Inspection history · 52
26 February 2021
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7143727
14 December 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7108899
17 August 2020
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7030031
19 July 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7009959
24 June 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6985466
1 April 2020
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6933294
19 February 2020
PSC A
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6908369
19 September 2019
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6814077
5 September 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6803894
31 May 2019
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6699761
29 May 2019
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6698278
29 May 2019
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6699327
8 March 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6628818
7 January 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6606618
10 November 2018
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6574082
8 November 2018
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6577746
26 September 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6549432
23 August 2018
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6517840
13 August 2018
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6502764
19 July 2018
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6484145
14 July 2018
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6478883
13 July 2018
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6476364
11 July 2018
In-Service Inspection · PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6404321
8 May 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6409523
2 May 2018
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6404337
10 April 2018
ISPS II Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6378630
29 December 2017
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6327206
16 November 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6291688
2 October 2017
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6279842
15 August 2017
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6234294
5 August 2017
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6237567
2 August 2017
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6228209
19 May 2017
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6149621
19 April 2017
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6124058
15 January 2017
Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6069301
6 January 2017
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6067224
15 November 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6041398
31 October 2016
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6032013
20 October 2016
PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6010906
12 October 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6021216
27 September 2016
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6010693
26 September 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6009307
16 September 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6002368
5 September 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5992643
29 August 2016
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5986254
17 August 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5975241
20 May 2016
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5882304
12 May 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5868206
18 April 2016
PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5856503
13 March 2016
Ballast Water Examination · PII Safety Exam · Deficiency Check · ISPS III Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5826924
5 January 2016
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5793770
4 January 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5790320
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 5 September 2019
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO noted the vessel's after fire dampeners on port and stbd sides did not close entirely and were difficult to close due to lack of maintenance. 74SOLAS(14) I/II(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 October 2019
Resolved 19 September 2019
Resolution: PSCO verified proper operation of both port and stbd side fire dampers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 May 2019
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. PSCO NOTED LINKAGE BETWEEN MOTOR AND CONTROLLABLE PITCH PROPELLER PUMP WAS BROKING.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 May 2019
Resolution: PSCO verified proper repairs and reviewed Class Report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 July 2018
Resolved
1400-After any survey of the ship under regulations 7, 8, 9, and 10 of this chapter has been completed no change shall be made in the structural arrangements machinery, equipment covered by the survey. PSCO noted control pitch propellar not functioning as designed.
Action required: 17 - Rectify deficiencies prior to departure
Due 17 July 2018
Resolved 19 July 2018
Resolution: Recieved class survey report witnessing satisfactory testing and interviewed technician who attested to repairs. Inspected system under pressure. All satisfactory for CPP system. Witnessed starboard engine also satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 July 2018
Resolved
13199-after any survey of the ship, no change shall be made to machinery or equipment. PSCO observed lube oil mist leaking from air compressor serving the ship main engine start air system. 74 SOLAS I/11
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 31 August 2018
Resolved 23 August 2018
Resolution: Recieved Class Report and PSCO verified proper repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 11 July 2018
Resolved
07199-after any survey of the ship no change shall be made to the machinery or equipment. PSCO noted multiple fuel oil leaks on the fuel oil purifier backflush filter system. 74 SOLAS I/II.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 July 2018
Resolved 13 July 2018
Resolution: All leaks were rectified by the vessel crew.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 July 2018
Resolved
09219- wiring shall be supported in such a manner as to avoid chafing or other injury. PSCO noted multiple wire passes without suitable material to prevent chafing throughout engine spaces. 47 SOLAS I/27(a)(vi)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 August 2018
Resolved 13 August 2018
Resolution: Wire was correctly supported so it would not chafe.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 11 July 2018
Resolved
13106- in spaces where penetration of oil products is possible, the surface of insulation shall be impervious to oil or oil vapors. PSCO noted multiple pipe lagging insulations that were not made impervious to oil or oil vapors. 74 SOLAS(14) II-2/4.4.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 August 2018
Resolved 13 August 2018
Resolution: New lagging was put in.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 29 December 2017
Resolved
1430-main source of electrical power shall consiste of at least two generators sets. One of the two generator sets was reported out of commission due to overheating. 74SOLAS(14) II-1/ 41.1.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 December 2017
Resolved 30 December 2017
Operations/Management › Pollution › Approved Method for Annex VI Compliance
Issued 2 August 2017
Resolved
MARPOL VI.5.5: An additional survey, either general or partial according to the circumstances shall be made whenever any important repairs or renewals are made as prescribed in paragraph 5 of this regulation or after repairs resulting from investigation prescribed in paragraph 6 of this regulation. PSCO noted that vessel has overflow pipe from HFMGO to LSMGO causing vessel to burn HSMGO in ECA. 17
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2017
Resolved 5 August 2017
Resolution: PSCO reviewed class report and satisfactory completion of fuel piping modifications.
Fire Fighting › Combustible Materials › Insulation
Issued 19 April 2017
Resolved
74SOLAS II-2/33(a): 0820: Arrangements for the distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO noted that througout the engine room lagging and protection for fuel oil lines was missing/damaged.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 19 May 2017
Resolution: Witnessed new lagging in place, especially on main engines and boiler systems.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 19 April 2017
Resolved
74SOLAS II-1/27.a.i.1: 0999: All electrical apparatus shall be so constructed and so installed that danger or injury in ordinary handling shall not exist. PSCO noted that juntion boxes throughout the ship were uncovered and not properly mounted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 19 May 2017
Resolution: Witnessed every junction box with installed covers and properly mounted
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 19 April 2017
Resolved
1499: The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO noted exhaust leaks on the port Main Diesel Engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 May 2017
Resolved 19 May 2017
Resolution: Witnessed satisfactory test report survey from class society and replaced exhaust lagging on port engine
Engineering › Diesel Engine (propulsion-direct drive) › Air Cleaner
Issued 20 October 2016
Resolved
1410 74SOLAS(14CONS)1/11 THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESSNET REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA. STARBOARD MAIN ENGINE STILL IN PROCESS OF BEING REPAIRED. START AIR DISTRIBUTION BOX WILL NOT ALLOW START IN ALL POSITIONS. CLASS CURRENTLY ABOARD TO WITNESS TESTING OF REPAIRS.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 October 2016
Resolution: Received report of survey from Class Society that starboard engine repairs are completed and engine has been successfully tested and witnessed.
Communications › Alarms/Indicators › General Alarm
Issued 23 March 2016
Resolved
PSCO noted that all audible alarm signals for the engine room were found to be inoperable. 1000 - Communications - Engine room shall be manned with regular patrols carried out and logged in engine room log book until such time defective alarm(s) are rectified. 74SOLAS(14) I/11.a
Action required: 705 - Other - as specified
Due 31 July 2016
Resolved 24 April 2016
Resolution: Vessel installed a new engine room alarm pannel.
Construction/Loadline › Structures › Door
Issued 13 March 2016
Resolved
0910 - Construction - In the case of hydraulic operation, each power source of power-operated sliding doors (Class 3) shall consist of a pump capable of closing all watertight doors in not more than 60 seconds. The ship's #2 power-operated sliding door (Class 3) hydraulic pump was inoperable. 1974 SOLAS II-1/13.i.iii
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2016
Resolution: Vessel crew repaired hydraulic pump to power-sliding door and Class attested to the repair.
Engineering › Fuel Oil Service System › Piping
Issued 13 March 2016
Resolved
0820 - Engineering - In a ship in which oil fuel is used, the arrangement for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. The fuel supply line to the ships emergency generator is actively leaking. 1974 SOLAS II-2/33.a
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 March 2016
Resolution: Vessel crew replaced fuel supply line on generator and Class attested to the repair.
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 5 January 2016
Resolved
1410-Propulsion Main Engine-Condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship and all respects will remain to proceed to sea without danger to the ship or persons onboard. Ship suffered a catastrophic failure of port main propulsion engine. SOLAS 74(amended)14 I/11a
Action required: 705 - Other - as specified
Due 30 April 2016
Resolved 18 April 2016
Resolution: PSCO witnessed and received Lloyd's Register report attesting proper operation of port main engine.