Records from 2016 to 2026. Most recent: inspection, 18 May 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units and the documentation record — is Professional, $39 a month. Sign in.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 18 May 2026
Resolved
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. Cable for Starboard CPP was severely chafed. Repair to the satisfaction of the MI. 46 CFR 111.01-1(a)(1)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 May 2026
Resolution: Cable Repaired
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 18 May 2026
Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable, and sanitary condition. Forward and aft decommissioned elevators in accommodations have doors that are not secured to prevent inadvertent entry into elevator shaft. Secure elevator doors to satisfaction of MI. 46 CFR 92.20-15
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 May 2026
Resolution: Elevator doors were secured.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 18 May 2026
Resolved
The boundary bulkheads and decks separating the accommodations and control stations from cargo and machinery spaces, galleys, main pantries and storerooms, other than small service lockers, shall be of “A” Class construction. Two open penetrations were found going from the main deck into the port and starboard side of the pump room. Plug/cap penetrations to satisfaction of MI. 46 CFR 92.07-10(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 20 May 2026
Resolution: Penetrations sealed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 May 2026
Resolved
Each shore connection box must have a bottom entrance for the shore connection cable. The box must provide protection to the shore connection when the connection is in use. Watertight fittings for shore power cables were broken. Repair to the satisfaction of the MIs. 46 CFR 111.83-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2026
Resolved 20 May 2026
Resolution: Shore cables repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 September 2025
Resolved
Each thermocouple, pyrometer, or instrumentation cable conductor must be 22 AWG (0.33 mm2) or larger. Engine thermocouples had multiple areas of chaffing. Inspect all engine thermocouple wiring and repair broken/worn wiring. 46 CFR 111.60-4(b) 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2025
Resolved 22 September 2025
Resolution: Thermocouple wire insulation was taped. Monitor during future inspections.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 3 September 2025
Resolved
The routine maintenance of the oily water separating equipment and the bilge alarm must be clearly defined by the manufacturer in the associated operating and maintenance manuals. All routine and repair maintenance must be recorded. Port Aft OWS was inoperable. Repair to the satisfaction of the Marine inspector. 33 CFR 155.380(f) 16 c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2025
Resolved 22 September 2025
Resolution: Witnessed satisfactory test of OWS.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 3 September 2025
Resolved
Machinery driving forced-draft and induced-draft fans, fuel-oil transfer pumps, fuel-oil unit and service pumps, and similar fuel-oil pumps must be fitted with remote controls from a readily accessible position outside the space concerned so that the fans or pumps may be stopped in case of fire in the compartment in which they are located. The controls must be suitably protected against accidental operation and against tampering and must be suitably marked. Fuel shutoff cable on the starboard inboard engine was showing signs of wear. Replace or repair to the satisfaction of the marine inspector. 46 CFR 58.01-25 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 September 2025
Resolved 22 September 2025
Resolution: Cable replaced and tested.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 September 2025
Resolved
Piping conveying oil must be run away from hot surfaces wherever possible. Where such leads are unavoidable, only welded joints are to be used, or alternatively, suitable shields are to be fitted in the way of flanged or mechanical pipe joints when welded joints are not practicable. Multiple shielding/insulation around piping was damaged. Conduct inspection on all pipe insulation/shielding and repair to the satisfaction of the marine inspector. 46 CFR 56.50-60(j) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Insulation replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 September 2025
No resolution recorded
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. Multiple TLIs were not functioning properly. Repair/replace TLIs. Until TLIs are repaired, conduct weekly soundings and soundings during transfers. 46 CFR 111.01-1(a)(1) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 September 2025
Resolved
Fixed fire-extinguishing systems must be checked as noted in Table 91.25-20(a)(2). In addition, all parts of the fixed fire-extinguishing systems, must be examined for excessive corrosion and general conditions. Ventilation shutdown pressure switch for P/S exhaust vents for forward and aft winch rooms was found dislodged within the CO2 control cabinet on the port side. Reattach pressure switch to satisfaction of MI. 46 CFR 91.25-20(a)(2) 50 c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Pressure switch mounted properly.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 September 2025
Resolved
General arrangement plans showing for each deck the control stations, the various fire sections enclosed by fire resisting bulkheads, the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to different compartments and decks and the ventilation system including location of ventilation shutdowns, positions of dampers and the numbers identifying each system. Port and starboard Steam Gen Room A-class doors and port and starboard Fan Room A-class doors within the accommodation space are missing self-closing devices as indicated on the vessel’s fire control plan. Install closing devices to satisfaction of MI. 46CFR91.55-5(d)(1) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Closing devices installed and tested.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 3 September 2025
Resolved
All vessels shall have efficient guard rails or bulwarks on decks and bridges. Stanchions above the rescue boat on the stack deck have cracked welds at the base. Repair to satisfaction of MI. 46 CFR 92.25-5 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Stanchions rewelded to deck.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 September 2025
Resolved
General arrangement plans showing for each deck the control stations, the various fire sections enclosed by fire resisting bulkheads, the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to different compartments and decks and the ventilation system including location of ventilation shutdowns, positions of dampers and the numbers identifying each system. Fan Room and Pump Control House A-class doors are missing locking mechanism causing the doors to be holed. Secure holes to satisfaction of MI. 46CFR91.55-5(d)(1) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Holes plugged with metal plate.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 3 September 2025
Resolved
During preparation and launching, the survival craft, its launching appliance, and the area of water into which it is to be launched are illuminated by lighting supplied from the vessel's emergency source of electrical power. Kick pipe for rescue boat light intended for illuminating area of water during launching is severed. Repair to satisfaction of MI. 46 CFR 199.150(f)(6) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 22 September 2025
Resolution: Kick pipe renewed.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 3 September 2025
Resolved
In general, compliance with the standards established by the American Bureau of Shipping, see subpart 90.35 of this subchapter, will be considered as satisfactory evidence of the structural efficiency of the vessel. Port aft rollers are holed at gunwale. Repair to satisfaction of MI. 46 CFR 92.01-10 (a) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2025
Resolved 29 May 2026
Resolution: Repairs completed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 September 2025
No resolution recorded
The deck line is a horizontal line 12 inches in length and 1 inch in breadth. It shall be marked amidships on each side of the vessel, and its upper edge shall normally pass through the point where the continuation outwards of the upper surface of the freeboard deck intersects the outer surface of the shell. Deck line was not present on the starboard side of the vessel. Permanently mark deck line to satisfaction of certificate issuing authority prior to credit drydock. 46 CFR 42.13-20(a) 705c
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 September 2025
Resolved
Vessels that operate in fresh water at least six months in every 12 month period since the last drydock examination must be examined in accordance with the intervals set forth in Table 91.40-3(b) of this section. Vessel completed ISE inspection but has not completed repairs. Complete ISE repair list to the satisfaction of the marine inspector prior to credit ISE. 46 CFR 91.40-3(a)(2) 705c
Action required: 705 - Other - as specified
Resolved 5 June 2026
Resolution: Worklist completed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 September 2025
Resolved
All firehose must be subjected to a test pressure equivalent to the maximum pressure to which they may be subjected in service, but not less than 100 p.s.i. During testing, one 2 ½” hose was found leaking. Hose was replaced with spare. 46 CFR 91.25-20(a)(4) 10c
Action required: 10 - Deficiency Rectified
Resolved 3 September 2025
Resolution: Hose replaced with spare and tested.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 18 March 2025
Resolved
No person may operate an oceangoing ship of less than 400 gross tons, unless it has approved oily-water separating equipment for processing oily mixtures from bilges or fuel oil tank ballast and discharges into the sea. Vessel reported failure of number 3 oily content meter. Vessel is allowed to continue operations with
lines that can be monitored by the remaining operational oil content meters.
Action required: 66 - Prior to drilling or production operations
Due 19 March 2025
Resolved 21 March 2025
Resolution: OWS and OCM are now fully operational.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 16 July 2024
Resolved
Fire-extinguishing equipment must be in suitable condition. Portable and fixed fire extinguishing must be serviced in accordance with this regulation. Fire extinguishing equipment, both portable and fixed were not serviced.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 15 August 2024
Resolution: Witness CO2 testing. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 16 July 2024
Resolved
Each vessel must carry at least one rescue boat. Vessel's rescue boat was not present at the time of inspection due to servicing.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 August 2024
Resolution: conducted satisfactory inspection of rescue boat.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 16 July 2024
Resolved
GMDSS radio tests shall be conducted weekly and logged appropriately. These tests were not logged.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2024
Resolved 12 August 2024
Resolution: Conducted satisfactory inspection of GMDSS logs.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 16 July 2024
Resolved
Each Class 1 door on a vessel in ocean service must be designed to withstand a head of water equivalent to the depth from the sill of the door to the margin line but in no case less than 10 feet. Starboard side windlass room door on upper deck did not seal completely on the upper right hand corner, when viewed from inside the windlass room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2024
Resolved 12 August 2024
Resolution: Conducted satisfactory inspection of watertight door.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 July 2024
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space. Light #24 on upper deck in the forward house did not light when tested.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2024
Resolved 12 August 2024
Resolution: Conducted satisfactory inspection of emergency light.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 25 May 2023
Resolved
Each lifeboat must carry the equipment listed in this paragraph and specified for in table 1. Lifeboat’s #1 & #2 do not have the correct quantity of water per person.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 June 2023
Resolution: Vessel provided the correct quantity of water per person for both lifeboats and verified by CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 May 2023
Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use. Found fire station #10 nozzle bail broken.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 June 2023
Resolution: Vessel provided a new firefighting nozzle on fire station #10, verified by CGMI.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 May 2023
Resolved
It shall be the duty of the owner, master, or person in charge to require and have performed at least once in every twelve months the tests and inspections of all fixed fire extinguishing systems on board, as described in Table 91.25-20(a)(2) in § 91.25-20 of this subchapter. Galley APC system inspection is incomplete. Action&Code: 705C (other) - Prior to opening galley for operations.
Action required: 705 - Other - as specified
Resolved 2 June 2023
Resolution: Galley APC system inspection was completed by Hiller, and a service report was provided to the vessel. Verified by CGMI.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 25 May 2023
Resolved
During preparation, launching, and recovery, each survival craft and rescue boat, its launching appliance, and the area of water into which it is to be launched or recovered must be adequately illuminated by lighting supplied from the emergency power source. #1 lifeboat embarkation light is not operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Embarkion Light was found operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
Electric installations on vessels shall be such that the safety of passengers, crew, and vessel from electrical hazards will be assured. Mounting bolts for electrical outlet at rescue boat davit are sheared off and outlet is hanging by its wire and temporarily mounted with line. Aft laundry electrical outlet isn’t properly mounted and is hanging by its wire. Junction box at ball joint davit starboard side isn’t properly mounted and is hanging by its wire.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: All outlets were properly mounted and verified by CGMI.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 25 May 2023
Resolved
The manufacturer's instructions for onboard maintenance of lifesaving appliances must be on board the vessel. The following must be provided for each appliance - A schedule of periodic maintenance. None of the vessels 6 disposable hydrostatic release units are marked with expiration dates.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: All hydrostatic releases were marked with expiration dates, verified by CGMI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
The enclosure of distribution panelboards shall be completely enclosed or protect against accidental contact. Galley panel P120 door is missing its securing device, and breaker cover plate is missing securing screw.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Securing device for the panel door and cover plate had been replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 25 May 2023
Resolved
Vertical communication shall be provided between the various weather decks by means of permanent inclined ladders. Found aft left handrail for vertical ladder
wasted and holed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: Handrail repaired and verified by CGMI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 25 May 2023
Resolved
Means shall be provided to close off all vents and ventilators. Winch room supply ventilation duct cover securing dog mount is broken.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: A new securing dog was mounted, vent cover operationally tested and witnessed by CGMI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
Electric installations on vessels shall be such that the safety of passengers, crew, and vessel from electrical hazards will be assured. Found electrical control panel uncovered with wires hanging and found a drain hose disconnected and sitting on top of a power panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: Control panel cover and wires secured and mounted. Drain hose was permanently removed. Verified by CGMI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Found numerous recently installed LED lights on mates deck port & starboard sides, and on forecastle that are spliced and covered with electrical tape.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Proper repairs had been made.
09 - Working and Living Conditions › 091 - Living Conditions › Access/structure
Issued 25 May 2023
Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended. Stateroom 500 is missing the main entry door latch rendering it incapable of being secured.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: New latch was installed. Door knob and latch operationally tested an witnessed by CGMI.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 25 May 2023
No resolution recorded
The inspection for certification shall include an inspection of the structure. The inspection shall be such as to ensure that the vessel, as regards the structure, piping is in satisfactory condition and fit for the service for which it is intended, and that it complies with the applicable regulations. Found deck & bulkhead under air handlers outside of 506 light bulb storage locker, and outside of 504 trunk room showing signs of wastage. Also found pipe holed/rotted out at the deck penetration outside 506 light bulb storage locker.
Action required: 705 - Other - as specified
Due 24 June 2023 — due date passed with no resolution recorded
Resolution: Temporary repairs completed
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 25 May 2023
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Found an altered pipe in the collision bulkhead that’s not watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 2 June 2023
Resolution: Pipe was capped and verified by CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 May 2023
Resolved
The hull, superstructure, structural bulkheads, decks, and deckhouses shall be constructed of steel. Found the following MCT’s approved systems were altered, and not IAW manufacturers instruction. MCT locations – under feeder panel EL 102 radio room, 03 level forecastle deck, and 3 on the bridge under fire detection panel, and bridge panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2023
Resolved 22 June 2023
Resolution: Fire stop had been installed iaw Manufacture's instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 25 May 2023
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Found 1 immersion suit with failed velcro stitching – destroyed in presence of Coast Guard Marine Inspector (CGMI). Found 1 immersion suit missing lifejacket light – installed in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: 1 - Immersion suit was destroyed in presence of CGMI, with a replacement installed. 1 immersion suit light was installed in presence of CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 May 2023
Resolved
The fire main system must be operated and the pressure checked at the most remote and highest outlets. All firehose must be subjected to a test pressure equivalent to the maximum pressure to which they may be subjected in service, but not less than 100 p.s.i. Found 1 1 ½” firehose that failed pressure testing. Firehose was destroyed in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Firehose was destroyed in the presence of CGMI. New hose placed in service.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2023
Resolved
The enclosure of distribution panelboards shall be completely enclosed or protect against accidental contact. Found feeder panelboard L 114 has duct tape covering multiple openings. Duct tape removed and proper repairs were made in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Duct tape removed and proper repairs were made in presence of CGMI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 May 2023
Resolved
On all fire-extinguishing systems, all piping controls, valves, and alarms must be checked to ascertain that the system is in operating condition. Fire station #3 1 ½” hose threads damaged. Hose destroyed in presence of, and a new hose was installed in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Hose destroyed in presence of, and a new hose was installed in presence of CGMI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 25 May 2023
Resolved
Means shall be provided to close off all vents and ventilators. Bow anchor windless exhaust cover bolts are missing nuts. Installed nuts in presence of CGMI.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2023
Resolution: Installed nuts in presence of CGMI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 October 2021
No resolution recorded
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of
each auxiliary, directly connected to
the engine and supplied as such, must
be at least equivalent to the standards
established by the ABS Steel Vessel. Propeller blades no longer meet ABS standards or can be repaired in a manner to meet the rules. Replace blades that meet the applicable ABS rules at time of next Dry-Dock & conduct inspections required by USCG Sector Virginia Memorandum dated 06 September 2022 to ensure effectiveness of temporary repairs. .
Action required: 705 - Other - as specified
Due 16 June 2022 — due date passed with no resolution recorded
Resolution: Witnessed satisfactory TEMPORARY repairs. Req'd due date extended.
24FEB25: Received Rolls Royce sat testing of hub/seal, required by SEC VA every 6 months. 29MAY2026: Received report of satisfactory service.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 4 October 2021
Resolved
An inspection either general or partial depending upon the circumstances shall be made whenever any important repairs or alterations are undertaken. Vessel conducted temporary repairs to the STBD Draghead Winch Foundations in accordance with letter dated 10March2023 from Robert N. Samuel, P.E. Vessel shall operational raise & lower Draghead winch & then conduct NDT to temporary repairs prior to being used for dredging operations.
Action required: 705 - Other - as specified
Due 8 June 2023
Resolved 13 July 2023
Resolution: Witnessed satisfactory articulation of drag head. Witnessed SAT dye penetration NDT following articulation.
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 26 April 2021
Resolved
Multiple emergency escape hatches were not labeled as such and the fire plan is not updated to appropriately reflect all emergency escape hatches. Vessel must label all egress spots and update fire plan.
46 CFR 92.10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2021
Resolved 27 April 2021
Resolution: All emergency escapes marked and updated on fire control plan.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 April 2021
Resolved
Junction box located in starboard void space has exposed wires. Each outlet or junction box must be securely attached to its mounting and be affixed so as to maintain its designated degree of protection.
46 CFR 111.81-1(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2021
Resolved 26 April 2021
Resolution: Received pictures clearing def.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 April 2021
Resolved
Non-marine grade extension cord is being used as an electrical connection to a WiFi router located in the cadet berating passageway, this requires a permanent connection.
46 CFR 111.60-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 May 2021
Resolved 26 April 2021
Resolution: Received pictures clearing def.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 March 2020
Resolved
The following items need to be completed prior to credit for annual inspection. Launching port and stbd lifeboats, launching rescue boat, fixed fire extinguishing pressure switches, fire detection, MMCs, TWICs, Medical certificates, navigation lights, steering test, machinery inspection. 46 CFR 91.25-10
Action required: 705 - Other - as specified
Due 31 March 2020
Resolved 15 April 2020
Resolution: Vessel completed annual inspection.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 31 March 2020
Resolved
The inspector shall determine that all fire extinguishing equipment is in suitable condition. Found nitrogen bottles for time delays, and CO2 system not connected in pump rooms and winch room. 46 CFR 91.25-20
Action required: 60 - Rectify deficiencies prior to movement
Due 31 March 2020
Resolved 15 April 2020
Resolution: Vessel had nitrogen bottles serviced and all CO2 systems connected.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 31 March 2020
Resolved
Davit inspection shall be made to the satisfaction of the inspector. UT shots required as marked on port and stbd lifeboat davit foundations. 20-25 shots per side. 46 CFR 94.35-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 6 April 2020
Resolution: UT report was provided to Coast Guard. UT report uploaded to activity documents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 31 March 2020
Resolved
Inspection of hulls, the standards established by ABS shall be accepted. Penetration pipe under port side ball joint davit needs to be repacked.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: Penetration was re-packed.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 31 March 2020
Resolved
The superstructure shall be constructed of steel or suitable material. Bridge marine cable transits found unsatisfactory due to not being sealed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: Bridge MCT was filled with fire stop.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 March 2020
Resolved
Electrical engineering equipment shall be IAW subchapter J. Wire on the stern of the vessel was found to be supported by plastic wire ties.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: Vessel replaced platic wire ties with metal wire supports.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 31 March 2020
Resolved
In the inspection of hulls the standards established by ABS shall be accepted as standard. Vessel's international load line certificate in not endorsed. Vessel must have certificate endorsed prior to sailing beyond the boundary line.
Action required: 705 - Other - as specified
Due 31 March 2020
Resolved 15 April 2020
Resolution: Vessel had international load line certificate endorsed.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 31 March 2020
Resolved
Davit inspection shall be made to the satisfaction of the inspector. UT shots revealed wastage beyond allowable tolerances for both port and stbd lifeboat davit foundations. Permanently repair lifeboat davits in accordance with manufacturers procedures to the satisfaction of the Coast Guard prior to departure. 46 CFR 94.35-5
Action required: 17 - Rectify deficiencies prior to departure
Due 6 April 2020
Resolved 15 April 2020
Resolution: Vessel replaced foundations of both port and stbd life boats. Vessel completed 1.1 weight test using 5800 lbs on a spreader bar. MT was conducted at the completion of the test, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 March 2020
Resolved
An audible and visual alarm must activate upon occurrence of a low oil level in reservoir. The starboard low level alarm float was inoperable. Corrected on the spot. 46 CFR 58.25-25(d)(3)
Action required: 10 - Deficiency Rectified
Due 15 April 2020
Resolved 15 April 2020
Resolution: Vessel cleaned float and replaced gasket.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 April 2019
Resolved
Complete engine testing on the MDEs to the satisfaction of the attending CG inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 May 2019
Resolution: MDEs where operational
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 30 April 2019
Resolved
Repair fuel leak identified on emergency generator governor.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 May 2019
Resolution: Governor seals were replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 April 2019
Resolved
Make repairs to decrypt overhead metal sheeting above the port ladderway leading to the lower engine room prior to completion of drydock.
Due 15 June 2019
Resolved 23 May 2019
Resolution: Repairs were complete
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 30 April 2019
Resolved
Renew/replace fire station piping, valves, and connections for enductor at fire station 14 and 23 within cargo pump space prior to cargo ops.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 May 2019
Resolution: Witnessed repair of fire stations.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 30 April 2019
Resolved
Make repairs to aft steering ventilation exhaust piping above CO2 suppression system prior to completion of drydock.
Due 15 June 2019
Resolved 23 May 2019
Resolution: Repairs were complete
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2019
Resolved
All five pressure vessels listed on the COI are past inspection date. Complete hydrostatic test of each pressure vessel & safety relief valves prior to operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 4 April 2019
Resolution: Pressure vessels were tested, all sat.
Personnel › Certificates/Documents/Licenses › MMD, Able Seaman
Issued 24 February 2017
Resolved
03 crew members serving on board found without MMC. All crew members employed on vessel are required to have MMC endorsed for the position of employment. As of 2/24/2017 company must stop the practice of employing crew members waiting to apply for MMCs.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 February 2017
Resolved 24 February 2017
Resolution: ACOE Philadelphia District issued letter detailing the cease of hiring practice in question. Letter attached.
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 24 February 2017
Resolved
Newly installed rescue boat/davit not witnessed being launched while vessel moving at 5 knots. Demonstrate to the satisfaction of CG marine inspector.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 10 March 2017
Resolution: Received video of launching the resuce boat wil underway at 5 knots.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 24 February 2017
Resolved
Muster stations 1 & 2, liferafts on flying bridge, found without embarkation lighting to illuminate liferaft and instruction. Install emergengy lighting in these locations.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 20 March 2017
Resolution: Received pictures of installed lighting. All sat
Lifesaving › Line-Throwing Appliances › Lines
Issued 24 February 2017
Resolved
Appropriate 1500 ft auxiliary line for line throwing appliance not on board the vessel. Provide proper length and breaking strength of line.
Action required: 705 - Other - as specified
Due 24 March 2017
Resolved 20 March 2017
Resolution: Received picture of approved line. All sat