Inspection history · 27
2 July 2026
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8426237
21 June 2026
COC-CVE Annual · PSC A
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8407206
17 July 2023
COC-CVE Initial · COC-CVE Initial Prep
Administrative · Activities Europe · Activity 7756703
21 January 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7383805
2 December 2021
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7361321
2 November 2021
Type not recorded
No type recorded · USCG Southeast District (dp) · USCG Southeast District (CGD-SE) · Activity 7343964
19 August 2021
COC-CVE Annual · Ballast Water Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7291183
1 February 2020
COE-Dockside
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6896140
1 February 2020
Bulk Liquid Transfer Monitor
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6902130
31 January 2020
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6897528
25 January 2020
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7059713
29 December 2019
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6880800
24 October 2019
COC-CVE Quarterly · Ballast Water Examination · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6837695
24 October 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6841818
12 July 2019
Bulk Liquid Transfer Monitor
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6747627
19 June 2019
ISPS III Exam · NPV Safety Exam · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6716910
25 April 2019
ISPS II Exam · PII Safety Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6654057
10 December 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6594774
29 November 2018
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6586066
23 October 2018
COC-CVE Quarterly · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6565612
7 May 2018
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6408443
29 April 2018
ISPS II Exam · COC-CVE Annual
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6401526
22 April 2017
COC-CVE Quarterly · Ballast Water Examination · Administrative Inspection · ISPS II Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6129382
28 October 2016
Ballast Water Examination · Deficiency Check · COC-CVE Annual · ISPS II Exam
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6029551
30 August 2016
In-Service Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5987235
22 August 2016
Administrative Inspection
Administrative · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 5979549
8 March 2016
In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5829484
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 21 June 2026
Resolved
74 SOLAS 01 II-2/41-2.4.7 16ac
In addition to the emergency lighting required by regulations 11-1/42 and 111/11.5, the means of escape including stairways and exits shall be marked, at all points of the escape route including angles and intersections, by lighting or photoluminescent strip indicators placed not more than .03m above the deck. The marking must enable passengers to identify all routes of escape and readily identify the escape exits. If electric illumination is used, it shall be supplied by the emergency source of power and it shall be so arranged the the failure of any single light, or cut in a lighting strip, will not result in the marking being ineffective. Additionally, all escape route signs and fire equipment location markings shall be of photoluminescent material. The administration shall ensure that such lighting or photoluminescent equipment has been evaluated, tested and applied in accordance with the guidelines developed by the Organization. PSCO observed emergency escape route sign was covered by stored equipment in AC room.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 July 2026
Resolved 21 June 2026
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 21 June 2026
Resolved
74 SOLAS 81 Amend II-2/11.2.3 16ac
In passenger ships, doors other than power-operated watertight doors, shall be so arranged that positive closure is assured in case of fire in the space, by power-operated closing arrangements or b ythe provision of self-closing doors capable of closing against an inclination of 3.5° opposing closure and having a fail-safe hook-back facility, provided with a remotely operated release device. PSCO observed fire doors 315, 326, 677B, 677A, 690 and 123B that did not fully close or latch when released.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 July 2026
Resolved 21 June 2026
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 21 June 2026
Resolved
74 SOLAS 81 amend II-2/30.4 16ac
The speed of door closure shall, if necessary, be controlled so as to prevent undue danger to persons. PSCO witnessed fire doors 579A and 811 closing too fast when activated.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 July 2026
Resolved 21 June 2026
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 21 June 2026
Resolved
46 CFR 147.60b(2) 50ac
Lockers or housings must be vented to the open air near the top and bottom for positive circulation of vapors. PSCO observed only top ventilation in the oxygen and acetylene storage locker.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2026
Resolved 2 July 2026
Resolution: Received photos from the vessel showing installed natural ventillation for storage areas.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 June 2026
Resolved
74 SOLAS 81 Amend II-2/26.2.2 50ac
Where the contents and use of a space are such that there is a doubt as to its classification for the purpose of this regulation, it shall be treated as a space within the relevant category having the most stringent boundary requirements. PSCO found NFPA 30 lockers with permanently stored chemicals and flammable liquids in a category 13 space (shop store).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2026
Resolved 21 June 2026
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 20 August 2021
Resolved
The doors shall be self-closing and have an approximately uniform rate of closure of no more than 40 seconds and no less than 10 seconds.
18 doors were found to close in less than 10 seconds.
Condition: Design Flaw
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 August 2021
Resolved 26 August 2021
Resolution: All doors were readjusted to close within the required rate. New door-pumps were ordered in case more doors should be found with the same issues.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 August 2021
Resolved
Terminations and joints in all connections shall be made so as to retain the original electrical, mechanical, flame-retarding and fire-resisting properties of the cable.
PSCO observed multiple cut wires/cables in the carpernter shop.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 August 2021
Resolved 26 August 2021
Resolution: Wires found were from a speed log removed in the past. All wires have been removed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 20 August 2021
Resolved
A gauge indicating the pressure in the system shall be provided at each section stop valve and at a central station.
The gauges measuring the pressure at sprinkler section valce #28 were inoperable.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 August 2021
Resolved 20 August 2021
Resolution: Gauge was replaced before Examination team left the vessel.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 August 2021
Resolved
The following basic principles underlie the regulations in this chapter and are embodied in the regulations as appropriate, having regard to the type of ships and potential fire hazard involved:
containment and extinction of any fire in the space of origin.
PSCO found combustible materials stored above the highest sprinkler head in the Carpenter Workshop.
Condition: Design Flaw
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 August 2021
Resolved 26 August 2021
Resolution: All combustible materials were removed from the shelves above the sprinkler heads. The shelves were painted in red and labeled with signage "NO FLAMMABLE MATERIALS TO BE STORED".
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 19 August 2021
Resolved
Any required fire detection system shall be capable of immediate operation at all times and no action by the crew shall be nessacary to set it in operation.
Central #2 Fire detection panel on bridge was found showing "Fault" on the screen.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 August 2021
Resolved 26 August 2021
Resolution: The power supply and communication card of the unit in Pre Alarm condition were replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Continuous synopsis record
Issued 26 April 2019
Resolved
Current CSR ver. 10 ISM company information does not match ISM certificates.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2019
Resolved 9 May 2019
Resolution: See DNV GL Narrative Summary dated 08May2019.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 26 April 2019
Resolved
Emergency Egress from machinery space missing signage. In addition two emergency egress doors (WTC 7 and WTC 11) require other actions (magnetic release push button/twist release knob) in addition to operating the handle. Either remove additional steps to prevent escape during an emergency or properly label/provide instructions at the egress point.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2019
Resolved 9 May 2019
Resolution: See DNV GL Narrative Summary dated 08May2019.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 April 2019
Resolved
Properly install and configure ventilation for compressor control unit. Current setup has circuit isolation via taping off control to prevent overload when plugging in portable ventilation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2019
Resolved 9 May 2019
Resolution: See DNV GL Narrative Summary dated 08May2019.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 April 2019
Resolved
Fantail overhead has 02 lights and 01 junction box hanging from power supply due to corrosion of mounting hardware. 01 dead end wire coiled in wire run above/outside CO2 room access and wiring for light fixture inside paint locker is not properly supported.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2019
Resolved 9 May 2019
Resolution: See DNV GL Narrative Summary dated 08May2019.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 26 April 2019
Resolved
Fire station on fantail port side leaks water from valve stem regardless of valve position.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2019
Resolved 9 May 2019
Resolution: See DNV GL Narrative Summary dated 08May2019.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 26 April 2019
Resolved
Smoke detector not properly installed in fire locker adjacent from front office managers door, deck 5.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2019
Resolved 9 May 2019
Resolution: See DNV GL Narrative Summary dated 08May2019.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 26 April 2019
Resolved
Survey all fire stations/lockers and ensure free from debris, cleaning gear, etc. (entire vessel).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2019
Resolved 9 May 2019
Resolution: See DNV GL Narrative Summary dated 08May2019.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 October 2018
Resolved
1410- Propulsion main engine- 50ac
Machinery shall be of design and construction adequate for the service for which they are intended. The #3 main propulsion engine is leaking jacket water through the gasket. 74 SOLAS (1997) II-2/26.2(10)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 November 2018
Resolved 2 December 2018
Resolution: SEC NOLA RECIEVED A CLASS REPORT FROM DNV-GL SATISFYING THE REQUIREMENT.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 23 October 2018
Resolved
0750- Fire prevention- 10c
Auxiliary machinery spaces where storage of combustibles is prohibited, such as ventilation and air conditioning rooms. A/C station deck 2 port in way of FSD 1201 was being used for storage of 3 pallets of A/C filters which were combustible. 74 SOLAS (1997) II-2/26.2
Action required: 10 - Deficiency Rectified
Due 24 October 2018
Resolved 24 October 2018
Resolution: Removed combustibiles from space.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Piping
Issued 28 October 2016
Resolved
0725 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations and shall remain fit to proceed to sea without danger to the ship or persons on board. During test of the aft morring deck deluge water system, PSCO observed a hole in the water supply piping. - SOLAS 74a I/11
Condition: Invalid
Action required: 705 - Other - as specified
Due 28 October 2016
Resolved 1 November 2016
Resolution: Vessel provided class attestation to the proper repair.
Fire Fighting › Combustible Materials › Furniture/Furnishings
Issued 8 March 2016
Resolved
0750- Vessel has added a significant amount of materials and furnishings for use throughout the vessel until 25MAR16. The securing methods for the additional containers and generators must be accepted by the Administration. In addition, the fire watch and refueling procedures must be accepted. 74SOLAS(14) CH.I/11(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 March 2016
Resolution: Vessel provided a Class report and statement from Flag.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 8 March 2016
Resolved
0750 - The vessel does not have up-to-date structural fire protection plans approved by the RO. In addition, plans must be submitted to the USCG MSC. 74SOLAS(14) CH.I/11(a)
Action required: 705 - Other - as specified
Due 25 April 2016
Resolved 28 October 2016
Resolution: Vessel provided evidence that plans had been submitted to both classification socisety and USCG MSC for review.