Inspection history · 84
7 February 2018
Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6355089
14 January 2014
Administrative Inspection
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4782766
28 October 2013
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4742542
28 September 2012
Administrative Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4452493
20 September 2012
MTSA Verification · Periodic Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4437366
18 October 2011
Annual Inspection · Administrative Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4170481
25 October 2010
Annual Inspection · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3876886
24 September 2009
Cargo Tank Internal · COI Inspection · Internal Structural Exam · MTSA Verification · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3602314
6 August 2009
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3557419
5 February 2009
MTSA Verification · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3412967
17 October 2008
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3346623
16 September 2008
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3326203
8 August 2008
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3292678
15 June 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3239127
8 April 2008
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3179841
19 February 2008
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3149684
21 December 2007
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3119350
31 August 2007
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3044080
31 August 2007
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3061349
15 June 2007
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2962464
10 April 2007
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2905024
10 April 2007
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2919687
3 April 2007
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2900841
3 April 2007
Damage Survey · Permit to Proceed
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2900848
5 February 2007
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2867300
3 July 2006
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2702698
1 June 2006
MTSA Verification · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2702369
12 January 2006
Administrative Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2565451
15 November 2005
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2535031
12 September 2005
Administrative Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2491072
17 May 2005
Administrative Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2359889
19 April 2005
MTSA Verification · Administrative Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2339493
26 January 2005
Annual Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2290119
23 September 2004
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2202909
30 August 2004
MTSA Verification · Administrative Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2180845
16 March 2004
Internal Structural Exam · COI Inspection · Examination of Repairs · Cargo Tank Internal · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1985063
24 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1986306
24 July 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1855862
21 February 2003
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1748548
31 October 2002
Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1705044
9 October 2002
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1687124
18 July 2002
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1650135
18 March 2002
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1495953
8 March 2002
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1603665
27 February 2002
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1491390
31 January 2001
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1071038
5 July 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 138917
4 January 2000
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1048023
8 February 1999
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1388739
10 December 1998
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 807989
22 October 1998
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 804178
13 October 1997
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 776850
8 October 1996
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 840281
9 November 1995
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 886066
24 May 1995
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1181143
7 October 1994
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 867473
19 November 1993
COI Inspection · Hull Examination
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1157534
30 August 1993
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1134526
16 July 1993
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1152314
16 July 1992
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1259439
2 April 1992
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1258113
30 March 1992
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 961799
11 February 1992
Deficiency Check · Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 959244
21 November 1991
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1248542
4 September 1991
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 940522
19 February 1991
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 923774
2 August 1990
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 921955
14 August 1989
Deficiency Check · Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 889271
6 July 1989
Administrative
Administrative · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1339034
6 December 1988
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1207818
4 August 1988
COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1348967
18 September 1987
Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1007228
24 August 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1031799
29 November 1986
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1335907
20 August 1986
COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1273699
12 July 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 461664
29 August 1985
Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1296696
6 April 1985
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 458606
5 January 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 455751
21 August 1984
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 974318
29 June 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 966132
8 January 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1279373
7 December 1982
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 968976
6 July 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 965351
Construction/Loadline › Hull › Hull Plating
Issued 14 January 2014
Resolved
Vessel granted 12-month drydock extension in accordance with Marine Safety Manual Vol. II, Section B, Chapter 3, vessel is laid-up and out of service. Vessel must undergo all required hull examinations prior to going back into service.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 January 2014
Engineering › Diesel Engine (auxiliary) › Distributor (fuel injection)
Issued 20 September 2012
Resolved
The flexible hose, supply line, going into the Fuel Oil filter on the cargo prime mover was leaking F/O. Ensure system intact with no leaks.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 September 2012
Resolved 28 September 2012
Resolution: Fitting was replaced in kind.
Stability › Watertight Integrity › Coaming
Issued 20 September 2012
Resolved
Void coamings on various void entries had paint on them. Actual site is 46 CFR 35.05-15 (i) Remove paint from the top of coaming (knife edge) of all void entries as needed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 September 2012
Resolved 28 September 2012
Resolution: All paint on void entries was removed.
Stability › Watertight Integrity › General
Issued 20 September 2012
Resolved
Void hatch gaskets, on various void entries were wasted and need replacement. Actual cite is 46 CFR 35.05-15 (i) Replace all rubber gaskets that are dry rotted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 September 2012
Resolved 28 September 2012
Resolution: 14 void hatch gaskets were replaced with new in kind.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 27 October 2010
Resolved
The rising sticks for all three cargo tanks were excessively worn with damage around the top end.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 November 2010
Resolved 28 October 2010
Resolution: Replaced dammaged rising sticks with new.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 5 November 2009
Resolved
Provide copy of MSC VRP approval letter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 December 2009
Resolution: Received copy of approved MCS VRP approval letter for the Ohio Valley COTP zone excluding Huntington, WV and Paducah KY alternate classified cities.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 6 August 2009
Resolved
Vessel to conduct ISE prior to being placed back into service, also ensure vessel is adequate condition to continue it intended service.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 September 2009
Resolution: Conducted ISE at Tubal Cain in Port Arthur, TX by MSU Port Arthur.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 February 2009
Resolved
Vessel to have ISE, CTIE, and DD exam prior to being placed back into service.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 August 2009
Resolution: Def updated to reflect new condition
Construction/Loadline › Hull › Double Hull
Issued 8 August 2008
Resolved
Vessel reports pinhole in #3 port wing tank 3rd bay .
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 October 2008
Resolved 17 October 2008
Resolution: Vessel C/R 3'' X 3'' X 1/2" BILGE KNUCKLE # 3 STBD WING TANK .
Construction/Loadline › Hull › Bottom Plating
Issued 21 December 2007
Resolved
Vessel reports 1/4 " hole found in stbd side 15 ft from bow 2 ft up from bilge knuckle.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 February 2008
Resolved 19 February 2008
Resolution: Conducted repair check. Examined welds and witnessed satisfactory air test of an 8'' x 18'' x 3/8" slope sheet insert, a 7'' x 6'' x 3/8" side shell insert, and a 7'' x 4'' x 1/2" transition knuckle insert to the stbd bow void.
Construction/Loadline › Hull › Side Shell
Issued 3 April 2007
Resolved
On Stern Void, just below the timberhead, port side there is a 13 1/2" long fracture, 3/4" wide. Temporary repairs were made with splizone (epoxy) patch. Once cargo is discharged barge is to proceed directly to shipyard for permanent repairs.
Action required: 705 - Other - as specified
Due 4 April 2007
Resolved 10 April 2007
Resolution: Witnessed satisfactory repairs and air test of 24" x 24" x 3/8" side shell insert to port stern void.
Construction/Loadline › Hull
Issued 9 October 2002
Resolved
Port side knuckle crushed. LEGACY COMPONENT DESC: Hull Plating
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 October 2002
Resolution: Port side knuckle insert; 4''''''''x 6''''''''x1/2"; Port side shell insert; 8'' x 16'' x 3/8"; Stbd side shell insert 2'' x 2'' x 3/8"
Documentation
Issued 7 October 1994
Resolved
PROVIDE DOCUMENTATION THAT THE DESIGN OF THIS VESSEL IS SUITABLE FOR CARRYING CARGOES HAVING TOXIC PROPERTIES AND THAT IT COMPLIES WITH 46 CFR 151.50-5(e). THE DESIGN PRESSURE OF THE CARGO TANKS MUST BE PROVIDED.
Condition: Unknown
Due 7 October 1994
Resolved 7 October 1994
Construction/Loadline
Issued 30 March 1992
Resolved
MAKE TEMPORARY REPAIRS TO LEAK IN WAY OF BOW RAKE PORT SIDE APPROXIMATELY TWO FEET BELOW LOADED WATERLINE, PROCEED TO OFFLOAD PRESENT CARGO AND MAKE PERMANENT REPAIRS, PRIOR TO CONDUCTING FURTHER CARGO TRANSFER.
Condition: Unknown
Due 3 April 1992
Resolved 3 April 1992
Documentation
Issued 21 November 1991
Resolved
Provide copy of approved plans for the cargo tank electrical overfill protection system when received from the CG Marine Safety Center.
Condition: Unknown
Due 21 November 1991
Resolved 21 November 1991
Construction/Loadline
Issued 4 September 1991
Resolved
REPAIR DECK WINCH HAND WHEEL BRAKES AND RATCHETS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 September 1991
Resolved 4 September 1991
Construction/Loadline
Issued 4 September 1991
Resolved
REPAIR WHERE FRACTURED AFT PORT AND STBD AND FWD. PORT BITS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 September 1991
Resolved 4 September 1991
Construction/Loadline
Issued 4 September 1991
Resolved
REPAIR WHERE WASTED #3 AND #4 PORT AND STBD WING VOID HATCH COVERS/KNIFE EDGES._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 September 1991
Resolved 4 September 1991
Construction/Loadline
Issued 4 September 1991
Resolved
REPAIR WHERE FRACTURED AFT STBD KEVEL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 September 1991
Resolved 4 September 1991
Deck/Cargo
Issued 6 December 1988
Resolved
PROVIDE APPROVED PLANS FROM THE USCG MARINE SAFETY CENTER WASHINGTON, DC FOR THE FOLLOWING INSTALLED SYSTEMS. (1) VAPOR RECOVERY (2) SIGHT GLASS (3) CLOSED GAUGING.
Condition: Unknown
Due 6 December 1988
Resolved 6 December 1988
Unknown
Issued 29 June 1983
Resolved
PRESENT THE VESSELS CARGO TANKS FOR INTERNAL INSPECTION AS REQUIRED BY 46 CFR 151.04-5(B)(2).
Condition: Unknown
Due 29 June 1983
Resolved 29 June 1983
Unknown
Issued 29 June 1983
Resolved
DRYDOCK THE VESSEL OR PRESENT EVIDENCE OF QUALIFYING FRESHWATER SERVICE.
Condition: Unknown
Due 29 June 1983
Resolved 29 June 1983
Unknown
Issued 29 June 1983
Resolved
REPAIR THE COVER ON THE #2 CARGO TANK P/V VALVE.
Condition: Unknown
Due 29 June 1983
Resolved 29 June 1983
Unknown
Issued 29 June 1983
Resolved
REPAIR THE FLAME SCREEN ON THE DAY TANK VENT.
Condition: Unknown
Due 29 June 1983
Resolved 29 June 1983
Unknown
Issued 29 June 1983
Resolved
PERMANENTLY REPAIR THE CARGO PUMP EMERGENCY SHUTDOWN.
Condition: Unknown
Due 29 June 1983
Resolved 29 June 1983
Unknown
Issued 29 June 1983
Resolved
CONDUCT THE REQUIRED CARGO PIPING, RELIEF VALVE AND PRESSURE GAUGE TESTS ASPER 33 CFR 156.170.
Condition: Unknown
Due 29 June 1983
Resolved 29 June 1983
Navigation
Issued 7 December 1982
Resolved
MAKE PERMANENT REPAIRS TO THE PORT AND STBD RUNNING LIGHT STANCHIONS PRIOR TO NIGHT OPERATIONS.
Condition: Unknown
Due 7 December 1982
Resolved 7 December 1982