Records from 2005 to 2025. Most recent: inspection, 27 August 2025.
Inspection history · 29
27 August 2025
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8219273
30 April 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8124220
19 April 2025
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8129094
12 December 2024
Administrative Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8046937
4 December 2024
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8043694
19 September 2024
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8005598
10 May 2024
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7910092
31 July 2023
Damage Survey · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7764065
20 April 2023
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7738438
20 January 2023
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7623358
16 December 2022
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7610039
20 August 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7292192
24 May 2021
Hull Examination · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7205542
20 May 2020
COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6952986
24 October 2019
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6841097
21 August 2019
Annual Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6790149
12 April 2019
Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6662647
11 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6537761
6 August 2018
MTSA Verification · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6502725
4 May 2018
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6405627
16 October 2017
Examination of Repairs · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6288857
1 September 2017
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6256708
28 June 2017
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6189715
20 June 2017
Type not recorded
No type recorded · Base Support Unit Boston · Activity 6181721
22 March 2017
Excursion Permit
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6109627
23 February 2017
Internal Structural Exam · Administrative Inspection · Examination of Repairs · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6093344
24 August 2016
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5988522
29 May 2016
Damage Survey · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5894788
28 May 2016
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5893954
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 April 2025
No resolution recorded
13101 - This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Wing clamp on port shaft packing gland was cracked. Repairs completed to the satisfaction of attending Marine Inspector.
Wing Clamp to be replaced at next credit drydock (NLT 5/31/2026)
Action required: 705 - Other - as specified
Due 31 May 2026 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 April 2025
Resolved
This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Wing clamp on port shaft packing gland is cracked. Repair must be made proir to getting underway with passengers. Pier side dinner cruise is authorized until 21Apr2025.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 April 2025
Resolved 21 April 2025
Resolution: Deficiency was repaired and inspected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 13 December 2024
Resolved
13108 - Propulsion machinery must capable of operating at constant marine load under such requirements without exceeding its designed limitations. While underway the vessel's crew noticed the port side generator was running at a high temperature. The cause is still to be determined.
46 CFR 182.200(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 December 2024
Resolution: Received tech report for the generator.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 September 2024
Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gauge. The vessels fire pump gauge was inoperable and the pressure was not able to be verified. Pressure at the hose was inadequate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 October 2024
Resolution: Received video showing proper operation and psi of fire pump.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 19 September 2024
Resolved
On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accommodation spaces and all other spaces normally manned by crew members. Vessels public address system was inoperable on the interior passenger decks.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 September 2024
Resolution: Verified proper operation of public address system throughout vessel.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 20 August 2021
Resolved
Where fire extinguisher systems are not required, but are installed, the system or equipment and its installation shall meet the requirements of 46 CFR 181. The system was found to have leaks and is inoperable. Make permanent repairs to the system and provide documentation from a servicing technician that the system is fully operable.
46CFR181.05-5
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 September 2021
Resolution: System inspected and servicing report reviewed, sat.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 20 August 2021
Resolved
A grease extraction hood must be equipped with a dry or wet chemical fire extinguishing system meeting the applicable sections of NFPA 17 “Dry Chemical Extinguishing Systems,” 17A “Wet Chemical Extinguishing Systems,” or other standard specified by the Commandant, and must be listed by an independent laboratory recognized by the Commandant. The vessel’s hood has not been serviced. Provide documentation of the systems servicing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 October 2021
Resolution: Provided documentation of full system test, sat.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 20 August 2021
Resolved
EPIRB shall be installed to automatically float free. The vessels hydrostatic release mechanism is expired in 2018. Replace the hydrostatic release with a valid unit.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2021
Resolved 1 September 2021
Resolution: EPIRB installation inspected, sat.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 20 August 2021
Resolved
Vessel is required to ensure a garbage management plan is in place. Vessel did not have a garbage management plan IAW 33 CFR part 151. Ensure the signed management plan is retained on board and posted.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 September 2021
Resolved 1 September 2021
Resolution: waste management plan inspected, sat.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 May 2021
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] the extent of material defect and mark repairs in kind at the following identified locations to the satisfaction of the attending marine inspector:
(1) Hole identified on the stbd bow rub rail
(2) 02 most outboard wasted frames and numerous holes in the deck on the stbd quarter.
(3) Marked area on port quarter deck.
Action required: 705 - Other - as specified
Resolved 1 June 2021
Resolution: Repairs were made to the damaged plate identified on the stbd bow, port quarter deck area and the frames and holes on the stbd quarter. Conducted visual inspection of all repairs and associated weldment. All sat.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 11 September 2018
Resolved
Vsl is broadcasting no IMO #, no dimension information (AIS Antenna Position ABCD values equals 0) and no static draft information.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 21 August 2019
Resolution: AIS WAS REPAIRED BY TECHNICIAN
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 September 2017
Resolved
Enclose exposed wires in FWD head
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Exposed wires enclosed in outlet box.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 1 September 2017
Resolved
Remove excess paints, thinners and alcohol gels.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Combustible materials removed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 1 September 2017
Resolved
Mount electrical box's near sprinkler head tank #1 and engine room bilge pump boxes
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Electrical boxes mounted.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 1 September 2017
Resolved
Mount fire extinguisher behind the bar and in the pilot house.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Extinguishers for bar and pilot house are mounted.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 1 September 2017
Resolved
Mark emergency escape for galley and engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Both emergency escapes marked.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 1 September 2017
Resolved
Prove proper operation of fire door separating the galley and accommodation space.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Witnessed proper operation of fire door.
Engineering › Lubricating Oil Service System › Manifold
Issued 1 September 2017
Resolved
Replace both generators by NOV 1st, 2017
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 November 2017
Resolved 12 December 2017
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 September 2017
Resolved
Remove hold back device and install sill/jam of fire door separating bridal suite and main accommodation space.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 26 September 2017
Resolution: A threshold has been installed. The holdback device is authorized.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 1 September 2017
Resolved
Pack wire penetration separating pilot house from female head with approved fire stop material.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Observed penetration packing/fire stop material.
Engineering › Bilge Water Management System › Strainer
Issued 1 September 2017
Resolved
Replace bilge strainer in galley. Current strainer does not have enough open area.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Bilge strainer replaced.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 September 2017
Resolved
Remove hold back device and install latch on fire door separating female head and 2nd deck bar.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 1 September 2017
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 1 September 2017
Resolved
Adjust shaft packing on port side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 15 September 2017
Resolution: Observed satisfactory operation of port side shaft packing.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 1 September 2017
Resolved
Man overboard arrangements are not adequate to recover a helpless victim from the water. Demonstrate procedures for recovery of a helpless victim.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 September 2017
Resolved 1 September 2017
Resolution: Recived e-mail from vessel master attensting to additional arrangements to assist in recovery of a helpless victim.
Construction/Loadline › Hull › Side Shell
Issued 11 May 2017
Resolved
Properly repair wasted pipe guard on STBD FWD bow in front of the main deck windows.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 4 May 2018
Resolution: Received photo evidence of sat repair.
Construction/Loadline › Hull › Side Shell
Issued 11 May 2017
Resolved
Properly repair the STBD side lower fender plate from the 5th to the 7th windows forward.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 June 2017
Resolved 30 November 2017
Construction/Loadline › Hull › Side Shell
Issued 11 May 2017
Resolved
Properly repair the port side rub rail half pipe from the loading door forward approximately 20' where holed/ wasted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 4 May 2018
Resolution: Received photo evidence of sat repair.
Construction/Loadline › Hull › Bottom Plating
Issued 11 May 2017
Resolved
Reinstall concrete in sewage tank to original condition. Approximately to top of keel with exception of two sumps.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 November 2017
Resolved 26 October 2017
Construction/Loadline › Hull › Bottom Plating
Issued 23 February 2017
Resolved
Crop and renew to good metal the bottom plating and associated framing in the galley starboard side. The vessel is restricted to Boston Harbor.
Action required: 705 - Other - as specified
Due 1 November 2017
Resolved 30 October 2017
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 24 August 2016
Resolved
Permanently hardwire electrical receptacle on stbd side of steering consol. Or alternatively remove.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 7 September 2016
Resolution: Electrical outlet was permanently hardwired on the stbd side of the steering console.
Electrical › Electric Supply System (service) › Cable
Issued 24 August 2016
Resolved
Permanently hardwire electrical equipment connected to 02 power strips installed on stbd side of steering consol.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 7 September 2016
Resolution: The power strip cords were removed from under the steering console. The remaining electrical equipment was permanently hardwired.
Electrical › Electric Supply System (service) › Cable
Issued 24 August 2016
Resolved
Remove extension cord in engine room powering air compressor. Make permanent electrical cord for power.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 September 2016
Resolved 7 September 2016
Resolution: Extension cord in engine room was removed and a permanent cord was installed for air compressor power.
Construction/Loadline › Hull › Transverse Frame
Issued 24 August 2016
Resolved
Several transverse frames were found wasted in vessel's bilge in galley room. Vessel is restricted to Boston Harbor and Harbor Islands and not more than 1 mile from shore.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 November 2017
Resolved 26 October 2017
Resolution: 5/2017 the port side framing is completed and several frames on the starboard side have been doubled. In Nov 2017 the remainder of the bottom in the galley will be replaced along with the wasted framing.
Construction/Loadline › Hull › Hull Plating
Issued 29 May 2016
Resolved
Due to grounding vessel must complete insternal structural exam conducted by CGMI and also conduct a dive survey to be reviewed by attending MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 May 2016
Resolution: All requirements completed.