Records from 1985 to 2026. Most recent: inspection, 18 May 2026.
Inspection history · 140
18 May 2026
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8344010
3 September 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8225068
8 May 2025
Internal Structural Exam · Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8130837
21 March 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8097547
18 March 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8096020
24 February 2025
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8083488
12 August 2024
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7979495
16 July 2024
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7942252
23 April 2024
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7899982
28 March 2024
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7886534
2 January 2024
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7844425
2 August 2023
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7758893
12 July 2023
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7741702
10 July 2023
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7746875
22 June 2023
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7720863
24 May 2023
Deficiency Check · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7696509
4 October 2021
Administrative Inspection · Hull Examination · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7326108
26 April 2021
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7182813
13 January 2021
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7106362
27 November 2020
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7103509
25 November 2020
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7102556
20 October 2020
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7081941
31 March 2020
MTSA Verification · Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6933167
11 July 2019
Hull Examination · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6745565
25 June 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6725539
25 March 2019
Administrative Inspection · Annual Inspection · MTSA Verification · Examination of Repairs · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6648826
7 February 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6622801
4 April 2018
Annual Survey · MTSA Verification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6385316
1 March 2018
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6365758
3 March 2017
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6112479
21 February 2017
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6087231
24 October 2016
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6028768
12 July 2016
Hull Examination · Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5946266
8 October 2015
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5739373
17 August 2015
Re-Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5228606
3 October 2014
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5000725
2 May 2014
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4851083
16 May 2012
Examination of Repairs · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4314888
7 May 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4312987
11 February 2012
Damage Survey · Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4241344
19 August 2011
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4120804
27 July 2011
Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4096026
22 July 2011
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4059278
2 February 2011
Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3937865
29 October 2010
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3880827
18 October 2010
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3872076
7 October 2010
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3865268
27 September 2010
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3857906
11 February 2010
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3678824
7 April 2009
Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3454841
20 February 2009
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3421013
13 February 2009
In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 3427360
27 December 2008
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3376774
6 June 2008
Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3228892
6 April 2008
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 3185625
6 March 2008
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3159358
25 October 2007
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 3087044
22 October 2007
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3094500
17 September 2007
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3059609
13 September 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3057334
14 June 2007
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2955023
10 January 2007
Deficiency Check · Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2853716
29 August 2006
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2762829
17 May 2006
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2647914
21 March 2006
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2606314
14 September 2005
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2492057
25 May 2005
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2374119
12 January 2005
Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2273856
30 August 2004
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2181855
16 June 2004
Periodic Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2099976
25 May 2004
Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2059499
23 April 2004
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2070219
3 November 2003
Hull Examination · Internal Structural Exam
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1906926
7 July 2003
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1837988
24 June 2003
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1825195
2 May 2003
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1785013
24 September 2002
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1679634
14 August 2002
Internal Structural Exam · Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1661513
15 July 2002
Annual Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1646551
12 March 2002
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1493133
10 May 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1068325
16 April 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1370106
29 March 2001
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429515
8 February 2001
Examination of Repairs
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1469656
11 July 2000
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 819788
23 June 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1050405
4 April 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1393391
1 December 1999
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1130115
6 October 1999
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1194979
3 June 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 805880
31 March 1999
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1473408
16 December 1998
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 813126
15 December 1998
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 809272
17 April 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1123645
8 April 1998
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1125665
27 March 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 787467
14 March 1998
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1107494
13 March 1998
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1106739
14 February 1998
Hull Examination · Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1390664
11 March 1997
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1101222
20 February 1997
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1455442
29 December 1996
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1374822
26 January 1996
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 882899
31 October 1995
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1189489
17 October 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 871066
10 January 1995
Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1443578
14 April 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 856787
4 March 1994
Re-Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1164964
23 March 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1147652
20 November 1992
Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1137683
17 November 1992
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 56224
11 June 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 76503
14 January 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 944699
29 October 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 963014
28 September 1991
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1248984
30 August 1990
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 916149
23 August 1990
COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 907975
2 February 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1238212
29 December 1989
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1229047
13 October 1989
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1345301
19 May 1989
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1207634
26 April 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1037116
4 January 1989
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1351806
5 November 1988
Examination of Repairs
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1207297
11 October 1988
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1045373
29 August 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 895294
29 August 1988
Hull Examination · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1039577
8 April 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 995870
30 November 1987
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1016402
7 October 1987
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1322570
26 May 1987
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1334107
6 April 1987
COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1022729
31 December 1986
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1006315
9 October 1986
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1314930
19 September 1986
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1027840
11 August 1986
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 999233
25 February 1986
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 990108
20 November 1985
Credit Drydock · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 996023
3 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 981272
15 February 1985
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1286627
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 18 May 2026
Resolved
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. Cable for Starboard CPP was severely chafed. Repair to the satisfaction of the MI. 46 CFR 111.01-1(a)(1)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 May 2026
Resolution: Cable Repaired
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 18 May 2026
Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable, and sanitary condition. Forward and aft decommissioned elevators in accommodations have doors that are not secured to prevent inadvertent entry into elevator shaft. Secure elevator doors to satisfaction of MI. 46 CFR 92.20-15
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 May 2026
Resolution: Elevator doors were secured.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 18 May 2026
Resolved
The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces, galleys, main pantries and storerooms, other than small service lockers, shall be of “A” Class construction. Two open penetrations were found going from the main deck into the port and starboard side of the pump room. Plug/cap penetrations to satisfaction of MI. 46 CFR 92.07-10(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 20 May 2026
Resolution: Penetrations sealed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 May 2026
Resolved
Each shore connection box must have a bottom entrance for the shore connection cable. The box must provide protection to the shore connection when the connection is in use. Watertight fittings for shore power cables were broken. Repair to the satisfaction of the MIs. 46 CFR 111.83-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 20 May 2026
Resolution: Shore cables repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 September 2025
Resolved
Each thermocouple, pyrometer, or instrumentation cable conductor must be 22 AWG (0.33 mm2) or larger. Engine thermocouples had multiple areas of chaffing. Inspect all engine thermocouple wiring and repair broken/worn wiring. 46 CFR 111.60-4(b) 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2025
Resolved 22 September 2025
Resolution: Thermocouple wire insulation was taped. Monitor during future inspections.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 3 September 2025
Resolved
The routine maintenance of the oily water separating equipment and the bilge alarm must be clearly defined by the manufacturer in the associated operating and maintenance manuals. All routine and repair maintenance must be recorded. Port Aft OWS was inoperable. Repair to the satisfaction of the Marine inspector. 33 CFR 155.380(f) 16 c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2025
Resolved 22 September 2025
Resolution: Witnessed satisfactory test of OWS.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 3 September 2025
Resolved
Machinery driving forced-draft and induced-draft fans, fuel-oil transfer pumps, fuel-oil unit and service pumps, and similar fuel-oil pumps must be fitted with remote controls from a readily accessible position outside the space concerned so that the fans or pumps may be stopped in case of fire in the compartment in which they are located. The controls must be suitably protected against accidental operation and against tampering and must be suitably marked. Fuel shutoff cable on the starboard inboard engine was showing signs of wear. Replace or repair to the satisfaction of the marine inspector. 46 CFR 58.01-25 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2025
Resolved 22 September 2025
Resolution: Cable replaced and tested.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 September 2025
Resolved
Piping conveying oil must be run away from hot surfaces wherever possible. Where such leads are unavoidable, only welded joints are to be used, or alternatively, suitable shields are to be fitted in the way of flanged or mechanical pipe joints when welded joints are not practicable. Multiple shielding/insulation around piping was damaged. Conduct inspection on all pipe insulation/shielding and repair to the satisfaction of the marine inspector. 46 CFR 56.50-60(j) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Insulation replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 September 2025
No resolution recorded
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. Multiple TLIs were not functioning properly. Repair/replace TLIs. Until TLIs are repaired, conduct weekly soundings and soundings during transfers. 46 CFR 111.01-1(a)(1) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 September 2025
Resolved
Fixed fire-extinguishing systems must be checked as noted in Table 91.25-20(a)(2). In addition, all parts of the fixed fire-extinguishing systems, must be examined for excessive corrosion and general conditions. Ventilation shutdown pressure switch for P/S exhaust vents for forward and aft winch rooms was found dislodged within the CO2 control cabinet on the port side. Reattach pressure switch to satisfaction of MI. 46 CFR 91.25-20(a)(2) 50 c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Pressure switch mounted properly.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 September 2025
Resolved
General arrangement plans showing for each deck the control stations, the various fire sections enclosed by fire resisting bulkheads, the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to different compartments and decks and the ventilation system including location of ventilation shutdowns, positions of dampers and the numbers identifying each system. Port and starboard Steam Gen Room A-class doors and port and starboard Fan Room A-class doors within the accommodation space are missing self-closing devices as indicated on the vessel’s fire control plan. Install closing devices to satisfaction of MI. 46CFR91.55-5(d)(1) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Closing devices installed and tested.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 3 September 2025
Resolved
All vessels shall have efficient guard rails or bulwarks on decks and bridges. Stanchions above the rescue boat on the stack deck have cracked welds at the base. Repair to satisfaction of MI. 46 CFR 92.25-5 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Stanchions rewelded to deck.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 September 2025
Resolved
General arrangement plans showing for each deck the control stations, the various fire sections enclosed by fire resisting bulkheads, the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to different compartments and decks and the ventilation system including location of ventilation shutdowns, positions of dampers and the numbers identifying each system. Fan Room and Pump Control House A-class doors are missing locking mechanism causing the doors to be holed. Secure holes to satisfaction of MI. 46CFR91.55-5(d)(1) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Holes plugged with metal plate.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 3 September 2025
Resolved
During preparation and launching, the survival craft, its launching appliance, and the area of water into which it is to be launched are illuminated by lighting supplied from the vessel's emergency source of electrical power. Kick pipe for rescue boat light intended for illuminating area of water during launching is severed. Repair to satisfaction of MI. 46 CFR 199.150(f)(6) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Kick pipe renewed.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 3 September 2025
Resolved
In general, compliance with the standards established by the American Bureau of Shipping, see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. Port aft rollers are holed at gunwale. Repair to satisfaction of MI. 46 CFR 92.01-10 (a) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 29 May 2026
Resolution: Repairs completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 September 2025
No resolution recorded
The deck line is a horizontal line 12 inches in length and 1 inch in breadth. It shall be marked amidships on each side of the vessel, and its upper edge shall normally pass through the point where the continuation outwards of the upper surface of the freeboard deck intersects the outer surface of the shell. Deck line was not present on the starboard side of the vessel. Permanently mark deck line to satisfaction of certificate issuing authority prior to credit drydock. 46 CFR 42.13-20(a) 705c
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 September 2025
Resolved
Vessels that operate in fresh water at least six months in every 12 month period since the last drydock examination must be examined in accordance with the intervals set forth in Table 91.40-3(b) of this section. Vessel completed ISE inspection but has not completed repairs. Complete ISE repair list to the satisfaction of the marine inspector prior to credit ISE. 46 CFR 91.40-3(a)(2) 705c
Action required: 705 - Other - as specified
Resolved 5 June 2026
Resolution: Worklist completed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 September 2025
Resolved
All firehose must be subjected to a test pressure equivalent to the maximum pressure to which they may be subjected in service, but not less than 100 p.s.i. During testing, one 2 ½” hose was found leaking. Hose was replaced with spare. 46 CFR 91.25-20(a)(4) 10c
Action required: 10 - Deficiency Rectified
Resolved 3 September 2025
Resolution: Hose replaced with spare and tested.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 18 March 2025
Resolved
No person may operate an oceangoing ship of less than 400 gross tons, unless it has approved oily-water separating equipment for processing oily mixtures from bilges or fuel oil tank ballast and discharges into the sea. Vessel reported failure of number 3 oily content meter. Vessel is allowed to continue operations with
lines that can be monitored by the remaining operational oil content meters.
Action required: 66 - Prior to drilling or production operations
Due 19 March 2025
Resolved 21 March 2025
Resolution: OWS and OCM are now fully operational.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 16 July 2024
Resolved
Fire-extinguishing equipment must be in suitable condition. Portable and fixed fire extinguishing must be serviced in accordance with this regulation. Fire extinguishing equipment, both portable and fixed were not serviced.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 August 2024
Resolution: Witness CO2 testing. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 16 July 2024
Resolved
Each vessel must carry at least one rescue boat. Vessel's rescue boat was not present at the time of inspection due to servicing.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 August 2024
Resolution: conducted satisfactory inspection of rescue boat.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 16 July 2024
Resolved
GMDSS radio tests shall be conducted weekly and logged appropriately. These tests were not logged.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2024
Resolved 12 August 2024
Resolution: Conducted satisfactory inspection of GMDSS logs.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 July 2024
Resolved
Each Class 1 door on a vessel in ocean service must be designed to withstand a head of water equivalent to the depth from the sill of the door to the margin line but in no case less than 10 feet. Starboard side windlass room door on upper deck did not seal completely on the upper right hand corner, when viewed from inside the windlass room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2024
Resolved 12 August 2024
Resolution: Conducted satisfactory inspection of watertight door.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 July 2024
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space. Light #24 on upper deck in the forward house did not light when tested.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2024
Resolved 12 August 2024
Resolution: Conducted satisfactory inspection of emergency light.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 25 May 2023
Resolved
Each lifeboat must carry the equipment listed in this paragraph and specified for in table 1. Lifeboat’s #1 & #2 do not have the correct quantity of water per person.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 June 2023
Resolution: Vessel provided the correct quantity of water per person for both lifeboats and verified by CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 May 2023
Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use. Found fire station #10 nozzle bail broken.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 June 2023
Resolution: Vessel provided a new firefighting nozzle on fire station #10, verified by CGMI.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 May 2023
Resolved
It shall be the duty of the owner, master, or person in charge to require and have performed at least once in every twelve months the tests and inspections of all fixed fire extinguishing systems on board, as described in Table 91.25-20(a)(2) in § 91.25-20 of this subchapter. Galley APC system inspection is incomplete. Action&Code: 705C (other) - Prior to opening galley for operations.
Action required: 705 - Other - as specified
Resolved 2 June 2023
Resolution: Galley APC system inspection was completed by Hiller, and a service report was provided to the vessel. Verified by CGMI.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 25 May 2023
Resolved
During preparation, launching, and recovery, each survival craft and rescue boat, its launching appliance, and the area of water into which it is to be launched or recovered must be adequately illuminated by lighting supplied from the emergency power source. #1 lifeboat embarkation light is not operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Embarkion Light was found operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
Electric installations on vessels shall be such that the safety of passengers, crew, and vessel from electrical hazards will be assured. Mounting bolts for electrical outlet at rescue boat davit are sheared off and outlet is hanging by its wire and temporarily mounted with line. Aft laundry electrical outlet isn’t properly mounted and is hanging by its wire. Junction box at ball joint davit starboard side isn’t properly mounted and is hanging by its wire.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: All outlets were properly mounted and verified by CGMI.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 25 May 2023
Resolved
The manufacturer's instructions for onboard maintenance of lifesaving appliances must be on board the vessel. The following must be provided for each appliance - A schedule of periodic maintenance. None of the vessels 6 disposable hydrostatic release units are marked with expiration dates.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: All hydrostatic releases were marked with expiration dates, verified by CGMI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
The enclosure of distribution panelboards shall be completely enclosed or protect against accidental contact. Galley panel P120 door is missing its securing device, and breaker cover plate is missing securing screw.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Securing device for the panel door and cover plate had been replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 25 May 2023
Resolved
Vertical communication shall be provided between the various weather decks by means of permanent inclined ladders. Found aft left handrail for vertical ladder
wasted and holed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: Handrail repaired and verified by CGMI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 25 May 2023
Resolved
Means shall be provided to close off all vents and ventilators. Winch room supply ventilation duct cover securing dog mount is broken.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: A new securing dog was mounted, vent cover operationally tested and witnessed by CGMI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
Electric installations on vessels shall be such that the safety of passengers, crew, and vessel from electrical hazards will be assured. Found electrical control panel uncovered with wires hanging and found a drain hose disconnected and sitting on top of a power panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: Control panel cover and wires secured and mounted. Drain hose was permanently removed. Verified by CGMI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Found numerous recently installed LED lights on mates deck port & starboard sides, and on forecastle that are spliced and covered with electrical tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Proper repairs had been made.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 25 May 2023
Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended. Stateroom 500 is missing the main entry door latch rendering it incapable of being secured.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: New latch was installed. Door knob and latch operationally tested an witnessed by CGMI.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 25 May 2023
No resolution recorded
The inspection for certification shall include an inspection of the structure. The inspection shall be such as to ensure that the vessel, as regards the structure, piping is in satisfactory condition and fit for the service for which it is intended, and that it complies with the applicable regulations. Found deck & bulkhead under air handlers outside of 506 light bulb storage locker, and outside of 504 trunk room showing signs of wastage. Also found pipe holed/rotted out at the deck penetration outside 506 light bulb storage locker.
Action required: 705 - Other - as specified
Due 24 June 2023 — due date passed with no resolution recorded
Resolution: Temporary repairs completed
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 25 May 2023
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Found an altered pipe in the collision bulkhead that’s not watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: Pipe was capped and verified by CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 May 2023
Resolved
The hull, superstructure, structural bulkheads, decks, and deckhouses shall be constructed of steel. Found the following MCT’s approved systems were altered, and not IAW manufacturers instruction. MCT locations – under feeder panel EL 102 radio room, 03 level forecastle deck, and 3 on the bridge under fire detection panel, and bridge panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Fire stop had been installed iaw Manufacture's instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 25 May 2023
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Found 1 immersion suit with failed velcro stitching – destroyed in presence of Coast Guard Marine Inspector (CGMI). Found 1 immersion suit missing lifejacket light – installed in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: 1 - Immersion suit was destroyed in presence of CGMI, with a replacement installed. 1 immersion suit light was installed in presence of CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 May 2023
Resolved
The fire main system must be operated and the pressure checked at the most remote and highest outlets. All firehose must be subjected to a test pressure equivalent to the maximum pressure to which they may be subjected in service, but not less than 100 p.s.i. Found 1 1 ½” firehose that failed pressure testing. Firehose was destroyed in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Firehose was destroyed in the presence of CGMI. New hose placed in service.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
The enclosure of distribution panelboards shall be completely enclosed or protect against accidental contact. Found feeder panelboard L 114 has duct tape covering multiple openings. Duct tape removed and proper repairs were made in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Duct tape removed and proper repairs were made in presence of CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 May 2023
Resolved
On all fire-extinguishing systems, all piping controls, valves, and alarms must be checked to ascertain that the system is in operating condition. Fire station #3 1 ½” hose threads damaged. Hose destroyed in presence of, and a new hose was installed in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Hose destroyed in presence of, and a new hose was installed in presence of CGMI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 25 May 2023
Resolved
Means shall be provided to close off all vents and ventilators. Bow anchor windless exhaust cover bolts are missing nuts. Installed nuts in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Installed nuts in presence of CGMI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 October 2021
No resolution recorded
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of
each auxiliary, directly connected to
the engine and supplied as such, must
be at least equivalent to the standards
established by the ABS Steel Vessel. Propeller blades no longer meet ABS standards or can be repaired in a manner to meet the rules. Replace blades that meet the applicable ABS rules at time of next Dry-Dock & conduct inspections required by USCG Sector Virginia Memorandum dated 06 September 2022 to ensure effectiveness of temporary repairs. .
Action required: 705 - Other - as specified
Due 16 June 2022 — due date passed with no resolution recorded
Resolution: Witnessed satisfactory TEMPORARY repairs. Req'd due date extended.
24FEB25: Received Rolls Royce sat testing of hub/seal, required by SEC VA every 6 months. 29MAY2026: Received report of satisfactory service.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 October 2021
Resolved
An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs or alterations are undertaken. Vessel conducted temporary repairs to the STBD Draghead Winch Foundations in accordance with letter dated 10March2023 from Robert N. Samuel, P.E. Vessel shall operational raise & lower Draghead winch & then conduct NDT to temporary repairs prior to being used for dredging operations.
Action required: 705 - Other - as specified
Due 8 June 2023
Resolved 13 July 2023
Resolution: Witnessed satisfactory articulation of drag head. Witnessed SAT dye penetration NDT following articulation.
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 26 April 2021
Resolved
Multiple emergency escape hatches were not labeled as such and the fire plan is not updated to appropriately reflect all emergency escape hatches. Vessel must label all egress spots and update fire plan.
46 CFR 92.10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2021
Resolved 27 April 2021
Resolution: All emergency escapes marked and updated on fire control plan.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 April 2021
Resolved
Junction box located in starboard void space has exposed wires. Each outlet or junction box must be securely attached to its mounting and be affixed so as to maintain its designated degree of protection.
46 CFR 111.81-1(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2021
Resolved 26 April 2021
Resolution: Received pictures clearing def.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 April 2021
Resolved
Non-marine grade extension cord is being used as an electrical connection to a WiFi router located in the cadet berating passageway, this requires a permanent connection.
46 CFR 111.60-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2021
Resolved 26 April 2021
Resolution: Received pictures clearing def.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 March 2020
Resolved
The following items need to be completed prior to credit for annual inspection. Launching port and stbd lifeboats, launching rescue boat, fixed fire extinguishing pressure switches, fire detection, MMCs, TWICs, Medical certificates, navigation lights, steering test, machinery inspection. 46 CFR 91.25-10
Action required: 705 - Other - as specified
Due 31 March 2020
Resolved 15 April 2020
Resolution: Vessel completed annual inspection.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 31 March 2020
Resolved
The inspector shall determine that all fire extinguishing equipment is in suitable condition. Found nitrogen bottles for time delays, and CO2 system not connected in pump rooms and winch room. 46 CFR 91.25-20
Action required: 60 - Rectify deficiencies prior to movement
Due 31 March 2020
Resolved 15 April 2020
Resolution: Vessel had nitrogen bottles serviced and all CO2 systems connected.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 31 March 2020
Resolved
Davit inspection shall be made to the satisfaction of the inspector. UT shots required as marked on port and stbd lifeboat davit foundations. 20-25 shots per side. 46 CFR 94.35-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 6 April 2020
Resolution: UT report was provided to Coast Guard. UT report uploaded to activity documents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 31 March 2020
Resolved
Inspection of hulls, the standards established by ABS shall be accepted. Penetration pipe under port side ball joint davit needs to be repacked.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: Penetration was re-packed.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 31 March 2020
Resolved
The superstructure shall be constructed of steel or suitable material. Bridge marine cable transits found unsatisfactory due to not being sealed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: Bridge MCT was filled with fire stop.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 March 2020
Resolved
Electrical engineering equipment shall be IAW subchapter J. Wire on the stern of the vessel was found to be supported by plastic wire ties.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: Vessel replaced platic wire ties with metal wire supports.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 31 March 2020
Resolved
In the inspection of hulls the standards established by ABS shall be accepted as standard. Vessel's international load line certificate in not endorsed. Vessel must have certificate endorsed prior to sailing beyond the boundary line.
Action required: 705 - Other - as specified
Due 31 March 2020
Resolved 15 April 2020
Resolution: Vessel had international load line certificate endorsed.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 31 March 2020
Resolved
Davit inspection shall be made to the satisfaction of the inspector. UT shots revealed wastage beyond allowable tolerances for both port and stbd lifeboat davit foundations. Permanently repair lifeboat davits in accordance with manufacturers procedures to the satisfaction of the Coast Guard prior to departure. 46 CFR 94.35-5
Action required: 17 - Rectify deficiencies prior to departure
Due 6 April 2020
Resolved 15 April 2020
Resolution: Vessel replaced foundations of both port and stbd life boats. Vessel completed 1.1 weight test using 5800 lbs on a spreader bar. MT was conducted at the completion of the test, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 March 2020
Resolved
An audible and visual alarm must activate upon occurrence of a low oil level in reservoir. The starboard low level alarm float was inoperable. Corrected on the spot. 46 CFR 58.25-25(d)(3)
Action required: 10 - Deficiency Rectified
Due 15 April 2020
Resolved 15 April 2020
Resolution: Vessel cleaned float and replaced gasket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 April 2019
Resolved
Complete engine testing on the MDEs to the satisfaction of the attending CG inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2019
Resolution: MDEs where operational
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 30 April 2019
Resolved
Repair fuel leak identified on emergency generator governor.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: Governor seals were replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 April 2019
Resolved
Make repairs to decrypt overhead metal sheeting above the port ladderway leading to the lower engine room prior to completion of drydock.
Due 15 June 2019
Resolved 23 May 2019
Resolution: Repairs were complete
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 30 April 2019
Resolved
Renew/replace fire station piping, valves, and connections for enductor at fire station 14 and 23 within cargo pump space prior to cargo ops.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 May 2019
Resolution: Witnessed repair of fire stations.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 April 2019
Resolved
Make repairs to aft steering ventilation exhaust piping above CO2 suppression system prior to completion of drydock.
Due 15 June 2019
Resolved 23 May 2019
Resolution: Repairs were complete
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2019
Resolved
All five pressure vessels listed on the COI are past inspection date. Complete hydrostatic test of each pressure vessel & safety relief valves prior to operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 4 April 2019
Resolution: Pressure vessels were tested, all sat.
Personnel › Certificates/Documents/Licenses › MMD, Able Seaman
Issued 24 February 2017
Resolved
03 crew members serving on board found without MMC. All crew members employed on vessel are required to have MMC endorsed for the position of employment. As of 2/24/2017 company must stop the practice of employing crew members waiting to apply for MMCs.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 February 2017
Resolved 24 February 2017
Resolution: ACOE Philadelphia District issued letter detailing the cease of hiring practice in question. Letter attached.
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 24 February 2017
Resolved
Newly installed rescue boat/davit not witnessed being launched while vessel moving at 5 knots. Demonstrate to the satisfaction of CG marine inspector.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 10 March 2017
Resolution: Received video of launching the resuce boat wil underway at 5 knots.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 24 February 2017
Resolved
Muster stations 1 & 2, liferafts on flying bridge, found without embarkation lighting to illuminate liferaft and instruction. Install emergengy lighting in these locations.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 20 March 2017
Resolution: Received pictures of installed lighting. All sat
Lifesaving › Line-Throwing Appliances › Lines
Issued 24 February 2017
Resolved
Appropriate 1500 ft auxiliary line for line throwing appliance not on board the vessel. Provide proper length and breaking strength of line.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 20 March 2017
Resolution: Received picture of approved line. All sat
Lifesaving › Lifebuoys › Serviceable
Issued 8 October 2015
Resolved
Replace to original all damaged/work lifebuoy grab lines IAW 46CFR160.050
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 9 October 2015
Resolution: Replaced lifebuoys with new. All sat
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 8 October 2015
Resolved
Replace all waterlight batteries with approved per manufacturer
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 9 October 2015
Resolution: Watertight batteries replaced.
Operations/Management › Navigation Safety › Proper Use of Navigation/Anchor Lights
Issued 8 October 2015
Resolved
Prove proper operation of naviagtion light alarm panel
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 23 October 2015
Resolution: Verified nav light alarm panel function correctly.
Stability › Watertight Integrity › General
Issued 8 October 2015
Resolved
Replace gasket on reefer space watertight door
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 9 October 2015
Resolution: Replaced gasket on watertight door.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 8 October 2015
Resolved
Main propulsion E/R has significant fuel and L/O in bilges. Clean bilges to satisfaction of CGMI prior to sailing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 October 2015
Resolved 9 October 2015
Resolution: Bilges were power washed and vacuumed out, clean and dry.
Engineering › Steering Gear System › Ram Seal
Issued 8 October 2015
Resolved
Steering gear has hydraulic leak on stbd fitting to ram. Submit drydock repair plan and operational control measure.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 October 2015
Resolved 23 October 2015
Resolution: Plan submitted and approved.
Engineering › Steering Gear System › Piping
Issued 7 October 2014
Resolved
Install rigid metallic piping between the steering gear hydraulic oil storage tank and steering unit reservoirs.
Due 23 October 2014
Resolved 22 October 2014
Resolution: 1.5" NPT seamless steel has been installed along with one main and two individual ball valves for each reservoir.
Engineering › Fuel Oil Service System › Piping
Issued 7 October 2014
Resolved
Replace in kind fuel oil piping from purifiers to racor filters. Soft patch discovered.
Due 23 October 2014
Resolved 22 October 2014
Resolution: New piping and fittings installed. Leak tested under operating pressure.
Engineering › Fuel Oil Service System › Pump
Issued 7 October 2014
Resolved
Repair standby service fuel oil pump shaft packing gland.
Due 23 October 2014
Resolved 22 October 2014
Resolution: According to the C/E, when the pump was run, the discharge valve was closed the packing to leak. Witnessed operationg of the pump while the fuel oil was recirced, all sat.
Engineering › Pressure Vessel › Relief Valve
Issued 7 October 2014
Resolved
Repair or replace air receiver relief valve for proper reseating operation.
Due 23 October 2014
Resolved 22 October 2014
Resolution: Witness testing of the new installed relief valve. Valve was set for 200 PSI and popped at 200.
Lifesaving › Rescue Boat › Carriage Requirement
Issued 2 May 2014
Resolved
Provide approved rescue boat and launching arrangement IAW 46 CFR Subchapter W.
Due 6 August 2014
Resolved 10 March 2017
Resolution: Vessel has approved rescue boat installation.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 7 May 2012
Resolved
Find source of plant failure prior to conducting dredging operations. Prove proper operation of emergency generator and make permanent repairs to power plant to the satisfaction of the attending marine inspector. Vessel is authorized one time transit to Ft. Mifflin with an assisting tug to conduct permanent repairs.
Due 21 May 2012
Resolved 17 May 2012
Resolution: Several repairs were made to the emergency/main switchboards and main generator voltage regulators. Witnessed successful test electrical system.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 22 July 2011
Resolved
Prove proper operation of inboard aft OWS.
Action required: 705 - Other - as specified
Due 22 August 2011
Resolved 19 August 2011
Resolution: Witnessed proper operation for inboard aft OWS. Oil content meter calibration verified.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 22 July 2011
Resolved
Provide revised copy of design verification test procedures to Sector Hampton Roads for approval.
Action required: 705 - Other - as specified
Due 22 August 2011
Resolved 6 October 2011
Construction/Loadline › Structures › Deck Plating
Issued 22 July 2011
Resolved
Crop and renew deck in aft winch room starboard side IWO Winch foundation.
Action required: 705 - Other - as specified
Due 31 October 2011
Resolved 17 November 2011
Resolution: deck repair in aft winch room starboard side completed satisfactory.
Engineering › Steering Gear System › Rudder Bearing
Issued 29 October 2010
Resolved
Port rudder making loud knocking noise when operated. Vsl to lock rudder amidships and await shipyard for permanent repairs.
Action required: 705 - Other - as specified
Due 15 February 2011
Resolved 25 May 2011
Resolution: Permanent repairs completed.
Construction/Loadline › Hull › Bracket
Issued 27 December 2008
Resolved
Crop & renew as needed port bow #1 bracket.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Hull › Side Shell
Issued 27 December 2008
Resolved
On 01 level IWO port chock crop & renew wasted side shell as needed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Hull › Bracket
Issued 27 December 2008
Resolved
On 01 level IWO port side stairs crop & renew wasted angle as needed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Hull › Bracket
Issued 27 December 2008
Resolved
On main deck stbd aft outside galley crop & renew wasted angle as needed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Hull › Bracket
Issued 27 December 2008
Resolved
On main deck crop and renew two wasted flanged brackets.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Structures › Transverse Bulkhead
Issued 27 December 2008
Resolved
On main deck stbd side outside engine room vent space crop & renew wasted angle.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 27 December 2008
Resolved
On 01 level crop & renew all needed wasted/broken hand rail supports.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 27 December 2008
Resolved
On 01 level renew hand grab pipe for ladder iwo stbd trunion.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Structures › Trunk
Issued 27 December 2008
Resolved
On main deck crop and renew wasted angle iwo void access trunk.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Structures › Deck Plating
Issued 27 December 2008
Resolved
On upper main deck both port and stbd side crop & renew wasted channel as needed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Engineering › Lubricating Oil Service System › Piping
Issued 27 December 2008
Resolved
On main deck afk stbd side iwo galley door crop & renew wasted/missing hydraulic pipe hangers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 27 December 2008
Resolved
On main deck port side iwo pump room door, crop & renew wasted hand rail pipe as needed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Engineering › Lubricating Oil Service System › Piping
Issued 27 December 2008
Resolved
On main deck stbd side near access trunks, crop & renew wasted/missing 1" pipe hangers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Hull › Stiffener
Issued 27 December 2008
Resolved
On main deck iwo access trunks port/stbd sides, crop & renew wasted side shell angle stiffiners #1 from top.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 27 December 2008
Resolved
On main deck near port side davit crop & renew wasted step(s) on ladder.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Structures › Superstructure
Issued 27 December 2008
Resolved
On main deck port side #1 vertical support lower section, grind and, if necessary, crop & renew wasted metal.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Hull › Stiffener
Issued 27 December 2008
Resolved
On main deck port side iwo aft swing doors crop & renew wasted angles as needed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 December 2008
Construction/Loadline › Hull › Bottom Plating
Issued 17 September 2007
Resolved
Submit repair proposal for hull damage to SEC HAMPTON ROADS MI prior to beginning repairs (await approval of proposal).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 22 October 2007
Construction/Loadline › Hull › Bottom Plating
Issued 17 September 2007
Resolved
Complete hull damage repairs to satisfaction of SEC HAMPTON ROADS MI prior to departure from BAE shipyard.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2007
Lifesaving › Lifeboat › Hull
Issued 15 June 2007
Resolved
Refurbish port and starboard lifeboats and davits. hand rails loose, scuppers are inop and leak, davit supports wasted.
Action required: 705 - Other - as specified
Due 15 December 2007
Resolved 6 March 2008
Fire Fighting › Fire Pumps › Gland Sealing
Issued 6 March 2007
Resolved
Vessel has a leaky seal on the fwd fire pump.
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 7 April 2009
Resolution: Attended vessel to witness testing of main fire pump, fire pump tested at 130 PSi with two fire hoses in operation.
Communications › Audible Communications › SPD (Other)
Issued 21 March 2006
Resolved
Properly install PA system in accordance with reg 46 CFR 113.50-5
Action required: 705 - Other - as specified
Due 13 December 2006
Resolved 11 April 2007
Resolution: New PA and general alarm system installed and tested satisfactory throughout vessel.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 21 March 2006
Resolved
Have CO2 system properly serviced by 05/04/06. Servicing to be witnessed by CG Marine Inspector.
Action required: 705 - Other - as specified
Due 4 May 2006
Resolved 17 May 2006
Resolution: Witnessed operational test of CO2 system by third party.
Electrical › Electric Supply System (service) › Cable
Issued 17 March 2005
Resolved
Remove all dead end electrical cables throughout the machinery spaces.
Action required: 705 - Other - as specified
Due 17 April 2005
Resolved 25 May 2005
Engineering › Reduction Gearing/Clutches › Casing
Issued 17 March 2005
Resolved
Repair all lube oil leaks on both reduction gears.
Action required: 705 - Other - as specified
Due 17 April 2005
Resolved 25 May 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 17 March 2005
Resolved
Properly install the light in the emergency generator room or remove it.
Action required: 705 - Other - as specified
Due 17 April 2005
Resolved 25 May 2005
Engineering › Compressed Air System (start air) › Piping
Issued 17 March 2005
Resolved
Make proper repair to the compressed air line in the machine shop in way of the soft patch.
Action required: 705 - Other - as specified
Due 17 April 2005
Resolved 25 May 2005
Engineering › Bilge Water Management System › Not Operational
Issued 17 March 2005
Resolved
Remove diesel and oil form the engine room bilge.
Action required: 705 - Other - as specified
Due 17 April 2005
Resolved 25 May 2005
Electrical › Electrical Distribution System (emergency) › Circuit Breaker
Issued 16 June 2004
Resolved
Prior to sailing, demonstrate a satisfactory test of the emergency generator auto start feature and testing of all emergency lights.
Due 30 June 2004
Resolved 18 June 2004
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 16 June 2004
Resolved
Prior to sail demonstrate a test of the vessel sound producing device.
Due 30 June 2004
Resolved 18 June 2004
Navigation › Piloting/Steering › Binnacle
Issued 16 June 2004
Resolved
Repair the light feature on the flying bridge mounted magnetic compass.
Due 17 July 2004
Resolved 8 July 2004
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 16 June 2004
Resolved
Provide a complete and approved Shipboard Oil Pollution Emergency Plan (SOPEP) iaw 33 CFR 151.26 no later than 16 September 2004.
Due 16 September 2004
Resolved 24 August 2004
Resolution: Operator dropped off a copy of the SOPEP approval letter to MSO Philly.
Construction/Loadline › Penetrations › Gasket
Issued 16 June 2004
Resolved
Repair the operating gear and regasket the port side pumproom egress scuttle.
Due 17 July 2004
Resolved 8 July 2004
Documentation › Markings/Placards › Garbage Placard
Issued 16 June 2004
Resolved
Provide MARPOL trash placards at the on deck trash stowage and trash compactor locations.
Due 17 July 2004
Resolved 8 July 2004
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 16 June 2004
Resolved
Show proper operation of both oily water separators.
Due 16 September 2004
Resolved 15 June 2007
Resolution: All three OWS units tested, and are operating properly.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Overspeed Device
Issued 16 June 2004
Resolved
Demonstrate proper operation of the stbd main engine overspeed trip and operation of the indicator light located in the main control room.
Condition: Improper/Lack of Maintenance
Due 17 July 2004
Resolved 8 July 2004
Engineering › Steam System (auxiliary) › Valve, Control
Issued 16 June 2004
Resolved
Demonstrate proper operation of the ships heating boiler, to include operational safeties.
Condition: Improper/Lack of Maintenance
Due 31 December 2004
Resolved 21 September 2004
Resolution: Recieved letter from Asst. Chief Engineer stating that the boilers power, fuel and feed water have been disconnected and the boiler is disabled, to be removed at a later date.
Pollution Prevention/Response › Prevention Equipment › Standard Discharge Connection
Issued 16 June 2004
Resolved
Hydrostatically test the fuel bunker line, provide written documentation of the test and mark piping accordingly.
Due 17 July 2004
Resolved 8 July 2004
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 5 May 2004
Resolved
Demonstrate proper operation of automatic engine shutdown upon actuation of the fixed CO2 system as per system design. Test should include all engines. with the exception of Emer. Gen. ( E gen already done).
Due 3 June 2004
Resolved 16 June 2004
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 5 May 2004
Resolved
Make all overdue air recievers and relief valves ready for inspection.
Due 20 June 2004
Resolved 16 June 2004
Fire Fighting › Ventilation Systems › Fans
Issued 8 December 2003
Resolved
Repair and prove operation of all exterior machinery space ventilation closures located on the main deck. LEGACY COMPONENT DESC: Ventilation Closures
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 January 2004
Resolved 16 July 2004
Fire Fighting › Miscellaneous Items › A Class Division Penetrations
Issued 8 December 2003
Resolved
Repair and prove operation of all doors in required fire boundaries throughout vessel. LEGACY COMPONENT DESC: Fire Screen Doors
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 January 2004
Resolved 16 June 2004
Construction/Loadline › Structures
Issued 8 December 2003
Resolved
Repair and prove tightness of fractured bulkhead in way of the removed incinerator on port side main deck. LEGACY COMPONENT DESC: Superstructure
Action required: 705 - Other - as specified
Due 15 January 2004
Resolved 25 May 2004
Construction/Loadline › Structures
Issued 8 December 2003
Resolved
Crop and renew wasted bracket and rider plate in way of the starboard side dredge arm wire pulley support. LEGACY COMPONENT DESC: Bracket
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 January 2004
Resolved 25 May 2004
Engineering › Steering Gear System
Issued 8 December 2003
Resolved
Provide and post updated steering diagram and instructions in aft steering compartment. LEGACY COMPONENT DESC: Diagram
Action required: 705 - Other - as specified
Due 15 January 2004
Resolved 25 May 2004
Construction/Loadline › Hull › Hull Plating
Issued 8 December 2003
Resolved
Provide to [name withheld], a copy of the Coast Guard Marine Safety Center plan approval letter for hull modifications conducted during 12/08/03 drydock period @ Bender Shipyard, Mobile, Alabama. LEGACY COMPONENT DESC: Drawings
Action required: 705 - Other - as specified
Due 8 February 2004
Resolved 30 August 2004
Resolution: Received letter from MSC for approval of modifications to hull.
Operations/Management
Issued 24 June 2003
Resolved
Provide original Officers licences and MMD cards for review in accordance with the COI manning chart.
Due 24 July 2003
Resolved 7 July 2003
Electrical
Issued 24 June 2003
Resolved
Calibrate the stbd shaft pitch system indicator on all bridge operating stations and repair the bridge wing control lighted indicators.
Due 24 July 2003
Resolved 7 July 2003
Navigation
Issued 24 June 2003
Resolved
Provide a copy of the GMDSS land based servicing contract for the current year.
Due 24 July 2003
Resolved 7 July 2003
Fire Fighting
Issued 24 June 2003
Resolved
Prior to operation of the vessel, service all fixed and portable fire extinquishing systems and Properly mount and service all liferafts.
Due 24 July 2003
Resolved 7 July 2003
Lifesaving
Issued 24 June 2003
Resolved
Prior to vessel operations, provide a new hydrostatic release unit for the EPIRB.
Due 24 July 2003
Resolved 7 July 2003
Communications › Internal Communications System › Voice Tube
Issued 24 June 2003
Resolved
Repair or replace the vessel loudspeaker system and demonstate operation in accordance with 46 CFR 113.50.
Due 1 December 2003
Resolved 12 May 2006
Resolution: This deficiency is a duplicate of deficiency #1 from activity # 2606314 issued on 21 March 2006. The deficiency must be corrected by 13 December 2006.
Fire Fighting
Issued 24 June 2003
Resolved
Provide a fire extinquisher for each lifeboat and rescue boat.
Due 24 July 2003
Resolved 7 July 2003
Lifesaving
Issued 24 June 2003
Resolved
Provide updated sea sick pills for both life boats.
Due 24 July 2003
Resolved 7 July 2003
Deck/Cargo
Issued 24 June 2003
Resolved
Provide life boat davits cable end for end information and a 110 % weight test of both life boats in the presence of a Marine Inspector
Due 24 July 2003
Resolved 7 July 2003
Navigation
Issued 24 June 2003
Resolved
Repair or renew echo depth sounder to display a recorded print out.
Due 24 July 2003
Resolved 7 July 2003
Personnel
Issued 24 June 2003
Resolved
Provide a full crew to demonstrate a fire and lifeboat emergency drill. Demonstrate the proper operation of the rescue boat.
Due 24 July 2003
Resolved 7 July 2003
Operations/Management
Issued 24 June 2003
Resolved
Provide a copy of the chemical testing agreement for the 2003 operating season.
Due 24 July 2003
Resolved 7 July 2003
Electrical
Issued 24 June 2003
Resolved
Remove or properly terminate the dead end wires in the battery stowage compartment.
Due 24 July 2003
Resolved 7 July 2003
Engineering
Issued 24 June 2003
Resolved
Repair or new three (3) defective air reciever relief valves.
Due 24 July 2003
Resolved 7 July 2003
Engineering
Issued 24 June 2003
Resolved
Prior to operation, provide the ships service heating boiler for a fireside and waterside inspection and demonstrate all required safety shutdowns.
Due 24 July 2003
Resolved 7 July 2003
Engineering
Issued 24 June 2003
Resolved
Repair or replace the emergency shut down device for the port diesel generator.
Due 24 July 2003
Resolved 7 July 2003
Lifesaving
Issued 24 June 2003
Resolved
Provide a lifesaving equipment and maintenance record in accordance with 46 CFR 199.109.
Due 24 July 2003
Resolved 7 July 2003
Electrical › Lighting (service)
Issued 15 July 2002
Resolved
Multiple battery lights in way of engine need to be repaired. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper/Lack of Maintenance
Due 4 August 2002
Resolved 24 September 2002
Resolution: All battery lights in way of the engine room were found and tested satisfactory.
Electrical › Lighting (service)
Issued 15 July 2002
Resolved
Multiple light fixtures in engine room need intrinsically safe covers attached. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Unknown
Due 4 August 2002
Resolved 24 September 2002
Resolution: Covers have been installed or repaired on all light fixtures within the engine room.
Accommodation/Occupational Safety › Occupational Safety
Issued 15 July 2002
Resolved
Crop and renew stairs across forward hopper. LEGACY COMPONENT DESC: Stairs
Condition: Improper/Lack of Maintenance
Due 4 August 2002
Resolved 24 September 2002
Resolution: New carwalk has been installed across forward hopper.
Engineering
Issued 16 April 2001
Resolved
Provide exhaust insulation on al MDE's and Ships service generators @ manifold to turbocharger connection.
Condition: Unknown
Due 10 May 2001
Resolved 10 May 2001
Fire Fighting
Issued 16 April 2001
Resolved
Provide updated firefighting plan to reflect vessels arrangements.
Condition: Unknown
Due 16 May 2001
Resolved 24 September 2002
Resolution: An updated fire control plan was posted where required.
Engineering
Issued 16 April 2001
Resolved
Prove proper operation of lube oil shut down on STBD SSDG.
Condition: Unknown
Due 10 May 2001
Resolved 10 May 2001
Lifesaving
Issued 29 March 2001
Resolved
LIFE RAFTS ARE EXPIRED. PROVE PROPER SERVICING.
Condition: Unknown
Due 29 March 2001
Resolved 29 March 2001
Lifesaving
Issued 29 March 2001
Resolved
RESTENCIL LIFERINGS (2) ON DECK ABOVE BRIDGE.
Condition: Unknown
Due 29 March 2001
Resolved 29 March 2001
Construction/Loadline
Issued 8 February 2001
Resolved
PROVE HULL PLATE INTEGRITY IN WAY OF HOPPER SLOPE WEAR PLATES DURING NEXT CREDIT DRYDOCK.
Condition: Unknown
Due 31 March 2002
Resolved 22 May 2002
Resolution: Hopper AR plating to be repaired at vessel''s next scheduled drydocking or not later than 31 March 2004.
Accommodation/Occupational Safety
Issued 4 April 2000
Resolved
Remove boxes & cleaning gear from hospital space & conduct general cleaningin space.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Electrical
Issued 4 April 2000
Resolved
Provide labels for remote-operated valve switches of hopper collection system st port side main weather deck.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Unknown
Issued 4 April 2000
Resolved
Repair leaks on sanitary water tank (at piping connections & weld seam) & present tank for internal exam OR remove tank.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Electrical
Issued 4 April 2000
Resolved
Provide metallic banding around electrical cables adjacent to fire extinguisher #35 (outside engine room control cemter).
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Lifesaving
Issued 4 April 2000
Resolved
Renew both lifeboat falls and weight test or provide renewal certificates to the cognizant USCG OCMI.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Engineering
Issued 4 April 2000
Resolved
Prove proper operation of auxiliary boiler & safety valve, IAW 46 CFR 61.05-10.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Lifesaving
Issued 4 April 2000
Resolved
Replace liferaft weak links or provide breaking strength for currently installed weak links.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Fire Fighting
Issued 4 April 2000
Resolved
Prove proper operation of smoke alarms in crew's quarters.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Electrical
Issued 4 April 2000
Resolved
Remove extension cords from crew's quarters.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Lifesaving
Issued 4 April 2000
Resolved
Replace dryer exhaust ducts with metallic type.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Documentation
Issued 4 April 2000
Resolved
Provide servicing tech report for air receivers' relief valve tests.
Condition: Unknown
Due 6 May 2000
Resolved 20 April 2000
Engineering
Issued 4 April 2000
Resolved
Demonstrate satisfactory hydro test of auxiliary boiler IAW 46 CFR 61.05- 10.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Electrical
Issued 4 April 2000
Resolved
Remove dead end cables located above starboard dredge engine (Forward, inboard) & port reduction gear (coming out of junction box).
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Electrical
Issued 4 April 2000
Resolved
Provide metallic supports for engine control (thermocouple) wiring in engine room IAW 46 CFR 111.60-5.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Engineering
Issued 4 April 2000
Resolved
Repair leak on port dredge engine lube oil cooler.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Electrical
Issued 4 April 2000
Resolved
Label electrical panelboard directories throughout the vessel IAW 46 CFR 111.40-11.
Condition: Unknown
Due 4 April 2000
Resolved 4 April 2000
Lifesaving
Issued 31 March 1999
Resolved
REPAIR AS NEEDED ENGINE ROOM DOORS IN WAY OF MAIN PROPULSION SPACE.
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Lifesaving
Issued 31 March 1999
Resolved
REPAIR AS NEEDED FORWARD EMERGENCY LOCKER DOOR TO ALLOW FULL ACCESS.
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Fire Fighting
Issued 31 March 1999
Resolved
PROVIDE AND PROVE OPERATION OF SUPPLY VENTILATION SHUTDOWNS FOR FIXED C02 SYSTEM IN WAY OF FORWARD AND AFTER HOPPER VOIDS.
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Navigation
Issued 31 March 1999
Resolved
Provide deck grating or non-skid surface in way of steering gear flat as required by 46CFR58.25-40(3).
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Engineering
Issued 31 March 1999
Resolved
Provide corrected copy of periodic safety test procedures addressing additional vital systems per 46CFR61.40-6 and also addressing comments of MSC ltr, 16710/P003961/rns, Serial: E2-9703388, dtd 28OCT99 to MSO HAMPTON ROADS, Colonna's S/Y detachment.
Condition: Unknown
Due 31 March 1999
Resolved 31 March 1999
Electrical
Issued 14 February 1998
Resolved
PROVE PROPER OPERATION OF SHIP'S SERVICE DIESEL GOVERNORS DURING TRANSFER OF POWER FROM SHIP TO SHORE WITHOUT USE OF WIRE TIES OR SHIP'S CREW HOLDINGSSDG GOVERNORS IN PLACE._x001C_ _x001C_
Condition: Unknown
Due 14 February 1998
Resolved 14 February 1998
Electrical
Issued 14 February 1998
Resolved
SECURE ELECTRICL CABLES IN WAY OF STARBOARD UPPER TRUNK PUMP ROOM DECK ACCESS HATCH._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 February 1998
Resolved 14 February 1998
Electrical
Issued 14 February 1998
Resolved
PROVE PROPER OPERATION OF THE EMERGENCY DIESEL GENERATOR UNDER LOAD (EXCESSIVE JACKET WATER LEAKS)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 February 1998
Resolved 19 February 1998
Lifesaving
Issued 14 February 1998
Resolved
MAKE PERMANENT REPAIRS TO AND PROVE PROPER OPERATION OF "MAN LOCKED IN FREEZER" ALARM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 February 1998
Resolved 14 February 1998
Electrical
Issued 14 February 1998
Resolved
REMOVE OR SECURE AND TAG BOTH ENDS OF ALL DEAD END WIRING THROUGHOUT MACHINERY SPACES AND HOUSE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 February 1998
Resolved 14 February 1998
Accommodation/Occupational Safety
Issued 14 February 1998
Resolved
MAKE PERMANENT REPAIRS OR REPLACE BLOWER PUMP RELIEF VALVES FOR MARINE SANITATION DEVICE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 February 1998
Resolved 14 February 1998
Electrical
Issued 14 February 1998
Resolved
MAKE PERMANENT REPAIRS TO EMERGENCY LIGHT IWO UPPER MACHINERY SPACE EXITS, PORT AND STARBOARD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 February 1998
Resolved 19 February 1998
Construction/Loadline
Issued 14 February 1998
Resolved
MAKE WATER TIGHT BOTH HYDRAULIC LINES PENETRATING THE MAIN DECK AT FRAME 88, STARBOARD SIDE, BY WELDING OR INSTALLING STUFFING TUBES._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 February 1998
Resolved 14 February 1998
Engineering
Issued 14 February 1998
Resolved
MAKE PERMANENT REPAIRS TO WASTED ENGINE ROOM VENTILATION DUCTING IN WAY OF FIRE STATION #28._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 February 1998
Resolved 14 February 1998
Electrical
Issued 29 December 1996
Resolved
MAKE DECK WIRE RUNS BETWEEN THE PILOTHOUSE AND FAN ROOM BELOW AN "A" CLASS BOUNDARY IAW 46CFR92.07-1(A). SEE 92.07-10 (CONSTRUCTION)
Condition: Unknown
Due 29 December 1996
Resolved 29 December 1996
Engineering
Issued 29 December 1996
Resolved
PROVE PROPER OPERATION OF FUEL OIL SHUTOFF REACH RODS FOR AUX DAY TANK AND PORT AND STBD FUEL TANKS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 December 1996
Resolved 29 December 1996
Construction/Loadline
Issued 29 December 1996
Resolved
INSTALL AND MAKE AVAILABLE FOR INSPECTION 3 WATERTIGHT DOORS ON MAIN DECK AS DISCUSSED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 December 1996
Resolved 29 December 1996
Construction/Loadline
Issued 29 December 1996
Resolved
REPAIR HIGH BILGE ALARM FOR #10 FWD DOUBLE BOTTOM TANK._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 December 1996
Resolved 29 December 1996
Electrical
Issued 29 December 1996
Resolved
RELABEL VENTILATION SHUTDOWN BREAKERS ON MAIN SWITCHBOARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 December 1996
Resolved 29 December 1996
Construction/Loadline
Issued 29 December 1996
Resolved
REPLACE EXPANSION JOINTS LISTED ON COI OVER 10 YRS OLD AT NEXT DRYDOCK._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 December 1996
Resolved 29 December 1996
Engineering
Issued 17 October 1995
Resolved
PRIOR TO OPERATING THE OILY-WATER SEPARATOR PROVE PROPER OPERATION OF SAME.
Condition: Unknown
Due 17 October 1995
Resolved 17 October 1995
Lifesaving
Issued 4 March 1994
Resolved
REINSULATE BARE HOT PIPING AT PORT SCUTTLE ENTRANCE TO FORWARD POTABLE WATER TANK COFFERDAM.
Condition: Unknown
Due 4 March 1994
Resolved 4 March 1994
Electrical
Issued 4 March 1994
Resolved
REWELD CABLE RUN SUPPORT BEAM AND RENEW CABLE SUPPORT BRACKETS ON PORT SIDEAFT MAIN WEATHER DECK.
Condition: Unknown
Due 4 March 1994
Resolved 4 March 1994
Fire Fighting
Issued 4 March 1994
Resolved
PROVIDE NEW FACE SHIELDS FOR PROXIMITY SUIT HELMETS.
Condition: Unknown
Due 4 March 1994
Resolved 4 March 1994
Accommodation/Occupational Safety
Issued 20 November 1992
Resolved
REPAIR OR REMOVE SHIP'S EVAPORATOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 20 November 1992
Resolved 20 November 1992
Lifesaving
Issued 20 November 1992
Resolved
MAKE REPAIRS TO THE SHIPS RESCUE BOAT, AND THE RESCUE BOAT DAVITS. PRIOR TO ACTIVATING, AND IN THE PRESENCE OF A COAST GUARD INSPECTOR, CONDUCT A WEIGHT TEST ON THE DAVITS AND ON THE RESCUE BOAT. ALL REPAIRS TO DAVITS AND THE RESCUE BOAT ARE TO BE TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 20 November 1992
Resolved 20 November 1992
Construction/Loadline
Issued 28 September 1991
Resolved
PROPERLY REPAIR DOUBLER PLATE INSTALLED STBD SIDE ENGINEROOM IN WAY OF STBDSTORE ROOM PLATFORM & STBD F.O. TANKS TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR. TO BE COMPLETED AND NEXT DRYDOCK AUGUST 1992.
Condition: Unknown
Due 28 September 1991
Resolved 28 September 1991
Construction/Loadline
Issued 28 September 1991
Resolved
C & R DETERIORATED LADDER PLATFORM LOCATED ON STBD FANDECK AFT OF PILOTHOUSE TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR. TO BE COMPLETED AT NEXT DRYDOCK AUGUST 1992.
Condition: Unknown
Due 28 September 1991
Resolved 28 September 1991
Construction/Loadline
Issued 28 September 1991
Resolved
PROVIDE MISSING SHAFT GUARD ON SECONDARY MIDDLE BILGE PUMP IN THE ENGINEROOM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 28 September 1991
Resolved 28 September 1991
Fire Fighting
Issued 23 August 1990
Resolved
INSTALL ADEQUATE GENERAL ALARM FLASHING LIGHTS IN THE DREDGE PUMPROOM.
Condition: Unknown
Due 23 August 1990
Resolved 23 August 1990
Accommodation/Occupational Safety
Issued 13 October 1989
Resolved
DEMONSTRATE PROPER OPERATION OF ELEVATORS.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Accommodation/Occupational Safety
Issued 13 October 1989
Resolved
DEMONSTRATE PROPER OPERATION OF INCINERATOR. DO NOT USE INCINERATOR UNTIL IT IS FULLY OPERATIONAL.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Electrical
Issued 13 October 1989
Resolved
AT NEXT DRYDOCK RENEW THE WASTED WIRE HANGERS IN WAY OF THE ROUND TABLE.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Construction/Loadline
Issued 13 October 1989
Resolved
AT NEXT DRYDOCK, CROP AND RENEW THE WASTED BHD WHERE PRESENT DOUBLER PLATE IS WELDED ON THE PORTSIDE OF THE FORWARD HOUSE ON THE 02 DECK.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
RECONFIGURE THE FIXED CO2 SYSTEM TO TREAT THE CARPENTER SHOP/STORES, WINDLASS ROOM AND ELECTRICIAN'S STORES AS ONE SPACE. SUBMIT PLAN TO [name withheld] PRIOR TO COMMENCING WORK.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
PAINT THE CO2 ALARMS RED AND STENCIL THEM SO THEY MAY BE IDENTIFIED.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
PROVIDE SCHEMATICS AND INSTRUCTIONS AT ALL REMOTE CO2 STATIONS MEETING THE REQUIREMENTS OF 46 CFR 95.15-10(H).
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
PROVIDE A SCHEMATIC OF ALL SYSTEMS MEETING 46 CFR 95.15-10(H) AT THE LOCAL CONTROL STATION IN THE CO2 ROOM.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
MODIFY THE INSTRUCTIONS FOR ALL FIXED CO2 SYSTEMS TO INCLUDE CLOSING ALL VENTS, DAMPERS AND OPENINGS PRIOR TO DISCHARGING CO2.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
AMEND THE FIRE CONTROL PLAN TO REFLECT THE MODIFICATIONS AND CHANGES MADE AT THIS INSPECTION. PLAN MUST BE SUBMITTED TO THE [name withheld].
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Accommodation/Occupational Safety
Issued 13 October 1989
Resolved
AT NEXT DRYDOCK, MAKE PERMANENT REPAIRS TO THE FUEL OIL DOUBLE BOTTOM VENT ON THE STBD BOW, PRESENTLY HOLED AND SOFT PATCHED.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
AT NEXT DRY DOCK RELOCATE CO2 ACTUATED ALARMS IN MACHINERY SPACES TO "CONSPICUOUS AND CENTRAL" LOCATIONS.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Construction/Loadline
Issued 13 October 1989
Resolved
AT NEXT DRY DOCK MAKE REPAIRS IN WAY OF CRACKED DECK PLATE PORT SIDE FORWARD OF THE POTABLE WATER TANK.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Accommodation/Occupational Safety
Issued 13 October 1989
Resolved
AT NEXT DRY DOCK REBUILD VENT MOUNTS AND VIBRATION ABSORBER ON VENT SHAFT (01 DECK AFT) VENT SHAFT 01-135, LEADING TO GALLEY AND STEERING COMPARTMENT
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Electrical
Issued 13 October 1989
Resolved
AT NEXT DRY DOCK MAKE LUBE OIL STRAINER ON THE PORT SHIP'S SERVICE GENERATOR EASILY ACCESSABLE.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Construction/Loadline
Issued 13 October 1989
Resolved
AT NEXT DRY DOCK RENEW WASTED HULL STIFFENERS AND ASSOCIATED STRUCTRUAL MEMBERS IN THE FORWARD PUMP ROOM, PORT AND STBD SIDES.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
RELOCATE THE TIME DELAYS AND STOP VALVE CONTROLS FOR THE FOLLOWING FIXED CO2 SYSTEMS TO OUTSIDE OF THE SPACE PROTECTED: FORWARD PUMP ROOM, FORWARD HOPPER AND AFT HOPPER.
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Fire Fighting
Issued 13 October 1989
Resolved
MARK THE FIXED CO2 REMOTE SHUTDOWNS IAW 46 CFR 95.15-10(H).
Condition: Unknown
Due 13 October 1989
Resolved 13 October 1989
Unknown
Issued 29 August 1988
Resolved
REMOVE THE DRAIN VALVES AND INSTALL THE PLUGS ON THE PORT AND STARBOARD MAIN ENGINE FUEL OIL DAY TANKS.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Construction/Loadline
Issued 29 August 1988
Resolved
REPAIR & CONDUCT OPERATIONAL TEST OF INDICATOR FOR WATERTIGHT DOOR FRAME 104, AT REMOTE STATION UPPER DECK, AFT HOUSE.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Electrical
Issued 29 August 1988
Resolved
SUBMIT PLANS FOR APPROVAL TO U.S. COAST GUARD OF PROPOSED MODIFICATIONS TO EMERGENCY SWITCHBOARD.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Electrical
Issued 29 August 1988
Resolved
COMPLETE MODIFICATION OF EMERGENCY SWITCHBOARD TO INCLUDE REPLACEMENT OF NON-APPROVED CIRCUIT BREAKERS AND PANEL BOARD IN COMPLIANCE WITH APPROVED PLANS.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Electrical
Issued 29 August 1988
Resolved
REMOVE NON-OPERATIONAL "NORRIS VALVE" CONTROL ON BRIDGE.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Accommodation/Occupational Safety
Issued 29 August 1988
Resolved
INSTALL HANDLE FOR DOOR ON DECK LOCKER 425A.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
CONDUCT TEST OF ALARMS, SHUTDOWNS AND AUTOMATION CONTROLS AND TEST AND SEALSAFETIES FOR STARBOARD AUXILIARY BOILER.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Electrical
Issued 29 August 1988
Resolved
INSTALL PERMANENT LUGS ON THE EMERGENCY GENERATOR STARTING BATTERY CABLES.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Electrical
Issued 29 August 1988
Resolved
REMOVE THE PANELBOARD, WIRING, AND TANK FOR UNUSED DEGASSER IN THE PUMP- ROOM.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Construction/Loadline
Issued 29 August 1988
Resolved
INSTALL HYDRAULIC ACCUMULATOR BACK-UP FOR WATERTIGHT DOORS AND CONDUCT OPERATIONAL TEST.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
INSTALL FILTERS AND DRYERS IN THE CONTROL AIRLINES FOR THE PITCH AND CLUTCHSYSTEM.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Accommodation/Occupational Safety
Issued 29 August 1988
Resolved
REPAIR AND CONDUCT OPERATIONAL TEST OF THE INCINERATOR.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Accommodation/Occupational Safety
Issued 29 August 1988
Resolved
REMOVE THE BRASS TEST COCKS FOR THE INCINERATOR FUEL TANK.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
REPAIR THE PORT, CENTER AND STARBOARD BRIDGE PITCH CONTROLS AND CONDUCT OPERATIONAL TEST TO ENSURE THE BRIDGE AND ENGINEROOM PITCH METERS ARE SYNCHRONIZED.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Accommodation/Occupational Safety
Issued 29 August 1988
Resolved
REPAIR AND MAKE READY FOR INSPECTION AFT, PUMP ROOM, & FOREHOUSE ELEVATORS.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Fire Fighting
Issued 29 August 1988
Resolved
MOUNT LINE DIAGRAM FOR FORWARD HOUSE CO2 CONTROL STATION & AFT HOUSE CO2 CONTROL STATION IN STEERING ROOM.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Electrical
Issued 29 August 1988
Resolved
REPLACE FLEXIBLE FUEL LINES, "PUSH-ON TYPE", ON EMERGENCY GENERATOR.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
REMOVE THE BRASS VALVES OR PROVIDE TEMPERATURE SPECIFICATIONS FOR THE PORT AND STARBOARD MAIN ENGINE DAY TANKS AND THE PORT AND STARBOARD HUB OIL TANKS.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
REMOVE THE DRAIN VALVES AND INSTALL THE PLUGS ON THE PORT AND STARBOARD MAIN ENGINE FUEL OIL DAY TANKS AND THE PORT AND STARBOARD HUB OIL TANKS.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Deck/Cargo
Issued 29 August 1988
Resolved
INSTALL GOOSENECK & FLAMESCREEN IN AUXILIARY HYDRAULIC OIL TANK IN PUMP ROOM.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
REMOVE BRASS PETCOCKS & PLUGS FROM LUBE OIL & FUEL OIL STRAINERS & FILTERS THROUGHOUT MACHINERY SPACES.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Fire Fighting
Issued 29 August 1988
Resolved
MAKE APPROPRIATE LABELS FOR FIXED CO2 SYSTEM TO GENERATORS.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
INSTALL REMOTE STOP FOR THE F.O. TRANSFER PUMP ATTACHED TO THE F.O. PURI- FIER MANIFOLD & PROVIDE FIXED PIPING IN WAY OF FLEXIBLE LINES.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
REMOVE OR MAKE OPERABLE BOTH L.O. PURIFIERS & BOTH HEATERS (FOR L.O. PURI- FIERS) IN AFT MACHINERY SPACE.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Construction/Loadline
Issued 29 August 1988
Resolved
REMOVE FLAMMABLE AND COMBUSTIBLE MATERIALS FROM ALL MACHINERY SPACE BILGES AND CLEAN ALL MACHINERY SPACE BILGES.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Fire Fighting
Issued 29 August 1988
Resolved
PROVIDE AND INSTALL APPROVED MOUNTING BRACKETS FOR ALL PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 29 August 1988
Resolved
REPAIR OR REPLACE THE MAIN STEAM STOP VALVE FOR THE STARBOARD AUXILIARY BOILER.
Condition: Unknown
Due 29 August 1988
Resolved 29 August 1988
Engineering
Issued 6 April 1987
Resolved
PROVE OPERATION OF THE PORT DREDGE PUMP ENGINE LOW LUBE OIL PRESSURE TRIP.
Condition: Unknown
Due 6 April 1987
Resolved 6 April 1987
Construction/Loadline
Issued 6 April 1987
Resolved
LABEL ALL VENTS.
Condition: Unknown
Due 6 April 1987
Resolved 6 April 1987
Fire Fighting
Issued 20 November 1985
Resolved
PROVIDE LOCAL CONTROL IN CO2 ROOM FOR FIXED CO2 SYSTEMS. SUBMIT PLANS TO CCGD3(MMT) NO LATER THAN 20DEC85. COMPLETE INSTALLATION WITHIN 6 MONTHS OF PLAN APPROVAL. EXISTING SYSTEM TO BE INSPECTED BY COAST GUARD EVERY 3 MONTHTO ENSURE COMPLIANCE WITH 40 LBS PULL & 14" MOVEMNT REQMNTS UNTIL CORRECTED
Condition: Unknown
Due 20 November 1985
Resolved 20 November 1985
Lifesaving
Issued 3 April 1985
Resolved
CONDUCT A WEIGHT TEST ON THE STARBOARD LIFEBOAT.
Condition: Unknown
Due 3 April 1985
Resolved 3 April 1985
Lifesaving
Issued 3 April 1985
Resolved
PROVIDE 83 COAST GUARD EXPOSURE SUITS APPROVED UNDER 46 CFR 160.071 AND SUBMIT DOCUMENTATION AS SOON AS POSSIBLE THAT SUITS HAVE BEEN ORDERED.
Condition: Unknown
Due 3 April 1985
Resolved 3 April 1985
Navigation
Issued 3 April 1985
Resolved
REMOVE STEERING MOTOR OVERLOAD CUT OUT AND PROVE PROPER OPERATION OF OVER- LOAD ALARM.
Condition: Unknown
Due 3 April 1985
Resolved 3 April 1985