Records from 1994 to 2026. Most recent: inspection, 15 June 2026.
Documentation record
Registered dimensions (L × B × D)64.1 ft × 26.1 ft × 9.9 ft
Registered tonnagegross 178 / net 120
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALBERT ORTIS BOAT BUILDING INC · KROTZ SPRINGS, LA, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMEMPHIS, TN
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 6 May 2026 · expires 31 May 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it178 - Regulatory (Subpart C or D), Gross Ton
120 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 36
15 June 2026
TPO Audit
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8456872
6 March 2025
Construction Oversight
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8089569
13 January 2025
COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8062671
4 January 2022
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7396587
3 September 2021
TPO Audit
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7343231
14 July 2021
Administrative Inspection
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7270655
10 September 2020
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7060692
5 April 2020
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6935908
14 February 2020
Initial Certification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6909198
5 December 2017
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 6318878
13 August 2015
Industry Initiated Exam · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5218929
20 July 2013
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4672577
4 March 2013
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4543428
23 October 2012
Deficiency Check · MTSA Verification · Industry Initiated Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4471869
7 April 2011
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3982138
19 March 2010
DAPI Audit · MTSA Verification · Industry Initiated Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3700145
7 January 2009
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3390125
16 December 2008
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3382028
15 November 2008
Administration
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3363509
12 September 2006
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2776728
26 June 2006
MTSA Verification · Administrative Inspection · Uninspected Other
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2681554
13 June 2006
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2678351
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1989536
11 June 2002
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1657956
9 May 2000
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 56967
4 May 2000
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 277817
3 May 2000
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 115676
3 May 2000
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 181585
12 July 1999
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 107377
24 March 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 426986
19 March 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 92361
16 November 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 131793
31 August 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 38067
2 March 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 140967
6 February 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 15197
7 July 1994
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 95375
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 31 January 2025
Resolved
Each towing vessel must be maintained and operated so as to minimize fire hazards.
Fuel leak from fitting/hose on starboard generator. Fuel leak from fuel supply pipe, centerline in the bilge.
Repair fuel leaks for generator and supply pipe in the bilge.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 January 2025
Resolution: Fuel leaks repaired.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 31 January 2025
Resolved
All bilges and void spaces are kept free from accumulation of combustible and flammable materials and liquids insofar as practicable.
Excessive fuel accumulation in the machinery space bilge due to the above mentioned fuel leaks.
Thoroughly clean all fuel/oil from machinery space bilge.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 31 January 2025
Resolution: Bilges cleaned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 January 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under normal and emergency conditions.
Crankcase breather assemblies for both main engines are inadequate. Starboard main engine hose is damaged. Port main engine stack pipe is missing and hose is improperly redirected to the bilge.
Repair starboard main engine crankcase breather hose. Replace port main engine crankcase breather stack pipe and re-route hose to the correct stack pipe configuration.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 February 2025
Resolved 20 July 2025
Resolution: Crankcase breather pipe replaced in kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 31 January 2025
Resolved
The following systems must be equipped with gauges at the machinery location:(1) Main engine lubricating oil pressure and main engine RPM;
Port main engine RPM gauge inoperable. Renew/repair port main engine RPM gauge.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 February 2025
Resolved 31 January 2025
Resolution: RPM gauge repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 April 2020
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under
normal and emergency conditions.
Vessel reported a broke pressure valve nipple which caused a loss of air to ships critical systems and caused a loss of steering. Repairs are to be made to the satisfaction of USCG Marine Inspector.
46 CFR 143.205(a)
Action required: 15 - Rectify deficiencies by next port
Resolved 6 April 2020
Resolution: Vessel provided statement and pictures confirming repairs have been completed and air receiver is operational.
Fire Fighting › Fire Hoses › Condition
Issued 26 June 2006
Resolved
Port/Stbd fire hoses need to be replaced.
Condition: Unknown
Due 16 July 2006
Resolved 12 September 2006
Fire Fighting › Semiportable CO2 Fire Extinguishers › Approval
Issued 26 June 2006
Resolved
298lb fire extinguisher outside engine room needs to have proper approval/marking. Minimal requirement is to have a B-V or fixed fire extinguishing system for the engine room. Inspection label is up-to-date and hose reaches all areas of engine room.
Due 16 July 2006
Resolved 12 September 2006
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 26 June 2006
Resolved
Prove proper operation of fire detection system.
Condition: Unknown
Due 16 July 2006
Resolved 12 September 2006
Communications › Internal Communications System › Sound-powered Telephone
Issued 26 June 2006
Resolved
Install PA system that can be heard throughout accommodation space(s).
Condition: Unknown
Due 16 July 2006
Resolved 12 September 2006
Construction/Loadline
Issued 24 March 1999
Resolved
HAILING PORT NOT CLEARLY DISPLAYED, NEEDS TO BE REPAINTED IAW 46CFR 67.123(b).
Condition: Unknown
Due 12 May 2000
Resolved 12 May 2000
Electrical
Issued 24 March 1999
Resolved
RECOMMENDED LIGHT COVERS IN ENGINE ROOM.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 24 March 1999
Resolved
MACHINERY GUARDS ON ALL ROTATING MACHINERY IN ENGINE ROOM WERE MISSING IAW 33 CFR 160.111.
Condition: Unknown
Due 12 May 2000
Resolved 12 May 2000