DT 285 is a 1995 freight barge. The Coast Guard has recorded 30 inspections since 1995, most recently in February 2026, along with 17 deficiencies — 1 with no resolution recorded — and 2 casualty investigations between 2016 and 2026.
Records from 1995 to 2026. Most recent: inspection, 4 February 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
DocumentationValid · issued 15 May 2026 · expires 31 May 2027
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it869 - Convention (Subpart B), Net Ton 2898 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page
30 inspections, each with its date, unit and type; 17 deficiencies with the resolution recorded against each; 3 vessels inspected with it, by name and date; 2 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
PlansSign in
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
Crop and renew in STBD #1 void; frame 6 1/2 from transverse to sideshell.
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 5 February 2013
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Side Shell
Issued 11 December 2012Resolved
Crop and renew in STBD #1 void: sideshell iwo pigeon hole ladder.
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 5 February 2013
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Hull Plating
Issued 11 December 2012Resolved
Crop and renew in STBD #1 void; side shell iwo frame 6 include sideshell.
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 5 February 2013
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Side Shell
Issued 11 December 2012Resolved
Crop and renew in STBD #2 void: frame 13 side shell stiffner iwo side longitudinal 5 and 6.
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 5 February 2013
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Side Shell
Issued 11 December 2012Resolved
Crop and renew in STBD #2 void frame 12 side longitudinal #6 6 feet aft of side longitudinal side shell stiffner.
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 5 February 2013
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Sheerstrake
Issued 11 December 2012No resolution recorded
Crop and renew in STBD #2 void frame 15 insert bulkhead at gunwale.
Action required: 705 - Other - as specified
Due 30 January 2013 — due date passed with no resolution recorded
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Side Shell
Issued 11 December 2012Resolved
Crop and renew in STBD #2 at frame 14 side shell stiffner 6 feet.
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 5 February 2013
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Side Shell
Issued 11 December 2012Resolved
Crop and renew in STBD #3 at frame 16 insert bulkhead at gunwale
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 2 February 2013
Resolution: Duplicate deficiency. Cleared with #CG6.
Construction/Loadline › Hull › Side Shell
Issued 11 December 2012Resolved
Crop and renew in PORT #2 void side shell stiffners # 1, 2, and 3 between frame 4 and 5 fwd of the ladder and #4 transverse frame at #3 side shell stiffner.
Action required: 705 - Other - as specified
Due 30 December 2012
Resolved 5 February 2013
Resolution: Satisfactory insert and weld repair.
Construction/Loadline › Hull › Side Shell
Issued 11 December 2012Resolved
Crop and renew inset between frame 35 & 36 in knuckle or aft stbd rake.
Action required: 705 - Other - as specified
Due 30 January 2013
Resolved 5 February 2013
Resolution: Satisfactory weld repair.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 December 2011Resolved
Annual exam not completed within 90 days before or after COI anniversary date of May 5, 2011
Action required: 705 - Other - as specified
Resolved 2 December 2011
Construction/Loadline › Structures › End Bulkhead
Issued 5 May 2010Resolved
FWD Rake: Bulkhead found to be buckled on Port/STBD side between longs 2&3. Crop to good metal and replace to orginal IAW NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 June 2010
Resolved 4 June 2010
Resolution: Visited barge and verified repairs completed IAW NVIC 7-68.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 May 2010Resolved
Port #2 Void: Side long 12 buckled between side longs 5&6. Crop to good steel and replace to orginal IAW NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 June 2010
Resolved 18 June 2010
Resolution: Visited on 4JUN10. Repairs were in progress. On 18JUN10, verified with ABS that repairs were completed IAW NVIC 7-68.
Construction/Loadline › Hull › Bottom Plating
Issued 5 May 2010Resolved
Port #5 Void: Side shell at turn of bilge was inset between fr 30&31. Crop to good steel and replace to original IAW NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 June 2010
Resolved 4 June 2010
Resolution: Visited barge and verified repairs completed IAW NVIC 7-68.
Construction/Loadline › Hull › Bottom Plating
Issued 5 May 2010Resolved
Port Aft Rake: Side shell at turn of bilge was inset IWO frame 34. Crop to good steel and replace to orginal IAW NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 June 2010
Resolved 4 June 2010
Resolution: Visited barge and verified repairs completed IAW NVIC 7-68.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 May 2010Resolved
STBD #1: Trans frame #3 at side shell was buckled and detached from side. Crop to good steel and replace to original IAW NVIC 7-68.
Action required: 705 - Other - as specified
Due 18 June 2010
Resolved 4 June 2010
Resolution: Visited barge and verified repairs completed IAW NVIC 7-68.
Construction/Loadline › Hull › Hull Plating
Issued 21 May 2008Resolved
Make permanent repairs to insets at port chin, frame 31-32 (3'X8' 1.3'deep) and frame 35 (2'X5' 10" deep). Work is to be completed by dry-dock MAY 2010.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 May 2010
Resolved 4 June 2010
Resolution: Visited barge and verified repairs completed IAW NVIC 7-68.
14 February 2016Routine · role: Involved in a Marine Casualty · activity 5817063
4 February 2026Routine · role: Involved in a Marine Casualty · activity 8350898
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.