MAURY USCG vessel records
← All vessels

K-MARINE V

K-MARINE V is a 1992 offshore supply vessel. The Coast Guard has recorded 14 inspections since 2016, most recently in May 2025, along with 14 deficiencies and 1 casualty investigation in 2023.

Records from 2016 to 2025. Most recent: inspection, 20 May 2025.

Built
1992
Last inspected
20 May 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 2016.

Inspection record

Last inspected 20 May 2025
…with no type recorded2
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9019195
WBD9290
369861
Flag
UNITED STATES
Maury page id
psix-369861

Documentation record

Tonnage as PSIX records it474 - Regulatory (Subpart C or D), Gross Ton
886 - Convention (Subpart B), Gross Ton
322 - Regulatory (Subpart C or D), Net Ton
265 - Convention (Subpart B), Net Ton
1646 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

JOAN ROSE Towing Vessel · MISLE 338690 · 30 November 2023 · activity 7833522ROSS CANDIES Industrial Vessel · MISLE 933514 · 26 July 2020 · activity 7047444

Inspection history · 14

20 May 2025 Reflagging & Initial Certification
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8139968
2 October 2024 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8013305
1 December 2023 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7832206
30 November 2023 Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7831923
30 November 2023 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7833522
21 December 2022 Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7612078
24 September 2021 MTSA Verification · Drydock Exam · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7319802
19 November 2020 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7098278
26 July 2020 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7047444
11 September 2019 Drydock Exam · Periodic Inspection · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6809725
26 September 2018 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6548910
12 October 2017 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6286410
17 November 2016 COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6043172
24 August 2016 Administrative Inspection · MTSA Verification · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5981964

Deficiency record · 14

02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 October 2024 Resolved
"If, during an internal structural, cargo tank internal examination, or underwater survey, damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the Officer in Charge, Marine Inspection, may require the vessel to be drydocked or otherwise taken out of service to further assess the extent of the damage and to effect permanent repairs." Rectify the following: Crop renew bow 2 doublers Crop and renew P/S sideshell chain-lockers 4ft up from the deck to good metal Crop and renew chain-locker bulkhead in-between spaces Main deck fwd near chain locker entrances, crop renew P/S Hawspipe replace both Crop and renew chain-locker bulkhead 3 holes Crop and renew chain locker deck P/S Crop and renew 8 angles per chain-locker P way framing to e/r 5 holes within internal framing, crop renew #1 Ballast Ladder rung replace + 2 tripping brackets #8 Ballast Stbd striker plate for sounding tube P/S chain locker replace both ladders STBD Rudder pin replace L/O vent main deck, replace 4 Lids replace main deck hatch openings P/S Bulk tanks drain plugs leaking Thru hull entering E/R loose wires Once the above chain-locker bulkhead is replaced re-anchor chain. Pull bilge check valve, for inspection Anchor chain gauging Collision bulkhead gauge to test metal thickness
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 November 2024
Resolved 16 July 2025
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 December 2023 Resolved
Halon cylinders forming part of a fixed fire extinguishing system must be visually inspected for damage, corrosion, or deterioration every year and replaced if found unserviceable. Halon cylinder was found to be deteriorated requiring maintenance and bottom cylinder support was broken. 46 CFR 147.65(b)
Condition: Improper/Lack of Maintenance
Due 18 December 2023
Resolved 6 December 2023
Resolution: Vessel replaced Halon cylinder.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 21 December 2022 Resolved
Each fire main piping valve must meet applicable requirements of part 128. The middle engineering passageway fire hydrant shutoff valve was seized and the handle broken in to pieces. Replace valve and handle.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 21 December 2022
Resolution: Replaced valve and tested sat.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 14 October 2021 Resolved
The control system shall be designed for automatic shutdown of the engine with actuation of audible and visible alarms at shutdown. The visible malfunction indicator shall indicate what condition caused the shutdown and remain visible until reset. Vessel had several alarms and shutdowns that were inoperaable when testing NVIC 1-78 approved automation test proceedures. Vessel is required to be fully manned in the engineering department until all automation testing has been completed satisfactorily by ABS or attending Marine Inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2021
Resolved 15 October 2021
Resolution: Automation tests were conducted, SAT.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 October 2021 Resolved
The Convention certificates must be on board the vessel and readily available for examination at all times. Due to automation issues, ABS class and other documents were not onboard and completed. Vessel needs to have all claasification and conventional certificates onboard and completed before COI can be issued.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 28 October 2021
Resolved 15 October 2021
Resolution: Class documents were issued and valid, SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 19 November 2020 Resolved
Multiple Hatches and QAWTDs needed adjusted and gasket replaced, including ones leading to engine room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2020
Resolved 20 November 2020
Resolution: All QAWTD and Hatches were checked for watertight integrity
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 November 2020 Resolved
Multiple Fuel Hoses need replaced 1) Hose on bow thruster engine needs replaced and chaffing gear 2) Port Auxillary Engine (Liquid Mud Pump)PTO requires two new fuel hoses 3) Port Generator require new lube oil hose and fuel hose 4) STBD generator requires fuel hose and lube oil hose 5) STBD main requires new fuel return hose 6) multiple cotton jacket hoses were found that need replaced with hoses meeting SEA-J 1942 approval
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2020
Resolved 20 November 2020
Resolution: hoses replaced to the satisfaction of the CG inspector
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 19 November 2020 Resolved
VSL had STBD liferaft improperly stowed, painter line was disconnected and hydrostatic release was upside down.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 November 2020
Resolved 19 November 2020
Resolution: VSL properly connected liferaft
05 - Radio Communications › N/A - No Subsystem › Operation of GMDSS equipment
Issued 19 November 2020 Resolved
GMDSS daily log was not being kept on the VSL. 47 CFR 80.1065
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 November 2020
Resolved 19 November 2020
Resolution: VSL obtained GMDSS log for VSL
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 19 November 2020 Resolved
Oil record book enteries for monthly OWS checks were not being logged.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 November 2020
Resolved 19 November 2020
Resolution: Spoke to Captain and Engineer regarding proper logging of OWS Testing into Oil Record Book
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 November 2020 Resolved
STBD service generator was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 November 2020
Resolved 19 November 2020
Resolution: Solenoid was replaced prior to completion of inspection and generator was operational.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 November 2020 Resolved
Fire pump gauge on bridge was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 December 2020
Resolved 20 November 2020
Resolution: Cleared to satisfaction of MI.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 November 2020 Resolved
Navigation lights at for the primary starboard and aft anchor station were inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 November 2020
Resolved 20 November 2020
Resolution: Navigation lights operational
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 19 November 2020 Resolved
Magnetic Compass and Gyro Compass had a deviation of 16 degrees.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2020
Resolved 20 November 2020
Resolution: VSL had technician complete calibration of compass

Casualty record · 1

30 November 2023Routine · role: Involved in a Marine Casualty · activity 7833522
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.