020 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6897069
30 July 2019 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6769222
30 June 2019 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6734938
30 June 2019 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6961975
14 December 2018 Plan Review (Other than "T")
Administrative · USCG Heartland District (dp) · USCG Heartland District (CGD-H) · Activity 6597751
18 October 2017 Initial Construction-Excluding Oversight · Administrative Inspection · MTSA/ISPS Verification · Initial Certification · Construction Oversight
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6290314

Deficiency record · 19

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 May 2026 Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Vessel experienced reduction in required voltage for port and starboard engines resulting in loss of propulsion/equipment failure. Vessel cannot depart until repairs cleared by USCG/TPO.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 12 May 2026
Resolved 11 May 2026
Resolution: Replacement of 02 batteries.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 November 2025 Resolved
Notwithstanding the requirements of § 155.5021 of this subpart, a vessel may continue to operate for up to 2 years after the date of submission of a vessel response plan (VRP) pending approval of that VRP, if the vessel has received written authorization for continued operations from the Coast Guard. (b) To receive this authorization, the vessel owner or operator must certify in writing with an original or electronic signature to the Coast Guard that the vessel owner or operator has identified and has ensured, by contract or other approved means, the availability of the necessary private response resources to respond, to the maximum extent practicable, to a worst case discharge or substantial threat of such a discharge from their vessel. (c) Those nontank vessels temporarily authorized to operate under the provisions provided in this section must comply with 33 CFR 155.1070(c), (d), and (e). Vessel does not have an approved NTVRP or written authorization for continued operations from the Coast Guard. Provide NTVRP approval letter or UCCG authorization letter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 November 2025
Resolution: vessel was issued a non tank vessel response plan one time waiver
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 30 October 2025 Resolved
External audits for obtaining and renewing a TSMS certificate are conducted through a TPO and must include both management and vessels as follows: (b) Vessel audits. (2)An external audit must be conducted no later than 6 months after the issuance of the initial COI for vessels subject to the owner or managing operator's TSMS that have been owned or operated for fewer than 6 months prior to receiving the initial COI. Vessel has been not been operating under the new managing operator's TSMS. Vessel must complete an external audit within 6 months.
Action required: 705 - Other - as specified
Due 31 July 2026
Resolved 31 July 2026
Resolution: Vessel must provide objective evidence from TPO of completion
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 February 2021 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2021
Resolution: Replaced Reduction cooling pumps.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 February 2021 Resolved
MACHINERY MUST BE DESIGNED AND MAINTAINED TO PROVIDE FOR SAFE OPERATION OF THE TOWING VESSEL AND SAFETY OF PERSONS ONBOARD UNDER NORMAL AND EMERGENCY CONDITIONS. ENGINEER REPORTED BOTH GEAR PUMPS ARE INOPERABLE FOR REDUCTION GEAR CLUTCH COOLING SYSTEM CAUSING OVERHEATING.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2021
Resolution: Replaced Reduction gear cooling pumps.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 February 2021 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2021
Resolution: Vessel cleared Deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 February 2021 Resolved
MACHINERY MUST BE DESIGNED AND MAINTAINED TO PROVIDE FOR SAFE OPERATION OF THE TOWING VESSEL AND SAFETY OF PERSONS ONBOARD UNDER NORMAL AND EMERGENCY CONDITIONS. VESSEL INCURRED DAMAGE TO PROPELLER RENDERING IT INOPERABLE. PROVIDE REPAIR PLAN PRIOR TO CONDUCTING PERMANENT REPAIRS. PERMANENT REPAIRS TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR PRIOR TO THE MOVEMENT OF VESSEL.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 April 2021
Resolution: Received documentation that propeller repair had been conducted at Godfrey Propeller repair, LLC. Def Cleared
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 February 2021 Resolved
THE OWNER, AGENT, MASTER, OPERATOR, OR PERSON IN CHARGE MUST, WITHIN 5 DAYS, FILE A WRITTEN REPORT OF ANY MARINE CASUALTY REQUIRED TO BE REPORTED UNDER 4.05-1. INCIDENT OCCURED ON 24DEC2021, SUBMIT CG-2692 PRIOR TO MOVEMENT OF VESSEL.
Action required: 60 - Rectify deficiencies prior to movement
Due 19 April 2021
Resolved 19 April 2021
Resolution: Corrected Item, ENF from IO's Pending.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 February 2021 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2021
Resolution: Replaced Reduction gear cooling pumps.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 5 February 2021 Resolved
RAILS OR EQUIVALENT PROTECTION MUST BE INSTALLED NEAR THE PERIPHERY OF ALL DECKS ACCESSIBLE TO CREW. VESSEL HAND RAILS ON STARBOARD SIDE 01 DECK DAMAGED PROVIDING INSUFFICIENT FALL PROTECTION FOR PERSONS ON BOARD.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2021
Resolution: Rewelded, Handrails for satisfactory fall protection.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 5 February 2021 Resolved
MEANS MUST BE PROVIDED FOR STOPPING EACH FAN IN A VENTILATION SYSTEM SERVING MACHINERY SPACES AND FOR CLOSING, IN CASE OF FIRE, EACH DOORWAY, VENTILATOR, AND ANNULAR SPACE AROUND FUNNELS AND OTHER OPENINGS INTO SUCH SPACES. STARBOARD SIDE EXHAUST STACK VENTILATION DAMPENER DAMAGED AND CANNOT BE CLOSED.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 April 2021
Resolution: Repairs completed to the satisfaction of the attending marine inspector.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 5 February 2021 Resolved
ALL VESSEL EQUIPMENT MUST BE USED IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDED PRACTICE AND IN A MANNER THAT MINIMIZES THE RISK OF INJURY. STARBOARD SEWAGE VENTILATION GOOSE NECK DAMAGED; AND TEMPORARY REPAIR OF FOAM INSULATION INSTALLED WHERE PREVIOUSLY WELDED TO BULKHEAD.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 April 2021
Resolution: Corrected and re-welded torn Gooseneck.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 June 2020 Resolved
EACH LIFE BOUY MUST BE MARKED IN BLOCK CAPITAL LETTERS WITH THE NAME OF THE VESSEL. LETTERING WORN OFF ALL LIFE RINGS.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 June 2020
Resolved 18 June 2020
Resolution: VESSEL PROVIDED PHOTOS OF LIFE BOUYS MARKED AND IN THEIR RESPECTIVE PLACES.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 27 January 2020 Resolved
A towing vessel may not be operated without having onboard a valid COI issued by the Coast Guard. Vessel has 30 days to obtain new COI via Coast Guard Option due to non-conformities identified during ISM-DOC audit dated 23-24JAN2020. Vessel 835v is extended till 28MARCH2020 as dirceted by CG HQs due to the authorization of DNV-GL to issue the compnay its temp DOC.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2020
Resolved 8 June 2020
Resolution: issued new COI under Coast Guard Option.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 20 August 2019 Resolved
On 31Jul19 the DOC for Bouchard Transportation Co. Inc. was revoked by the USCG. The EVENING BREEZE utilized an existing SMS to obtain an initial COI in accordance with 46 CFR 138.225 and subsequently requires a DOC and SMC. The company must submit a plan of how it intends to be compliant with its issued COI by 29OCT19.
Action required: 705 - Other - as specified
Due 29 October 2019
Resolved 12 September 2019
Resolution: Received guidance from D5 Towing Vessel Coordinator to rescind deficiency.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 31 July 2019 Resolved
In light of the company's DOC being revoked, the vessel shall not be engaged as a towing vessel as defined in 46 CFR 136.110 until the local OCMI completes a satisfactory Subchapter M compliance inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 June 2019 Resolved
1. Submit written causal analysis via Class Surveyor for securing 2 of 3 generators.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 July 2019
Resolved 8 June 2020
Resolution: accepted DNV-GL survey for repair of generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 June 2019 Resolved
2. Repair secured generators to satisfaction of Class Surveyor [name withheld] report to USCG Marine Inspector to clear. 701 AC.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 July 2019
Resolved 8 June 2020
Resolution: accepted DNV-GL survey for repair of generator.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 June 2019 Resolved
3. Vessel must schedule and complete USCG Subchapter M survey within 15 days or vessel will be restricted from tug operations.
Action required: 705 - Other - as specified
Due 16 July 2019
Resolved 8 June 2020
Resolution: completed Change Over COI on vessel, issued new COI.

Casualty record · 3

18 August 2022Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7547033
21 May 2024Routine · role: Involved in a Marine Casualty · activity 7917105
11 May 2026Routine · role: Involved in a Marine Casualty · activity 8370753
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

SUSAN ROSE (2022–2026). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.