Inspection history · 23
23 March 2026
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8330503
4 December 2024
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8044132
5 September 2024
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7996849
31 January 2023
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7626754
21 July 2022
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7562210
19 July 2021
Deficiency Check · Initial Certification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7261447
25 October 2019
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6842331
25 October 2019
Administrative Inspection · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6843719
4 July 2016
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5956030
11 May 2013
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4603850
28 November 2011
Deficiency Check · Industry Initiated Exam · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4211351
31 August 2011
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 4133996
19 December 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3914380
5 May 2010
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3732443
14 May 2009
DAPI Audit
Administrative · USCG East District (dp) · USCG East District (CGD-E) · Activity 3481763
27 June 2007
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2985505
3 November 2006
MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2813845
17 October 2005
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2516195
16 December 2003
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1965709
27 June 2001
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 186223
6 June 2001
Uninspected Towing Vessel
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1068804
8 March 2001
Type not recorded
No type recorded · USCGC CHOCK (WYTL 65602) · USCG East District (CGD-E) · Activity 1519862
23 July 1996
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 866310
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 23 March 2026
Resolved
Each towing vessel operating in oceans and coastwise service must have a line throwing appliance.
Line throwing appliance only has 3 out of the 4 required services lines.
46 CFR 141.385
Action required: 705 - Other - as specified
Due 7 April 2026
Resolved 26 March 2026
Resolution: Vsl rep submitted photo of service line needed to meet the standard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 March 2026
Resolved
Piping and tanks exposed to the outside of the hull must be made of metal and maintained in a leak free condition.
MI observed excessive leaking on the pipe system connecting the bilge to the fire pump.
46 CFR 143.270
46 CFR 143.270
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 April 2026
Resolved 9 June 2026
Resolution: Vsl rep sent video of bilge pump not leaking.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 23 March 2026
Resolved
Charts, including electronic charts acceptable to the Coast Guard, of appropriate scale to make safe navigation possible. Towing vessels operating on the
Western Rivers must have maps of appropriate scale
issued by the Army Corps of Engineers or a river
authority;“U.S. Coast Pilot” or similar publication;(3)
Coast Guard light list.
MI observed light list publication not downloaded to helm system.
46 CFR 140.705(b)
Action required: 10 - Deficiency Rectified
Due 23 March 2026
Resolved 23 March 2026
Resolution: Dowloaded Light list to helm system
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 March 2026
Resolved
Electrical components that pose an electrical hazard must be in an enclosure.
MI observed open wires under there op. station in the bridge.
46 CFR 143.400(g)
Action required: 10 - Deficiency Rectified
Due 23 March 2026
Resolved 23 March 2026
Resolution: Secured Open wires with electrical tape.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 March 2026
Resolved
Multi-outlet adapters (power strips) may not be connected to other adapters (“daisy-chained”), or otherwise used in a manner that could overload the capacity of a receptacle.
MI observed power strips connected to another adapter under the operating station in the bridge.
46 CFR 140.420(a)
Action required: 10 - Deficiency Rectified
Due 23 March 2026
Resolved 23 March 2026
Resolution: Vsl disconnected power strips connected to adapters.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 March 2026
Resolved
A towing vessel must carry a combination of day and night visual distress signals indicated in Table 141.370 of § 141.370 for specified areas where the vessel operates.
Vsl did not have a total of 6 day and 6 night flares on board the vessel.
46 CFR 141.370
Action required: 10 - Deficiency Rectified
Due 23 March 2026
Resolved 23 March 2026
Resolution: Vsl aquirred required amount of flares fit for route.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 July 2021
Resolved
The local fire pump pressure gauge read 28psi during the fire drill. A fixed fire pump must be capable of: (1) Delivering water simultaneously from the two highest hydrants, or from both branches of the fitting if the highest hydrant has a Siamese fitting, at a pitot-tube pressure of at least 344 kilopascals (kPa) (50 pounds per square inch (psi).
Vessel requested a two week extension to allow for shipping and installation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2021
Resolved 14 September 2021
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 19 July 2021
Resolved
The following need to be labeled; Bilge and Fuel system. Fire Pump remote controller, PFD storage places under the bench in the E/R and in the crew accommodation space, and fuel shut off valves.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2021
Resolved 6 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 July 2021
Resolved
Bilge pump has excessive leaking which is extending the time it takes for the pump to prime.
Vessel requested a two week extension to allow for shipping and installation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2021
Resolved 19 August 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 July 2021
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. 02 light guards are missing from fixtures in the E/R.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2021
Resolved 6 August 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 July 2021
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards.Capstan motor controller is missing a reset button.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2021
Resolved 6 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 July 2021
Resolved
Starboard generator lagging covered in soot indicative of an exhaust leak. Address potential exhaust leak and replace lagging.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2021
Resolved 6 August 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 19 July 2021
Resolved
Both watertight doors leading to the engine room did not seal properly to obtain water or weather tight integrity
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2021
Resolved 6 August 2021
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 19 July 2021
Resolved
Security exercises must be conducted at least once a calendar year, with no more than 18 months between exercises. Vessel was unable to provide annual exercise.
33 CFR 104.230(c)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2021
Resolved 6 August 2021
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 19 July 2021
Resolved
The CSO or VSO must ensure an audit of the VSP is performed annually. Vessel was unable to provide its annual audit.
33 CFR 104.415(b)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2021
Resolved 6 August 2021
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 19 July 2021
Resolved
The VSO must have general knowledge, through training or equivalent job experience in the VSP. The VSO was not familiar with the VSP and duties and responsibilities of the VSO.
33 CFR 104.215(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2021
Resolved 6 August 2021
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 19 July 2021
Resolved
All crew members must be provided with health and safety information and training. Crew on board were not completing the required trainings outlined in the vessels health and safety plan.
46 CFR 140.515(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 August 2021
Resolved 6 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 19 July 2021
Resolved
Life raft not secured to vessel correctly.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 July 2021
Resolution: Stowage of liferaft was corrected on the spot.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 25 October 2019
Resolved
There must be an individual holding an appropriate license or MMC with endorsement as master in command of every towing vessel of at least 26 feet or more in length. Master's credential was expired at the time of the damage survey.
46 CFR 15.805
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 October 2019
Resolution: Replaced master with licensed master.
Operations/Management › Drug and Alcohol Testing › Testing, Pre-employment
Issued 14 May 2009
Resolved
Pre-employment Background Check on Employee hired within Two years not completed.
Due 15 June 2009
Resolved 18 June 2009
Resolution: Pre-employment background check done on employees hired within a 2 yr time period.
Operations/Management › Drug and Alcohol Testing › Testing, Serious Marine Incident
Issued 14 May 2009
Resolved
Arrangements need to be made for testing in case of a serious marine incident, testing kits not onboard vessels
Due 15 June 2009
Resolved 18 June 2009
Resolution: Serious marine incident kits on board vessel, required forms in binder. DAPI told DER that they are in need of a 2692 that accompanies the 2692B.
Operations/Management › Drug and Alcohol Testing › Testing, Reasonable Cause
Issued 14 May 2009
Resolved
Reasonable cause testing arrangements and training for identifying how to conduct intervention process.
Due 15 June 2009
Resolved 18 June 2009
Resolution: Training is being completed by necessary personnel (supervisors).
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 14 May 2009
Resolved
Supervisor and crew need to be trained properly with the required training.
Due 15 June 2009
Resolved 18 June 2009
Resolution: Training material has been completed by partial crew and is ongoing for the remainder. Certificates of completion and movie CD is on hand at administration office.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 14 May 2009
Resolved
MIS report needs to be submitted by company for 2008.
Due 15 June 2009
Resolved 18 June 2009
Resolution: Management Information Systems Report Submitted after March 15th. Employer during inspection was not aware of requirements but did get information and access information from [name withheld].