Records from 1985 to 2026. Most recent: inspection, 20 May 2026.
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 30 March 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Lighting in crew berthing E-7, D-4, D-5 berthing spaces have exposed wires, missing light bulbs and covers, and inoperable lights throughout spaces creating safety hazards. 74 SOLAS (24) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2026
Resolved 23 April 2026
Resolution: Received ABS report.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 March 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Laundry lint trap in stbd crew berthing was incorrectly installed allowing lint to discharge in the space creating a fire hazard. 74 SOLAS (24) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2026
Resolved 23 April 2026
Resolution: Received ABS report.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 30 March 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Hydraulic pump for sliding watertight door to shaft alleys had guard turned around backwards exposing spinning shaft. 74 SOLAS (24) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2026
Resolved 23 April 2026
Resolution: Received ABS report.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 March 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Multiple indicator bulbs on controls for remote fuel shut-off on control panel outside of [name withheld] office were burnt out making it unknown to know if valves were opened or closed. 74 SOLAS (24) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2026
Resolved 23 April 2026
Resolution: Received ABS report.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 March 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Ground indicated on 120 volt on AMR Switchboard. Identified as light in Marine berthing. 74 SOLAS (24) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 April 2026
Resolved 23 April 2026
Resolution: Received ABS report.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 30 March 2026
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. STBD Lifeboat did not start when tested during inspection. Corrected on the spot.74 SOLAS (24) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 30 March 2026
Resolution: Witnessed succesful start, propulsion, and steering checks.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 17 September 2025
Resolved
A certificate issued under section 19.2 shall cease to be valid in any of the following cases: .3 when a Company assumes the responsibility for the operation of a ship not previously operated by that Company. Vessel’s ISSC SOVC has ceased to be valid due to a new company assuming responsibility for the operation of the ship.
33 CFR 104.115(b)(1)
ISPS 19.3.8.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Continuous synopsis record
Issued 17 September 2025
Resolved
In case of any changes relating to the entries referred to in paragraph 4.1, the Administration, pending the issue of a revised and updated version of the Continuous Synopsis Record, shall authorize and require either the Company as defined in regulation IX/1 or the master of the ship to amend the Continuous Synopsis Record to reflect the changes. In such cases, after the Continuous Synopsis Record has been amended, the Company shall, without delay, inform the Administration accordingly. A new company has assumed responsibility for the operation of the ship and the CSR is now outdated. 74 SOLAS (24) XI-1/5.4.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2025
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 17 September 2025
Resolved
In each washing space in a visible location there shall be information regarding procedures and resources to report crimes upon the vessel, including sexual assault and sexual harassment, and vessel owner or company policies prohibiting sexual assault and sexual harassment, retaliation, and drug and alcohol usage. SASH reporting documentation was not posted in washrooms. 46 USC 11101(d)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 17 September 2025
Resolved
An International Load Line Certificate (1966) shall be issued to every ship which has been surveyed and marked in accordance with the present Convention. The ILLC states that “the vessel shall be operated in accordance with the “Trim and Stability Booklet for U.S.N.S. Wright,” MSC Plan No. T-AVB-843-5987403, bearing the ABS Americas approval stamp dated 3 August 2018.” This booklet was not on board or available for inspection. ILLC I/16
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 17 September 2025
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. STBD life boat was cluttered with misc. items, reducing the passenger space drastically. 74 SOLAS (24) III/20
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2025
Resolution: Received proof of acceptance from ABS.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 September 2025
Resolved
The condition of the ship and its equipment shall be maintained to confirm with the provisions of present regulations to confirm with the provisions of the present regulations to ensure that the ship in all respects will remain fit to sea without danger to the ship or persons on board. A ground is indicated in the 120v Emergency Bus.
74 SOLAS (24) I/11
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2025
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 September 2025
Resolved
The condition of the ship and its equipment shall be maintained to confirm with the provisions of present regulations to confirm with the provisions of the present regulations to ensure that the ship in all respects will remain fit to sea without danger to the ship or persons on board. #2 cargo hatch control box hydraulic piping leaking and mixing with water on deck causing visible sheen.
74 SOLAS (24) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 17 September 2025
Resolved
Containers, brackets, racks, and other similar stowage locations for life-saving equipment shall be marked with symbols in accordance with the recommendations of the Organization, indicating the devices stowed in that location for that purpose. If more than one device is stowed in that location, the number of devices shall also be indicated. Multiple staterooms had partial or no symbols per IMO Resolution A.760(18) for the stowage locations of personal lifesaving equipment. 74 SOLAS (24) III/20.10
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2025
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 17 September 2025
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Port bridge wing life buoy floating water light was initially inoperable, corrected on the spot. 74 SOLAS (24) III/20
Action required: 10 - Deficiency Rectified
Resolved 7 October 2025
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 17 September 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessels installed watertight door indicator panel on bridge had burnt out bulbs, corrected on the spot. 74 SOLAS (24) I/11
Action required: 10 - Deficiency Rectified
Resolved 7 October 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 September 2025
Resolved
The condition of the ship and its equipment shall be maintained to confirm with the provisions of present regulations to confirm with the provisions of the present regulations to ensure that the ship in all respects will remain fit to sea without danger to the ship or persons on board. Blank missing in EL-101 distribution panel, corrected on the spot. 74 SOLAS (24) I/11
Action required: 10 - Deficiency Rectified
Resolved 7 October 2025
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 17 September 2025
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: .2 fire detection and fire alarm systems.
The fire alarm annunciator panel on the bridge for the cargo decks has an inop light for Zone 7. 74 SOLAS (24) II-2/14.2.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 October 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 5 September 2025
Resolved
No vessel subject to inspection and certification shall
be operated without a valid certificate of inspection.
To maintain a valid Certificate of Inspection, you must complete your annual inspections within the periods specified in § 91.27-1 (a) and (b). Vessel's window for annual inspection closed on 31AUG25.
46 CFR 91.01-2(a)
46 CFR 91.27-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 September 2025
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 20 November 2024
Resolved
The following fire protection systems shall be kept in good working order so as to ensure their required performance: structural fire protections, including fire-resisting divisions, and protection of openings and penetrations in these divisions. The engine room portside supply fire damper louvers failed to close. SOLAS 74 (2020) II-2/14.2.1.1.1, 60a
Action required: 60 - Rectify deficiencies prior to movement
Resolved 5 December 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 November 2024
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The ring buoy located on the port bridge wing has a crack in the plug that can affect the buoyancy. SOLAS 74 (2020) III/20.2, 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2024
Resolved 5 December 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 November 2024
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The ring buoy floating lights on the port bridge wing and below the starboard lifeboat are cracked around the housing affecting their buoyancy. SOLAS 74 (2020) III/20.2, 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2024
Resolved 5 December 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 November 2024
Resolved
efore the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The lines connecting the self-igniting smoke to the quick-release ring buoys on the port and starboard bridge wings do not have a long enough line per the manufacturer’s recommendation. SOLAS 74 (2020) III/20.2 , 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2024
Resolved 5 December 2024
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 20 November 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The magnetic compass at the bridge helm is blurry and the numbers on the compass card cannot be seen. SOLAS 74 (2020) I/11(a), 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2024
Resolved 5 December 2024
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 20 November 2024
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: fire alarm systems. The fixed CO2 fire suppression system warning signs for evacuation above the fire alarms in vehicle deck 1C and 3C are partially painted over and obstructed from view. SOLAS 74 (2020) II-2/14.2.2.1.1.2, 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2024
Resolved 5 December 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 November 2024
Resolved
he condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The electrical panel aft 1+G panel blank is not secured, and the door is missing the latch in the portside engine room deck level connecting to the cargo ro-ro deck. SOLAS 74 (2020) I/11(a), 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2024
Resolved 5 December 2024
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 11 October 2024
Resolved
No vessel subject to inspection and certification shall be operated without a valid certificate of inspection.
To maintain a valid Certificate of Inspection, you must complete your annual inspections within the periods specified in § 91.27-1 (a) and (b)
Vessel's window for annual inspection closed on 31AUG24. Vessel's COI is invalid.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 November 2024
Resolution: Completed ACP Annual Inspection.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 9 August 2023
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: .2 fire detection and alarm systems.
Fire detection panel on the bridge is powered by a temporary arrangement consisting of a hardwired extension cord.
74 SOLAS (20) II-2/14, 17a
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2023
Resolved
Periodic Safety tests must be conducted annually to demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks and safety controls. Systems addressed must include fire detection and extinguishing, flooding safety, propulsion, maneuvering electric power generation and distribution and emergency internal communications. Design Verification and Periodic Safety test procedures are to be submitted for approval and retained aboard the vessel. Only ABS approved PSTPs onboard provided were for Boiler Management Automation. Fire detection and extinguishing,flooding safety, maneuvering electric power generation and distribution and emergency internal communications were not provided.
U.S. SUPPLEMENT TO ABS RULES FOR STEEL VESSELS FOR VESSELS CERTIFICATED FOR INTERNATIONAL VOYAGES 1 JUNE 2003, 4-9-1/7 Remote Propulsion Control and Automation – General – Required Plans and Data
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2023
Resolved 21 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with provisions of the present regulations of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
24v batteries highly corroded for SSDG control power.
74 SOLAS (20) I/11(a), 50a
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2023
Resolved 21 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 August 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with provisions of the present regulations of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
Pin hole leak in weld the S/W servicing pipe for the SSTG.
74 SOLAS (20) I/11(a), 50a
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 September 2023
Resolved 21 August 2023
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 9 August 2023
Resolved
Every crew member shall participate in one abandon ship drill and one fire drill every month.
Vessel does not have recent fire and abandon ship drill records.
Rectify prior to activation.
74 SOLAS(20) III/18.3.2, 705c
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 29 September 2025
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 9 August 2023
Resolved
Nautical charts and publications shall be adequate and up to date.
Vessel charts are not reflective of most current updates.
Rectify prior to activation.
74 SOLAS (20) V/27;
33 CFR 164.33
705c
Action required: 705 - Other - as specified
Resolved 29 September 2025
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 9 August 2023
Resolved
All lifesaving appliances shall be ready for immediate use.
Lifesaving appliances and equipment are stowed off station.
Rectify prior to activation.
74 SOLAS (20) III/20.2, 705c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Verified lifesaving appliances and equipment were on station during recent inspection.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 9 August 2023
Resolved
The certificate of inspection (COI) issued by an Officer in Charge, Marine Inspection (OCMI), to a vessel required to be inspected under 46 U.S.C. 3301 specifies the minimum complement of officers and crew necessary for the safe operation of the vessel.
Vessel was not fully manned in accordance with COI.
Rectify prior to activation.
46 CFR 15.501, 705c
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 29 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 September 2022
Resolved
Vessel is required 2 tug escorts greater than or equal to 5,000 aggregate total horsepower (one tug must have a minimum of 2,000 horsepower); or 2 tug escorts greater than or equal to 50 ton bollard pull to assist the vessel to the sea buoy upon departure. If the vessel experiences any propulsion or steering issues while underway you are to follow Coast Guard casualty reporting requirements to the nearest Captain of the Port.
33 CFR 160.111(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 September 2022
Resolution: Vessel departed port under tug escort without issue.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 September 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel reported the #1 and #2 boilers went off line causing a loss in electricity and preventing the vessel from getting underway.
74 SOLAS (20) I/11(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 September 2022
Resolution: Accepted as a condition of ACS. Please see ABS preliminary report revision one for details.
11 - Life Saving Appliances › N/A - No Subsystem › Emergency equipment for 2-way comm.
Issued 30 August 2022
Resolved
At least three two-way VHF radiotelephone apparatus shall be provided on every cargo ship of 500 gross tonnage and upwards. Such apparatus shall conform to performance standards not inferior to those adopted by the Organization. One of the two-way VHF radios on board does not have an unused primary battery.
74 SOLAS (20) III/6.2.1.1
A.809(19)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 September 2022
Resolution: 30AUG: Accepted as a condition of ACS. Awaiting confirmation of all equipment on board.
06SEP: Verified all radios are on board and have new unopened batteries for each.
05 - Radio Communications › N/A - No Subsystem › Operation of GMDSS equipment
Issued 30 August 2022
Resolved
Every ship engaged on voyages beyond sea areas A1 and A2 shall be provided with an INMARSAT ship earth station capable of transmitting and receiving distress and safety communications using direct printing telegraphy. Both GMDSS printers on the bridge are either inoperable or non-functional.
74 SOLAS (20) IV/10.1.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2022
Resolved 2 September 2022
Resolution: 02SEP: Accepted as a condition of ACS.
06SEP: Verified both printers worked satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 30 August 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. There is a hole on the boatswain hatch below the hatch cover near the closing mechanism.
74 SOLAS (20) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2022
Resolved 2 September 2022
Resolution: Accepted as a condition of ACS.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 30 August 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The watertight door indicator on the bridge for Engine Room Frame 103 is not illuminated.
74 SOLAS (20) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2022
Resolved 2 September 2022
Resolution: Accepted as a condition of ACS.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 30 August 2022
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. 3 of the 4 shutters in the aft galley space do not properly secure and tighten down. The latching mechanisms are missing or seized.
74 SOLAS (20) II-2/14.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 September 2022
Resolved 2 September 2022
Resolution: Accepted as a condition of ACS.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 30 August 2022
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if fire occurs: structural fire protection, including fire-resistant divisions, and protection of openings and penetration of these division. Port and Starboard engine room ventilation supply fire dampers were seized open.
74 SOLAS (20) 74 SOLAS(20) II-2/14.2.1.1.1
Action required: 10 - Deficiency Rectified
Due 30 September 2022
Resolved 30 August 2022
Resolution: Engineers were able to free the dampers and return proper movement.
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 15 June 2020
Resolved
Prior to activation, prove updated charts and publications to attending CG marine inspector.
Action required: 705 - Other - as specified
Resolved 12 November 2021
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 15 June 2020
Resolved
Prior to activation, prove fully stocked medical kit.
Action required: 705 - Other - as specified
Resolved 12 November 2021
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 15 June 2020
Resolved
Prior to activation, conduct fire and abandon ship drills to the satisfaction of attending CG marine inspector.
Action required: 705 - Other - as specified
Resolved 12 November 2021
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 15 June 2020
Resolved
Prior to activation, provide officer and crew licenses to meet minimum safe manning.
Action required: 705 - Other - as specified
Resolved 12 November 2021
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 15 June 2020
Resolved
Prior to activation, ensure all lifesaving and firefighting equipment are mounted on station in accordance with fire control and lifesaving plan.
Action required: 705 - Other - as specified
Resolved 12 November 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 15 June 2020
Resolved
Prior to activation, ensure all lifeboat equipment is
properly stowed within the lifeboat
Action required: 705 - Other - as specified
Resolved 12 November 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 15 June 2020
Resolved
Shaft Alley sliding watertight door did not operate. Make repairs and prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 June 2020
Resolution: Witnessed operation.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 15 June 2020
Resolved
The chief mate was unfamiliar with the Bridge Navigational Watch Alarm System(BNWAS). Prior to activation, ensure a test of the system is completed with all watch crew.
Action required: 705 - Other - as specified
Resolved 12 November 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 June 2020
Resolved
The port bridge wing water light was inoperable. make repairs and prove proper operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified operation.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 June 2020
Resolved
Not all emergency lights were observed to be operating properly. Make repairs and prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2020
Resolution: ABS witnessed test.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020
Resolved
Dead end wire was observed on the starboard mast light.
Properly terminate or remove.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified removal.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 15 June 2020
Resolved
The hydrostatic release units were not marked properly
on the port center bay liferafts. Prove proper marking.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified marking.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020
Resolved
Dead end wire was observed on the stbd bridge wing
DirecTV unit. Terminate properly or remove.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified removal.
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 15 June 2020
Resolved
Containment plugs were missing on the port and starboard
main deck at the international shore connection bays.
Prove containment plugs availability.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified plugs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020
Resolved
Dead end wire located outside storage room inside the
starboard stairtower to upper platform.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified removal.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 15 June 2020
Resolved
Holed vent pipe for No.5 double bottom tank observed on port side main deck. Make repairs and prove satisfactory condition.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified repair.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 15 June 2020
Resolved
No certificates, documents, plans, drills, or logs were available for inspection. Make all available prior to annual inspection credit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2020
Resolution: Verified during inspection.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 13 May 2019
Resolved
Provide drill logs and records of maintenance of ship's equipment.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2019
Resolution: Reviewed logs with Chief Mate.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 13 May 2019
Resolved
Hydrostatic release on EPIRB is expired. Replace and properly install new hydrostatic release unit. Vessel is restricted to lakes, bays, and sounds route prior to resolution.
Action required: 705 - Other - as specified
Resolved 2 July 2019
Resolution: Hydrostatic release was replaced. Expiry date MAY 2021.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 May 2019
Resolved
The self-activating smoke signal for the port bridge wing life ring is expired. Vessel must replace with new smoke signal.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 July 2019
Resolution: Smoke signal on port bridge wing was replaced. Expiry date NOV2022.
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 13 May 2019
Resolved
Prior to activation, prove updated charts and publications to attending CG marine inspector.
Action required: 705 - Other - as specified
Resolved 29 January 2020
Resolution: Verified updated ECDIS and charts.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 13 May 2019
Resolved
Prior to activation, prove fully stocked medical kit.
Action required: 705 - Other - as specified
Resolved 29 January 2020
Resolution: Verified stocked medical kit.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 13 May 2019
Resolved
Prior to activation, conduct fire and abandon ship drills to the satisfaction of attending CG marine inspector.
Action required: 705 - Other - as specified
Resolved 29 January 2020
Resolution: Conducted fire and abandon ship drills.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 13 May 2019
Resolved
Prior to activation, provide officer and crew licenses to meet minimum safe manning.
Action required: 705 - Other - as specified
Resolved 29 January 2020
Resolution: Verified crew licenses and certificates.
10 - Safety of Navigation › N/A - No Subsystem › Speed and distance indicator
Issued 13 May 2019
Resolved
Prove proper operation of speed log.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 August 2019
Resolution: Speed sword installed.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 13 May 2019
Resolved
The magnetic compass at the steering station is unreadable. Adjust the compass and prove proper operation.
Action required: 705 - Other - as specified
Resolved 22 May 2019
Resolution: Compass is readable
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 13 May 2019
Resolved
The VHF radio on the starboard side of the bridge is not functioning properly. The external speaker on the port side VHF is also not functioning properly. Prove proper operation to attending marine inspector.
Action required: 705 - Other - as specified
Resolved 2 July 2019
Resolution: Satisfactory radio check was conducted on both port and starboard VHF radios on the bridge
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 13 May 2019
Resolved
The starboard lifeboat rudder was removed for servicing. Properly install and prove proper operation prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 August 2019
Resolution: ABS cleared the deficiency.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 13 May 2019
Resolved
04 port holes located below the deck line on the starboard side had water intrusion during the hose test. Repair port holes and test to the satisfaction of attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 August 2019
Resolution: ABS witnessed repairs and hose test.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 13 May 2019
Resolved
Prove proper operation of the EDG low L/O alarm. 46 CFR 112.25
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 May 2019
Resolution: SF proved operation of the L/O alarm
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 13 May 2019
Resolved
Numerous hydraulic oil leaks were found of the vessels steering gear. The steering gear shall be proven to be free of leaks. 46 CFR 58.25-10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 July 2019
Resolution: Satisfactory steering test was conducted free of hydraulic leaks.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 13 May 2019
Resolved
Properly affix light cover in the steering gear space. 46 CFR 111.75-20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2019
Resolved 22 May 2019
Resolution: Light fixture was repaired
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 13 May 2019
Resolved
Remove heavily corroded nitrogen bottle in the steering gear space. If replaced, the new bottle should be stowed off the deck to reduce corrosion rate. 46 CFR 91.25-50
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2019
Resolved 22 May 2019
Resolution: Nitrogen bottle was removed from the space.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 13 May 2019
Resolved
Remove and properly cap exposed wires protruding from two junction boxes above STBD reefer units. 46 CFR 111.60
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2019
Resolved 22 May 2019
Resolution: Junction boxes were sealed
Documentation › Manuals/Policy Documentation › Stability Instructions
Issued 3 May 2018
Resolved
Provide explanation for disparity between CargoMax calculations and approved Trim and Stability Book; ensure proper loading in accordance with approved trim and stability book.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 10 August 2018
Resolution: Received email from Port Engineer, [name withheld], with an attachment to view the newly approved Trim and Stability book and Cargo Max calculations approved by ABS.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 3 May 2018
Resolved
Make permanent repairs to the L/O fitting leaks in way of the head tank for the stern tube forward seal.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2018
Resolved 10 May 2018
Resolution: Inspected with no leaks found, pipe plug was removed, cleaned and re-installed.
Stability › Watertight Integrity › General
Issued 3 May 2018
Resolved
Make permanent repairs to the closing limit switch for the watertight door to the auxiliary generator compartment.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 May 2018
Resolution: Witnessed proper operation of limit switch.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 3 May 2018
Resolved
Provide servicing report for annual servicing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 13 September 2018
Resolution: Received annual firefighting servicing report from Hiller.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 3 May 2018
Resolved
Inspect all doors in main/center ladder well for proper closure and latching, noted many doors did not properly latch.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 24 July 2018
Resolution: Chief Mate worked on doors to stairway. Spot checked them and they worked properly.
Lifesaving › Immersion Suits › General
Issued 3 May 2018
Resolved
Replace expired waterlights on immersion suits. Noted 5 with expired batteries.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 July 2018
Resolution: All expired waterlights on life jackets and immersion suits were replaced with new ones.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 3 May 2018
Resolved
Improper piping penetration noted beneath the 10 cm radar console.
Action required: 705 - Other - as specified
Resolved 10 May 2018
Resolution: Observed firestop installed in penetration.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 3 May 2018
Resolved
Improper piping penetration noted aft of the 10 cm radar console along bulkhead.
Action required: 705 - Other - as specified
Resolved 10 May 2018
Resolution: Observed proper installation of firestop in penetration.
Fire Fighting › Structural - A Class Divisions › Windows
Issued 3 May 2018
Resolved
Repair starboard aft window penetration on bridge; currently has "direct tv" cable running through.
Action required: 705 - Other - as specified
Resolved 10 May 2018
Resolution: Noted cabling removed, penetration repaired.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 3 May 2018
Resolved
Replace (04) expired primer ejector cartridges for line throwing appliance.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 June 2018
Resolution: Provided new cartridges
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 May 2018
Resolved
Remove dead-ended wiring on flying bridge.
Action required: 705 - Other - as specified
Resolved 10 May 2018
Resolution: Verified wiring removed.
Construction/Loadline › Structures › Door
Issued 3 May 2018
Resolved
Repair watertight door leading to flying bridge, conduct chalk test to ensure tightness.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 22 May 2018
Resolution: Cleared by ABS.
Construction/Loadline › Structures › Superstructure
Issued 3 May 2018
Resolved
Repair numerous missing and broken dogs on bridge windows and ensure hingepins are properly seated and equipped with cotter pins.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 May 2018
Resolution: Cleared by ABS.
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 3 May 2018
Resolved
Renew rotted storm railing along port and starboard bridgewings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 24 July 2018
Resolution: Vessel replaced rotting railing with new one.
Construction/Loadline › Structures › Door
Issued 3 May 2018
Resolved
Repair broken dog on stairtower entrance to weatherdeck: 34'-6' flat on boat deck.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 13 September 2018
Resolution: Vessel replaced broken dog with new one. Cleared by ABS.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 3 May 2018
Resolved
Free frozen stancions on boat deck in way of accommodation ladders along port and starboard side.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 13 September 2018
Resolution: Frozen stancion was freed. Cleared by ABS.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 3 May 2018
Resolved
Repair broken panel door on L-130-11: Aft ltg panel
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 10 May 2018
Resolution: Verified repair.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 3 May 2018
Resolved
Repair emergency escape lighting in #6 tween deck, port side.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 May 2018
Resolved 10 May 2018
Resolution: Witnessed lighting repair
Electrical › Electrical Distribution System (service) › Panelboard
Issued 3 May 2018
Resolved
Repair broken panel door at P201, Power Panel
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 10 May 2018
Resolution: Vessel made proper repairs.
Fire Fighting › Fire Main › Condition
Issued 3 May 2018
Resolved
Repair leaking fire main, starboard side
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2018
Resolved 13 September 2018
Resolution: Firemain was repaired and tested by ABS.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 3 May 2018
Resolved
Replace missing blanks in 2nd Deck lighting panel (L2/22) stair tower to Ro-Ro hold.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 May 2018
Resolution: Verified installed blanks.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 3 May 2018
Resolved
Prior to sailing following activation, provide officer and crew licenses and endorsements to meet minimum safe manning.
Action required: 705 - Other - as specified
Resolved 13 September 2018
Resolution: Inspected all crewmember's credentials and ensured they had enough personnel to meet their minimum safe manning.
Operations/Management › Drills/Instruction › Not Conducted
Issued 3 May 2018
Resolved
Prior to sailing following activation, conduct fire and abandon ship drills in the presence of a CG Marine Inspector.
Action required: 705 - Other - as specified
Resolved 13 September 2018
Resolution: Witnessed satisfactory fire and abandon ship drills.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 3 May 2018
Resolved
Prior to sailing following activation, prove updated charts and publications to attending MI.
Action required: 705 - Other - as specified
Resolved 17 September 2018
Resolution: Vessel received updated charts and publications.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 May 2018
Resolved
Prior to sailing following activation, prove fully stocked medicine chest.
Action required: 705 - Other - as specified
Resolved 13 September 2018
Resolution: Vessel received adequate medical supplies.
Operations/Management › Drills/Instruction › Not Conducted
Issued 7 June 2017
Resolved
AB01- Prior to sailing after activation, conduct fire and abandon ship drills.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2017
Resolved 11 September 2017
Resolution: Conducted satisfactory fire and abandon ship drills.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 7 June 2017
Resolved
AB02- Prior to sailing after activation, provide officer and crew licenses to meet minimum safe manning.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2017
Resolved 11 September 2017
Resolution: Verified all crewmembers had proper licenses and vessel met minimum safe manning.
Navigation › Piloting/Steering › Marine Charts
Issued 7 June 2017
Resolved
AB03- Prior to sailing after activation, provide updated charts and publications.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2017
Resolved 11 September 2017
Resolution: Verified vessel had adequate charts and publications for upcoming voyage.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 7 June 2017
Resolved
AB04- Prior to sailing after activation, provide fully stocked medicine chest.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2017
Resolved 11 September 2017
Resolution: Verified vessel's medicine chest was adequate.
Lifesaving › Lifeboat › Embarkation/Disembarkation Capabilities
Issued 7 June 2017
Resolved
AB05- Demonstrate proper operation of remote release for both port and starboard life boats.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2017
Resolved 11 September 2017
Resolution: Verified during abandon ship drill.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 7 June 2017
Resolved
AB06- Prior to sailing after activation, ensure all lifejackets and life rafts are onboard and in correct stowage places.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 1 October 2017
Resolved 15 September 2017
Resolution: Verified every crewmember onboard had life jackets and that all life rafts were onboard and stowed properly.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 24 February 2017
Resolved
Have the CO2 system for the Emergency Diesel Generator serviced to refill/replace the CO2 bottles that were accidentally discharged.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 March 2017
Resolved 24 February 2017
Resolution: Received an email from the Cheif Engineer with a receipt from Harris Fire Protection Co., Inc. showing that they had 2 new CO2 bottles and hoses installed for the CO2 system for the Emergency Diesel Generator Room.
Engineering › Lubricating Oil Service System › Cooler
Issued 8 April 2016
Resolved
#2 SSTG lube oil cooler ruptured while onboard. Make proper repairs to and prover proper operation of #2 SSTG
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2016
Resolution: ABS attended and attested to satisfactory operation. All sat
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 8 April 2016
Resolved
Establish at least a 3 watch system for both deck and engine departments
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 April 2016
Resolution: Master provided a satisfactory 3 watch schedule. All sat
Lifesaving › Lifebuoys › Serviceable
Issued 19 August 2015
Resolved
Repair/replace life ring buoys as discussed (waterlight on stbd quarter, replace 02 light buoys on stbd side, restencil ring buoys throughout, life line on stbd lifeboat deck).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 September 2015
Resolved 20 August 2015
Resolution: Repaired, replaced, and restenciled ring buoys, life lines, and replaced life light batteries as necessary.
Construction/Loadline › Structures › Door
Issued 19 August 2015
Resolved
Replace light bulbs for visual indicator lights on navigation bridge for Aux Machinery Room WTD, Shaft Alley WTD, and Stbd Steering Gear pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 September 2015
Resolved 20 August 2015
Resolution: All inidcator lights were replaced.
Lifesaving › Rescue Boat Equipment › Electric Torch
Issued 19 August 2015
Resolved
Replace batteries in starboard lifeboat flashlight.
Action required: 705 - Other - as specified
Due 19 September 2015
Resolved 20 August 2015
Resolution: Replaced batteries in the flashlight.
Electrical › Lighting (service) › Lighting Fixture
Issued 19 August 2015
Resolved
Repair/replace lighting (including emergency lighting) in hospital space.
Action required: 705 - Other - as specified
Due 19 September 2015
Resolved 20 August 2015
Resolution: Repaired and replaced lighting in hospital space.
Fire Fighting › Grease Extraction Hood › General
Issued 19 August 2015
Resolved
Clean grease in galley around and above griddles and deep fat fryer.
Action required: 705 - Other - as specified
Due 19 September 2015
Resolved 20 August 2015
Resolution: The grease was cleaned and removed from hoods and deck.
Fire Fighting › Structural - B Class Divisions › Corridors
Issued 19 August 2015
Resolved
Make proper electrical installation for penetration in Class B bulkhead on main deck athwartship's passageway.
Action required: 705 - Other - as specified
Due 20 September 2015
Resolved 8 April 2016
Resolution: Penetration to Class B bulkhead all sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 August 2015
Resolved
Make permanent electrical installation by water fountain on maindeck.
Action required: 705 - Other - as specified
Due 19 September 2015
Resolved 20 August 2015
Resolution: Removed improper electrical installation and surge protector.
Operations/Management › Drills/Instruction › Not Conducted
Issued 19 August 2015
Resolved
Prior to sailing after activation, conduct fire and abondonship drill.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 September 2015
Resolved 8 April 2016
Resolution: Conducted fire and abandon ship drill. All sat
Personnel › Certificates/Documents/Licenses › License, Master
Issued 19 August 2015
Resolved
Prior to sailing after activation, provide officer and crew licenses to meet minimum safe manning.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 September 2015
Resolved 8 April 2016
Resolution: All officers and crew licenses checked. Vessel meets MSM
Navigation › Piloting/Steering › Marine Charts
Issued 19 August 2015
Resolved
Prior to sailing after activation, provided updated charts and navigation publications.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 September 2015
Resolved 8 April 2016
Resolution: Updated charts and nav pubs are onboard.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 19 August 2015
Resolved
Prior to sailing after activation, provide fully stocked medicine chest.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 September 2015
Resolved 8 April 2016
Resolution: Medicine chest is stocked. All sat
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 11 March 2009
Resolved
The vessel received upgrades to the boiler automation. For the most part the automation had very little changes. Two noticed were 1) bridge alarms originally listed on approved procedures but now longer exist 2) the ready light operation post purge sequence. Ship's crew to review procedures for any other changes and make all necessary upgrades.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 30 April 2009
Resolution: All changes made by pen and ink via the Chief Engineer verified by CG and ABS.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 11 March 2009
Resolved
The ff Co2 hose reel just immediately aft of the main control in the engine room has a dry rotted and cracked hose. Vessel personnel to replace hose during upcoming annual ff servicing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 30 April 2009
Resolution: New hose was installed.
Engineering › Fuel Oil Service System › Piping
Issued 11 March 2009
Resolved
The diesel fuel piping in cargo hold #3 aft has two soft patches due to corrosion from water. Ship crew is going to contract repair facility to make permanent repairs.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 May 2009
Resolved 31 May 2009
Resolution: New piping was installed as planned.
Engineering › Diesel Engine (auxiliary) › Valve Actuating Gear
Issued 11 March 2009
Resolved
The hydraulic acutating valve on emergency generator leaks hydraulic fluid exclusively. The valve was replaced 8 months ago but needs to be replaced again.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 April 2009
Resolved 30 April 2009
Resolution: New actuating valve was installed.
Operations/Management › Drills/Instruction › Fire
Issued 11 March 2009
Resolved
Prior to departure/upon recall status complete fire and abandon ships drills to the satisfaction of the attending MI.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 January 2010
Resolution: Sat drills were completed with entire crew that has reported for activation.
Personnel › Certificates/Documents/Licenses › License, Master
Issued 11 March 2009
Resolved
Prior to getting underway provide proof of original license and documents for crew members joining the vessel to the satisfaction of the attending MI
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 January 2010
Resolution: All crew licenses and twics were checked and found sat .
Stability › Watertight Integrity › General
Issued 11 March 2009
Resolved
All of the hydraulic WTD in the enginerrom did not operate as designed. Many of the position indicators could not be read from the bridge (place of closing). regular PMS was not being conducted as prescribed. The lower aux door did not even fully close with the hand pump resovior being empty. Please check operation every year.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 March 2009
Resolved 31 March 2009
Resolution: PMS was completed and the wtd''s operate as they are suppose to.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 4 June 2008
Resolved
Make repairs and prove proper operation of all self closing fire doors in the MVZ and for all two deck penetrations. Remove all hold backs from fire doors.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Fire doors operating properly.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 4 June 2008
Resolved
Deckline is to be painted white or yellow.
Due 4 June 2008
Resolved 4 June 2008
Resolution: painted white
Construction/Loadline › Markings › Load Line Mark
Issued 4 June 2008
Resolved
Seasonal marks for the load line are to be permently marked to conform with the load line certificate.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Corrected.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 4 June 2008
Resolved
Make repairs to make weathertight hatch covers; 5P, 5C, 6S, 3P, and 1C.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Gaskets replaced and satisfactory water test performed by ships crew.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 4 June 2008
Resolved
Hydralic rams in hatch covers 2 port and 3 port forward are leaking, clean oil, make repairs and prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Hydralic rams repaired and satisfactory operational test performed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 4 June 2008
Resolved
Electrical communication boxes in hold 3 port (ro-ro deck) found broken with exposed electronics, remove or make repairs.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 September 2008
Resolved 16 March 2009
Resolution: Communication boxes were fixed and all wiring is no longer exposed.
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 4 June 2008
Resolved
Certificate of Voluntary Compliance for SOLAS safety equipment (form e) only lists two lifeboat radios, make correction.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 30 July 2008
Resolution: New form E issued by ABS
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 4 June 2008
Resolved
Certificate of Voluntary Complience for SOLAS safety equipment (form E) does not reflect the type of secondary radar fitted on board (3cm or 10cm) Class to correct.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 30 July 2008
Resolution: New form E issued by ABS
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 4 June 2008
Resolved
USCG approval letter for non-tank vessel response plan has expired. submit plan and reciev dated approval.
Due 4 June 2008
Resolved 4 June 2008
Resolution: new approval letter provided.
Documentation › Certificates/Documents › IOPP Certificate
Issued 4 June 2008
Resolved
Supplement to IOPP (form A) found not signed by issuing authority, Class to sign as original.
Due 4 June 2008
Resolved 4 June 2008
Resolution: Class signed.
Engineering › Diesel Engine (auxiliary) › Crankcase
Issued 4 June 2008
Resolved
Emergency diesel generator found to have oil leak at filter, make repairs and show proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: leake repaired
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 4 June 2008
Resolved
Cargo hold heat detection system on bridge shows fault, not showing locality or zone. Make repairs and show proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: All faults cleared by Harris ire Co.
Fire Fighting › Means of Escape › Doorways
Issued 4 June 2008
Resolved
Kick-out door from the CO2 room found inoperative, make repairs and show proper operation.
Due 4 June 2008
Resolved 4 June 2008
Resolution: Repairs completed.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 4 June 2008
Resolved
Emerengcy fire pump (aft) found leaking at the gland. Make repairs and show proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Gland leak repaired.
Construction/Loadline › Structures › Superstructure
Issued 4 June 2008
Resolved
Bulkhead to fan room, port side aft found holed and wasted exposed to weather deck and internall to stair tower. Make repairs and prove weather tight integrity.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Repaired and tested, sat.
Construction/Loadline › Structures › Door
Issued 4 June 2008
Resolved
Watertight hatch from Ro-Ro deck to AMR missing securing device (dog) stbd side. replace as original.
Due 4 June 2008
Resolved 4 June 2008
Resolution: replaced.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 4 June 2008
Resolved
Properly mark the stowage locations of the emersion suits and life jackets in the engine room.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Marked.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 4 June 2008
Resolved
HFO crossover line for #3 deep tanks found leaking at valve port side. stop leakage and repair as original.
Action required: 705 - Other - as specified
Due 1 September 2008
Resolved 21 November 2008
Resolution: Valve repaired.
Fire Fighting › Semiportable CO2 Fire Extinguishers › Service
Issued 4 June 2008
Resolved
Provide servicing reports from an approved servicing facility for all portable, semi-portable and fixed fire systems on board.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 20 June 2008
Resolution: Service report provided.
Lifesaving › Launching Appliances › Davit
Issued 4 June 2008
Resolved
Prepare all on deck life saving appliances for USCG inspection, to include life rings, life rafts, and life boats.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 July 2008
Resolved 12 July 2008
Resolution: Inspected and corrected.
Operations/Management › Drills/Instruction › Not Conducted
Issued 13 July 2007
Resolved
Upon recall and prior to departure, complete to the satisfaction of attending marine inspector; satisfactory fire, abandon ship and security drills
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2008
Resolution: Completed satisfactory fire, abandon ship and security drills.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 13 July 2007
Resolved
Prior to getting underway, provide proof of and post license & documentation on board for applicable assigned crew IAW vessel COI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2008
Resolution: Examined all license and documentation all found correct order. All documents were posted as required.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 13 July 2007
Resolved
Demonstrate the proper operation of the Oil water separator prior to getting underway.
At time of inspection the slop and storage tanks were pumped down to shore facility and bilges were clean. Not enough waste stored to operate OWS as per operating instructions.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 October 2007
Resolution: OWS operationtested in presence of attending CG marine Inspector satisfactory.
Construction/Loadline › Structures › Cofferdam
Issued 13 July 2007
Resolved
Provide repair proposal for approval to correct pitting in way of #1 reserve F/O tank top / cofferdam aft of frame 40 .
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 January 2008
Resolved 14 November 2007
Resolution: satisfactory weld repair using ABS mill spec steel plate. Air test witnessed by ABS and CG.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 13 July 2007
Resolved
Provide repair proposal for approval to correct current condition in way of the port and starboard dogs for fwd cargo hatch where the dog mechanisms were removed to accommodate freezer box containers that were brought on board to accommodate troop deployment. With these boxes in place the dogs would not operate as per intended operation.
Action required: 705 - Other - as specified
Due 2 January 2008
Resolved 30 July 2008
Resolution: New dogs installed.
Lifesaving › Lifebuoys › Immediately Available
Issued 13 July 2007
Resolved
Prior to getting underway re-install all Lifesaving Equipment IAW, COI allowance.
Equipment is stored while at the pier to prevent weathering
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2008
Resolution: Inspected and found all life saving equipment stored on board ship in appropriate locations.
Lifesaving › Lifeboat Equipment › Radio (fixed two-way VHF radio-telephone)
Issued 13 July 2007
Resolved
Provide 1 approved Lifeboat Radio.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 August 2007
Resolution: New radio ordered, received on board.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 13 July 2007
Resolved
Provide three life preservers to replace three failed preservers found during annual exam.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 October 2007
Resolution: Three new lifejackets provided and inspected by attending CG marine Inspector sat.
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 6 May 2005
Resolved
Prove proper operation of all steam related items as deemed necessary by attending CG Marine Inspector prior to activation of vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 September 2005
Operations/Management › Drills/Instruction › Not Conducted
Issued 6 May 2005
Resolved
Conduct proper fire and abandon ship drills with full crew prior to activation of vessel in the presence of attending CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 September 2005
Electrical › Electric Generation Source (emergency)
Issued 25 June 2002
Resolved
PROVE PROPER OPERATION OF REVERSE POWER RELAY ON # 2 SSTG.
Condition: Unknown
Action required: 705 - Other - as specified
Due 2 October 2002
Resolved 10 October 2002
Resolution: Replaced reverse power relay on #2 SSTG. Conducted full operational test. Test Sat.
Operations/Management › Drills/Instruction
Issued 16 July 2001
Resolved
Conduct fire and abandon ship drills upon vessel activation. LEGACY COMPONENT DESC: Safety Orientation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 August 2002
Resolution: Conducted proper fire and abandon ship drills to the satisfaction of the attending Marine Inspector.
Fire Fighting
Issued 13 April 1999
Resolved
MAKE PERMANENT REPAIRS TO GAYLORD HOOD DAMPERS IN CREW'S GALLEY.
Condition: Unknown
Due 4 October 1999
Resolved 4 October 1999
Lifesaving
Issued 13 April 1999
Resolved
CONDUCT FIRE AND ABANDONSHIP DRILLS AND CONDUCT WORKING INSPECTION OF PORT AND STBD LIFEBOAT DAVIT, BRAKE, AND RELEASE SYSTEMS.
Condition: Unknown
Due 13 April 1999
Resolved 13 April 1999
Lifesaving
Issued 18 March 1997
Resolved
CONDUCT FIRE AND BOAT DRILL PRIOR TO GETTING UNDERWAY
Condition: Unknown
Due 18 March 1997
Resolved 18 March 1997
Lifesaving
Issued 18 March 1997
Resolved
TEST TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR, THE GAS DETECTION SYSTEM.
Condition: Unknown
Due 18 March 1997
Resolved 18 March 1997
Navigation
Issued 18 March 1997
Resolved
ENSURE CURRENT PUBS AND CHARTS ARE ONBOARD PRIOR TO GETTING UNDERWAY_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 March 1997
Resolved 18 March 1997
Lifesaving
Issued 18 March 1997
Resolved
PROPERLY STENCIL THE SAMPLE LINES WITHIN THE SMOKE DETECTION CABINET PRIOR TO GETTING UNDERWAY_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 March 1997
Resolved 18 March 1997
Electrical
Issued 18 March 1997
Resolved
TEST TO THE SATISFACTION OF THE ATTENDINGMARINE INSPECTOR, THE REVERSE CURRENT RELAY FOR #2 SSTG PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 18 March 1997
Resolved 18 March 1997
Engineering
Issued 18 March 1997
Resolved
SHOW PROPER OPERATION OF THE APEX ALARM SUMMARY SYSTEM PRIOR TO GETTING UNDERWAY_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 18 March 1997
Resolved 18 March 1997
Electrical
Issued 25 May 1995
Resolved
MAKE PERMANENT REPAIRS TO THE BRIDGE CONSOLE INDICATOR/OPERATING LIGHTS (VENT CONTROLS/RUNNING LIGHTS)
Condition: Unknown
Due 25 May 1996
Resolved 25 April 1996
Electrical
Issued 25 May 1995
Resolved
WIRE SHAFT ALLEY FIRE PUMP TO THE EMERGENCY SWITCHBOARD
Condition: Unknown
Due 25 May 1996
Resolved 22 September 1995
Electrical
Issued 25 May 1995
Resolved
INSTALL ADDITIONAL EMERGENCY LIGHTS IN THE UPPER CO2 ROOM.
Condition: Unknown
Due 25 May 1996
Resolved 22 September 1995
Electrical
Issued 25 May 1995
Resolved
MAKE PERMANENT REPAIRS TO INOP ALARMS/LIGHTS ON THE ENGINE ROOM CONSOLE.
Condition: Unknown
Due 25 May 1996
Resolved 25 April 1996
Lifesaving
Issued 25 May 1995
Resolved
CONDUST FIRE/BOAT AND EXPOSURE SUIT DRILL WITH FULL CREW COMPLIMENT PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 25 May 1996
Resolved 25 April 1996
Engineering
Issued 26 April 1994
Resolved
Remove all port and starboard boiler mountings and open for inspection unpon return to Baltimore from scheduled deployment on or about 16 MAY 94. Inspection must be completed prior to getting underway subsequent to the scheduled deployment.
Condition: Unknown
Due 26 April 1994
Resolved 26 April 1994
Lifesaving
Issued 26 April 1994
Resolved
Reroute P&S Emer. Esc.'s fm AMS(Ex #6 hold), to prevent entrapment of pers.in container cell guides of #6 'tween deck. Install emer. lights to aid escape. Powerize & provide remote oper. from ER & AMS water tight doors between spaces. Stencile Imm. door to #6 tween dk "To be kept closed at sea
Condition: Unknown
Due 26 April 1994
Resolved 26 April 1994
Fire Fighting
Issued 26 April 1994
Resolved
Install means to indicate open/closed condition of the fwd DFM pumproom door, remotely at main deck CO2 release station for this space. Also, all electrical equipment in the DFM pumproom shall be converted/replaced with explosion proof or intrinsically safe fixtures, panels, motors, etc.
Condition: Unknown
Due 26 April 1994
Resolved 26 April 1994
Engineering
Issued 26 April 1994
Resolved
Submit a revised boiler automation test procedure I.A.W. NVIC 1-69 which indicates all the features fo the port and starboard boiler burner management syste, prior to the vessels next deploymnet.
Condition: Unknown
Due 26 April 1994
Resolved 26 April 1994
Engineering
Issued 30 March 1993
Resolved
SUBMIT TO THE LOCAL OCMI FOR APPROVAL, A REVISED AUTOMATION TEST PROCEDURE_x001C_REFLECTING ALL CHANGES MADE TO THE SYSTEM.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Engineering
Issued 30 March 1993
Resolved
REMOVE DOUBLER AND MAKE PERMANENT REPAIRS TO THE STBD FUEL OIL SETTLER TANKIN WAY OF THE FWD ENGINE ROOM BULKHEAD.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Engineering
Issued 30 March 1993
Resolved
PROVE PROPER OPERATION OF THE NEW NIREX DISTILLER.
Condition: Unknown
Due 31 July 1993
Resolved 7 April 1993
Documentation
Issued 30 March 1993
Resolved
SUBMIT TO THE LOCAL OCMI FOR APPROVAL, THREE REVISED, LEGIBLE, FIRE CONTROLPLANS.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Documentation
Issued 30 March 1993
Resolved
SUBMIT TO U.S. COAST GUARD MARINE SAFETY CENTER, PLANS REFLECTING THE ALTERATIONS MADE TO WATERTIGHT DOORS #6 AND #7 LOCATED ON THE RO-RO DECK.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Construction/Loadline
Issued 30 March 1993
Resolved
REPLACE THE TWO MISSING FAIRLEADS, ALSO MAKE PERMANENT REPAIRS TO THE PORT CORNER WHERE THE TRANSOM MEETS THE SIDE SHELL APROX. 20 FEET ABOVE THE WATERLINE. REMOVE THE DOUBLER ON THE MAIN DECK AFT PORT CORNER AND MAKE PERMANENT REPAIRS.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Lifesaving
Issued 30 March 1993
Resolved
REPAIR OR REMOVE THE GAS DETECTION SYSTEM.
Condition: Unknown
Due 30 March 1993
Resolved 30 March 1993
Deck/Cargo
Issued 6 September 1991
Resolved
RENEW MISSING DOG AND BROKEN SPRING ON STAIRWELL HATCH LEADING FROM VEHICALDECK TO AMR.
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Deck/Cargo
Issued 6 September 1991
Resolved
RENEW THREE MISSING DOG PADS ON THE VEHICAL DECK DOORS.
Condition: Unknown
Due 6 September 1991
Resolved 6 September 1991
Accommodation/Occupational Safety
Issued 20 August 1990
Resolved
PROVIDE VALVE WHEEL HANDLES AS NEEDED ON LOWER LEVEL OF ENGINE ROOM.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Electrical
Issued 20 August 1990
Resolved
PROVIDE A BULB FOR THE AUXILIARY DIESEL GENERATOR ALARM BEACON.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Electrical
Issued 20 August 1990
Resolved
PROVIDE AUDIBLE ALARM FOR THE AUXILIARY DIESEL GENERATOR.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Fire Fighting
Issued 20 August 1990
Resolved
PROVIDE A RELIEF VALVE LIMITING FIRE MAIN PRESSURE FROM MAIN FIRE PUMP TO 125 PSI PRIOR TO USE.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Electrical
Issued 20 August 1990
Resolved
MAKE PERMANENT REPAIRS TO CARBON MONOXIDE/HYDROGEN/COMBUSTIBLE GAS MONITOR IN ZONES 2 AND 7.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Navigation
Issued 20 August 1990
Resolved
PROVIDE MOST RECENT COPY OF DEVIATION TABLE UPON COMPLETION OF SWINGING OF VESSEL.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Electrical
Issued 20 August 1990
Resolved
PROVIDE WIRING DIAGRAMS FOR ALL MOTOR CONTROLLERS.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Construction/Loadline
Issued 20 August 1990
Resolved
PROVIDE A LATCH FOR THE ESCAPE HATCH FROM THE SHAFT ALLEY.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Engineering
Issued 20 August 1990
Resolved
MAKE PERMANENT REPAIRS TO 12"AUXILIARY CONDENSER INLET LINE NEAR FRAME 130 ON THE STRARBOARD SIDE MIDDLE ENGINE ROOM LEVEL.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Engineering
Issued 20 August 1990
Resolved
MAKE PERMANENT REPAIRS TO PORT BOILER BOTTOM BLOW SPOOL PIECE LINE.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Electrical
Issued 20 August 1990
Resolved
MAKE PERMANENT REPAIRS TO THE EMERGENCY GENERATOR FAILURE ALARM ON THE MAIN ENGINEERING CONSOLE.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Electrical
Issued 20 August 1990
Resolved
REPAIR AND OR RELAMP LIGHTING AS NECESSARY THROUGHOUT VESSEL.
Condition: Unknown
Due 20 August 1990
Resolved 20 August 1990
Accommodation/Occupational Safety
Issued 17 January 1989
Resolved
PROVIDE PLANS FOR ANSUL R-102 GALLEY CO2 SYSTEM.
Condition: Unknown
Due 17 January 1989
Resolved 17 January 1989
Lifesaving
Issued 25 May 1988
Resolved
TEST RUN MOTOR LIFEBOAT IN WATER. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Lifesaving
Issued 25 May 1988
Resolved
TEST HAND PROPELLED LIFEBOAT. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Lifesaving
Issued 25 May 1988
Resolved
PROPERLY STOW LIFESAVING EQUIPMENT. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Lifesaving
Issued 25 May 1988
Resolved
TEST GENERAL ALARM SYSTEM. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Lifesaving
Issued 25 May 1988
Resolved
PROVIDE EPIRB. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Accommodation/Occupational Safety
Issued 25 May 1988
Resolved
TEST ALL VENTILATION FANS INCLUDING REMOTE SHUTDOWN. TO BE COMPLETED PRIORTO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Navigation
Issued 25 May 1988
Resolved
CONDUCT STEERING GEAR TEST. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Navigation
Issued 25 May 1988
Resolved
PROVE OPERATION OF ALL NAVIGATION AND ELECTRONIC EQUIPMENT. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Lifesaving
Issued 25 May 1988
Resolved
PROVIDE DISTRESS FLARES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Lifesaving
Issued 25 May 1988
Resolved
OPERATE LIFEBOAT DAVITS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Construction/Loadline
Issued 25 May 1988
Resolved
TEST SEA SUCTIONS AND OVERBOARD DISCHARGES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Fire Fighting
Issued 25 May 1988
Resolved
TEST OPERATE FIREPUMPS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Accommodation/Occupational Safety
Issued 25 May 1988
Resolved
TEST OPERATE WATERTIGHT DOORS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Electrical
Issued 25 May 1988
Resolved
TEST S/S GENERATORS AND SAFETY DEVICES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Lifesaving
Issued 25 May 1988
Resolved
TEST LIFEBOAT WINCHES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Navigation
Issued 25 May 1988
Resolved
TEST INTERNAL COMMUNICATION. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Accommodation/Occupational Safety
Issued 25 May 1988
Resolved
TEST VENTILATION SYSTEM AND EMERGENCY SHUTDOWN. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Unknown
Issued 25 May 1988
Resolved
TEST EVAPORATOR. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Engineering
Issued 25 May 1988
Resolved
TEST LUBE OIL SYSTEM. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Accommodation/Occupational Safety
Issued 25 May 1988
Resolved
TEST SANITARY SYSTEM. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Accommodation/Occupational Safety
Issued 25 May 1988
Resolved
TEST FRESH WATER SYSTEM. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Navigation
Issued 25 May 1988
Resolved
TEST STEERING GEAR SYSTEM. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Deck/Cargo
Issued 25 May 1988
Resolved
TEST DECK MACHINERY. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Engineering
Issued 25 May 1988
Resolved
TEST BOILER SAFETY VALVES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Accommodation/Occupational Safety
Issued 25 May 1988
Resolved
PROVIDE APPROVED PILOT LADDER. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Documentation
Issued 25 May 1988
Resolved
PROVIDE ALL CERTIFICATES INCLUDING FCC, CARGO GEAR, AND INTERNATIONAL CERTIFICATES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Construction/Loadline
Issued 25 May 1988
Resolved
TEST OPERATION AND WATERTIGHTNESS OF DECK HATCHES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Fire Fighting
Issued 25 May 1988
Resolved
CONDUCT FIRE, BOAT AND EXPOSURE SUIT DRILL. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Navigation
Issued 25 May 1988
Resolved
PROVE OPERATION OF NAVIGATION LIGHT FAILURE ALARMS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Construction/Loadline
Issued 25 May 1988
Resolved
OPERATE ALL WATERTIGHT DOORS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Deck/Cargo
Issued 25 May 1988
Resolved
TEST VALVES AND CONTROLS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Construction/Loadline
Issued 25 May 1988
Resolved
TEST WATERTIGHTNESS OF HULL OPENINGS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Engineering
Issued 25 May 1988
Resolved
TEST SAFETY DEVICES FOR PROPULSION MACHINERY. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Engineering
Issued 25 May 1988
Resolved
TEST FORCED DRAFT BLOWERS AND EMERGENCY SHUTDOWN. TO BE COMPLETED PRIOR TOACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Engineering
Issued 25 May 1988
Resolved
TEST OPERATE FUEL PUMPS AND ASSOCIATED PIPING AND EMERGENCY SHUTDOWN. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Deck/Cargo
Issued 25 May 1988
Resolved
TEST OPERATE FEED PUMPS AND ASSOCIATED PIPING. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Engineering
Issued 25 May 1988
Resolved
TEST BOILER AUTOMATION SYSTEM. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Deck/Cargo
Issued 25 May 1988
Resolved
TEST PRESSURE VESSEL RELIEF VALVES. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Deck/Cargo
Issued 25 May 1988
Resolved
TEST OPERATE BILGE AND BALLAST PUMPS AND ASSOCIATED PIPING. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Deck/Cargo
Issued 25 May 1988
Resolved
TEST AIR CONDITIONING AND REEFER EQUIPMENT. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Unknown
Issued 25 May 1988
Resolved
TEST COMPRESSED AIR SYSTEM. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 25 May 1988
Resolved 25 May 1988
Construction/Loadline
Issued 10 April 1988
Resolved
PROVIDE DOGGING IRONS (WRENCHES) THAT FIT ALL OF THE WATER TIGHT DOORS, ACCESS HATCHES, PLENUM SCUTTLES, ETC.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Fire Fighting
Issued 10 April 1988
Resolved
REPAIR FIREMAIN STRAINER VALVE WHERE LEAKING. SUBJECT STRAINER LOCATED ON THE PORT SIDE UPPER TROOP COMPARTMENT.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Construction/Loadline
Issued 10 April 1988
Resolved
PROVE OPERATION OF ALL CARGO HATCHES PRIOR TO DEPARTURE OF MOOREHEAD CITY, NORTH CAROLINA.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Construction/Loadline
Issued 10 April 1988
Resolved
HOSE TEST THE HATCHES FOR THE #6, PORT, CENTER AND STARBOARD CARGO HOLDS PRIOR TO DEPARTURE OF MOOREHEAD CITY, NORTH CAROLINA.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Construction/Loadline
Issued 10 April 1988
Resolved
PROVIDE LOWER DOGGING PLATES AND 2 BOLTS FOR THE DOGGING PLATES FOR THE WATER TIGHT DOORS (2ND DECK) AT HOLD #6/ENGINE ROOM AND HOLD #7/ENGINE ROOM.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Electrical
Issued 10 April 1988
Resolved
DEMONSTRATE THE REMOTE SHUTDOWN FOR THE AUXILIARY GENERATOR DIESEL UNIT THAT IS LOCATED AT THE MACHINERY SPACE OPERATING CONSOLE.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Electrical
Issued 10 April 1988
Resolved
CLEAR ALL ELECTRICAL GROUNDS FROM THE MAIN AND EMERGENCY GENERATOR SWITCHBOARDS.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Fire Fighting
Issued 10 April 1988
Resolved
PROVIDE SECURING RACK FOR THE #26 FIRE EXTINGUISHER.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Electrical
Issued 10 April 1988
Resolved
SECURE PROPERLY THE ELECTRICAL WIRING WHICH IS HANGING DOWN IN WAY OF THE CABLE RACK LOCATED ON THE PORT SIDE STAIR TOWER BETWEEN #4/5 HOLD.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Engineering
Issued 10 April 1988
Resolved
DEMONSTRATE THE AUTOMATED BRIDGE CONTROLS FOR THE MAIN PROPULSION ENGINE THROTTLE AND DIRECTION. UNTIL THIS IS PROPERLY DEMONSTRATED THE MACHINERY SPACE IS TO BE FULLY MANNED. ENGINEER ON WATCH, OILER AND FIRE/WATERTENDERWHILE UNDERWAY.
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Lifesaving
Issued 10 April 1988
Resolved
MARK ALL LIFESAVING/FIREFIGHTING EQUIPMENT WITH THE VESSELS PROPER NAME WRIGHT VICE USNS WRIGHT (OBLITERATE USNS).
Condition: Unknown
Due 10 April 1988
Resolved 10 April 1988
Navigation
Issued 8 May 1987
Resolved
PROVIDE EPIRB PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Fire Fighting
Issued 8 May 1987
Resolved
TEST CO2 ALARMS AND SHUTDOWNS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Fire Fighting
Issued 8 May 1987
Resolved
TEST GENERAL ALARM SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Accommodation/Occupational Safety
Issued 8 May 1987
Resolved
TEST VENTILATION SYSTEM AND EMERGENCY SHUTDOWN PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Fire Fighting
Issued 8 May 1987
Resolved
TEST OPERATE FIREPUMPS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987
Resolved
TEST OPERATE WATERTIGHT DOORS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987
Resolved
TEST SEA SUCTIONS AND OVERBOARD DISCHARGES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
CONDUCT FIRE, BOAT AND EXPOSURE SUIT DRILL PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Documentation
Issued 8 May 1987
Resolved
PROVIDE ALL FORMS, NOTICES AND PUBLICATIONS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987
Resolved
PROVIDE APPROVED PILOT LADDER PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Fire Fighting
Issued 8 May 1987
Resolved
PROVIDE SERVICING REPORT FOR GAS INDICATOR SYSTEM FOR VEHICLE SPACE PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Documentation
Issued 8 May 1987
Resolved
PROVIDE ALL CERTIFICATES INCLUDING FCC, CARGO GEAR, CERTIFICATE OF FINANCIAL RESPONSIBILITY AND INTERNATIONAL CERTIFICATES PRIOR TO ACTIVATION
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST SAFETY DEVICES FOR PROPULSION MACHINERY PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST FORCED DRAFT BLOWERS AND EMERGENCY SHUTDOWN PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST BOILER SAFETY VALVES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Documentation
Issued 8 May 1987
Resolved
PROVIDE OIL TRANSFER PROCEDURES AS PER 33 CFR 155.720 PRIOR TO ANY BUNKERING OPERATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Documentation
Issued 8 May 1987
Resolved
PROVIDE OIL DISCHARGE PLACARD PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Documentation
Issued 8 May 1987
Resolved
PROVIDE OIL RECORD BOOK PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Documentation
Issued 8 May 1987
Resolved
MARK VESSEL IN ACCORDANCE WITH 46 CFR 67.15. VESSEL NAME IMPROPERLY MARKEDAS US NAVAL SHIP WRIGHT.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Deck/Cargo
Issued 8 May 1987
Resolved
TEST DECK MACHINERY PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Electrical
Issued 8 May 1987
Resolved
TEST S/S GENERATORS AND SAFETY DEVICES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
TEST LIFEBOAT WINCHES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Electrical
Issued 8 May 1987
Resolved
TEST INTERNAL COMMUNICATION PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Accommodation/Occupational Safety
Issued 8 May 1987
Resolved
TEST ALL VENTILATION FANS INCLUDING REMOTE SHUTDOWN PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Navigation
Issued 8 May 1987
Resolved
CONDUCT STEERING GEAR TEST PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Navigation
Issued 8 May 1987
Resolved
PROVE OPERATION OF ALL NAVIGATION AND ELECTRONIC EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
PROVIDE DISTRESS FLARES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Navigation
Issued 8 May 1987
Resolved
PROVE OPERATION OF NAVIGATION LIGHT FAILURE ALARMS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Deck/Cargo
Issued 8 May 1987
Resolved
TEST OPERATE MOORING EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987
Resolved
OPERATE ALL WATERTIGHT DOORS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987
Resolved
TEST VALVES AND CONTROLS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Deck/Cargo
Issued 8 May 1987
Resolved
PROVE OPERATION OF CARGO HOLD BILGE SUCTIONS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987
Resolved
TEST WATERTIGHTNESS OF HULL OPENINGS PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Construction/Loadline
Issued 8 May 1987
Resolved
TEST OPERATION AND WATERTIGHTNESS OF DECK HATCHES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Accommodation/Occupational Safety
Issued 8 May 1987
Resolved
MAKE AVAILABLE FOR EXAMINATION ACCOMMODATION SPACES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST OPERATE FUEL PUMPS AND ASSOCIATED PIPING AND EMERGENCY SHUTDOWN PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST OPERATE FEED PUMPS AND ASSOCIATED PIPING PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST BOILER AUTOMATION SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST PRESSURE VESSEL RELIEF VALVES PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST OPERATE BILGE AND BALLAST PUMPS AND ASSOCIATED PIPING PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Accommodation/Occupational Safety
Issued 8 May 1987
Resolved
TEST AIR CONDITIONING AND REEFER EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Accommodation/Occupational Safety
Issued 8 May 1987
Resolved
TEST COMPRESSED AIR SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST EVAPORATOR PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Engineering
Issued 8 May 1987
Resolved
TEST LUBE OIL SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Accommodation/Occupational Safety
Issued 8 May 1987
Resolved
TEST SANITARY SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Accommodation/Occupational Safety
Issued 8 May 1987
Resolved
TEST FRESH WATER SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Navigation
Issued 8 May 1987
Resolved
TEST STEERING GEAR SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
PLACE ALL EQUIPMENT IN LIFEBOATS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
POST LAUNCHING INSTRUCTIONS FOR SKID MOUNTED LIFERAFTS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
POST VIKING RAFT INSTRUCTIONS FOR TWO VIKING RAFTS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
TEST RUN MOTOR LIFEBOAT IN WATER. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
TEST HAND PROPELLED LIFEBOAT. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
OPERATE LIFEBOAT DAVITS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
PROVIDE SURVIVAL SUITS FOR 371 PERSONS. TO BE COMPLETED PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Lifesaving
Issued 8 May 1987
Resolved
PROPERLY STOW LIFESAVING EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 8 May 1987
Resolved 8 May 1987
Navigation
Issued 9 June 1986
Resolved
PROVIDE A MEANS FOR ILLUMINATION OF THE SHIP'S MAGNETIC COMPASS AS REQ BY 33 CFR 164.35(B) TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR PRIOR TO 9JUL86.
Condition: Unknown
Due 9 June 1986
Resolved 9 June 1986
Navigation
Issued 14 May 1986
Resolved
RENEW/REPAIR MAGNETIC COMPASS AND PROVIDE AN ACCURATE DEVIATION TABLE FOR SAME. COMPASS SHOULD BE INSTALLED AND DEVIATION TABLE COMPILED PRIOR TO THEVESSEL'S DEPARTURE ENROUTE TO NORFOLK, VA.
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986
Documentation
Issued 14 May 1986
Resolved
PROVIDE CURRENT, VALID FCC CERTIFICATES FOR THE VESSEL'S COMMUNICATIONS EQUIPMENT ONCE OPERATIONAL CONTROL IS RETURNED TO MARAD FROM MSC. CERTIFICATES SHOULD BE OBTAINED AND POSTED ABOARD BY 14SEP86.
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986
Documentation
Issued 14 May 1986
Resolved
OBTAIN A VALID CERTIFICATE OF DOCUMENTATION FOR THE VESSEL.
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986
Electrical
Issued 14 May 1986
Resolved
DEMONSTRATE SAFE EFFICIENT OPERATION OF THE INSTALLED ELEVATOR UNIT.
Condition: Unknown
Due 14 May 1986
Resolved 14 May 1986