Records from 1993 to 2024. Most recent: inspection, 28 February 2024.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 3 January 2003
Resolved
Provide alarm system IAW plan submitted by class surveyor. Have flag state attest to repair, and testing of system. LEGACY COMPONENT DESC: Operating Controls
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: [name withheld] attested.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 3 January 2003
Resolved
Provide instructions for fixed CO2 system, and prove maintenance. LEGACY COMPONENT DESC: Instructions
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Instructions provided.
Electrical › Electrical Distribution System (service)
Issued 3 January 2003
Resolved
Provide proper cable run from switchboard to welding machine. Have flag state rep attest to repair. LEGACY COMPONENT DESC: Cable
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Flag state attested.
Electrical › Electrical Distribution System (service)
Issued 3 January 2003
Resolved
Repair broken switches/wiring on Switchboard. Have flag state rep attest to proper repair. LEGACY COMPONENT DESC: Switchboard
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Switches repaired.
Engineering › Lubricating Oil Service System
Issued 3 January 2003
Resolved
Repair oil piping on Engine. There is a rubber hose from engine to filter and from filter to bilge. Have flag state rep attest to repair. LEGACY COMPONENT DESC: Piping
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Piping repaired.
Engineering › Fuel Oil Service System
Issued 3 January 2003
Resolved
Repair fuel return line on #2 generator. There is a rubber hose from generator to fuel return box. Have flag state rep attest to repair. LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Fuel return line repaired.
Engineering › Sea-water System (primary cooling)
Issued 3 January 2003
Resolved
Repair salt water discharge line on #1 generator. There is a rubber hose from generator to overboard discharge. Have flag state rep attest to proper repair. LEGACY COMPONENT DESC: Piping
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Salt water discharge repaired.
Engineering › Lubricating Oil Service System
Issued 3 January 2003
Resolved
Repair oil piping from oil pump to reduction gear. There are rubber hoses from the oil transfer pump to the reduction gear and from the pump to other locations. Have flag state rep attest to proper repairs. LEGACY COMPONENT DESC: Piping
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Oil piping repaired.
Documentation › Certificates/Documents
Issued 3 January 2003
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 January 2003
Resolved 21 February 2003
Resolution: Safe manning document updated and corrected.
Lifesaving › Lifebuoys
Issued 3 January 2003
Resolved
Replace all damaged life ring buoys onboard vessel.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Life rings repaired.
Accommodation/Occupational Safety › Occupational Safety
Issued 3 January 2003
Resolved
Repair damaged railing by STBD liferaft. LEGACY COMPONENT DESC: Deck Rail
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Railing repaired.
Personnel › Certificates/Documents/Licenses
Issued 3 January 2003
Resolved
Provide Seamans book for an AB (Claviro Sixto). LEGACY COMPONENT DESC: MMD, Able Seaman
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2003
Resolution: Endorsement accepted.
Engineering
Issued 3 January 2003
Resolved
Properly terminate loose end cables in the engine room.
Due 21 March 2003
Resolved 28 February 2024
Resolution: 28FEB2024: Due to age of open deficiencies and the fact that the vessel sunk, I have cleared them to clean up Sector Miami Open Deficiencies List.
Documentation
Issued 3 January 2003
Resolved
Update fireplan to indicate location of CO2 room.
Due 21 March 2003
Resolved 28 February 2024
Resolution: 28FEB2024: Due to age of open deficiencies and the fact that the vessel sunk, I have cleared them to clean up Sector Miami Open Deficiencies List.
Personnel › Certificates/Documents/Licenses
Issued 9 November 2002
Resolved
Provide Flag State Endorsement & Seaman's booklet for all neccessary members of the crew I.A.W. STCW 95'. LEGACY COMPONENT DESC: STCW Endorsement
Action required: 15 - Rectify deficiencies by next port
Resolved 3 January 2003
Personnel › Manning/Qualifications
Issued 9 November 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 15 - Rectify deficiencies by next port
Resolved 3 January 2003
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 23 May 2002
Resolved
Vessel's KW'S in engine room total exceeds 750 KW's. Vessel is to have installed a fixed fire extinguishing system in engine room as per CCSSC 3.10.3. Vessel must provide proof that system is installed before entry of next US port.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Resolved 3 January 2003
Resolution: System installed. New def issued to have tested and alarm installed prior to departure.
Stability
Issued 23 May 2002
Resolved
Vessel has a stability book; however there is no proof that it is approved. Vessel to have stability book approved.
Action required: 15 - Rectify deficiencies by next port
Resolved 3 January 2003
Resolution: Approved by class.
Lifesaving › Lifejacket/PFD (General)
Issued 17 April 2002
Resolved
Service all liferafts prior to loading and prior to departure. ( liferafts expired Feb 2002)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 April 2002
Resolved 23 May 2002
Fire Fighting
Issued 17 April 2002
Resolved
Service all fire extinguishers.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2002
Personnel › Certificates/Documents/Licenses
Issued 17 April 2002
Resolved
Provide valid license for [name withheld], Chief Mate and second engineer. All licenses expired Jan 2002. Provide prior to loading and departure. LEGACY COMPONENT DESC: License, Master
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2002
Engineering
Issued 17 April 2002
Resolved
Crop and renew Hydraulic pipes Maindeck port side amidships where soft patches are located. Prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2002
Lifesaving › Embarkation Appliances/Stations
Issued 17 April 2002
Resolved
Crop and renew rescue boat davit bases & weight test davits. Prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2002
Electrical
Issued 17 April 2002
Resolved
Remove / replace all exposed wires and unprotected lighting fixtures. All accommodation spaces.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2002
Pollution Prevention/Response
Issued 17 April 2002
Resolved
Remove all diesel from #1and #2 diesel tanks and #2 port side ballast. Tranfer product to approved facility.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2002
Accommodation/Occupational Safety › Occupational Safety
Issued 17 April 2002
Resolved
Provide gas free certificate and surveyors report addressing leak between diesel tanks and ballast tanks and provide repair proposal.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Stability
Issued 17 April 2002
Resolved
Provide current stability book.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Engineering
Issued 17 April 2002
Resolved
Repair #1 port ballast tank, vent and starboard side forward on forecastle.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Deck/Cargo
Issued 17 April 2002
Resolved
Provide surveyors report addressing original scantling of main deck wastage allowance. Provide ultrasound report and repair proposal.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Deck/Cargo
Issued 17 April 2002
Resolved
Crop and renew wasted steel on main deck between #1and #2 cargo hatches - light can be seen from below deck.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Deck/Cargo
Issued 17 April 2002
Resolved
Provide Gasket for manhole leading to cargo hold on main deck.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Construction/Loadline › Structures
Issued 17 April 2002
Resolved
Have class provide reoport on wood located in exposed surfaces, ceilings, corridors, stairways, accommodation spaces. Inspect as per CCSSC 3.16.3.1 - low flame spread characteristics.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 23 May 2002
Engineering
Issued 17 April 2002
Resolved
Provide manufactures description and horsepower for main diesel engjne and P/S generator to determine if CO2 system is required.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Engineering
Issued 17 April 2002
Resolved
Replace overboard discharge piping in engine room - frame 10 starboard side above generator battery.
Action required: 705 - Other - as specified
Resolved 23 May 2002
Fire Fighting › Nozzles
Issued 17 April 2002
Resolved
Provide fire hose nozzle for fire station #3. Nozzle is missing. Reflected on Fire Control Plan.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Deck/Cargo › Mooring/Anchoring
Issued 17 April 2002
Resolved
Vessel has two different types of anchors and anchor chains. Portside is smaller than starboard. Have class provide report. LEGACY COMPONENT DESC: Anchor
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 23 May 2002
Deck/Cargo
Issued 17 April 2002
Resolved
crop and renew - cargo boom crane winches mounts (wasted). Have class provide report.
Action required: 705 - Other - as specified
Resolved 23 May 2002
Construction/Loadline › Structures
Issued 17 April 2002
Resolved
Have surveyor provide report; port and starboard side stiffner and shell are wasted in cargo hold p&s sides.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Stability › Watertight Integrity
Issued 17 April 2002
Resolved
Have surveyor attest to the watertight integrity of all cargo hatches and coamings.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 May 2002
Fire Fighting
Issued 17 April 2002
Resolved
Provide racor filter flame guards for main diesel engine.
Action required: 705 - Other - as specified
Resolved 23 May 2002
Deck/Cargo
Issued 17 April 2002
Resolved
Provide missing dogs for cargo hatches.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 23 May 2002
Electrical
Issued 4 January 2002
Resolved
REMOVE ALL DEAD END WIRES FROM BRIDGE/ENGINE ROOM/ENGINE ROOMESCAPE HAATCH AND OTHER LOCATIONS THROUGHOUT THE VESSEL.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 26 January 2002
Resolution: All deadend wires from from bridge/engine room & other locations throughout the vessel have been removed and approved by class.
Lifesaving › Buoyant Apparatus
Issued 4 January 2002
Resolved
RENEW WASTED RETRO TAPE ON RING BUOYS AND REPLACE BUOYS AS NEEDED.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: retro tape renewed and buoys replaced as needed.
Deck/Cargo › Cargo Stowage
Issued 4 January 2002
Resolved
PROVIDE APPROPRIATE STOWAGE LOCATION FOR SCBA BOTTLES.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: SCBA bottles removed from inappropriate locations.
Deck/Cargo › Cargo Stowage
Issued 4 January 2002
Resolved
REMOVE CARGO FROM CREW ACCOMODATIONS
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: cargo removed from crew accomodations.
Construction/Loadline › Structures
Issued 4 January 2002
Resolved
SEAL PENETRATIONS IN COLLISION BULKHEAD LEGACY COMPONENT DESC: Transverse Bulkhead
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: penetrations in collision bulkhead sealed.
Construction/Loadline › Structures
Issued 4 January 2002
Resolved
MAKE PERMANENT REPAIRS TO WASTE STEEL/ALUMINUM IN WAY OF HOUSE SUPERSTRUCTER AND MAIN DECK. (CABIN- ALUMINUM/ DECK- STEEL.) LEGACY COMPONENT DESC: Superstructure
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 26 January 2002
Resolution: permanent repairs to waste steel/aluminum complete and inspected. Approved by flag with letter of satisfaction.
Operations/Management › Drills/Instruction
Issued 4 January 2002
Resolved
CONDUCT ABANDON SHIP AND FIRE DRILL TO THE SATISFACTION OF THE USCG MARINE INSPECTOR LEGACY COMPONENT DESC: Abandon Ship
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 January 2002
Resolved 25 January 2002
Resolution: fire drills conducted to the satisfaction of the USCG Marine Inspector.
Deck/Cargo › Mooring/Anchoring
Issued 4 January 2002
Resolved
REPLACE/RENEW WASTED PORT AND STBD ANCHOR PELICAN HOOKS LEGACY COMPONENT DESC: Brake
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: pelican hooks on port and starboard sides have been repaired.
Fire Fighting › Emergency Fire Pumps
Issued 4 January 2002
Resolved
PROVE OPERATION OF EMERGENCY FIRE PUMP. LEGACY COMPONENT DESC: Pressure
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: Emergency fire pump tested to the satisfaction of the inspector.
Personnel › Certificates/Documents/Licenses
Issued 4 January 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: Letter from flag accepting licenses on file.
Personnel › Manning/Qualifications
Issued 4 January 2002
Resolved
PROVIDE MUSTER LIST IN ACCORDANCE WITH SAFE MANNING CERTIFICATE. LEGACY COMPONENT DESC: Minimum Safe Manning
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: muster list corrected to coincide with safe manning certificate.
Deck/Cargo › Cargo Stowage
Issued 4 January 2002
Resolved
REMOVE OILS/PAINTS FROM PROHIBITED SPACES AND PLACE IN CLASS APPROVED LOCATION.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 January 2002
Resolved 25 January 2002
Resolution: Oils/Paints have been removed from prohibited spaces and placed in class approved locations.
Engineering
Issued 29 May 1997
Resolved
VESSEL HAD LEAKING MAIN PROP SHAFT SEALS. MUST REPAIR AND PROVIDE CLASS REPORT TO MSO MIAMI PRIOR TO DEPARTURE FROM NEXT U.S PORT._x001C_ VSL AUTHORIZED TO TRANSIT FROM PORT EVERGLADES TO TAMPA FOR DRYDOCK.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 May 1997
Resolved 31 August 2001
Resolution: VSL ATTENDED DRYDOCK AT ASTIVIK, GRANDES. COLUMBIA, MAIN PROP SHAFT SEALS REPAIRED AT THAT TIME.
Lifesaving
Issued 11 April 1997
Resolved
Prior to departure, provide and install an embarkation ladder for each inflatable life raft and the vessel's rescueboat.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Lifesaving
Issued 11 April 1997
Resolved
Prior to departure, provide a valid service report for the vessel's starboard inflatable life raft.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Construction/Loadline
Issued 11 April 1997
Resolved
Prior to departure, provide documentation from vessel's Flag Administrationor Classification Society addressing wastage noted in way of the collision bulkhead.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Construction/Loadline
Issued 11 April 1997
Resolved
Provide evidence, in way of a surveyor's report, of the vessel's previous dry docking.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Navigation
Issued 11 April 1997
Resolved
Prior to departure, provide on board a current edition of the Tidal CurrentTables.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Engineering
Issued 11 April 1997
Resolved
Prior to departure, pump down the engine romm bilge to an approved shore side facility and provide an original receipt for review from such facility.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Navigation
Issued 11 April 1997
Resolved
Prior to departure, provide documentation from the vessel's Flag Administration or [name withheld] attesting to the fact that the vessel's navigation lights comply with the 72 COLREGS, Rule 22(a).
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Navigation
Issued 11 April 1997
Resolved
Prior to departure, provide on board a current copy of U.S. Coast Pilot 4.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Construction/Loadline
Issued 11 April 1997
Resolved
Prior to departure, provide for review documentation from the vessel's FlagAdministration or [name withheld] attesting to the material condition of the aluminum superstructure where it is rivited to the steel main deck. Several areas are wasted completely through.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Lifesaving
Issued 11 April 1997
Resolved
Prior to departure, provide on board a total of 6 handheld red and 6 orangedistress signals or 12 combination distress signals.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Fire Fighting
Issued 11 April 1997
Resolved
Prior to departue, demonstrate a satisfactory fire and abandon ship drill.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Lifesaving
Issued 11 April 1997
Resolved
Prior to departure, provide and post a life-saving signals placard.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Fire Fighting
Issued 11 April 1997
Resolved
Prior to departure, service or replace the galley's and the paint locker's hand portable fire extinguishers.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Accommodation/Occupational Safety
Issued 11 April 1997
Resolved
Chain and lock the MSD holding tank's overboard discharge valve in the closed position or secure the valve and remove the valve's handle.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Navigation
Issued 11 April 1997
Resolved
Prior to departue, provide on board a current edition of U.S. Coast Guard Light List Volume III.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Navigation
Issued 11 April 1997
Resolved
Prior to departure, provide on board a current edition of the Tide Tables.
Condition: Unknown
Due 11 April 1997
Resolved 11 April 1997
Documentation
Issued 16 September 1995
Resolved
VESSEL TO PROVIDE CERTIFICATE OF FINANCIAL RESPONSIBILITY PRIOR TO BUNKERING OR DEPARTING.
Condition: Unknown
Due 9 April 1997
Resolved 9 April 1997
Construction/Loadline
Issued 16 May 1995
Resolved
PROVIDE GAUGINGS TO BALLAST TANKS AND SUBMIT A SURVEYORS REPORT TO MSO MIAMI.
Condition: Unknown
Due 10 April 1997
Resolved 11 April 1997
Documentation
Issued 16 May 1995
Resolved
PROVIDE SAFETY RADIO CERTIFICATE.
Condition: Unknown
Due 9 April 1997
Resolved 9 April 1997
Construction/Loadline
Issued 16 May 1995
Resolved
PROVIDE PERMANENTLY MARKED LOADLINE ON THE VESSEL HULL PRIOR TOVESSEL RETURNING TO US WATERS AFTER 17MAY95.
Condition: Unknown
Due 19 September 1995
Resolved 19 September 1995
Deck/Cargo
Issued 25 March 1995
Resolved
Provide Discharge of oil prohibed placards as needed.
Condition: Unknown
Due 1 October 1995
Resolved 9 April 1997
Navigation
Issued 25 March 1995
Resolved
Provide U.S. Coast Pilot #5 prior to departure.
Condition: Unknown
Due 25 April 1995
Resolved 25 April 1995
Documentation
Issued 25 March 1995
Resolved
Provide one additional licenced mate on board prior to departure.
Condition: Unknown
Due 25 April 1995
Resolved 25 April 1995
Navigation
Issued 25 March 1995
Resolved
Provide a compass deviation table.
Condition: Unknown
Due 19 September 1995
Resolved 19 September 1995
Fire Fighting
Issued 25 March 1995
Resolved
Make permanent repairs to fire main piping where leaking.
Condition: Unknown
Due 25 April 1995
Resolved 25 April 1995
Accommodation/Occupational Safety
Issued 25 March 1995
Resolved
Make permanent repairs to railing starboard side aft.
Condition: Unknown
Due 19 May 1995
Resolved 19 May 1995
Lifesaving
Issued 25 March 1995
Resolved
Replace starboard side life boat or authorization from flag state to operate without it.
Condition: Unknown
Due 19 May 1995
Resolved 19 May 1995
Deck/Cargo
Issued 25 March 1995
Resolved
Provide oil transfer procedures prior to next U.S. Port.
Condition: Unknown
Due 19 May 1995
Resolved 19 May 1995
Lifesaving
Issued 25 March 1995
Resolved
Service life raft and install float free weak links and hydrostatic release.
Condition: Unknown
Due 25 April 1995
Resolved 25 April 1995
Navigation
Issued 25 March 1995
Resolved
Provide chart No. 11414 prior to departure.
Condition: Unknown
Due 25 April 1995
Resolved 25 April 1995