Records from 1991 to 2025. Most recent: inspection, 19 December 2025.
Inspection history · 53
19 December 2025
Hull Examination · Internal Structural Exam · Vessel Attendance
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8285683
31 July 2025
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8180315
24 October 2024
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8012257
23 January 2024
Internal Structural Exam · Hull Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7866005
25 October 2023
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7813599
19 October 2022
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7578666
6 September 2022
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7552595
15 April 2022
Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7430968
11 April 2022
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7457984
8 March 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7408068
19 October 2021
Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7333591
12 August 2020
Attraction Vessel Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7030142
9 June 2020
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6971894
16 July 2019
COI Inspection · Construction Oversight · Inclining Experiment
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6917613
30 January 2019
Construction Oversight · Plan Review "T" Boat
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6617606
12 January 2017
Plan Review "T" Boat · Examination of Repairs
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6075947
8 June 2016
Attraction Vessel Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5900849
17 December 2015
Examination of Repairs
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5783602
6 June 2012
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4334988
30 January 2012
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4234212
11 January 2011
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3902667
9 January 2009
Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3391283
2 January 2008
Hull Examination · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3095341
8 June 2007
Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2953912
30 May 2006
Re-Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2663973
7 December 2005
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2547637
12 January 2005
Examination of Repairs
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2273437
15 December 2003
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1963275
30 October 2003
Damage Survey
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1938791
17 June 2002
COI Inspection · Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1630580
7 June 2001
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1408749
29 July 2000
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1052695
29 June 2000
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1406755
27 December 1999
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1437648
29 January 1998
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1468424
10 May 1996
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1089494
30 January 1996
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1192054
19 January 1996
Deficiency Check · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1185737
10 September 1995
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 879756
20 July 1995
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1188375
30 June 1995
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1192012
20 January 1995
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 835158
5 April 1993
Examination of Repairs · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 836685
13 March 1993
Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 837223
22 December 1992
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1472097
3 December 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1141287
20 October 1992
Initial Certification · Plan Review "T" Boat
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1265797
21 May 1992
Inclining Experiment
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1254762
13 December 1991
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 941635
11 December 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1134274
16 June 1991
Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 939544
4 June 1991
COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 916587
15 May 1991
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1214410
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 31 July 2025
Resolved
The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections and tests:(1) Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10 (incorporated by reference, see § 175.600 of this chapter) as amended here: (ii) Monthly inspections required by NFPA 10 may be conducted by the owner, operator, person-in-charge, or a designated member of the crew. Monthly inspections of portable fire-extinguishers were not being conducted. Crew will begin monthly inspection regimen beginning 31Jul25. Deficiency rectified.
Action required: 10 - Deficiency Rectified
Due 31 July 2025
Resolved 31 July 2025
Resolution: Extinguishers insepcted. Crew will start inspecting monthly.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 31 July 2025
Resolved
The master of the vessel shall ensure that:(a) Each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly, using the integrated test circuit and output indicator, to determine that it is operative; The EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable. EPIRB tests were not being logged/conducted. Master performed satisfactory test on 31Jul25. Deficiency rectified.
Action required: 10 - Deficiency Rectified
Due 31 July 2025
Resolved 31 July 2025
Resolution: Master completed satisfactory test of EPIRB.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 April 2022
Resolved
The design, materials, and construction of masts, posts, yards, booms, bowsprits and standing rigging on a sailing vessel must be suitable for the intended service. The vessel's yard struck a land structure with an unknown amount of damage. Vessel to perform rigging survey of the yard prior to carrying underway passengers.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 September 2022
Resolution: Received satisfactory rig survey.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 October 2021
Resolved
An inspection is conducted to determine if the vessel is in satisfactory condition, fit for the service intended and complies with all applicable regulations. For a sail vessel, it includes inspection of the rigging and sails.
Passengers are not permitted to be carried underway until an inspection of the vessel's rigging and sails has been conducted.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 August 2025
Resolution: Inspected rigging and sails.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 5 June 2012
Resolved
Provide a safety radio certificate.
Due 15 June 2012
Resolved 15 June 2012
Resolution: A radio safety survey was completed and certificate issued.
Documentation › Certificates/Documents › FCC SSL
Issued 5 June 2012
Resolved
Provide up to date FCC station licence.
Due 15 June 2012
Resolved 15 June 2012
Resolution: Vessel rep has applied for a new FCC radio station license.
Fire Fighting › Fixed Fire Detection System › Annual Inspection
Issued 5 June 2012
Resolved
Service pre-engineered fixed firefighting system.
Due 15 June 2012
Resolved 15 June 2012
Resolution: Service for fireboy fixed firfighting system complete.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 June 2012
Resolved
Place open wires fro the fixed fire fighting system into and approved electrical junction box.
Due 15 June 2012
Resolved 15 June 2012
Resolution: Wires placed in box sat.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 5 June 2012
Resolved
Place open wires for the alarm system into an approved electrical junction box
Due 15 June 2012
Resolved 15 June 2012
Resolution: Wires for alarm system placed in junction box sat.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 5 June 2012
Resolved
Replace all mounting brackets on portable fire extinquishers that were not mounted properly.
Due 15 June 2012
Resolved 21 June 2012
Resolution: All portable fire extinquishers placed in mounting brackets as requested.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 5 June 2012
Resolved
Replace two heavily corroded portable fire extinquishers.
Due 15 June 2012
Resolved 15 June 2012
Resolution: The two portables were replaced sat.
Engineering › Bilge Water Management System › Not Operational
Issued 5 June 2012
Resolved
Repair inoperative audible alarm for the bilge high level system.
Due 8 June 2012
Resolved 8 June 2012
Resolution: Tested bilge high level alarm audible alarm sat.
Documentation › Certificates/Documents › Stability Letter
Issued 30 January 2012
Resolved
THE VESSEL'S OWNER/OPERATOR HAS NOT REQUESTED AN INITIAL OR UPDATED STABILITY LETTER OR HAS NOT CERTIFIED COMPLIANCE WITH THE REVISED STABILITY CRITERIA FOR ASSUMED AVERAGE WEIGHT PER PERSON (AAWPP) OF 185 POUNDS. BASED UPON A WEIGHT RATIO CALCULATION, THE VESSEL'S CAPACITY IS THEREFORE LIMITED TO: 64 PERSONS (PASSENGERS AND CREW) 46 CFR 170.090
Action required: 705 - Other - as specified
Due 1 June 2012
Resolved 5 April 2012
Resolution: Owner/operator elected weight ratio reduction option to meet new stability requirements.
Stability › Unintentional Flooding › General
Issued 11 January 2011
Resolved
Prior to allowing passengers onboard the vessel the water ingress coming from behind the 5th frame, forward of the generator room fwd bulkhead, on the port side must be inspected by a CG Marine Inspector from the Sector Boston Office.
Action required: 705 - Other - as specified
Resolved 18 March 2011
Resolution: Found to be satisfactory this date.
Construction/Loadline › Hull › Hull Plating
Issued 11 January 2011
Resolved
Replace section of rotten plank, main whale plank, located in the stbd quarter.
Action required: 705 - Other - as specified
Due 25 April 2011
Resolved 6 June 2012
Resolution: Rotten planking repaired sat.
Construction/Loadline › Hull › Stiffener
Issued 11 January 2011
Resolved
Re-new 1st hanging knee aft of frame #3, starboard side in way of the tween deck.
Action required: 705 - Other - as specified
Due 25 April 2011
Resolved 6 June 2012
Resolution: Hanging knee aft of frame #1 is in place sat.
Construction/Loadline › Hull › Bracket
Issued 9 January 2009
Resolved
Lower Hold - Renew fractured knees: Stbd 1st & last, Port 2nd & 4th from aft.
Action required: 705 - Other - as specified
Due 31 August 2009
Resolved 21 August 2009
Construction/Loadline › Hull › Bracket
Issued 9 January 2009
Resolved
Upper Hold - Renew fractured knee: Stbd/aft.
Action required: 705 - Other - as specified
Due 31 August 2009
Resolved 21 August 2009
Construction/Loadline › Structures › Superstructure
Issued 2 January 2008
Resolved
Prior to carrying passengers away from dock, complete drydock work list dated 02Jan2008. (Copy attached to MISLE activity 3095341.)
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2012
Resolved 6 June 2012
Resolution: All dry-dock worklist items completed sat.
Construction/Loadline › Structures › Superstructure
Issued 2 January 2008
Resolved
Prior to carrying passengers away from dock, provide Marine Surveyor work list with schedule for item completion.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2012
Resolution: This worklist was provided by Giffy Full and associates surveyor [name withheld] and all items are on going.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 8 June 2007
Resolved
Inspect fixed fire fighting system in the generator room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 June 2007
Resolved 18 June 2007
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 8 June 2007
Resolved
Provide one child lifejacket to meet the requirements of the COI.
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 June 2007
Resolved 18 June 2007
Lifesaving › Lifebuoys › Serviceable
Issued 8 June 2007
Resolved
Replace the worn life ring on the aft deck house.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 June 2007
Resolved 18 June 2007
Fire Fighting › Fire Hoses › Condition
Issued 30 May 2006
Resolved
Replace vessel's fire hoses.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2006
Resolved 15 September 2006
Resolution: hose''''s replaced sat.
Engineering › Bilge Water Management System › Not Operational
Issued 30 May 2006
Resolved
Clear vessel's bilge suction strainer.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 June 2006
Resolved 15 June 2006
Engineering › Bilge Water Management System › Interface Detector
Issued 30 May 2006
Resolved
Prove proper operation of vessel's high level bilge alarm.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2006
Resolved 15 June 2006
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 30 May 2006
Resolved
Replace vessel's ring buoys light.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 June 2006
Resolved 15 June 2006
Lifesaving › Buoyant Apparatus
Issued 17 June 2002
Resolved
Provide Seapainter and properly label the vessel name and capacity for the two Buoyant apparatus LEGACY COMPONENT DESC: Lifeline
Due 24 June 2002
Resolved 24 June 2002
Lifesaving › Lifejacket/PFD (Type I)
Issued 17 June 2002
Resolved
Provide 1 adult type 1 life preserver. The vessel is restricted to 74 total persons. LEGACY COMPONENT DESC: Quantity
Due 24 June 2002
Resolved 22 June 2002
Lifesaving › Lifebuoys
Issued 17 June 2002
Resolved
Prove proper operation of the ring buoy light. LEGACY COMPONENT DESC: Self-igniting Lights
Due 24 June 2002
Resolved 22 June 2002
Lifesaving
Issued 7 June 2001
Resolved
Properly label the correct vessel name on several adult life preservers.
Condition: Unknown
Due 7 June 2001
Resolved 8 June 2001
Lifesaving
Issued 7 June 2001
Resolved
Prior to carrying passengers, provide and properly stow the two 20 person B/A's.
Condition: Unknown
Due 7 June 2001
Resolved 7 June 2001
Lifesaving
Issued 29 June 2000
Resolved
PROVIDE THREE ORANGE SMOKE SIGNALS PRIOR TO SAILING.
Condition: Unknown
Due 7 July 2000
Resolved 12 July 2000
Lifesaving
Issued 29 June 2000
Resolved
PROVIDE TWO ADULT AND FOUR CHILDRENS LIFE JACKETS PRIOR TO SAILING.
Condition: Unknown
Due 7 July 2000
Resolved 12 July 2000
Construction/Loadline
Issued 27 December 1999
Resolved
PROPERLY REPLACE THE WHALE, STARBOARD SIDE IWO THE AFT CHAIN PLATE.
Condition: Unknown
Due 27 December 1999
Resolved 27 December 1999
Construction/Loadline
Issued 27 December 1999
Resolved
PROPERLY REPLACE THE PLANKS ON THE STARBOARD SIDE IWO THE SALLYPORT AMIDSHIPS.
Condition: Unknown
Due 27 December 1999
Resolved 27 December 1999
Construction/Loadline
Issued 29 January 1998
Resolved
PROPERLY REPAIR THE LEADING EDGE OF THE RUDDER BELOW THE WATERLINE AND THE STBD SIDE BY THE UPPER STRAP.
Condition: Unknown
Due 29 January 1998
Resolved 25 February 1998
Construction/Loadline
Issued 29 January 1998
Resolved
PROPERLY REPLACE THE PLANK ON THE PORT SIDE AFT IWO THE TRANSOM ABOVE THE WHALE.
Condition: Unknown
Due 29 January 1998
Resolved 25 February 1998
Documentation
Issued 19 January 1996
Resolved
PROVIDE PROPOSAL FOR COMPLETION OF WORK ITEMS AS OUTLINED IN SURVEYORS REPORT, DATED SEPTEMBER 1994.
Condition: Unknown
Due 19 January 1996
Resolved 19 January 1996
Documentation
Issued 19 January 1996
Resolved
SUBMIT PROPOSAL FOR MAKING AVAILBLE FOR INSPECTION, THE PORT AND STARBOARD GARBOARD PLANKS, ON OR BEFORE THE NEXT SCHEDULED DRYDOCK EXAMINATION.
Condition: Unknown
Due 19 January 1996
Resolved 19 January 1996
Fire Fighting
Issued 19 January 1996
Resolved
PRIOR TO OPERATING GENERATOR WITH PASSENGERS ON BOARD, RENEW FIXED HALON FIRE EXTINGUISHING SYSTEM.
Condition: Unknown
Due 19 January 1996
Resolved 19 January 1996
Documentation
Issued 19 January 1996
Resolved
ON OR BEFORE NEXT SCHEDULED DRYDOCK EXAMINATION, SUBMIT PROPOSAL FOR REMOVAL AND INSPECTION OF RUDDER ASSEMBLY.
Condition: Unknown
Due 19 January 1996
Resolved 19 January 1996
Engineering
Issued 20 July 1995
Resolved
RE-ROUTE WIRING AWAY FROM GENERATOR EXHAUST PIPING.
Condition: Unknown
Due 20 July 1995
Resolved 20 July 1995
Navigation
Issued 20 January 1995
Resolved
REPLACE GUDGEON BOLTS IN WAY OF ROTTEN PLANK (TRANSOM) DURING WORK REQUIREDTO REPLACE PLANK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 January 1995
Resolved 25 January 1995
Electrical
Issued 20 January 1995
Resolved
RECONNECT BOTH GROUNDING STRAPS TO GROUNDING PLATES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 January 1995
Resolved 25 January 1995
Construction/Loadline
Issued 20 January 1995
Resolved
REMOVE AND REPLACE IN KIND ROTTEN PLANK AT TRANSOM ON STBD SIDE OF HORN TIMBER AS MARKED DISCUSSED AND IDENTIFIED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 January 1995
Resolved 25 January 1995
Construction/Loadline
Issued 20 January 1995
Resolved
REMOVE AND REPLACE IN KIND THREE BILGE PLUGS AS MARKED, DISCUSSED AND IDENTIFIED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 January 1995
Resolved 25 January 1995
Construction/Loadline
Issued 20 January 1995
Resolved
PROVIDE AND INSTALL IN KIND WORM SHOE WHERE MISSING._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 25 January 1995
Resolved 25 January 1995
Construction/Loadline
Issued 20 January 1995
Resolved
PROVIDE DETAILED REPAIR PROPOSAL ADDRESSING CHECKED UNDER DECK SUPPORT KNEES THRU-OUT LOWER LEVEL, BOW SPRIT SUPPORTS, TWO BAD FRAMES IN FOC'SLE, AND ROTTEN PLANKING ON TRANSOM PORT SIDE WELL ABOVE WATERLINE._x001C_ _x001C_
Condition: Unknown
Due 20 January 1995
Resolved 20 January 1995