MOBRO 1210 is a 1994 freight barge. The Coast Guard has recorded 90 inspections since 1994, most recently in August 2025, along with 94 deficiencies — 1 with no resolution recorded —, 8 operational controls and 9 casualty investigations between 2010 and 2021.

Records from 1994 to 2025. Most recent: inspection, 14 August 2025.

Built
1994
Last inspected
14 August 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 14 August 2025
…with no type recorded31
Operational controls None recorded without a removal date
Years with a record 28 calendar years (1994–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

405931
Flag
UNITED STATES
Maury page id
psix-405931

Documentation record

Registered dimensions (L × B × D)144.0 ft × 50.0 ft × 8.0 ft
Registered tonnagegross 433 / net 129
ITC dimensions (L × B × D)144.0 ft × 50.0 ft × 8.0 ft
ITC tonnagegross 433 / net 129
BuilderCORN ISLAND SHIPYARD INC · GRANDVIEW, IN, UNITED STATES · built 1994
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portJACKSONVILLE, FL
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 2 July 2025 · expires 31 July 2026
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it433 - Convention (Subpart B), Gross Ton
129 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

90 inspections, each with its date, unit and type; 94 deficiencies with the resolution recorded against each; 8 operational controls with the dates imposed and removed; 5 vessels inspected with it, by name and date; 9 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 5

Inspection history · 90

14 August 2025 Administrative Inspection
Administrative · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8210185
22 March 2024 Examination of Repairs · Periodic Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7883445
20 April 2023 MARPOL Annex I Examination · Administrative Inspection · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7672309
22 August 2022 In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7540313
26 July 2022 MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA/ISPS Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7516768
28 June 2021 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7238656
7 May 2021 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7208545
24 March 2021 Administrative Inspection · MTSA/ISPS Verification · MARPOL Annex VI Survey · MARPOL Annex I Examination · COI Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7162352
22 February 2021 Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7143988
24 April 2020 Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6947790
12 December 2019 Load Line/Change of Employment · Administrative Inspection · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6872679
14 July 2017 Internal Structural Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6206763
10 March 2017 COI Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6099631
18 July 2014 Periodic Inspection · Internal Structural Exam · MARPOL Annex I Examination · MARPOL Annex VI Survey · Drydock Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4926106
8 April 2014 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4831677
1 November 2013 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4751005
18 October 2013 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4737063
15 October 2013 Administrative Inspection
Administrative · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 4734710
10 October 2013 Annual Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 4732706
2 July 2013 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 4640628
19 June 2013 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 4625125
9 June 2013 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 4618650
13 September 2012 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4444136
16 August 2012 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4412510
7 August 2012 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4404125
6 July 2012 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4369880
27 June 2012 Internal Structural Exam · MTSA Verification · Annual Inspection · Hull Examination · In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4359006
27 June 2012 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4359382
17 May 2012 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4313779
27 March 2012 MTSA Verification · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4273180
30 January 2012 Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4234469
23 January 2012 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4229922
7 December 2011 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4203855
10 August 2011 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4111543
28 July 2011 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4097437
12 July 2011 COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4078088
1 June 2011 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4038088
29 November 2010 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3900560
17 November 2010 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3893006
18 October 2010 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3872058
14 October 2010 In-Service Inspection · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3869853
5 October 2010 Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3863978
20 September 2010 Plan Review (Other than "T") · Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3854170
30 August 2010 In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3837661
27 July 2010 Damage Survey · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3808212
24 July 2010 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3828418
22 March 2010 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3700589
26 January 2010 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3670073
11 January 2010 Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3661880
24 September 2009 In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3602290
14 September 2009 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3558214
14 September 2009 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3594148
11 September 2009 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3592008
2 December 2008 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3372475
2 October 2008 Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3337009
12 February 2008 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3146194
4 September 2007 MTSA Verification · Annual Inspection · Deficiency Check · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3048562
7 August 2007 Internal Structural Exam · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3020732
26 June 2007 In-Service Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2975037
15 June 2007 Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 2962631
13 June 2007 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2960198
10 July 2006 COI Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2708259
12 September 2005 Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2490486
20 May 2005 MTSA Verification
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2363082
2 May 2005 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2313886
11 January 2005 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2298399
18 August 2004 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2169012
26 July 2004 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2140284
9 July 2004 Internal Structural Exam · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2127444
4 June 2004 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2092251
15 January 2004 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1995306
5 November 2003 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1945706
2 September 2003 Re-Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1894825
16 August 2003 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1881956
29 July 2003 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1861564
4 March 2003 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1755219
27 September 2002 Internal Structural Exam · Re-Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1682547
19 June 2001 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1423591
7 August 2000 Deficiency Check · Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1460455
21 June 1999 Hull Examination · COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1470985
24 February 1999 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 802532
14 December 1998 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 807725
17 August 1998 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1421543
18 December 1997 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 66422
24 August 1997 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1110271
21 July 1997 COI Inspection · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 780009
12 May 1997 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 116345
23 October 1995 Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 871314
23 August 1994 Hull Examination · COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1176555
24 May 1994 MARPOL Annex I Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1013787

Deficiency record · 94

01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 August 2025 No resolution recorded
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. (1) You must contact the cognizant OCMI to schedule an inspection at a time and place which he or she approves. Vessel's anniversary date is March 29, 2026. Vessel's anniversary dates for its IOPP and IAPP certificates is March 29th. Vessel missed its annual and annual surveys. Vessel is prohibited from carrying cargo listed under 46 CFR 2.01-7(a) which would require the barge to be inspected under 46 CFR subchapter I. Barge must submit an application for inspection for a new COI.
Action required: 701 - Prior to carriage of passengers/cargo
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 March 2024 Resolved
Each vessel which has not met the applicable examination schedules because it is on a voyage, must undergo the required examination upon completion of the voyage. MOBRO 1210's Internal Structural Exam (ISE) was due 28FEB2024. The vessel shall proceed to its next U.S. port of call upon completion of its current voyage and shall not depart until an ISE is complete to the satisfaction of an attending Marine Inspector. 46 CFR 91.40-3(f)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 22 March 2024
Resolved 8 April 2024
Resolution: Satisfactory ISE completed.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 26 July 2022 Resolved
Vessels subject to initial and periodic surveys shall have annual surveys, within 3 months either way of the certificate's anniversary date. Vessel was found to be more than one month overdue for annual Load Line survey.
Action required: 10 - Deficiency Rectified
Due 26 July 2022
Resolved 27 July 2022
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 26 July 2022 Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel was found to be more than one month past due for annual inspection. Vessel must undergo annual inspection prior to carriage of hazardous cargo.
Action required: 705 - Other - as specified
Due 26 July 2022
Resolved 3 August 2022
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 December 2019 Resolved
Each unmanned deck cargo barge that operates in salt water must undergo drydock examinations every five years. Vessel exceeded drydock examination date of 12NOV19. - 46CFR91.40-3(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 February 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 December 2019 Resolved
Each unmanned deck cargo barge that operates in salt water must undergo two internal structural examinations within any five year period and no more than three years may elapse between any two examinations.Vessel exceeded internal structural examination date of 12NOV19. - 46CFR91.40-3(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 February 2021
Resolved 28 February 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 December 2019 Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel exceeded annual examination date of 10JUN18. - 46CFR91.27-1(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 March 2021
Electrical › Electric Generation Source (service) › Power Requirement
Issued 18 October 2013 Resolved
Prior to using the Detroit generator, prove proper operation of the fuel oil shutoff.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 October 2013
Resolved 18 October 2013
Electrical › Electric Generation Source (emergency) › Switch
Issued 18 October 2013 Resolved
Prove proper operation of the John Deere generator including fuel oil shutoff.
Action required: 705 - Other - as specified
Due 18 November 2013
Resolved 1 November 2013
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 18 October 2013 Resolved
Mount bracket for port navigation light prior to operating at night.
Action required: 705 - Other - as specified
Due 18 November 2013
Resolved 18 October 2013
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 10 October 2013 Resolved
Provide proof to service for all portable fire extinguishers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 October 2013
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Emergency shutdown
Issued 10 October 2013 Resolved
Demonstrate proper operation of Aux Diesel Engine and remote emergency shutdown.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 October 2013
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 10 October 2013 Resolved
Make deck and voids/rakes available for external visual inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 October 2013
Lifesaving › Lifebuoys › Stowage
Issued 10 October 2013 Resolved
Properly mount life-ring and replace retro-reflective tape.
Action required: 705 - Other - as specified
Due 17 October 2013
Resolved 15 October 2013
Resolution: Barge is not required to carry Life-ring.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 10 October 2013 Resolved
Provide life-ring water-light, with 3ft lanyard and corrosion resistant clip.
Action required: 705 - Other - as specified
Due 17 October 2013
Resolved 15 October 2013
Resolution: Not required IAW COI.
Construction/Loadline › Hull › Hull Plating
Issued 27 June 2012 Resolved
The forward bow rake is flooded. Prior to loading cargo or proceeding outside the boundary line, gas free and de-water the bow rake for inspection.
Action required: 705 - Other - as specified
Due 27 July 2012
Resolved 27 July 2012
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 27 June 2012 Resolved
Provide SOPEP approval letter.
Action required: 705 - Other - as specified
Due 30 August 2012
Resolved 7 August 2012
Pollution Prevention/Response › Response Equipment › Non-sparking Hand Scoops/Shovels/Buckets
Issued 27 June 2012 Resolved
Provide required SOPEP equipment per tab F-2.
Action required: 705 - Other - as specified
Due 7 August 2012
Resolved 7 August 2012
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 27 June 2012 Resolved
Prior to operating at night, provide properly operating starboard navigation light.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 July 2012
Resolved 31 July 2012
Fire Fighting › Portable CO2 Fire Extinguisher › Number
Issued 27 June 2012 Resolved
Prior to getting underway, provide one additional portable fire extinguisher.
Action required: 705 - Other - as specified
Due 31 July 2012
Resolved 31 July 2012
Construction/Loadline › Structures › Superstructure
Issued 7 December 2011 Resolved
Repairs to the marine loading ramp identified in RB Enterprises letter dated 01 Dec 2011 to be completed by 01 Mar 2012.
Action required: 705 - Other - as specified
Due 1 March 2012
Resolved 30 January 2012
Construction/Loadline › Structures › Door
Issued 28 July 2011 Resolved
Stern ramp not inspected in accordance with recognized organization standards.
Action required: 705 - Other - as specified
Due 1 November 2011
Resolved 7 December 2011
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 12 July 2011 Resolved
Prior to getting underway, provide one B-II portable fire extinguisher in serviceable condition.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 July 2011
Resolved 12 July 2011
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 12 July 2011 Resolved
Install guard around rotating machinery on the inboard generator.
Action required: 705 - Other - as specified
Due 20 July 2011
Resolved 18 July 2011
Electrical › Electric Generation Source (service) › Generator
Issued 8 November 2010 Resolved
Make the following repairs to the generator space: a - ID oil leak to JD generator and properly repair, b - clean oil from space and battery box, c - provide correct lid for battery box and secure batteries, d - lag exhaust piping, e - properly secure instrument panel for JD generator, f - repair or remove Hz meter, g - properly repair 3 prong plug to warning light.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 November 2010
Resolved 9 November 2010
Construction/Loadline › Hull › Longitudinal Frame
Issued 14 October 2010 Resolved
Crop and renew all bottom longitudinal frames in the bow rake identified as having more than 25% wastage. New framing to extend to good steel and be no less than 24" in length.
Action required: 705 - Other - as specified
Due 14 November 2010
Resolved 8 November 2010
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2010 Resolved
Expand gauging of hull plating in way of readings 3 through 9 of reference report to identify all areas with more than 25% wastage. The gauging is to be completed by an independent contractor and a copy of the report sent to this office for review.
Action required: 705 - Other - as specified
Due 28 October 2010
Resolved 8 November 2010
Construction/Loadline › Hull › Bottom Plating
Issued 14 October 2010 Resolved
All bottom plating identified as having more than 25% wastage is to be cropped and renewed.
Action required: 705 - Other - as specified
Due 14 November 2010
Resolved 8 November 2010
Electrical › Electric Generation Source (service) › Generator
Issued 20 September 2010 Resolved
Prior to using newly installed generator, provide plans to OCMI detailing installation and model specifications for approval.
Action required: 705 - Other - as specified
Due 20 September 2010
Resolved 21 September 2010
Electrical › Electric Generation Source (service) › Generator
Issued 20 September 2010 Resolved
Prior to using either installed generator, proper operation and testing shall be witnessed by attending USCG Marine Inspector
Action required: 705 - Other - as specified
Due 20 September 2010
Resolved 22 September 2010
Electrical › Electric Generation Source (service) › Generator
Issued 20 September 2010 Resolved
Prior to using any additional temporary portable generator, a written request shall be submitted to cognizant OCMI for approval.
Action required: 705 - Other - as specified
Due 20 September 2010
Resolved 22 September 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 September 2010 Resolved
Make repairs to electrical distribution system to include removal of "power strip" and all improperly spliced wires.
Action required: 705 - Other - as specified
Due 20 September 2010
Resolved 22 September 2010
Construction/Loadline › Hull › Transverse Frame
Issued 30 August 2010 Resolved
Due to significant scale and wastage observed after July 2010 grounding investigation, barge Operator is to conduct a gauging survey of the bow rake, including all internal framing. Analysis of the survey is to be signed by a registered professional engineer not later than 12 Oct 2010. ABS structural standards are to be used as the guide.
Action required: 705 - Other - as specified
Due 12 October 2010
Resolved 14 October 2010
Construction/Loadline › Structures › Plowshare Breakwater
Issued 27 July 2010 Resolved
Make permanent repairs to the breakwater and diagonal support brackets.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 27 August 2010
Resolved 30 August 2010
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 27 July 2010 Resolved
Open all voids, de-water if necessary, and make available for inspection.
Action required: 705 - Other - as specified
Due 28 July 2010
Resolved 27 July 2010
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 27 July 2010 Resolved
Conduct dive survey of barge, provide results and repair proposal for any damage identified.
Action required: 705 - Other - as specified
Due 28 July 2010
Resolved 27 July 2010
Construction/Loadline › Hull › Bottom Plating
Issued 27 July 2010 Resolved
Barge is to proceed to Beyel Repair Yard for repairs to the forward void bottom plate. Repairs are to be to the satisfaction of the attending marine inspector and completed prior to the barge going to sea.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 29 July 2010
Resolved 29 July 2010
Electrical › Electric Generation Source (service) › Generator
Issued 14 September 2009 Resolved
Prior to installing Conex box with enclosed generator, switchboard and fuel tank; submit fuel tank and electircal plans to MSC for approval. Barge is restricted from operating with installed generator and fuel tank, until plans are approved by MSC and construction oversight is complete.
Action required: 705 - Other - as specified
Resolved 18 November 2009
Resolution: Recieved approved drawings from MLC, and completed construction oversight.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 30 July 2009 Resolved
-All references to Regulation 26 must be amended to reference Regulation 37.
Due 25 January 2010
Resolved 26 January 2010
Deck/Cargo › Cargo Stowage › General
Issued 7 August 2007 Resolved
Loading ramp is not installed. Renew all hinges, cables, pulley sheeves to the satisfaction of attending C.G. Inspector. Vessel is not permitted to use RO/RO Ramp until all repairs are made. Laoding by other methods i.e. crane is allowed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 4 September 2007
Resolution: Loading ramp was reinstalled and weight test witnessed by ABS Surveyor - report provided.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 26 June 2007 Resolved
Make permanent repair to electrical junction box and wiring run, port side aft, where wasted. Electrical wiring and connections to be approved or accepted devices.
Condition: Improper/Lack of Maintenance
Due 3 July 2007
Resolved 29 June 2007
Resolution: Cleared.
Electrical › Lighting (service) › Lighting Feeder
Issued 26 June 2007 Resolved
Make proper run of electrical supply using approved wiring, connections, conduit to lighting, aft RO/RO ramp, where needed.
Condition: Improper Installation
Due 3 July 2007
Resolved 29 June 2007
Resolution: Cleared.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 26 June 2007 Resolved
Provide proper means of closure to both ventilation systems on Main Generator Housing. Plywood inserts are combustible and not acceptable.
Condition: Improper/Lack of Maintenance
Due 3 July 2007
Resolved 29 June 2007
Resolution: Cleared.
Construction/Loadline › Hull › Hull Plating
Issued 26 June 2007 Resolved
Make bow rake available for inspection and provide plans to repair bottom plate, internal framing and head log where inset, starboard side. Area is significantly inset and external plate appears to have been fractured as a result of an allision with unknown object.
Condition: Damaged By Earlier Event
Due 3 July 2007
Resolved 29 June 2007
Resolution: Cleared.
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 26 June 2007 Resolved
Properly descale and repair Generator Enclosure where wasted and holed. Area must be made vapor tight and capable of retaining fire suppressant, if need arises to empty bottle into space to extinguish fire. Current housing holed in various places and wasted.
Condition: Improper/Lack of Maintenance
Due 3 July 2007
Resolved 28 August 2007
Resolution: Repaired by installing doubler plates and clad welding smaller holes. All Sat.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 26 June 2007 Resolved
Repair or remove bulwark on deck. System is holed, wasted and structural components have failed and/or distorted from damage and corrosion.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 July 2009
Resolved 14 September 2009
Resolution: Most of the deck (90%) have been replaced and all holed, wasted and structual compenents have been repaired.
Construction/Loadline › Hull › Bracket
Issued 26 June 2007 Resolved
Descale and prepare all sheaves, chocks and structural components associated with stern ramp where wasted. Items to be examined and proper repairs or replacement to be made. Numerous wasted and unacceptable risk were identified on the both the structure and tackle associated with this system.
Condition: Improper/Lack of Maintenance
Due 3 July 2007
Resolved 28 November 2007
Resolution: Work not complete, reissued CG 835 to be more inclusive and restrict the vessels use of the loading ramp. Not allowed to use the loading ramp to load or unload cargo until all work is complete.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 26 June 2007 Resolved
Replace W/T door and knife edge on Generator Housing aft, where wasted.
Condition: Improper/Lack of Maintenance
Due 3 July 2007
Resolved 29 June 2007
Resolution: Cleared.
Construction/Loadline › Structures › Deck Plating
Issued 26 June 2007 Resolved
Remove cargo from deck and make both deck and internal void spaces available for inspection. Barge shows signs of significant wastage and a more thorough examination must be conducted by qualified inspectors.
Condition: Improper/Lack of Maintenance
Due 3 July 2007
Resolved 28 November 2007
Resolution: All cargo removed, satisfactory Internal Sturctural Examination is complete.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 26 June 2007 Resolved
Provide evidence of approved SOPEP prior to operation
Condition: Unknown
Due 3 July 2007
Resolved 28 August 2007
Resolution: VRP web site shows SOPEP approved on 07 Aug 2007.
Deck/Cargo › Cargo Stowage › General
Issued 26 June 2007 Resolved
Replace/Repair cargo deck securing rings on main deck where extremely wasted. (If wasted more than 60 percent of original diameter.)
Condition: Improper/Lack of Maintenance
Due 27 July 2007
Resolved 28 August 2007
Resolution: All deck rings were replaced or removed as needed. All Sat.
Deck/Cargo › Cargo Refrigeration › General
Issued 26 June 2007 Resolved
Remove refrigerated cargo containers on Port and Stbd sides, Aft, or repair structural damage to both containers to acceptable standards.
Condition: Improper/Lack of Maintenance
Due 27 July 2007
Resolved 28 August 2007
Resolution: No containers were on board when vessel arrived in Sec Jax AOR.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 15 June 2007 Resolved
33 C.F.R. 151.28(c) The entire plan must be resubmitted to (CG-3PCV-1) for re-approval 6 months before the end of Coast Guard approval period. The MOBRO 1210 SOPEP expiration date is 25 Jun 07. The plan was resubmitted on 30 May 07. The plan is currently pending while the resubmission is under review, and the plan holder was informed via letter from (CG-3PCV-1), VRP Program dated 15 Jun 07.
Action required: 705 - Other - as specified
Resolved 3 July 2007
Resolution: SOPEP was approved 03 Jul 07, checked status with VRP web site.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 11 July 2006 Resolved
Vessels 5 yr approval for its SOPEP has expired in violation of 33 CFR 151.27(e). SOPEP is required to be resubmit to CG HQ for reapproval NLT18JUL06.
Action required: 705 - Other - as specified
Due 11 July 2006
Resolved 11 July 2006
Resolution: Valid SOPEP approval provided.
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 July 2006 Resolved
Wiring for the stern ramp electric motor has been chafed and pulled from it's junction box. Motor shall be rewired with appropriatly sized wiring approved for marine use NLT 11AUG06.
Action required: 705 - Other - as specified
Due 11 August 2006
Resolved 1 August 2006
Resolution: Witnessed satisfactory repairs ([name withheld]).
Documentation › Certificates/Documents › International Load Line Certificate
Issued 11 July 2006 Resolved
Annual survey for the vessels International Loadline certificate has not been carried out. Survey shall be completed prior to the vessel departing Port Canaveral, FL.
Action required: 705 - Other - as specified
Due 11 July 2006
Resolved 12 July 2006
Resolution: LL survey completed by ABS.
Personnel › Certificates/Documents/Licenses › License, Operator
Issued 11 July 2006 Resolved
Barge is prohibited from departing Port Canaveral, FL until it is under the direction and control of licensed master holding the proper towing endorsement applicable to the size vessel.
Action required: 705 - Other - as specified
Due 11 July 2006
Resolved 12 July 2006
Resolution: Properly licensed master provided.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 12 September 2005 Resolved
Provide original valid Cert. of Documentation.
Action required: 705 - Other - as specified
Due 12 October 2005
Resolved 13 September 2005
Resolution: Completed.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 12 September 2005 Resolved
Properly mark vessel's name and hailing port on stern.
Action required: 705 - Other - as specified
Due 12 October 2005
Resolved 29 September 2005
Resolution: Completed.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 12 September 2005 Resolved
Modify sight glass for fuel tank feeding generators using proper type materials.
Action required: 705 - Other - as specified
Due 12 October 2005
Resolved 29 September 2005
Resolution: Completed.
Engineering › Fuel Oil Service System › Filter
Issued 12 September 2005 Resolved
Install heat shield on Raycor fuel filter for forward generator.
Action required: 705 - Other - as specified
Due 12 October 2005
Resolved 29 September 2005
Resolution: Completed.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 12 September 2005 Resolved
Re-paint mount for sidelights matte black.
Action required: 705 - Other - as specified
Due 12 October 2005
Resolved 29 September 2005
Resolution: Completed.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 12 September 2005 Resolved
Demonstrate proper operation of sidelights prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 October 2005
Resolved 13 October 2005
Resolution: Completed.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 12 September 2005 Resolved
Provide proof of payment of vessel inspection fee.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 October 2005
Resolved 13 September 2005
Resolution: Completed.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 9 July 2004 Resolved
COD not endorsed for registry, Vessel making International voyages
Due 9 July 2004
Resolved 19 July 2004
Resolution: Recieved word from NVDC
Construction/Loadline › Hull › Bottom Plating
Issued 9 July 2004 Resolved
Found pin hole Stbd side fwd rake, also found wasted steel, insert approx 4x8 bottom plate
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2004
Resolution: Hose test Sat, Insert and NDT shoots found metal in good shape
Operations/Management › Log/Records › Ballast Water Reporting Form
Issued 4 June 2004 Resolved
VESSEL CANNOT BE USED UNTIL PAST USER FEE'S ARE PAID AND FOUR DEFICIENCIES OUTSTANDING FROM SEPTEMBER 2003 ARE CLEARED.
Due 11 June 2004
Resolved 9 July 2004
Resolution: Recieved cancel check
Electrical › Electrical Distribution System (service) › Cable
Issued 2 September 2003 Resolved
PROPERLY SECURE ALL ELECTRICAL WIRES IN AFT STARBOARD GENERATOR SPACE. LEGACY COMPONENT DESC: Wiring
Condition: Improper Installation
Due 12 September 2003
Resolved 27 July 2004
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 2 September 2003 Resolved
PROVIDE SERVICING REPORT FOR BOTH PORTABLE EXTINGUISHERS FOR GENERATOR SPACE. LEGACY COMPONENT DESC: Service
Condition: Improper/Lack of Maintenance
Due 12 September 2003
Resolved 9 July 2004
Resolution: Recvd Service report
Navigation › Piloting/Steering › Coast Guard Light List
Issued 2 September 2003 Resolved
PROVIDE U.L. APPROVED NAVIGATION LIGHTS.
Condition: Improper Installation
Due 12 September 2003
Resolved 29 June 2004
Construction/Loadline › Penetrations › Gasket
Issued 2 September 2003 Resolved
PROVIDE CAPTURE CHAIN FOR FOREPEAK HATCH COVER.
Condition: Improper/Lack of Maintenance
Due 12 September 2003
Resolved 9 July 2004
Construction/Loadline › Structures
Issued 27 September 2002 Resolved
#2 PORT VOID: REPAIR FRACTURED WELD AT SIDE SHELL 1ST "K" FRAME, CROP AND RENEW (3) BRACKETS AFT BULKHEAD AND FORWARD BULKHEAD AT SIDESHELL. LEGACY COMPONENT DESC: Deck Plating
Condition: Unknown
Due 27 October 2002
Resolved 4 November 2002
Resolution: ALL REPAIRS MADE TO FRACTURED WELDS & NEW BRACKETS INSTALLED.
Engineering › Lubricating Oil Service System
Issued 27 September 2002 Resolved
RENEW HYDRAULIC HOSES AT CONTROL STATION FOR STERN RAMP. LEGACY COMPONENT DESC: Hose
Condition: Unknown
Due 27 October 2002
Resolved 4 November 2002
Resolution: ALL HOSES REPLACED AT CONTROL STATION.
Electrical › Electric Generation Source (service)
Issued 27 September 2002 Resolved
PROPERLY MOUNT BOTH CONTROL PANELS FOR EACH GENERATOR SET. LEGACY COMPONENT DESC: Panelboard
Condition: Unknown
Due 27 October 2002
Resolved 4 November 2002
Resolution: CONTROL PANELS WERE PROPERLY MOUNTED.
Engineering › Fuel Oil Storage/Transfer System
Issued 27 September 2002 Resolved
INSTALL FLAME SCREEN IN FUEL OIL STORAGE TANK VENT, CLAMPS ON SECONDARY FUEL OIL FILTER HOSES, AND FLAME DEFLECTOR BOWLS ON RACOR FILTERS. LEGACY COMPONENT DESC: Vent Pipe
Condition: Unknown
Due 27 October 2002
Resolved 4 November 2002
Resolution: NEW FLAME SCREEN, CLAMPS & FLAME DEFLECTOR BOWLS WERE PROPERLY INSTALLED.
Electrical › Electric Supply System (service)
Issued 27 September 2002 Resolved
INSTALL CLAMPS/WIRE HANGERS FOR LOOSE ELECTRICAL CABLES IN GENERATOR HOUSE. LEGACY COMPONENT DESC: Cable
Condition: Unknown
Due 27 October 2002
Resolved 4 November 2002
Resolution: ELECTRICAL CABLES WERE PROPERLY MOUNTED.
Electrical › Electrical Distribution System (service)
Issued 27 September 2002 Resolved
REMOVE ALL DISCONNECTED WIRES LOCATED ON STERN JUCTION BOXES. INSURE DISCONNECTED FROM SOURCE. LEGACY COMPONENT DESC: Junction Box
Condition: Unknown
Due 27 October 2002
Resolved 4 November 2002
Resolution: DISCONNECTED WIRING WAS REMOVED AND JUNTION BOX SEALED.
Electrical › Electric Supply System (service)
Issued 27 September 2002 Resolved
REMOUNT BATTERIES IN GENERATOR SHACK. LEGACY COMPONENT DESC: Battery Installation
Condition: Improper Installation
Due 27 October 2002
Resolved 4 November 2002
Resolution: BATTERIES WERE PROPERLY MOUNTED.
Fire Fighting › Remote Fuel Shutoff
Issued 27 September 2002 Resolved
Condition: Unknown
Due 27 October 2002
Resolved 4 November 2002
Resolution: REMOTE FUEL SHUTDOWN WAS FABRICATED IN PLACE AND OPERATIONAL.
Documentation › Certificates/Documents
Issued 27 September 2002 Resolved
VESSEL OPERATED WITHOUT A VALID COI FORM 31JUL02 TO 27SEP02 LEGACY COMPONENT DESC: Certificate of Inspection
Action required: 705 - Other - as specified
Resolved 27 September 2002
Resolution: MOBRO 1210 EXCEEDED THE REQUIRED ISE DATE OF 31JUL02. VESSEL CONDUCTED OPERATIONS BETWEEN 31JUL02 & 27SEP02. ISE WAS CONDUCTED ON 27SEP02 & VESSEL WAS ISSUED A CERTIFICATE OF INSPECTION AMENDMENT. NOTED DEFICIENCIES WERE CLEARED ON 04NOV02.
Construction/Loadline
Issued 7 August 2000 Resolved
OPEN VOIDS 4 PORT AND STBD AND MAKE AVAILABLE FOR VISUAL EXAM FROM MAIN DECK.
Condition: Unknown
Due 11 August 2000
Resolved 22 August 2000
Fire Fighting
Issued 7 August 2000 Resolved
PROVIDE SERVICE REPORT FOR PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 11 August 2000
Resolved 22 August 2000
Unknown
Issued 7 August 2000 Resolved
PROVIDE DOCUMENTATION PAYMENT OF USER FEES.
Condition: Unknown
Due 11 August 2000
Resolved 22 August 2000
Construction/Loadline
Issued 7 August 2000 Resolved
RENEW OR REPLACE HATCH GASKETS, SECURING CHAINS WHERE MISSING OR DAMAGED.
Condition: Unknown
Due 11 August 2000
Resolved 22 August 2000
Electrical
Issued 17 August 1998 Resolved
PROVIDE COPY OF CG APPROVED PLANS (REVISED) INDICATING INSTALLATION OF NEW GENERATORS. (46 CFR 110.25)
Condition: Unknown
Due 17 August 1998
Resolved 17 August 1998
Documentation
Issued 21 July 1997 Resolved
PROVIDE ORIGINAL IOPP CERTIFICATE ON BOARD VESSEL, PRIOR TO DEPARTURE.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Navigation
Issued 21 July 1997 Resolved
PAINT NAVIGATION RUNNING LIGHT SCREENS FLAT BLACK.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Electrical
Issued 21 July 1997 Resolved
RENEW START SWITCH TO RAMP LIFT ENGINE.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Electrical
Issued 21 July 1997 Resolved
PLACE RUNNING LIGHT WIRING SPLICE IN APPROVED ELECTRICAL BOX, AND REMOVE WIRE NUTS.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Fire Fighting
Issued 21 July 1997 Resolved
PROVIDE AND PROPERLY MOUNT 2 C-II PORTABLE FIRE EXTINGUISHERS IN VICINITY OF GENERATOR COMPARTMENT PRIOR TO DEPARTURE.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Documentation
Issued 21 July 1997 Resolved
PROVIDE COPY OF C.G. APPROVED PLANS INDICATING INSTALLATION OF GENERATOR(S).
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Construction/Loadline
Issued 21 July 1997 Resolved
OPEN, GAS FREE AND MAKE AVAILABLE FOR INSPECTION CENTER VOIDS NUMBER 1 AND 2.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Engineering
Issued 21 July 1997 Resolved
COMPLETE PERMANENT INSTALLATION OF GENERATOR RETURN FUEL LINE.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997
Construction/Loadline
Issued 21 July 1997 Resolved
PROVIDE PORTABLE PUMP CAPABLE OF DEWATERING VOIDS IAW 46 CFR 56.50-55, PRIOR TO DEPARTURE.
Condition: Unknown
Due 21 July 1997
Resolved 21 July 1997

Casualty record · 9

24 July 2010Routine · role: Involved in a Marine Casualty · activity 3828418
29 November 2010Routine · role: Involved in a Marine Casualty · activity 3900560
15 May 2011Routine · role: Involved in a Marine Casualty · activity 4082728
27 June 2012Routine · role: Involved in a Marine Casualty · activity 4359382
13 September 2012Routine · role: Moored/Anchored in Vicinity of Primary Subject · serious marine incident, as classified · 1 injured · activity 4444136
9 June 2013Routine · role: Involved in a Marine Casualty · activity 4618650
2 July 2013Routine · role: Involved in a Marine Casualty · activity 4640628
7 May 2021Routine · role: Involved in a Marine Casualty · activity 7208545
28 June 2021Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 7238656
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record