MAURY USCG vessel records
← All vessels

FORT INDEPENDENCE

Built
1984
Last inspected
20 July 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 20 July 2026
…with no type recorded7
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WBH3169
228988
Flag
UNITED STATES
Maury page id
psix-228988

Documentation record

Registered dimensions (L × B × D)89.9 ft × 32.0 ft × 9.0 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEASTERN MARINE INC · PANAMA CITY, FL, UNITED STATES · built 1984
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBOSTON, MA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 6 August 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 31 inspections, each with its date, unit and type; 28 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 31

20 July 2026 Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8442475
23 May 2025 In-Service Inspection · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8142414
14 April 2025 Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8109000
25 March 2025 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8093107
6 July 2024 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7952455
3 July 2024 Deficiency Check · Annual Inspection · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7943362
26 September 2023 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7798551
20 June 2023 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7715032
30 May 2023 In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7689479
1 March 2023 Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7640366
30 September 2022 In-Service Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7562022
26 August 2022 Deficiency Check · Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7543800
25 August 2022 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7543852
21 April 2022 COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7426285
8 October 2021 In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7328283
10 June 2021 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7220533
3 February 2021 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7135027
20 July 2020 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7005339
24 October 2019 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6840952
11 July 2019 MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6744896
7 January 2019 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6606257
12 September 2018 Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6538807
12 June 2018 MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6442417
6 May 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6407070
6 May 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6407181
5 May 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6406503
28 April 2017 MTSA Verification · Hull Examination · COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6133850
7 March 2017 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6100215
6 December 2016 Construction Oversight
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6053549
10 July 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5935425
10 July 2016 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5935463

Deficiency record · 28

02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 July 2026 Resolved
An emergency switch must be provided in the normally ungrounded main supply conductor from a battery. The switch must be accessible and located as close to the battery as practicable. Port battery switch suffered a catastrophic failure and caught fire. Replace switch prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 July 2026
Resolution: New battery switch installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 July 2026 Resolved
The minimum number of portable fire extinguishers required on a vessel must be acceptable to the cognizant OCMI, but must be not less than the minimum number required by table 1 to § 118.500(b). Crew discharged 03 portable extinguishers during a fire casualty. Replace the extinguishers prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 July 2026
Resolution: New extinguishers installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 May 2025 Resolved
All machinery must be maintained in such a manner as to afford adequate protection against machinery failure. While operating, the vessel experienced a loss of propulsion on the starboard engine. Affect repairs to the satisfaction of the attending marin inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 May 2025
Resolution: Operator attested to satisfactory repairs and determination of causative factor.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 March 2025 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, and other persons, and the vessel, from electrical hazards, including fire, caused by or originating in electrical equipment. The starboard generator had oil pooling and dust accumulation around the air supply intake adjacent to the windings. Clean both the starboard and port generator windings and casings of oil and debris to the satisfaction of the attending marine inspector. 46 CFR 120.200(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 17 April 2025
Resolution: cleaned
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 March 2025 Resolved
Electrical equipment on a vessel must be installed and maintained to protect... from electrical hazards, including fire. The port aft light fixture was deemed unsafe due to the fixture smoking upon installation of light bulb. Repair lighting fixture to the satisfaction of the attending marine inspector. 46 CFR 120.200(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 3 April 2025
Resolution: Lighting fixture fixed to remove associated fire risk.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 March 2025 Resolved
Waste receptacles must be constructed of non-combustible materials with no openings in the sides or bottom. The port side bathrooms had three combustible trash receptacles. Replace trash receptacles to the satisfaction of the attending marine inspector. 46 CFR 116.405(i)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 17 April 2025
Resolution: replaced
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 25 March 2025 Resolved
Each window... must be capable of withstanding the maximum load from wave and wind conditions expected. The port window aft of the passenger embarkation doorway was cracked. Replace window to the satisfaction of the attending marine inspector. 46 CFR 116.1020
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 17 April 2025
Resolution: repaired
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 March 2025 Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. The bulkhead penetration for the bilge sensor wire in the lazarette was not made watertight. Make watertight to the satisfaction of the attending marine inspector. 46 CFR 171.114(a)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 3 April 2025
Resolution: Bulkhead penetration was made watertight.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 March 2025 Resolved
Receptacle outlets of the type providing a grounded pole or a specific direct current polarity must be of a configuration that will not permit improper connection. The starboard-most GFCI outlet in the galley is not functioning properly. Repair to the satisfaction of the attending marine inspector. 46 CFR 120.220(c)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 17 April 2025
Resolution: repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 July 2024 Resolved
The owner, managing operator, or master shall report damage to a boiler, unfired pressure vessel, or machinery that renders further use of the item unsafe until repairs are made, to the OCMI at the port in which the casualty occurred or nearest the port of first arrival, as soon as practicable after the damage occurs. The vessel experienced a failure of the starboard main diesel engine's gear shift control cable. As instructed, the vessel shall proceed from Long Wharf to the BHC maintenance facility at Mystic Pier Marina to effect repairs. At all times during the transit, an engineer shall be stationed in the engine room to assume local control of clutch in/out and throttle controls of the port main diesel engine in the event of a similar failure to that engine. The operator of the vessel shall demonstrate satisfactory operation of the vessel's gear shift and throttle controls to the attending marine inspector upon completion of repairs. 46 CFR 185.208
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 July 2024
Resolution: MI attended vessel, verified completed repair of Clutch In/Out cable, and witnessed functioning operation of STBD MDE.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 3 July 2024 Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gage. The fire pump was missing a pressure gage at the outlet, must install. 46 CFR 181.10-1(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 July 2024
Resolved 22 July 2024
Resolution: Verified new gauge was installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 July 2024 Resolved
Installation of diesel engine exhaust pipe shall be in accordance with 182.15-20. #2 SSDG has an exhaust leak on the bottom side of the manifold, must be addressed. 46 CFR 182.20-20(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 July 2024
Resolved 22 July 2024
Resolution: Verified exhaust leak was repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 July 2024 Resolved
The switchboard shall be adequately protected and provision shall be made for access thereto. The Battery distribution panel missing blocking slot to prevent accidental shocking, must be installed. 46 CFR 183.05-15(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 July 2024
Resolved 22 July 2024
Resolution: verified missing slot block was installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 20 June 2023 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of the hull structure and its appurtenances including the following: (1) Inspection of all accessible parts of the exterior of the hull. During inspection, 2 holes were found on the fuel fill containment skirt STBD side of the vessel. Repair to the satisfaction of the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2023
Resolved 29 June 2023
Resolution: Operator affected temporary repairs. Verified by on-scene marine inspector.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 March 2023 Resolved
The construction of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Hull plating beneath keel coolers was not available for inspection. Remove forward keel coolers to make relevant portion of hull visible for inspection. Additionally, replace rubber bushings that have become deteriorated.
Action required: 705 - Other - as specified
Due 2 March 2023
Resolved 20 March 2023
Resolution: Shipyard removed fore and aft keel coolers. Attending marine inspector conducted satisfactory inspection of hull underneath the coolers. Bottom plating is sound.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 1 March 2023 Resolved
The construction of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Marine Inspector observed significant wastage on second frame overhead, aft of engine room. Repair to the satisfaction of attending marine inspector.
Action required: 705 - Other - as specified
Due 2 March 2023
Resolved 11 April 2023
Resolution: Vessel representative conducted NDT on repaired insert. An air test sprayed with soap/water was conducted, all sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 March 2023 Resolved
An exterior lighting fixture must comply with the requirements of UL 595. Install light cover on second deck exterior light.
Action required: 705 - Other - as specified
Due 2 March 2023
Resolved 4 May 2023
Resolution: Vessel representative provided photos of repaired light cover.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 September 2022 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. Marine Inspector observed a surge protector in wheelhouse with multiple electrical sources plugged into it. Remove surge protector and plug directly vessel's receptacles.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2022
Resolved 7 December 2022
Resolution: Vessel is old T-L and does not have requirement regarding surge protectors. Vessel replaced the "household" surge protector with a UL heavy duty one to mitigiate potential issues.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 August 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. The vessel has a hole in the hull below the rub rail on port bow due to a pier strike. Submit repair proposal prior to commencing work on vessel and notify Sector Boston when work commences to ensure a marine inspector can attend vessel as needed.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 August 2022
Resolution: Welded doubler plate over hole. Conducted test of weld integrity using a pressure washer. All sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 April 2022 Resolved
A self priming, power driven fire pump must be installed on each vessel. The seal on the port fire pump is leaking. Repair or replace to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 May 2022
Resolved 12 May 2022
Resolution: Shaft gasket was replaced. Pump was operationally tested. All Sat,
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 21 July 2020 Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following tests and inspections of the hull structure and its appurtenances: Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads and weather deck. In the forward port section of the lazaratte, thick pieces of the deck were chipping off which contained layers of coating and metal. Conduct testing to determine thickness of hull plating in the identified location. If more than 25% wasted, crop and renew to good metal and make repairs in kind to the satisfaction of the attending marine inspector.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 28 February 2021
Resolved 3 February 2021
Resolution: Area descaled, UT shots indicate less than 25% wastage.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 20 July 2020 Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following tests and inspections of the hull structure and its appurtenances: Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads and weather deck. There is a penetration in the hull found in the #2 void between the 2nd and 3rd frame on the port side. Crop and renew. 46 CFR 176.25-5(a)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 July 2020
Resolved 21 July 2020
Resolution: Hull plating in area cropped and renewed. Tested sat.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 20 July 2020 Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following tests and inspections of the hull structure and its appurtenances: Examine all accessible parts of the exterior and interior of the hull, the watertight bulkheads and weather deck. In the forward port section of the lazaratte, thick pieces of the deck were chipping off which contained layers of coating and metal. Further examination and cleaning of the area is required to determine the condition. 46 CFR 176.25-5(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2020
Resolved 21 July 2020
Resolution: Area identified in lazzarette on the port side was cleared and ready for inspection. Inspected sat. Due to visual condition of area, issued 835 to have the hull plating in the area assesed during the vessels next hull exam in Feburary 2021.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 July 2020 Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 3 feet in length, not more than 6 feet, securing the waterlight around the body of the ring life buoy. The lanyard was in poor condition and needs to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 20 July 2020
Resolved 20 July 2020
Resolution: Line replaced prior to completion of inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 20 July 2020 Resolved
An ammeter must be provided for a generator rated at 50 volts or more. The ammeter for both generators are not operable. 46 CFR 183.15-5(g)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 September 2020
Resolved 3 February 2021
Resolution: Repairs were verified.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 12 September 2018 Resolved
Vsl is broadcasting no dimension information (AIS Antenna Position ABCD values equals 0) and Vsl is broadcasting no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 1 November 2018
Resolution: While running a query in VIVS, all information had been updated and AIS was broadcasting the proper information.
Construction/Loadline › Penetrations › Pipe Flange
Issued 13 June 2018 Resolved
Make STBD overhead IWO vent pipe watertight. 46 CFR 171.124 OLD "T"
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2018
Resolved 19 June 2018
Resolution: Repairs made and area is watertight.
Construction/Loadline › Structures › Door
Issued 28 April 2017 Resolved
Watertight door in engine room found not watertight. Make watertight.
Condition: Invalid
Action required: 705 - Other - as specified
Due 12 May 2017
Resolved 8 June 2017
Resolution: Conducted satisfactory light test of watertight door.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.