STOLT PEAK

STOLT PEAK is a 1991 tank ship. The Coast Guard has recorded 76 inspections since 1992, most recently in February 2010, along with 85 deficiencies and 17 operational controls, 1 with no removal date recorded.

Records from 1992 to 2010. Most recent: inspection, 22 February 2010.

Built
1991
Last inspected
22 February 2010
Documentation
Not in the documentation file of 10 September 2026
Controls
1 with no removal date recorded

Identity

8819081 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
374243
Flag
CAYMAN ISLANDS
—
Maury page id
psix-374243

Inspections, by type

…with no type recorded46
Years with a record 19 calendar years (1992–2010)
The 76 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 16 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it22650 - Convention (Subpart B), Gross Ton
13121 - Convention (Subpart B), Net Ton
39656 - Dead Weight, Ton
49687 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 6

Inspection history · 76

22 February 2010 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3683890
22 December 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3653938
21 December 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3653584
21 December 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3660281
12 December 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3649118
8 December 2009 Ballast Water Examination · ISPS II Exam · COC-CHEM Renew
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3646918
8 December 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3646992
5 December 2009 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3645071
8 July 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3526239
7 July 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3526834
19 February 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3420793
7 February 2009 COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3404205
8 September 2008 MARPOL Annex I Examination · Ballast Water Examination · COC-CHEM Annual · MARPOL Annex II Examination · MARPOL Annex V Examination · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3316074
9 March 2008 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3161017
23 February 2008 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3152268
23 February 2008 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3153278
27 July 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3009384
24 July 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3000728
22 July 2007 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3003360
20 July 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3001919
16 July 2007 COC-CHEM Renew · MARPOL Annex II Examination · MARPOL Annex I Examination · Ballast Water Examination · PII Safety Exam · ISPS II Exam · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2996670
12 July 2007 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2992186
17 June 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2682704
9 June 2006 ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2674646
3 March 2006 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2595332
24 February 2006 ISPS III Exam · COC-CHEM Annual · Ballast Water Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2591316
11 February 2006 ISPS I Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2583485
11 February 2006 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2583560
26 February 2005 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2299679
18 February 2005 Ballast Water Examination · ISPS II Exam · MARPOL Annex I Examination · COC-CHEM Renew · MARPOL Annex II Examination · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2295003
17 August 2004 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 2171480
14 August 2004 NPV Safety Exam · ISPS II Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2165693
24 June 2004 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 2109034
6 March 2004 Deficiency Check · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2017148
20 February 2004 Certificate of Compliance
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2010049
12 February 2004 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 2005682
10 February 2004 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 2004822
9 February 2004 Certificate of Compliance
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 2012053
7 March 2003 Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 1760124
12 September 2002 Ballast Water Examination · Certificate of Compliance
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1674906
31 July 2001 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 292425
25 January 2001 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 286288
25 January 2001 Letter of Compliance (Initial/Renewal)
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1471593
5 January 2000 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 273213
5 January 2000 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 813539
1 January 1999 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 424209
1 January 1999 Letter of Compliance (Initial/Renewal)
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1383995
1 September 1998 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 419881
11 January 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 64918
2 January 1998 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 702216
16 December 1997 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 3646
16 December 1997 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 410922
16 December 1997 MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1115446
4 August 1997 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 508152
14 October 1996 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 396318
14 October 1996 Letter of Compliance (Initial/Renewal)
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 844854
12 January 1996 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 386669
21 August 1995 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 381721
21 August 1995 MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1189930
4 April 1995 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 376963
4 April 1995 Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 839602
5 July 1994 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 864793
17 June 1994 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 695775
15 June 1994 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 214748
15 June 1994 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 367721
15 June 1994 Letter of Compliance (Initial/Renewal)
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1434125
1 September 1993 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1137974
21 August 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 496835
21 August 1993 Certificate of Compliance
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 845139
18 August 1993 Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 843817
17 August 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 170531
1 November 1992 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 500292
21 August 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 685559
24 May 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 48503
22 May 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 350891
22 May 1992 Certificate of Compliance
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 959214

Deficiency record · 85

Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 22 December 2009 Resolved
Vessel has been recommended to conduct SMS Audit after having two spills in a period of less than 48 hours while bunkering in Houston.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 December 2009
Resolution: Vessel submitted SMS Audit IAW COTP.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 21 December 2009 Resolved
Pin hole leak on the bunker line.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2009
Resolution: SITCON recieved repair report and released OPCON by direction.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 21 December 2009 Resolved
Vessel did not follow transfer procedures, specifically that at least one Engineer assisted by a crew member would keep watch on the ullages and soundings and that the supplier would be informed as soon as possible of an increase in the agreed bunkering rate.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 December 2009
Resolution: Received SMS Auidt.
Fire Fighting › Fixed Deck Foam System › Monitors
Issued 8 December 2009 Resolved
Fire monitors unable to provide adequate coverage of deck area. SOLAS II-2, FSS Code 7.2.3.2.1
Action required: 705 - Other - as specified
Due 8 December 2009
Resolved 8 December 2009
Resolution: Fire monitors provided good pressure prior to departing the vessel. Chief Engineer stated the cause of the weak pressure was due to a circuit breaker that kept tripping on one of the pumps.
Navigation › Piloting/Steering › Gyro Compass
Issued 19 February 2009 Resolved
Vessel reported that it's gyro compass is inoperable.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2009
Resolution: The vessel submitted a tech report attesting to the proper operation of the gyro compass.
Engineering › Diesel Engine (propulsion-direct drive) › Valve, Check (air start)
Issued 23 February 2008 Resolved
After taking on docking pilot, command was given for ahead power. Main engine did not start due to lack of sufficient air pressure for fuel combustion. It was determined that main engine distributor was sticking. The distributor was lubricated and cleaned. Upon completion, main engine functioned as intended and vessel was moored. Vessel to make full repairs and testing to satisfaction of class.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 March 2008
Resolved 24 February 2008
Resolution: Cleared to satisfaction of class (DNV).
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 23 February 2008 Resolved
Emergency fire pump has an exhaust leak that leaks into the space housing the emergency fire pump. Repair to satisfaction of class prior to departure from Baltimore.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2008
Resolution: Cleared to satisfaction of class (DNV).
Fire Fighting › Ventilation Systems › Operating Controls
Issued 23 February 2008 Resolved
Port and starboard fire dampers in way of aft ballast pump room do not fully close. Repair dampers to full operation and to satisfaction of class prior to departure from Baltimore.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2008
Resolution: Cleared to satisfaction of class (DNV).
Fire Fighting › Ventilation Systems › Operating Controls
Issued 23 February 2008 Resolved
Main engine space fire damper manual closures in way of stack space do not fully close. Repair dampers to full operation and satisfaction of class prior to departure from Baltimore.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 February 2008
Resolution: Cleared to satisfaction of class (DNV).
Engineering › Lubricating Oil Storage/Transfer System › Piping
Issued 23 February 2008 Resolved
Hydraulic oil supply to No. 5 starboard cargo hydraulic pump power head has pipe wastage and is weeping inboard of cutout valve. The tank is empty. Vessel is restricted from any cargo operations/loading/discharge or operation of cargo pump No. 5 until piping is repaired to satisfaction of class.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 March 2008
Resolved 9 March 2008
Resolution: SEC NOLA PSC/Arrivals Branch received a class report from Det Norske Veritas satisfying the requirement.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 23 February 2008 Resolved
Vessel has outstanding condition of class in way of non-operating cargo tank high-level alarms at No. 1 port, No. 1 starboard, No. 4 starboard, No. 7 starboard. Radar measurement system (and condition of class) for cargo tank No. 1 port and No. 1 starboard slop tank does not function properly. Repair all alarms prior to any cargo operations. Cite BCC-10 Ch VI, Col H.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 March 2008
Resolved 9 March 2008
Resolution: SEC NOLA PSC/Arrivals Branch received a class report from Det Norske Veritas satisfying the requirement.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 27 July 2007 Resolved
Vessel came into port of Houston with a missing Stbd anchor. Must replace anchor and provide report from certificate issuing authority attesting to repairs prior to departure
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 August 2007
Resolution: Stbd anchor replaced and approved by DNV.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 24 February 2006 Resolved
Vessels IGG could not produce oxygen at or below 5%. Vessel may not carry cargoes which are required to be inerted until IGG system is tested satisfactorily by an attending classification society surveyor.
Action required: 15 - Rectify deficiencies by next port
Due 25 February 2006
Resolved 3 March 2006
Resolution: Received class report from DNV satisfying requirement.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 24 February 2006 Resolved
Vessels high level alarm (98%) on the #1 starboard cargo tank continually sounded even while tank was empty. High level alarm failed to operate properly. Vessel may not load cargo in #1 starboard cargo tank until failure is identified and repaired to the satisfaction of the attending classification society surveyor.
Action required: 15 - Rectify deficiencies by next port
Due 25 February 2006
Resolved 3 March 2006
Resolution: Received class report from DNV satisfying requirement.
Personnel › Certificates/Documents/Licenses › STCW Endorsement
Issued 18 February 2005 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2005
Resolved 18 February 2005
Resolution: Received copy of fax from Liberia to vessel master stating acceptance of Croatian licenses for thirty days. Vessel clear to depart port.
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 18 February 2005 Resolved
Fixed Halon fire extinguishing system is past due for the annual inspection. Provide proof of service and inspection prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2005
Resolved 19 February 2005
Resolution: Received fax copy of certificate of inspection completed by Sea Safety. Vessel is clear to depart port.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 14 August 2004 Resolved
Vessel failed to comply with PSC requirments by required date/port call. Three deficiencies prieviously issued were not properly corrected, Vessel is restricted from leaving the port of New York until sutch time that outstanding deficiencies are properly corrected as per originator requirments.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 August 2004
Resolution: Recieved report from DNV attesting to thr correction of all overdue outstanding PSC requirments.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 3 March 2004 Resolved
O2 sensor for IG system is not operational. Tech rep onboard unable to effect repairs to the sensor and the system. Replace O2 sensor and complete a thorough survey of the IG system to the satisfaction of an attending Class Society Surveyor prior to the carriage of any cargoes requiring inerting. LEGACY COMPONENT DESC: O2 Sensor
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2005
Resolution: Verified proper operation of IG System and conducted satisfactory test of alarms and shut downs.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 3 March 2004 Resolved
High level alarms remain inoperable for the #2S & #3S cargo tanks. Replace or renew the high level alarms for both tanks and test to the satisfaction of an attending Class Society Surveyor. Vessel is restricted from loading cargo into those tanks until class approves the high level alarms. LEGACY COMPONENT DESC: High Level Alarms
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 May 2004
Resolved 15 August 2004
Resolution: Recieved proper class report attesting to the function of high level alarms.
Construction/Loadline › Penetrations
Issued 25 February 2004 Resolved
Cement patch on main deck IWO #2 center cargo tank. Cement patch covers crack(2") in filet weld between steam pipe penetration doubler and main deck(through to cargo tank). Repair crack to satisfaction of class and USCG prior to cargo onload and next US port. LEGACY COMPONENT DESC: Weld
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 25 February 2004
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed deck location in way of COT #2 center cargo tank steam heating coil pipe penetration through main deck renewed. Delete CC 104(2).
Engineering › Steam System (main)
Issued 25 February 2004 Resolved
#7 port cargo tank steam heating / return pipe leaking(cargo) at flange connection near main deck penetration. Locate damaged coil in cargo tank and repair leak to satisfaction of class and USCG prior to cargo onload and next US port. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 6 March 2004
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed COT #7 port steam heating/return piping flange connection blanked off. Delete CC 104 (2).
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 25 February 2004 Resolved
Cargo tank high level alarms inoperative on cargo tank #2 STBD and #3 STBD. Repair to satisfaction of class and USCG prior to cargo onload and next US port. LEGACY COMPONENT DESC: Tank Level Monitoring Device
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Due 12 May 2004
Resolved 14 August 2004
Resolution: Recieved report from DNV attesting to a satisfactory test of the afore mentioned overfill protection.
Deck/Cargo › Holds/Tanks
Issued 25 February 2004 Resolved
Manual over ride lever on high velocity cargo tank vent #2 PORT cargo tank is inoperative. Repair to satisfaction of class. and USCG prior to onload of cargo and next US port. LEGACY COMPONENT DESC: Ventilation Exhaust Trunking
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 25 February 2004
Resolved 6 March 2004
Resolution: Tested manual over ride lever on the high velocity cargo tank vent #2 port cargo tank satisfactory.
Electrical › Lighting (service)
Issued 25 February 2004 Resolved
Lighting fixtures on aft stbd deck and fwd centerline main deck wasted at wire connections and glass encasement seal. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 February 2004
Resolved 25 February 2004
Resolution: Corrected prior to offloading cargo.
Electrical › Electrical Distribution System (service)
Issued 25 February 2004 Resolved
Main deck electrical box enclosures for deck lighting, equipment, etc. has fractured penetrations where main conduit enters box. LEGACY COMPONENT DESC: Junction Box
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 February 2004
Resolved 25 February 2004
Resolution: Corrected prior to offloading cargo.
Deck/Cargo › Holds/Tanks
Issued 25 February 2004 Resolved
High level alarm for cargo tanks are set higher than 97% and cannot be seen or heard on the open deck. Correct to the satisfaction of class. and USCG prior to onload of cargo and next US port. LEGACY COMPONENT DESC: Tank Level Monitoring Device
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 25 February 2004
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed on board an operable 95% cargo level with audible and visual alarms in the cargo control room where the transfer operator in charge is stationed.
Fire Fighting › Fixed High-Expansion Foam Fire Extinguishing System
Issued 25 February 2004 Resolved
Verify foam onboard vsl. is alcohol resistant prior to loading alcohol product. Unitor foam certificate states foam is not alcohol resistant. LEGACY COMPONENT DESC: Quantity of Foam-Forming Liquid
Action required: 705 - Other - as specified
Due 25 February 2004
Resolved 6 March 2004
Resolution: Obtained copy of certificate from Fire Protection Services Inc. completing a foam analysis and concluding the foam onboard is alcohol resistant.
Deck/Cargo › Vapor Control Systems
Issued 25 February 2004 Resolved
Stbd vapor recover piping not painted properly. Stud missing on port side reducers. Correct to satisfaction of class. and USCG prior to onload of cargo. LEGACY COMPONENT DESC: Vapor Recovery Unit
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Due 25 February 2004
Resolved 6 March 2004
Resolution: Observed the starboard Vapor Recovery piping was properly painted. Stud was replaced for the portside reducer.
Documentation › Manuals/Policy Documentation
Issued 24 February 2004 Resolved
Vsl. not carrying 46 CFR 150 sub chapter O on board.
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Due 24 February 2004
Resolved 25 February 2004
Resolution: Defficiency corrected.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 9 February 2004 Resolved
US inland nav rules not on board.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Fire Fighting › Miscellaneous Items
Issued 9 February 2004 Resolved
Hold back devices on fire doors. LEGACY COMPONENT DESC: A Class Division Penetrations
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Resolution: Devices removed.
Fire Fighting › Miscellaneous Items
Issued 9 February 2004 Resolved
Firestation hose box missing door.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Resolution: Box and door replaced.
Construction/Loadline › Structures › Air Pipe
Issued 9 February 2004 Resolved
Ventilators for forecastle space broken off. Temp repair authorized to the satisfaction of class surveyor. LEGACY COMPONENT DESC: Ventilators
Action required: 17 - Rectify deficiencies prior to departure
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency and found it properly renewed.
Deck/Cargo › Vapor Control Systems
Issued 9 February 2004 Resolved
P/V breaker - 3SWBT bent. Renew. LEGACY COMPONENT DESC: Vessel Vapor Overpressure/Vacuum Protection
Condition: Unknown
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Observed the #3SWBT P/V Breaker to bent at approximately a five degree angle. Tested the operation of the manual override lever satisfactory. There apperas to be no restriction of flow from the tank to the vent.
Deck/Cargo › Mooring/Anchoring
Issued 9 February 2004 Resolved
Stbd anchor windlass protective cover missing bolts. LEGACY COMPONENT DESC: Capstan
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2004
Resolved 21 February 2004
Fire Fighting › Fire Pumps
Issued 9 February 2004 Resolved
Main fire pump panel on bridge overload light continuously energized. Troubleshoot & repair.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Electrical › Electrical Distribution System (service)
Issued 9 February 2004 Resolved
Electrical conduit on main deck, stbd side broken exposing cables in several places. Temp repairs authorized to satisfaction of class surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Deck/Cargo › Inert Gas System
Issued 9 February 2004 Resolved
IG System not properly inerting cargo tanks. Cause unknown by CG or crew. Crew maintains IG system is working as intended. Cargo tanks not being properly inerted.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 21 February 2004
Resolution: IG lines found to be wasted, with holing. IG escaping through wastage. Temp repairs made to satisfaction of class.
Documentation › Safety Management System
Issued 9 February 2004 Resolved
COTP doubts validity of the SMC, for the reasons stated in activity narrative. External ISM in presence of CG inpsector required. LEGACY COMPONENT DESC: Key Shipboard Operations Plans/Instructions
Action required: 15 - Rectify deficiencies by next port
Resolved 6 March 2004
Resolution: Observed copy of DNV ISM ship audit report conducted on February 12/23, 2004. 2 major nonconformities were downgraded and 2 non-conformities were issued to the vessel. Audit Complete.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 9 February 2004 Resolved
Survey IG generator internally and repair 25 pinhole leaks.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency item and found effected IGS piping properly renewed as well as numerous repairs to the IGG.
Deck/Cargo › Inert Gas System
Issued 9 February 2004 Resolved
Repair holes in IG piping in IG generator room.
Action required: 705 - Other - as specified
Resolved 21 February 2004
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 9 February 2004 Resolved
Repair inoperable O2 sensor in cargo control room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 12 May 2004
Resolved 14 August 2004
Resolution: This item cleared to align requirment with remaining outstanding deficiency to have entire IGS certified by DNV prior to carrage of any cargo requiring inerting. Outstanding condition of class issued requiring same in addition to CG requirement.
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 9 February 2004 Resolved
Repair HALON alarm power failure alarm in engine control room.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Communications › Alarms/Indicators
Issued 9 February 2004 Resolved
Tighten engineroom alarms and monitoring battery connections
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 9 February 2004 Resolved
Repair IG generator salt water pump pressure gauge piping at pump discharge.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency and found it properly renewed.
Fire Fighting › Fixed Halon Fire Extinguishing System › Nozzle
Issued 9 February 2004 Resolved
Replace missing HALON discharge nozzle, engineroom lower level stbd side aft - by purifier room.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 9 February 2004 Resolved
Renew leaking sewage overboard piping within engineroom at sea valve- just inboard. LEGACY COMPONENT DESC: Sewage System Piping
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency, no leakage detected.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 9 February 2004 Resolved
Repair IG salt water overboard drain valve, lower level engineroom.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency and found proper temperary repairs.
Engineering › Fuel Oil Service System
Issued 9 February 2004 Resolved
Clean up all fuel oil laying in bilge by HFO settling tank abd determine source of leakage.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Fire Fighting › Fixed Halon Fire Extinguishing System › Tanks
Issued 9 February 2004 Resolved
Install missing discharge pressure switch on HALON bottle by generator flat.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Engineering › Generator (propulsion-electric)
Issued 9 February 2004 Resolved
Repair Lube/Oil leaks on ships generators.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 6 March 2004
Resolved 6 March 2004
Resolution: Lube/Oil leaks on ship''s generators were repaired. Minor leaks still exsist but not of significance.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 9 February 2004 Resolved
Repair Fuel Oil pressure guage connection at Aux Boiler in way of plastic steel repair.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Received report from DNV attesting to the proper perminent repair of the F/O gage connection.
Engineering › Steam Boiler (auxiliary/waste heat) › Mount
Issued 9 February 2004 Resolved
Repair leaking man hole covers on Aux boilers. LEGACY COMPONENT DESC: Manhole
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: This Item had to be repaired (tightened) during the Def Check.
Fire Fighting › Portable CO2 Fire Extinguisher › Tanks
Issued 9 February 2004 Resolved
Service main engine scavenge air belt CO2 fire extinguisher bottle.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2004
Engineering › Sea-water System (primary cooling) › Piping
Issued 9 February 2004 Resolved
Renew deteriorated salt water circulating overboard valve, lower level engine room, aft of forward bulkhead. LEGACY COMPONENT DESC: Valve
Action required: 17 - Rectify deficiencies prior to departure
Due 31 October 2004
Resolved 14 August 2004
Resolution: Item temporarily repaired in way of cement box patch until next dry dock.
Construction/Loadline › Hull
Issued 9 February 2004 Resolved
Remove cement box patch on main deck and make area available for class inspection. Submit class report on conditions found and repairs conducted.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class Report #17604 dated March 4, 2004. Surveyor found main deck location in way of COT 2C steam heating coil pipe penetration through main deck renewed. CC 104 (2) deleted from the record.
Deck/Cargo › Crude Oil Washing Systems › Piping
Issued 9 February 2004 Resolved
Renew crude oil wash piping IWO soft patched COW pipe to cargo oil tank 5S. LEGACY COMPONENT DESC: Piping
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency and found no signes that the piping was holed, wasted, or soft pached.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 9 February 2004 Resolved
Renew main hydraulic (return) pipe where wasted and leaking IVO forward ladder of stbd cargo containment.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency and found it properly renewed.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 9 February 2004 Resolved
Renew main deck stbd mooring winch hydraulic pipe. LEGACY COMPONENT DESC: Winch
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 May 2004
Resolved 14 August 2004
Resolution: Completed check of this discrepency and found it properly renewed.
Deck/Cargo › Mooring/Anchoring
Issued 9 February 2004 Resolved
Renew anchor chain cables. LEGACY COMPONENT DESC: Anchor Cable
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV report #17604 dated March 4, 2004. Class Surveyor observed all visible portions of anchor chain cable links for both the port and starboard chain cables to be without defects.
Deck/Cargo › Mooring/Anchoring
Issued 9 February 2004 Resolved
Renew forward anchor windlass foundation bolts. LEGACY COMPONENT DESC: Winch
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed all foundation bolt heads on port windlass bed plate frame without defect.
Pollution Prevention/Response › Prevention Equipment
Issued 9 February 2004 Resolved
Renew/repair stbd cargo manifold discharge containment drain nipple. LEGACY COMPONENT DESC: Fixed Containment
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed the starboard cargo manifold MARPOL drain nipple was renewed and without defect.
Electrical › Lighting (service)
Issued 9 February 2004 Resolved
Renew wasted light fixtures on main deck. LEGACY COMPONENT DESC: Lighting Fixture
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor found lighting fixtures main deck locations arrangements at wire connections to be in order. Delete CC 092(4).
Lifesaving › Lifeboat
Issued 9 February 2004 Resolved
Make proper fiberglass repairs to port lifeboat. LEGACY COMPONENT DESC: Hull
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed port lifeboat hull fiberglass sealant material (gel coat) without defect. Delete CC095(2).
Fire Fighting › Fire Main
Issued 9 February 2004 Resolved
Renew wasted section of firemain IVO forecastle isolation valve. LEGACY COMPONENT DESC: Condition
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed fire main pipe, forward of isolation valve IOW forecastle deck dealt with.
Lifesaving › Launching Appliances
Issued 9 February 2004 Resolved
Repair stbd lifeboat davit limiting switches. LEGACY COMPONENT DESC: Davit
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed starboard life boat limit switch without defect. Delete CA 604(1).
Construction/Loadline
Issued 9 February 2004 Resolved
Repair fracture in main deck fish plate just aft of stbd discharge manifold.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed main deck fish plate, aft of starboard cargo hose rail to be without defect. Delete CC101 (3).
Navigation › Collision/Grounding Avoidance
Issued 9 February 2004 Resolved
Repair echo depth sounder visual numerical display. LEGACY COMPONENT DESC: Echo-sounding Device
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Observed the satisfactory operation of the echo depth sounding device including the visual numerical display.
Deck/Cargo
Issued 9 February 2004 Resolved
Repair all on deck hydraulic oil leaks.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. All hydraulic oil leaks on the main deck for deck cargo systems, mooring arangements etc. were corrected without defects. Delete CC 094 (1).
Construction/Loadline › Structures
Issued 9 February 2004 Resolved
Renew hatch dogs for forecastle hatch cover
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed all latch dogs for hatch covers on the forecastle deck for rope stores space without defect. Delete CC 092 (1).
Accommodation/Occupational Safety › Occupational Safety
Issued 9 February 2004 Resolved
Make repairs to broken hand rails near 3P and 2S cargo tanks. LEGACY COMPONENT DESC: Deck Rail
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed deck hand rails IWO COT#3 Port/Starboard and #2 Port without defect. Delete CC 094 (6).
Engineering › Steam Boiler (auxiliary/waste heat) › Manhole
Issued 9 February 2004 Resolved
Repair excessive leaks on exhaust gas boiler uptakes. LEGACY COMPONENT DESC: Uptake
Due 31 October 2004
Resolved 18 February 2005
Resolution: Verified repairs have been made.
Construction/Loadline › Hull
Issued 9 February 2004 Resolved
Repair fractures - transverse flat bar horizontal stiffiner IVO frame 84, port side. LEGACY COMPONENT DESC: Stiffener
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 March 2004
Resolution: Received DNV Class report #17604 dated March 4, 2004. Surveyor observed repairs were completed satisfactory to the fracture weld connection IWO transverse flat bar horizontal stiffener. Delete CC 101 (1).
Navigation › Collision/Grounding Avoidance › Radar
Issued 7 March 2003 Resolved
Vessel's agent reported secondary radar inoperable prior to entry into the Port of Point Comfort . Vessel was granted one time deviation to enter. Radar was repaired prior to departure. Representative from Litton Marine Systems submitted the product service report prior to departure.
Due 9 March 2003
Resolved 9 March 2003
Resolution: Received product service report from Litton Marine Systems technician. Radar was repaired and operated properly prior to departure.
Deck/Cargo
Issued 5 January 2000 Resolved
OVERFILL WARNING LIGHT ON DECK FOR THE CARGO TANKS IS INOPERATIVE. REPAIR TO THE SATISFACTION OF THE COAST GUARD.
Condition: Unknown
Due 8 January 2000
Resolved 11 January 2000
Lifesaving
Issued 5 January 2000 Resolved
EMBARKATION LIGHTING AT BOTH LIFEBOAT STATIONS ARE INOPERABLE. REPAIR TO THE SATISFACTION OF THE COAST GUARD.
Condition: Unknown
Due 8 January 2000
Resolved 11 January 2000
Navigation
Issued 21 August 1995 Resolved
VESSEL ENTERED THE PORT OF NEW YORK WITH BRITISH ADMIRALTY CHART #3204 NOT CORRECTED UP TO DATE AS REQUIRED BY 33 CFR 164.33(a)(1)(ii). (MISSING CORRECTIONS 2104, 2268, 2269, 2869, 3252, 3891, 4192, 4439, 2003).
Condition: Unknown
Due 12 January 1996
Resolved 12 January 1996
Deck/Cargo
Issued 15 June 1994 Resolved
TWO (2) USED CARGO HOSES STORED IN THE FORECASTLE WERE MISSING CLOSSURE DEVICES AT THE ENDS OF THE HOSES.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Deck/Cargo
Issued 15 June 1994 Resolved
EIGHT (8) OF THE USED CARGO HOSES ONBOARD THE VESSEL WERE NOT STENCILLED WITH THE MAXIMUM ALLOWABLE WORKING PRESSURE.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Deck/Cargo
Issued 15 June 1994 Resolved
A CARGO TANK ULLAGE HAD A 6 INCH FLAME SCREEN WITH TWO 1/4 INCH HOLES IN IT.
Condition: Unknown
Due 16 June 1994
Resolved 16 June 1994
Electrical
Issued 15 June 1994 Resolved
REPAIR AS ORIGINAL OR REPLACE 3 ELECTRIC JUNCTION BOXES ON PORT SIDE CATWALK TO MAKE INTRINSICALLY SAFE.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Documentation
Issued 15 June 1994 Resolved
OBTAIN PROPER CERTIFICATION FROM CLASSIFICATION SOCIETY FOR VCS AUTHORIZED CARGOS IN ACCORDANCE WITH 46 CFR 39.10-13(D) PRIOR TO THE OPERATION OF VAPOR CONTROL SYSTEM IN U.S. NAVIGABLE WATERS.
Condition: Unknown
Due 15 June 1994
Resolved 15 June 1994
Lifesaving
Issued 15 June 1994 Resolved
PROVIDE REQUIRED NUMBER OF REFILL CARTRIDGES/TANKS FOR SCBA'S IN ACCORDANCEWITH 46 CFR 153.214 FOR TOTAL OF 21 CARTRIDGES.
Condition: Unknown
Due 30 June 1994
Resolved 24 June 1994
Navigation
Issued 22 May 1992 Resolved
The vessel's Admiralty Coast Pilot - "Pacific Coasts of Central America andthe United States" (8th Ed. 1975) did not have the Admiralty Supplement #9 (1990) edition.
Condition: Unknown
Due 25 May 1992
Resolved 28 May 1992
Navigation
Issued 22 May 1992 Resolved
BA chart 588 (7 APR 89) was missing BA notice to mariners corrections 208/91 and 449/91. BA chart 591 (30 JAN 87) was missing BA notice to mariners corrections 139/92 and 280/92.
Condition: Unknown
Due 26 May 1992
Resolved 28 May 1992

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.