Records from 2004 to 2013. Most recent: inspection, 25 October 2013.
Fire Fighting › Fire Hoses › Condition
Issued 22 April 2005
Resolved
Prior to issuance of UTV sticker for satisfactory voluntary exam, new 2 holed fire hoses with new 50 ft., lined commercial grade hoses with a minimum diameter of 1 1/2 inches. The compliance date coincides with the effective date of 46 CFR 27.301.
Action required: 705 - Other - as specified
Due 29 April 2005
Resolved 11 May 2005
Resolution: [name withheld] attended vessel and examined 4 new, 50 ft 1 1/2" lined, commercial fire hoses. All sat.
Construction/Loadline › Structures › Superstructure
Issued 30 November 2004
Resolved
Provide classification society (ABS) attestation of satisfactory completion of permanent repairs to fractured flange portion of stbd midships bulwarks. Until cleared, vessel may not operate outside the Boundary Line as defined in 46 CFR Part 7.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: Examined and found satisfactory repair.
Construction/Loadline › Hull › Stiffener
Issued 30 November 2004
Resolved
Provide classification society (ABS) attestation of satisfactory completion of permanent repairs to 4 buckled transon stiffeners in steering gear compartment. Until cleared, vessel may not operate outside of the Boundary Line as defined in 46 CFR Part 7.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: ABS Surveyor examined and found satisfactory repair
Construction/Loadline › Hull › Longitudinal Frame
Issued 30 November 2004
Resolved
Provide classification society (ABS) attestation of satisfactory completion of permanent repairs to buckled longitudinal centerline frame in steering gear compartment IWO rudder post. Until cleared, vessel may not operate outside the Boundary Line as defined in 46 CFR Part 7.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: ABS Surveyor examined and found satisfactory repair.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 30 November 2004
No resolution recorded
Prior to completion of next dry dock exam, provide class (ABS) attestation of satisfactory completion of permanent repairs to buckled portion of longitudinal bulkhead separating the steering compartment and port ballast tank IWO bilge/transom . Temporary repairs completed to the satisfaction of ABS Surveyor 22Apr2005.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 November 2005 — due date passed with no resolution recorded
Construction/Loadline › Structures › Air Pipe
Issued 30 November 2004
Resolved
Renew/repair missing and broken vent closure devices on gooseneck vents.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: Examined and found satisfactory.
Communications › Alarms/Indicators › Bilge Alarm
Issued 30 November 2004
Resolved
Prove proper operation of all installed bilge high water alarms and heat sensors
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: Cleared item due to not required. Owner intends on installing another type of bilge alarm at a future date.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 30 November 2004
Resolved
Properly display name and hailing port on stern. These markings appear to be obscured by running rust.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: Examined satisfactory name/hailing port.
Construction/Loadline › Structures › Manhole
Issued 30 November 2004
Resolved
Provide classification society (ABS) attestation of satisfactory installation of replacement for missing dog on rope locker raised hatch. Until cleared, vessel may not operate outside the Boundary Line as defined in 46 CFR Part 7.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: Examined and found satisfactory replacement dog.
Engineering › Compressed Air System (control) › Valve
Issued 30 November 2004
Resolved
Install and make available for testing properly-sized safety relief valves on air receivers.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: Examined newly installed safety relief valves.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 30 November 2004
Resolved
Provide evidence of satisfactory completion of annual ABS survey for continued validity of Load Line Certificate. Until cleared, vessel may not operate outside the Boundary Line as defined in 46 CFR Part 7.
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 22 April 2005
Resolution: ABS Surveyor endorsed Loasd Line certificate this date.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 30 November 2004
Resolved
Provide documentation of satisfactory completion of hydrostatic testing and annual maintenance for engine room fixed CO2 extinguishing system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 6 January 2005
Resolution: Received satisfactory documentation of completion of required testing and maintenance.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 30 November 2004
Resolved
Provide documentation of satisfactory completion of hydrostatic testing and annual maintenance for engine room semi-portable CO2 extinguishing system and provide documentation of satisfactory annaul servicing for all other portable extinguishers on board.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 6 January 2005
Resolution: Received satisafctory documentation of completion of required testing and inspections.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 30 November 2004
Resolved
Renew expired hydrostatic release unit for liferaft.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 December 2004
Resolved 1 December 2004
Resolution: Renewed hydrostatic release unit on board.
Communications › Radio Communications › EPIRB
Issued 30 November 2004
Resolved
Renew expired hydrostatic release unit for EPIRB.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 December 2004
Resolved 1 December 2004
Resolution: Renewed hydrostatic release unit on board.
Deck/Cargo › Towing › Towline
Issued 30 November 2004
Resolved
Renew parted 10" towing hawser.
Action required: 705 - Other - as specified
Due 30 December 2004
Resolved 6 January 2005
Resolution: Received fax copy of invoice for new hawser with documentation of breaking strength.