1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Maury page id
psix-36952
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. Only barges and towing
vessels are in this archive, so any other vessel type in the same activity does not
appear here: these lists are a floor, not a complete manifest.
A foot long crack was discovered on the upper port stern corner.
46CFR31.10-17 (a)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 February 2020
Resolved 24 January 2020
Resolution: Insured crack on th upper stern corner was repaired to satisfaction of attending marine inspectors. Performed air test. All sat.
Engineering › Fuel Oil Service System › Valve
Issued 29 October 2015Resolved
Fuel shut off valves shall be constructed with indicator, rising stem or qarter turn valves. All supply and return valves did not meet the regulation 46CFR56.20-9(a).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 November 2015
Resolved 29 October 2015
Resolution: Witnessed sat installation of 04 rising stem fuel valves.
Deck/Cargo › Vapor Control Systems
Issued 13 February 2003Resolved
Missing stud on the VCS header flange. LEGACY COMPONENT DESC: Piping/Hoses
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2003
Resolution: Replaced stud on VCS Header flange.
Construction/Loadline › Structures
Issued 19 December 2002Resolved
Barge is not permitted to load/offload (ie. conduct cargo operations) after unloading in Lousiville, KY until survey and permanent repairs have been completed. LEGACY COMPONENT DESC: Rake
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 January 2003
Resolved 8 January 2003