Records from 1992 to 2026. Most recent: inspection, 6 August 2026.
Documentation record
Registered dimensions (L × B × D)49.4 ft × 18.0 ft × 8.5 ft
Registered tonnagegross 50 / net 34
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSHERMAN SHIPYARD, INC. · PANAMA CITY, FL, UNITED STATES · built 1976
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMIAMI, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 25 September 2025 · expires 31 October 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it50 - Regulatory (Subpart C or D), Gross Ton
34 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 30
6 August 2026
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8456725
3 January 2026
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8356722
17 November 2025
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8269090
2 October 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8012403
13 August 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7980369
14 August 2023
COI Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7767761
12 August 2023
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7766352
29 June 2023
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7813743
14 October 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7577167
12 October 2021
Administrative Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7332380
16 July 2021
Administrative Inspection · Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7258780
15 December 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7112221
11 October 2019
Administrative Inspection · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6832695
26 June 2018
Initial Certification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6456244
29 November 2017
Industry Initiated Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6315303
16 May 2014
Industry Initiated Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4859961
9 May 2012
Administration
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4311870
6 May 2011
Administration
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4283737
10 December 2009
Administration
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3677946
29 September 2007
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3071856
1 September 2007
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3067285
6 December 2006
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2835305
5 December 1997
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 144379
26 August 1997
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 161925
26 March 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 60880
14 March 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 51548
3 September 1995
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 41444
24 May 1995
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 19513
24 September 1994
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 140579
14 February 1992
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 160393
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 November 2025
Resolved
Individual circuit breakers on switchboards and distribution panels must be labeled with a description of the loads they serve. The breaker panel in the machinery space needs to be properly labeled.
46 CFR 143.400(d)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 December 2025
Resolved 19 November 2025
Resolution: Breaker panel properly labeled.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 17 November 2025
Resolved
An exposed hazard such as gears and rotating machinery, must be protected by a cover, guard or rail. A guard needs to be installed on the generator to protect from the hazards from the rotating belts.
46 CFR 144.820
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 December 2025
Resolved 25 November 2025
Resolution: Protective guard installed.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 2 October 2024
Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weather-tight function properly. 3 of the 4 securing devices on both the port and starboard side Watertight doors are inoperable. Repair seized dogging devices.
46 CFR 140.610
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 October 2024
Resolution: Received pictures from operator clearing deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 October 2024
Resolved
Each distribution panel or switchboard on a towing vessel must be: Totally enclosed and of the dead-front type. Electrical panel on bridge is missing a front cover.
46 CFR 143.560
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 October 2024
Resolution: Received pictures from operator clearing deficiency.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 2 October 2024
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards.
Remove standing water from starboard battery box and properly cover the generator battery box which is missing a protective case.
46 CFR 143.400 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 14 October 2024
Resolution: Received pictures from operator clearing deficiency.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 August 2023
Resolved
A towing vessel may not be operated without having on board a valid COI issued by the Coast Guard. Vessel was found to be in operation with current COI expired as of 20 July 2023. The renewal inspection must be completed prior to operations.
46 CFR 136.200
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2023