Inspection history · 39
11 May 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8373717
15 August 2025
Examination of Repairs · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8210787
21 May 2025
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8135911
24 February 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8084042
11 October 2024
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8019220
10 April 2024
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7893243
23 September 2023
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7797118
23 September 2023
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7803667
6 September 2023
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7786439
18 August 2023
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7771263
19 May 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7692418
17 April 2023
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7676411
13 February 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7636269
7 October 2022
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7595109
20 April 2022
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7435394
2 March 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7404500
14 May 2021
COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7194454
1 April 2021
Drydock Exam · Deadweight Survey · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7167330
10 December 2020
Administrative Inspection · Drydock Extension
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7109806
13 May 2020
COI Inspection · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6952303
9 December 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6870685
15 July 2019
Administrative Inspection · Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6751402
13 May 2019
COI Inspection · DAPI Audit
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6680329
29 April 2019
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6672723
28 December 2018
Administrative Inspection · Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6602118
17 September 2018
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6542563
3 August 2018
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6500373
23 July 2018
Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6492854
15 July 2018
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6481095
22 June 2018
Examination of Repairs · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6455414
10 May 2018
MTSA/ISPS Verification · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6411434
10 April 2018
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6388844
21 March 2018
Administrative Inspection · Damage Survey · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6377029
6 February 2018
Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6350744
16 May 2017
DAPI Audit · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6147031
2 February 2017
Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6080636
26 July 2016
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5953729
17 May 2016
Deficiency Check · COI Inspection · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5876648
2 February 2016
Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5808839
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2025
Resolved
Pressure vessels shall be protected by pressure-relieving devices that will prevent the pressure from rising more than 10 percent above the Maximum Allowable Working Pressure.
The installed pressure vessels have a Maximum Allowable Working Pressure of 200 psi and were fitted with relief valves set to open at 260 psi. This exceeds the 10% overpressure limit.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2025
Resolved 9 June 2025
Resolution: New 175 PSI valves purchased and installed.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 19 May 2023
Resolved
A vessel must be provided with a main steering gear that is: (1) of adequate strength and capable of steering the vessel at all service speeds. Vessel's port-side engine suffered an alarm, causing engine to go to idle and loss of steering. Issue has been repaired. Submittal of root cause analysis required within 30 days.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 June 2023
Resolved 31 May 2023
Resolution: Received email detailing root cause analysis of failure.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 20 April 2022
Resolved
Where cable protection is carried through watertight decks or bulkheads, the installation shall be such that will insure the watertight integrity of the structure. Cable penetrations in voids 1, 2, 3, and 4 on both port and starboard sides were loose and non-watertight.
46 CFR 183.10-20(e) OLD T
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 April 2022
Resolved 29 April 2022
Resolution: Watertight fittings tightened and inspected by USCG Marine Inspector
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 20 April 2022
Resolved
Vessel is subject to the structural standards in 46 CFR 177.10-1 in Old Subchapter T. Abandoned pipinh in voids 1, 2, 3, and 4, are closed off with a temporary pipe coupling and not permanently welded. Prove structural integrity of the bulkhead in way of alterations to piping.
46 CFR 177.10-1 OLD T
Action required: 10 - Deficiency Rectified
Due 17 April 2023
Resolved 17 April 2023
Resolution: Verifed all abandoned piping was permanently welded during 2023 drydock.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 March 2022
Resolved
Vessel prohibited from carriage of passengers until issued an approved General Arrangement plan review letter from MSC and any changes made to the vessel's general arrangement to facilitate compliance are approved and verified by an attending marine inspectors.
46 CFR 116.202
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2022
Resolution: Vessel permitted to operate as Subchapter T vessel only.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 May 2021
Resolved
Properly label location where lifejackets are stowed on main deck and upper passenger deck.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 May 2021
Resolved
Properly label child lifejackets location and quantity on main passenger deck.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2021
Resolved
Repaird ground on electrical switchboard in starboard engine room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2021
Resolved
Properly bond overhead cables in way of starboard main engine.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2021
Resolved
Non-metallix flexible hoses must be replaced in way of cooling system for main engines on port and starboard side.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2021
Resolved
Remove and cap abandoned hose in port side engine room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 14 May 2021
Resolved
Repaird foward fire damper on starboard side engine room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2021
Resolved
Repair cable box penetration on starboard side in way of proper installation to maintain watertight integrity.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 14 May 2021
Resolved
Smoke doors must be of self closing type and latch closed on borth port and starboard side.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 May 2021
Resolved
Provide fire load calculations in way of interior fitting; fire load if reduced to less than 1 lb per foot IAW MSC ltr HI-00652 dated July 5th, 1990.
Vessel is restricted to less than 150 passengers until fire load calculations can be brought below 1 lb/square foot outlined by MSC letter on routes and conditions.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 29 October 2021
Resolution: Received new stability letter to operate as a Subchapter T vessel thus removing the requirement for structural fire protection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2021
Resolved
Must be able to prove proper operation of bilge suction on starboard side.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 May 2021
Resolved
Must be able to prove proper operation of high level alarm panel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 14 May 2021
Resolved
Properly work GA bells on bridge and throughout the vessel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 May 2021
Resolved
Vessel restricted to limited coastwise route until all lifejackets are fitted with lights.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 26 May 2021
Resolution: Deficiency rectified during def check visit.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 14 May 2021
Resolved
Vessel is required to Domestics route until SOLAS requirements are met.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2021
Resolved 17 April 2023
Resolution: During 2023 annual, verified VSL route is designated as domestic. VSL no longer operates on SOLAS route
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 12 May 2021
Resolved
Passenger seats were replaced on vessel. Total wight change exceeds 2% of lightship displacement. Required to submit plan review to MSC for approval of vessel stability.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2021
Resolved 29 October 2021
Resolution: Conducted deadweight survey. Received new stability letter to operate under Subchapter T
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 13 May 2019
Resolved
Penetrations between watertight bulkheads must have means to keep them watertight
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 May 2019
Resolved 8 April 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 29 April 2019
Resolved
Vessel reported water intrusion of 1-2 gal/min at hull/jet penetration. Must repair leak prior to carriage of passengers
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 May 2019
Resolved 8 May 2019
Resolution: POC provided video evidence of satisfactory repairs.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 10 May 2018
Resolved
Port side aft fire damper would not close due to broken cable. Cable repaired on spot and damper in proper working order.
46 CFR 116.610(g)(4)
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 15 May 2018
Resolved 15 May 2018
Resolution: Corrected on the spot
Electrical › Electrical Distribution System (service) › Junction Box
Issued 10 May 2018
Resolved
Shorepower cover was removed leaving exposed wires with wire nuts. Crew replaced the cover.
46 CFR 120(i)(1)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 15 May 2018
Resolved 15 May 2018
Resolution: Corrected on the spot
Construction/Loadline › Hull › Hull Plating
Issued 21 March 2018
Resolved
Make periodic rounds of starboard jet tunnel space to ensure temporary patch is holding while underway.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 6 April 2018
Resolved 6 April 2018
Resolution: Inspected dye pen NDT of repair. All sat.
Construction/Loadline › Hull › Hull Plating
Issued 21 March 2018
Resolved
Make permanent repairs to the pin hole leak in the starboard jet tunnel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 April 2018
Resolved 6 April 2018
Resolution: Inspected permanent repair of jet tunnel, all sat.
Lifesaving › Inflatable Buoyant Apparatus › Float Free
Issued 16 May 2017
Resolved
PROVIDE NON EXPIRED HYDRO-STATIC RELEASE UNITS.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 May 2017
Resolved 16 May 2017
Resolution: HYDRO-STATIC RELEASE UNITS HAVE BEEN REPLACED
Lifesaving › Lifejacket/PFD (Type II) › Storage
Issued 16 May 2017
Resolved
PROVIDE PLACARD FOR CHILD PFD STORAGE BENCH
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 May 2017
Resolved 16 June 2017
Resolution: PLACARD INSTALLED FOR CHILD PFD STORAGE BENCH
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 17 May 2016
Resolved
Port side fire screen door must be capable of fully self closing.
Action required: 705 - Other - as specified
Due 26 May 2016
Resolved 27 June 2016
Resolution: Vessel rep. demonstrated self closing FSD fully.
Engineering › Bilge Water Management System › Interface Detector
Issued 17 May 2016
Resolved
A visual indicator for a bilge high level alarm for the STBD engine room must be provided at the operating station.
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 27 June 2016
Resolution: Visual indicator was installed at the operating station.
Lifesaving › Launching Appliances › Release Mechanism
Issued 17 May 2016
Resolved
Replace hook on crane used for rescue platform installation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 May 2016
Resolution: New hook was installed on crane of appropriate size to readily attach and lower the rescue platform.
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 February 2016
Resolved
Repair cracks on port and stbd at frame #12, 3rd longitudinal from the deck located in the tank space void.
Action required: 705 - Other - as specified
Due 12 February 2016
Resolved 10 February 2016
Construction/Loadline › Hull › Longitudinal Frame
Issued 2 February 2016
Resolved
Crop and renew 3" - 6" on either side of the cracked portion of the 4th longitudinal from the deck at frame #12 located in the tank space void.
Action required: 705 - Other - as specified
Due 12 February 2016
Resolved 10 February 2016