This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
1619 - Regulatory (Subpart C or D), Gross Ton
1619 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-22975
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 11 October 2018Resolved
The vessel is required to provide evidence of cargo vapor-tightness and pipeline header tests prior to on-loading of cargo.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 November 2018
Resolved 16 October 2018
Resolution: Cargo vapor-tightness and pipeline header tests conducted.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 11 October 2018Resolved
The high-level indicating device couldn't visually indicate the liquid level due to discoloration (1 stbd).
Vessel had set-ins of on #3 port gunnel and side shell, and #2 port gunnel and side shell.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 6 August 2012
Resolved 6 August 2012
Resolution: Conducted repair of #3 port gunnel replacing 22''''x3''''x1/2" plate and 20''''x48"x3/8 sideshell and internals in way. Conducted repair of #2 port gunnel replacing 6''''x3''''x1/2" plate and 5''''x48"x3/8 sideshell and internals in way.
Deck/Cargo › Vapor Control Systems
Issued 2 July 2002Resolved
Install .5in studs at ends of vapor collection line IAW regs. LEGACY COMPONENT DESC: Fixed Vapor Collection Arms
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 August 2002
Resolved 22 January 2003
Resolution: Found correct.