MAURY USCG vessel records
← All vessels

CAPE HUDSON

CAPE HUDSON is a 1979 freight ship. The Coast Guard has recorded 40 inspections since 2016, most recently in November 2025, along with 102 deficiencies, 6 operational controls and 13 casualty investigations between 1993 and 2025.

Records from 1993 to 2025. Most recent: inspection, 18 November 2025.

Built
1979
Last inspected
18 November 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 18 November 2025
…with no type recorded6
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7704930
228301
Flag
NORWAY
Maury page id
psix-228301

Documentation record

Registered dimensions (L × B × D)690.4 ft × 106.0 ft × 36.6 ft
Registered tonnagegross 37,815 / net 28,412
ITC dimensions (L × B × D)699.2 ft × 105.8 ft × 66.3 ft
ITC tonnagegross 39,889 / net 13,505
BuilderTANGER VERFT A/S · ARENDEL, NORWAY · built 1979
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNORFOLK, VA
Trade endorsementsRegistry
DocumentationValid · issued 13 February 2026 · expires 28 February 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13505 - Convention (Subpart B), Net Ton
28412 - Regulatory (Subpart C or D), Net Ton
31931 - Dead Weight, Ton
39889 - Convention (Subpart B), Gross Ton
37815 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 40

18 November 2025 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8270105
5 November 2025 Vessel Attendance · ACP Periodic Oversight · Periodic Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8260683
6 June 2025 Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8156087
21 May 2025 In-Service Inspection · ACP Additional Oversight – Risk Assessment · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8141107
4 December 2024 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8043186
21 November 2024 Annual Inspection · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8037097
5 July 2024 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7950254
29 June 2024 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7945181
14 June 2024 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7938802
14 June 2024 Administrative Inspection · In-Service Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7939086
30 April 2024 Annual Inspection · Deficiency Check · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7903644
5 December 2023 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7834111
8 November 2023 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7822617
12 September 2022 Re-Inspection · ACP COI Oversight · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7549764
27 August 2022 Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7544873
27 August 2022 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7577032
10 November 2021 Administrative Inspection · ACP Annual Oversight · Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7349100
8 March 2021 Annual Inspection · ACP Annual Oversight · Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7152501
25 January 2021 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7130317
1 July 2020 ACP Additional Oversight – Risk Assessment · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7013986
24 June 2020 Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6985258
17 January 2020 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6891825
8 January 2020 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6887421
5 January 2020 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6882813
19 November 2019 Annual Inspection · In-Service Inspection · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6881615
31 October 2019 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6846792
20 September 2019 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6816920
17 August 2019 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6786294
16 August 2019 In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6788439
10 July 2019 In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6745165
30 December 2018 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6605428
11 December 2018 In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6596189
15 November 2018 ACP Annual Oversight · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6581320
18 April 2018 Periodic Inspection · Administrative Inspection · ACP Periodic Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6395130
4 April 2018 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6385072
25 October 2017 MTSA/ISPS Verification · Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6295653
20 October 2017 Administrative Inspection · Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6292085
17 October 2017 Deficiency Check · ACP COI Oversight · Drydock Exam · Re-Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6262500
22 August 2017 In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6248174
18 November 2016 Deficiency Check · ACP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6048907

Deficiency record · 102

09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 5 November 2025 Resolved
The company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protections of the environment. The various tasks should be defined and assigned to qualified personnel. The calibration gas onboard expired in March 2025 and has not been replaced. There was no requisition for replacement calibration gas documented in ship's Nautical Systems Enterprise system. 74 SOLAS (20) IX/5 ISM Code Part A Reg 7
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2025
Resolved 11 November 2025
Resolution: Two (2) new cylinders with calibration gas (expiration date is Nov 2026) were inspected onboard to the satisfaction of the attending ABS surveyor.
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 5 November 2025 Resolved
The Administration shall be satisfied that adequate arrangements are in place to ensure that the performance of the equipment required by this chapter is maintained. Gyrocompass is showing a fault (CMZ900 gyrocompass operation unit is showing a "fail bz stop" light illuminated, unclear cause). 74 SOLAS(20) V/16
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 11 November 2025
Resolution: The attending Surveyor has verified that the Gyrocompass is operational and no longer showing any faults.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 November 2025 Resolved
Each separate circuit shall be protected against short circuit. The current-carrying capacity of each circuit shall be permanently indicated, together with the rating or setting of the appropriate overload protective device. The electrical cable trunk circuit breaker panels on decks 8, 7, 6, and 5 are improperly sized for use and ratings do not match panel cards. Additional accommodation space loads, such as portable air conditioning units, are being used that reportedly overloaded the as-designed breakers. 74 SOLAS (unamended) II-1/27(a)(vii)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 11 November 2025
Resolution: The crew replaced all improperly sized circuit breakers and removes potable air conditioning units from vessel. The electrical cable trunk circuit breaker panels on decks 8, 7, 6, and 5 were re-inspected to the satisfaction of attending surveyor
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 5 November 2025 Resolved
The following basic principles underlie the Regulations in this chapter, having regard to the type of ships and potential fire hazard involved: (e) containment and extinction of any fire in the space of origin. Accumulation of oil in the bilge between diesel generators, and in shaft alley, was observed in the engine room. 74 SOLAS (unamended) II-2/ 2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 11 November 2025
Resolution: Accumulation of oil in the bilge between diesel generators, and in shaft alley, was cleaned by the crew to the satisfaction of the attending surveyor.
01 - Certificates & Documentation › 011 - Ships Certificates › International Air Pollution Certificate (IAPP)
Issued 5 November 2025 Resolved
Vessels that do not fully comply with the specified regulations in MARPOL Annex VI are no longer eligible to receive International Air Pollution Prevention (IAPP) or International Energy Efficiency (IEEC) SOVCs. ABS may issue as appropriate for those RRF vessels that partially comply with other relevant provisions of MARPOL VI. Vessels not in compliance with MARPOL Annex VI may be issued a Statement of Fact attesting to the level of compliance of the vessel in accordance with USCG letter 16711/Serial No. 132 dated 29 May 2019. The subject vessel does not fully comply with MARPOL Annex VI (examples: HFO >0.5 % sulphur content, EEXI/CII, SEEMP Parts II and III, etc.), but at the time of inspection still had SOVCs for IAPP and IEEC issued by ABS. MARPOL VI/14 -2024 MARAD-CG MOU, Annex III/D
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 11 November 2025
Resolution: Per facility Comment No. 481812 from ABS Western Hemisphere Survey Dept. and per USCG letter dated 29 May 2019 (16711/Serial No. 132) since vessels not in compliance with MARPOL Annex VI, Statement of Fact for Annex VI was issued.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 5 November 2025 Resolved
The company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of the personnel, ship and protections of the environment. The various tasks should be defined and assigned to qualified personnel. The medical supply locker was found with multiple expired items, some over 2 years passed expiration. Procedures to discard expired medication were not being followed. 74 SOLAS (20) IX/5 ISM Code Part A Reg 7
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 11 November 2025
Resolution: The medical supply locker was reinspected by the attending surveyor. Expired items and/ or medical supply not observed at this time.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 5 November 2025 Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection, including protection of openings and penetrations in these divisions. Proximity switch 3716 for cargo hold ventilation damper is not working properly. 74 SOLAS (20) II-2/14.2.1.1.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 11 November 2025
Resolution: Proximity switch 3716 for cargo hold ventilation damper was replaced by the crew and tested to the satisfaction of the attending surveyor
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 5 November 2025 Resolved
The following basic principles underlie the Regulations in this chapter, having regard to the type of ships and potential fire hazard involved: (f) protection of means of escape or access for firefighting. The door leading to the emergency gear locker #1 was seized. Additionally, room 139 exterior door handle was not attached to the door and emergency lighting on deck 8 stairtower was inoperable. 74 SOLAS (unamended) II-2/ 2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 19 December 2025
Resolution: The door leading to the emergency gear locker #1 was confirmed to be replaced with new door. Additionally, room 139 was replaced as well. Operational test of these self-closing door were carried out and found to be satisfactory.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 5 November 2025 Resolved
In accommodation spaces, the corridor bulkheads shall be of steel or be constructed of “B” Class panels. 02 holes in bulkhead- near room 140 on deck five were covered with duct tape compromising the structural fire protection integrity. Shown as B-class on FCP. 74 SOLAS (unamended) II-2/ 51(b)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 December 2025
Resolved 11 November 2025
Resolution: Two (2) holes in corridor bulkhead were repaired by the crew by permanently covering of steel plates. The repair was inspected to the satisfaction of the attending surveyor.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 November 2025 Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection, including protection of openings and penetrations in these divisions. Fire door on deck 08- leading to the main stairway and port galley roller shutter door did not close fully at the time of inspection. 74 SOLAS (20) II-2/14.2.1.1.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 5 November 2025
Resolved 5 November 2025
Resolution: Crew was able to re-align the roller track and show proper operation of roller shutter door.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 May 2025 Resolved
Paint lockers shall be protected by: .1 a carbon dioxide system, designed to give a minimum volume of free gas equal to 40% of the gross volume of the protected space; .2 a dry powder system, designed for at least 0.5 kg powder/m3; .3 a water spraying or sprinkler system, designed for 5 l/m2 min. Water spraying systems may be connected to the fire main of the ship; or .4 a system providing equivalent protection, as determined by the Administration. Vessel found utilizing a container with open ventilation and no fire protection system for the storage of paint. 74SOLAS(20)II-2/10.6.3.1
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 21 May 2025
Resolution: Unauthorized paint locker removed from vessel.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 21 May 2025 Resolved
Onboard a seagoing vessel of 500 GT or more ...no person may employ or engage any person to serve, and no person may serve, in a position requiring a person to hold an STCW endorsement, including ... Second Engineer Officer, unless the person serving holds an appropriate, valid STCW endorsement issued in accordance with part 11 of this subchapter. Vessel found with First Assistant Engineer who was not properly endorsed as Second Engineer Officer. 46CFR15.1103(a)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 21 May 2025
Resolution: Mariner was moved from 1AE billet and was replaced by additional onboard 1AE with proper endorsement.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 21 November 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel found with hydraulic leaks in the forward fan house and bosun stores locker. 74SOLAS(20)I/11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 January 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 November 2024 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met: .5 ignition sources shall be separated from combustible materials and flammable liquids. Vessel found with non intrinsically safe fan temporarily installed in the ships paint locker. 74SOLAS(20)II-2/4.1.4
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 21 November 2024
Resolution: Fan removed during inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 June 2024 Resolved
A failure of the HT Cooling Pump. This pump is the secondary cooling pump for the main engine. A redundancy is required for this vessel.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 29 June 2024
Resolved 5 July 2024
Resolution: ABS Class Report (Work Order 6495508) received. HT Pump Repaired and tested. Condition of Class placed on vessel for further testing by 31JUL2024.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 June 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During sea trials, the port side steering gear limit switch malfunctioned and rendered steering gear incapable of operation to port. Provide report attesting to repair and proper operation of steering gear to the satisfaction of the marine inspector. 74 SOLAS (20) I/11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 24 June 2024
Resolved 25 June 2024
Resolution: ABS sent report of operational steering gear after attending an in-person inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 23 June 2024 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Vessel's 06 inflatable liferafts found with improper hydrostatic release installation. Corrected in the presence of the attending Marine Inspector. 60 SOLAS III/4(c)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 23 June 2024
Resolution: Corrected in the presence of the attending Marine Inspector.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 30 April 2024 Resolved
A person may not employ or engage an individual, and an individual may not serve in a position in which it is required by law or regulation that the individual hold an MMC endorsed with a national endorsement, as well as a corresponding STCW endorsement for service outside the boundary line. 1AE was found to be missing the required STCW III/2 endorsement. 46 CFR 15.401(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 June 2024
Resolution: Credentials were verified against IMO crew list. All found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 30 April 2024 Resolved
On ships designed for special purposes, such as automobile or railroad car ferries, where installation of such bulkheads would defeat the purpose for which the ship is intended, equivalent means for controlling and limiting a fire shall be substituted and specifically approved by the Administration. During Inspection, Marine Inspector found that cargo fan damper 3706 and emergency fire pump space damper on focsle failed to operate correctly. 60 SOLAS II/37(d)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1655.0
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 30 April 2024 Resolved
The main inlet and outlets of all ventilation systems shall be capable of being closed from outside the space in the event of a fire. The accommodation exhaust vent closures located on the port and starboard side of the 08 deck found with silicone installed on the knife edge. 60 SOLAS II/47(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1656.0
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 30 April 2024 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Marine inspector found that flange on Fire Station 4 on 08 Deck was wasted. 74 SOLAS (20) II-2/14.2.1.2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1657.0
07 - Fire Safety › N/A - No Subsystem › Emergency Escape Breathing Device and disposition
Issued 30 April 2024 Resolved
Fire safety appliances shall be kept in good order and available for immediate use. EEBD in steering gear room is missing. SOLAS 60 II/66
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1658.0
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 April 2024 Resolved
The power available shall be sufficient to supply all those services which are in the opinion of the Administration necessary for the safety of all on board in an emergency. Emergency light on at the lower ER fire escape trunk is inoperable. SOLAS 60 II/26 (a)(ii)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1659.0
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 30 April 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Installed clothes dryer on Officer Laundry on 08 deck found with dryer vent not installed properly, and cardboard installed on existing exhaust vent ducting. 74 SOLAS (20) I/11(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1660.0
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 30 April 2024 Resolved
Before ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Marine Inspectors found that starboard side life raft securing devices had corroded and seized that prevent life-rafts from being able to be deployed. 74 SOLAS III/20.2
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1661.0
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 30 April 2024 Resolved
The opening below the lowest course of the guard rails shall not exceed 230 mm (9 inches). The other courses shall be not more than 380 mm (15 inches) apart. Marine inspector found that lifeboat deck handrail lower rungs were wither missing or broken. ILLC (88) I/25(3)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1662.0
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 30 April 2024 Resolved
ISM shall be maintained IAW with the provisions of the ISM code. Offscan alarm log and offscanned alarms active of on ECR alarm controls, did not match and are not being maintained IAW SMS (C-01-175 rev1). 74 SOLAS (20) IX/5
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1663.0
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 30 April 2024 Resolved
Where “A” Class division are pierced for the passage of electric cables, arrangements shall be made to ensure that the fire resistance is not impaired. 02 cable penetrations on the deck of the Navigation Bridge found to be improperly installed. 60 SOLAS II/38(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1664.0
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 30 April 2024 Resolved
Ventilator opening shall be provided with weathertight closing appliances. Marine inspector found starboard 1 SUWB Ventilation Pipe missing a closure mechanism. ILLC (88) I/19(4)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1665.0
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 April 2024 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Starboard electrical trunk located on 06 deck found with electrical junction box missing strain relief device. 74 SOLAS (20) I/11(a)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 8 May 2024
Resolution: Accepted by RO as finding 1666.0
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 12 September 2022 Resolved
The muster list shall show all the special duties and shall indicate, in particular, the station to which each member must go, and the duties that he has to perform. The posted on-board muster list details duties for abandon ship specific to lifeboat operations despite the standard ROS procedure being to abandon via the gangway and muster ashore. 60 SOLAS III/Reg. 25(b)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 September 2022
Resolution: Accepted and closed by ABS.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 12 September 2022 Resolved
The date when musters are held, details of abandon ship and fire drills, enclosed space entry and rescue drills, drills of other life-saving appliances and on-board training shall be recorded in such logbook as may be required by the Administration. The vessel has no record of any fire, abandon ship, or enclosed space entry and recovery drill between July 2020 and June 2022 despite them being listed as conducted quarterly while in Reduced Operating Status (ROS) in the vessels SMS. 74 SOLAS(20cons)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: Accepted by ABS.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 12 September 2022 Resolved
Posters or signs shall be provided in the vicinity of survival craft and their launching controls and shall illustrate the purpose of controls and the procedures for operating the appliance and give relevant instructions and warning. The posted signs in the vicinity of the lifeboats do not accurately depict the relevant launching controls and procedures for operation. 74 SOLAS(20Cons) III/9.2.1
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: ASccepted by ABS.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 12 September 2022 Resolved
The training manual... shall contain instructions and information, in easily understood terms illustrated whenever possible, on the lifesaving appliances provided in the ship and on the best methods of survival. The following shall be explained in detail... recovery of survival craft... including stowage and securing. The training manual found on-board refers to Rottmer-type releasing gear in the section covering the recovery of survival craft. 74 SOLAS (20 cons) III/35.3.13
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 November 2022
Resolution: Accepted and closed by ABS.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 12 September 2022 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Ship does not have a way of safely removing harbor pins on newly installed lifeboat davits. 74 SOLAS (20 cons) III/20.2
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: Accepted by ABS.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 12 September 2022 Resolved
The company and the ship shall comply with the requirement of the International Safety Management Code. The vessel was found with multiple areas non-compliance with regards to the safety of personnel in the event of an emergency (muster list and survival craft signage), preparations for emergency actions (drill records, training manual and harbor pin access), and with actions in conflict with on-board SMS provisions (drill intervals). The company shall ensure an internal audit is conducted and corrective action taken within three months focusing on the noted discrepancies.
Action required: 705 - Other - as specified
Resolved 1 December 2022
Resolution: Internal Audit provided.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 12 September 2022 Resolved
Cargo ports and other similar openings in the sides of ships below the freeboard deck shall be fitted with doors so designed as to ensure he watertightness and structural integrity commensurate with the surrounding shell plating. Vessels port side bunker area side port found with heavily deteriorated knife edge. ICCL 66 II/21.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: Accepted by ABS.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 12 September 2022 Resolved
Bulkheads at exposed ends of enclosed superstructures shall be of efficient construction and shall be to the satisfaction of the administration. The superstructure access on the stbd side of deck 4 has an 8"x6" cut out adjacent to the weathertight door. ILLC 66 II/11.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: Accepted by ABS.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 12 September 2022 Resolved
The construction of all doors and door frames in “A” Class divisions, with the means of securing them when closed, shall provide resistance to fire as well as the passage of smoke and flame as far as practicable equivalent to that of the bulkheads in which those doors are situated. Door between galley and dry stores has heavily wasted sill. 60 SOLAS II/38(d)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: Accepted by ABS.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 September 2022 Resolved
The arrangement and efficiency of the means of closing any opening in the shell plating shall be consistent with its intended purpose and the position in which it is fitted and generally to the satisfaction of the administration. Kickpipes for weather deck electrical installations on the 04 (by the stbd gangway) and 05 (aft port quarter) found deteriorated and not weather tight as designed. 60 SOLAS 14(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 November 2022
Resolution: Accepted by ABS.
09 - Working and Living Conditions › 091 - Living Conditions › Sickbay
Issued 12 September 2022 Resolved
On vessels in which the crew is berthed in single occupancy rooms a hospital space will not be required:Provided, that one room shall be designated and fitted for use as a treatment and/or isolation room. Such room shall meet the following standards: (1) The room must be available for immediate medical use. Vessels treatment room found in disarray with boxes of expired medical supplies/inaccurate inventories/missing equipment and in a general unready state for medical use. U.S. Supplement to ABS Rules for Steel Vessels on International Voyages, 01Aug1997, Section III.B.8.f.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 November 2022
Resolution: Accepted and closed by ABS.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 September 2022 Resolved
Firedoors in main vertical zone bulkheads other than watertight doors shall be of self closing type. Self closing doors in stairway at galley and bridge decks have been adjusted so as to not be self closing. 60 SOLAS 11/38(e)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 November 2022
Resolution: Accepted and closed by ABS.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 September 2022 Resolved
All electrical apparatus shall be so constructed and so installed that danger of injury in ordinary handling shall not exist. MI discovered loose (hanging the wires) 220V receptacle on bridge and electrical distribution panels on 6 and 7 deck utility lockers found with missing dead front cover. 60 SOLAS 11/27(a)(i)(1)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 November 2022
Resolution: Accepted and closed by ABS.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 12 September 2022 Resolved
Spaces containing highly inflammable stores shall be so situated as to minimize the danger to passengers or crew in the event of fire. Acetylene tanks found of various sizes and shapes that did not allow for storage in appropriate storage brackets. Tanks found secured improperly with a ratchet strap. 74 SOLAS (20 cons) III/35.3.13
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 November 2022
Resolution: Accepted and closed by ABS.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 12 September 2022 Resolved
Spaces containing highly inflammable stores shall be so situated as to minimize the danger to passengers or crew in the event of fire. Paint cans found stored on bridge. 60 SOLAS II/45
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 November 2022
Resolution: Accepted and cleared by ABS.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 12 September 2022 Resolved
Illustrations and instructions in appropriate languages shall be…conspicuously displayed at muster stations…to inform passengers of their muster station. Muster station on 5 Deck Aft has muster station sticker that is faded and painted over. 74 SOLAS (20 cons) III/8.4.1
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 November 2022
Resolution: Accepted and cleared by ABS.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 12 September 2022 Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. Freezer temperature log is missing since July 2021 despite being required by the vessel SMS. Marine inspector found multiple inaccurate freezer gauges, while at the same time, temperatures are not being logged and gauges not reported as broken. Area to be included in required internal audit. 74 SOLAS (20 cons) IX/3.1, ISM Part A/10.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 December 2022
Resolution: Internal Audit received.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 12 September 2022 Resolved
The company should define and document the responsibility, authority and interrelation of all personnel who manage, perform, and verify work relating to and affecting safety and pollution prevention. The Chief Engineer found as the only signing authority in the Oil Record Book. The SMS does not define and document the various authorities granted to the Chief Mate and Chief Engineer while in Reduced Operating Status without a Master on-board the vessel. Area to be included in required internal audit. 74 SOLAS (20 cons) IX /3.1 ISM Code A/3.2
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 1 December 2022
Resolution: Internal audit report received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. The seawater inlet for the #2 AC compressor was holed and actively leaking seawater into the vessel. 74 SOLAS (20 cons) I/11
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 12 September 2022
Resolution: Repaired during the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 27 August 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Captain reported a fracture to a pipe associated with the fuel oil heater in the purifier room while conducting performance tests at higher RPM. Vessel must maintain continuous watch in purifier room while completing transit to Pier 50 San Francisco, tugs are required inbound from the Golden Gate Bridge. Once moored, vessel must demonstrate permanent repairs to the satisfaction of CG/RO prior to movement. SOLAS I/11
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 27 August 2022
Resolved 9 September 2022
Resolution: Fractured section of pipe renewed to original specifications to the satisfaction of attending class surveyor.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 15 November 2021 Resolved
Maintenance, testing and inspections of life-saving appliances shall be carried out in a manner having due regard to ensuring reliability of such appliances. Stbd (#1) lifeboat rudder discovered partly immobile for port steering test. 74 SOLAS (2014 cons.) III/20.3.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2021
Resolution: Witnessed satisfactory steering test of #1 lifeboat for proper rudder operation.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 15 November 2021 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Stbd (#1) lifeboat fuel tank level discovered halfway full. 74 SOLAS (2014 cons.) III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2021
Resolution: Witnessed #1 lifeboat fuel tank properly filled.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 15 November 2021 Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection, including fire resisting divisions. MCTS from engine room up to main console are open and need reinstalled IAW type approval. SOLAS 74 (2020) Chapter II-2 Reg 14.2.1.1.2
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 November 2021
Resolution: ABS accepted finding per report and work order #5034188.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 15 November 2021 Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection, including fire resisting divisions. MCT from main deck portside refer plug box aft is corroded beyond repair and needs RNR IAW type approval. Repair due prior to next drydock. 74 SOLAS (2020) II-2/14.2.1.1.2
Action required: 705 - Other - as specified
Resolved 29 November 2021
Resolution: ABS accepted finding per report and work order #5034188.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 15 November 2021 Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. 02 SCBAs in FWD emergency locked were found under filled. 74 SOLAS (2020) II-2/14.2.1.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 November 2021
Resolution: ABS accepted finding per report and work order #5034188.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 November 2021 Resolved
All exposed metal parts of electrical machines or equipment which are not intended to be live shall be earthed, and all electrical apparatus shall be constructed and so installed that danger in ordinary handling shall not exist. 06 power supply cables to purifier motor were improperly maintained at motor junction box. 60 SOLAS II/27(a)(i)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 November 2021
Resolution: ABS accepted finding per report and work order #5034188.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 November 2021 Resolved
Wiring shall be supported in such a manner as to avoid chafing and other injury. New cable runs on 08 deck discovered with improperly supported cable trays and zip tie supports. 60 SOLAS II/27(a)(vi)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 November 2021
Resolution: ABS accepted finding per report and work order #5034188.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 9 March 2021 Resolved
Fire protection systems shall be maintained and ready for use. EDG remote fuel shutoff valve leaks excessively when closed. 74 SOLAS (09 Cons.) II-2/ 14.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 March 2021
Resolution: Per ABS report, the emergency fuel shutoff valve was landed ashore, overhauled, reinstalled, and tested with no leaks observed to the satisfaction of the attending Surveyor.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 9 March 2021 Resolved
Fire protection systems shall be maintained and ready for use. Multiple cable transits (MCTs) in fwd upper EDG space and 03 panel under control console are improperly installed/open. 74 SOLAS (2009 Cons.) II-2/14.1.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 March 2021
Resolution: Per ABS report, the multi-cable transits were refitted to the attending Surveyor's satisfaction.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 9 March 2021 Resolved
The company should ensure that policy is implemented and maintained. Ship board personnel are not tracking/taking corrective action of off scan alarms/automation failures. 74 SOLAS (09 Cons.) IX, ISM 2.2
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 March 2021
Resolution: Per ABS Report, company created an Engine Control Room log and initialed tracking off scan alarms per SMS procedures.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 25 January 2021 Resolved
Your vessel must undergo a periodic inspection within the 3 months before or after the second or third anniversary of the date of your vessel's Certificate of Inspection. This inspection takes the place of an annual inspection. Your vessel's third anniversary date was October 19, 2020 and no inspection has been requested or conducted to date.
Action required: 60 - Rectify deficiencies prior to movement
Due 25 January 2021
Resolved 9 March 2021
Resolution: Vessel completed required ACP Periodic Inspection.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. The emergency diesel generator intermittently trips on low lube oil for unknown reason. Provide root cause analysis and propose method to resolve. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. The Skirt on engine room ventilation trunk heavily damaged, renew to make trunk air and watertight. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. The Frame IWO port forward fuel oil containment heavily wasted, crop and renew. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. IMO placards missing on bridge wing smoke floats, provide placards. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. Light can be seen coming in on 5th deck watertight door leading to lifeboats, make watertight. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. Lifeboat platforms damaging lifeboat gelcoat, prevent lifeboat platforms from causing damage. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. Exhaust manifold lagging missing on EDG, renew. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. Steering room escape reflective arrows not serviceable, renew. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 November 2018 Resolved
9. The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. Dead end wire located at shaft master control panel, remove or properly terminate. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 November 2018 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision of the present regulations to ensure that the ship is all respects will remain fit to proceed to sea without danger to the ship or persons on board. HFO purifier hose and clamps do not match other purifiers, verify they meet manufacturer specification. 74SOLAS(14)I/11.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2018
Resolved 26 November 2018
Resolution: Cleared IAW CVC-PR-001, see ABS report in deficiency documents.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 April 2018 Resolved
Secure wire penetration above bridge to prevent chaffing
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3491622) in documents.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 18 April 2018 Resolved
Prove proper operation of all cargo fan control lights, function, and sensors
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Repor (SF3491622) in documents.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 18 April 2018 Resolved
Prove proper operation of battle lantern at 6th deck stairwell stbd
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3491622) in documents.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 18 April 2018 Resolved
Prove proper operation of self-closing fire door in galley
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3514185) in documents.
Lifesaving › Lifeboat Equipment › Portable Fire-extinguishing Equipment
Issued 18 April 2018 Resolved
Provide proper brackets for fire extinguisher in stbd lifeboat
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3477112) in documents.
Lifesaving › Lifeboat › Windows/Translucent Panels
Issued 18 April 2018 Resolved
Provide windows in stbd lifeboat that are clear enough to safely operate boat
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3536363) in documents.
Lifesaving › Lifeboat › Skate
Issued 18 April 2018 Resolved
Tighten ski fasteners on port lifeboat
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3477112) in documents.
Lifesaving › Lifeboat › Fire Protection (water spray system)
Issued 18 April 2018 Resolved
Properly terminate abandoned sprinkler system through hull valve in stbd lifeboat
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3477112) in documents.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 18 April 2018 Resolved
Replace lifering light/provide proper light bracket IWO 1SUWB vent
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3477112) in documents.
Fire Fighting › Fire Hydrants › Condition
Issued 18 April 2018 Resolved
Provide proper functioning doors at fire station 14 & 15
Action required: 705 - Other - as specified
Resolved 17 January 2019
Resolution: Item closed due to incorporation into ABS report.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 18 April 2018 Resolved
Crop and renew wasted gooseneck vent containment port fwd IWO emergency fire pump fire damper
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3505891) in documents.
Engineering › Steam System (auxiliary) › Piping
Issued 18 April 2018 Resolved
Determine necessary permanent repairs to stbd engine room steam vent pipe currently repaired with soft patch
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Corrected, see ABS Report (SF3544324) in documents.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 25 October 2017 Resolved
Prove proper operation of MDE automation controls following repairs.
Action required: 705 - Other - as specified
Resolved 29 November 2017
Resolution: Test sat following repairs
Construction/Loadline › Hull › Bottom Plating
Issued 21 October 2017 Resolved
The vessel is directed to return to the Columbia River system. Make the affected area with the hole available for Coast Guard inspection prior to commencing repairs. Provide repair plan to the OCMI for review and approval prior to commencing repairs. All repairs are to be made available to the attending Marine Inspector. All repairs are to be completed to the satisfaction of the attending Marine Inspector and Classification society prior to departure from the Columbia River system. (ABS Steel Rules, Part 7)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 October 2017
Deck/Cargo › Holds/Tanks › Watertight Door
Issued 19 October 2017 Resolved
Prove proper operation of watertight door indicating lights.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Resolution: Indicator lights tested by ABS on this date. all sat.
Communications › Audible Communications › SPD (Other)
Issued 19 October 2017 Resolved
Prove satisfactory communications between aft steering and the bridge. 46 CFR 113.30-5
Condition: Design Flaw
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Resolution: Vessel to use hand held radios to augment the installed system.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 19 October 2017 Resolved
Replace broken lights in port side engine room emergency escape. 46 CFR 112.15-1(c)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Resolution: emergency lighting restored.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 19 October 2017 Resolved
Repair or replace lagging on the MDE F/O piping in vicinity of local engine control and on two valves fwd of control station. 46 CFR 56.50-1(k)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Resolution: ABS verified installation on this date.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 19 October 2017 Resolved
Clean and remove oil and oil soaked rags from under the compressor oil tank in engine room, stern door control station, end deck ramp control station, 2B ramp cover control station. 46 CFR 91.25-45
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 19 October 2017 Resolved
Identify and fix lube oil leak in the vicinity of the #1 SSDG.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Resolution: ABS verified oil was cleaned up and located leak.
Stability › Weathertight Integrity › General
Issued 19 October 2017 Resolved
Permanently repair deck penetration on stbd side bridge wing. Penetration has been temporarily repaired with belzona. Load Line Article 10
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 30 November 2017
Resolution: See ABS Report SF3409537.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 19 October 2017 Resolved
Adjust closure device on fwd engine control door so door closes completely. 46 CFR 92.07-10(c)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Resolution: ABS surveyor verified operation of door.
Electrical › Electrical Distribution System (service) › Cable
Issued 19 October 2017 Resolved
Remove old transducer cable from emergency fire pump generator space. 46 CFR 111.01-1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 November 2017
Resolved 19 October 2017
Resolution: ABS confirmed the cable was removed.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 19 October 2017 Resolved
Provide PSTPs for low pressure CO2 extinguishing system. 46 CFR 61.40-6
Condition: Design Flaw
Due 20 November 2017
Resolved 16 August 2019
Resolution: Vessel pre-dates applicability for 61.40-6 CG-835 determined invalid.
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 19 October 2017 Resolved
Remove Expanding Foam Insulation from Cable Transits and seal with an approved fire stop.
Condition: Improper Installation
Due 20 November 2017
Resolved 30 November 2017
Resolution: See ABS Report SF3409537.
Lifesaving › Launching Appliances › Falls
Issued 19 October 2017 Resolved
Make Permanent repairs to the Davit Falls Blocks.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 October 2017
Lifesaving › Immersion Suits › Approval
Issued 21 November 2016 Resolved
Remove all NON SOLAS immersion suits and replace with the proper number of SOLAS approved suits.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 December 2016
Construction/Loadline › Structures › Ventilators
Issued 21 November 2016 Resolved
Prove proper operation of all cargo vent closures on the main deck (4 deck), including all indicators.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 August 2017
Resolution: Cleared by ABS and verified by USCG
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 21 November 2016 Resolved
Prove repairs made to kick panels on Fire Screen Doors (silicone and/or tape) meet the requirements of the boundary listed on the Fire Control Plan.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 December 2016
Communications › Alarms/Indicators › Engineers' Assistance-needed Alarm
Issued 21 November 2016 Resolved
Provide approved DVTP/PSTP reflecting current equipment on board including main engines, emergency generator, aux boiler, and any other included equipment.
Action required: 705 - Other - as specified
Resolved 6 July 2017
Resolution: Corrected.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 21 November 2016 Resolved
Prove proper operation of fixed fire fighting pressure switch for emergency fire pump prime mover space following repairs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 July 2017
Resolution: Pressure switch does not operate any shutdowns so repair is not required.

Casualty record · 13

13 March 1993Major Marine Casualty · role: Involved in a Marine Casualty · 1 injured · activity 177757
15 October 1998Major Marine Casualty · role: Involved in a Marine Casualty · activity 142686
22 January 2002Routine · role: Moored/Anchored in Vicinity of Primary Subject · serious marine incident, as classified · 1 injured · activity 1484250
10 August 2007Routine · role: Involved in a Marine Casualty · activity 3040104
29 April 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3727589
22 September 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3964859
10 May 2011Routine · role: Moored/Anchored in Vicinity of Primary Subject · serious marine incident, as classified · 1 injured · activity 4017167
22 July 2011Routine · role: Moored/Anchored in Vicinity of Primary Subject · activity 4109654
23 July 2011Routine · role: Involved in a Marine Casualty · 1 injured · activity 4094229
27 September 2012Routine · role: Involved in a Marine Casualty · activity 4455479
30 December 2018Routine · role: Involved in a Marine Casualty · activity 6605428
24 June 2020Routine · role: Involved in a Marine Casualty · activity 6985258
6 June 2025Routine · role: Involved in a Marine Casualty · activity 8156087
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.