Inspection history · 74
22 July 2025
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 8192629
25 July 2024
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7966809
18 September 2023
Hull Examination · Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7801745
16 June 2022
COI Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7478245
18 November 2021
Administrative Inspection
Administrative · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7353677
29 June 2021
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7249414
19 August 2020
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 7043004
28 April 2020
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6944925
12 June 2019
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6711690
18 September 2018
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6542958
2 August 2018
Hull Examination · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6510870
11 July 2018
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6480965
14 June 2017
COI Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6176878
14 September 2016
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6034718
28 August 2016
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 5985609
15 October 2015
Deficiency Check
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 5743395
29 July 2015
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 5199614
10 December 2014
Deficiency Check
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 5036582
3 September 2014
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4952282
20 February 2014
Administrative Inspection
Administrative · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4805379
25 June 2013
Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4630170
18 June 2013
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4590230
19 June 2012
Deficiency Check · COI Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4340604
9 February 2012
Administrative Inspection
Administrative · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4241265
19 January 2012
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4229646
1 December 2011
Administrative Inspection
Administrative · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 4202824
29 June 2010
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3788508
30 June 2009
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3518013
28 July 2008
Deficiency Check
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3289587
25 July 2008
Annual Inspection · Hull Examination
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3278665
26 September 2007
Administrative Inspection
Administrative · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 3071349
27 June 2007
COI Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 2980994
7 July 2006
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 2704846
27 June 2005
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 2405319
19 July 2004
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 2138113
22 August 2003
Annual Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 1863654
17 July 2003
Hull Examination
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 1840721
27 June 2002
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 1637858
11 July 2001
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1397672
12 July 2000
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1381962
29 June 1999
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1441562
17 July 1998
Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1461062
30 June 1998
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1390812
8 July 1997
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1115100
22 January 1997
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1099872
28 June 1996
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 934564
14 June 1996
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 881274
30 June 1995
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1190458
1 July 1994
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 861990
27 July 1993
Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1425341
1 July 1993
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1379823
21 June 1993
Drydock Extension
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1382599
19 May 1993
Drydock Extension
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1132567
19 May 1993
Drydock Extension
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1139924
28 July 1992
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 955584
1 July 1992
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1261174
1 July 1991
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1243955
17 September 1990
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1232695
1 July 1990
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1221371
1 July 1989
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1206487
17 August 1988
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1347067
1 July 1988
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1347792
26 May 1988
Administrative
Administrative · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1194518
11 May 1988
Hull Examination
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1040763
30 July 1987
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1334025
2 July 1987
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1320149
2 July 1987
COI Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1339153
24 July 1986
Deficiency Check
Physical examination · MSO CINCINNATI · Activity 993280
9 July 1986
COI Inspection
Physical examination · MSO CINCINNATI · Activity 1306945
10 September 1985
Deficiency Check
Physical examination · MSO CINCINNATI · Activity 1296896
10 July 1985
Re-Inspection
Physical examination · MSO CINCINNATI · Activity 1285979
16 May 1985
Type not recorded
No type recorded · MSO CINCINNATI · Activity 979542
19 April 1985
Type not recorded
No type recorded · MSO CINCINNATI · Activity 1290098
11 April 1985
Type not recorded
No type recorded · MSO CINCINNATI · Activity 985914
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 July 2025
Resolved
Vessel draft marks have been painted over. Each vessel must—(1) Have permanent draft marks at each end of the vessel. Paint draft marks on port and starboard on bow and stern to the satisfaction of the attending Coast Guard marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 August 2025
Resolved 30 July 2025
Resolution: Received objective evidence that draft marks are installed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 28 April 2020
Resolved
Owner reported vessel has a leak in the KY side rake. No major repairs affecting the safety of the vessel with regard to hull, machinery or equipment shall be made without the knowledge and approval of the Officer in Charge Marine Inspections. Vessel shall proceed to dry dock and make repairs, prior to carrying passengers, to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 July 2020
Resolution: Condcuted final hull inspection with satisfactory results.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 18 September 2018
Resolved
On a vessel authorized to carry one or more vehicles, suitable chains, cables, or other barriers must be installed at the end of each vehicle runway. In addition, temporary rails or equivalent protection must be installed in way of each vehicle ramp, in compliance with the following: Rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers and crew and must be be designed and constructed to withstand a point load of 200 pounds applied at any point in any direction, and a uniform load of 50 pounds per foot applied to the top rail in any direction.
Please consult with this office before installation to ensure that it meets the intent of this regulation.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2018
Resolved 31 January 2019
Resolution: Cargo webbing integrated with steel wire and steel swing bar installed meeting the requirements.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 July 2018
Resolved
Fire pump must be fitted with an operable pressure gauge.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 August 2018
Resolved 11 September 2018
Resolution: Installed pressure gauge.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 July 2018
Resolved
Each stowage container for life jackets must not be capable of being locked. Remove locking mechanisms or provide written procedures for crew that ensures the locks are always removed before the beginning of daily operation.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 August 2018
Resolved 11 September 2018
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 July 2018
Resolved
Placards containing instructions for the donning and use of the EVERY TYPE of life-jacket aboard must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 August 2018
Resolved 11 September 2018
Electrical › Electrical Distribution System (service) › Junction Box
Issued 28 July 2015
Resolved
Wiring joints and splices shall be mechanicaly secure and made in a junction boxes IAW 46 CFR 183.05-50 (Old "T")
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 August 2015
Resolved 15 October 2015
Engineering › Bilge Water Management System › Hose
Issued 28 July 2015
Resolved
Replace hose on portable bilge pump IAW 46 CFR 182.25-5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 August 2015
Resolved 15 October 2015
Stability › Watertight Integrity › General
Issued 3 September 2014
Resolved
Provide and properly install captive chains in way of all deck hatches for the void spaces to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 3 October 2014
Resolved 10 December 2014
Resolution: Captive chains were installed on all hatches on the vehicle deck.
Personnel › Training › Fire Fighting Basic
Issued 3 September 2014
Resolved
Provide a means to accurately count all passengers on board the vessel prior to each voyage. The passenger count must be communicated verbally or in writing and available on shore in the event of an emergency
Action required: 705 - Other - as specified
Due 3 October 2014
Resolved 24 February 2015
Resolution: Owner has developed/utilized a software based system to track passengers that is uploaded by the Master upon departure at each landing and for each trip.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 3 September 2014
Resolved
Make repairs and demonstrate proper operation of the stern navigational light on the Ohio end of the vehicle ferry to the satisfaction of an attending Coast Guard Marine Inspector. Vessel is not permitted to operate outside of daylight hours and in periods of restricted visibility until corrected.
Action required: 705 - Other - as specified
Due 3 October 2014
Resolved 10 December 2014
Resolution: Stern navigational light on the Ohio end was energized and observed burning brightly.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 3 September 2014
Resolved
Provide and install a special flashing light on the forward end of the vehicle ferry barge to meet the requirements of the Inland Navigation Rules, Rule 24, paragraph F(ii). The light must flash between 50-70 times per minute and have an unbroken arc of not less than 180 degrees and not more than 225 degrees.
Action required: 705 - Other - as specified
Due 3 October 2014
Resolved 10 December 2015
Resolution: Received Certificate of Alternate Compliance COAC from D8.
Lifesaving › Lifebuoys › Serviceable
Issued 3 September 2014
Resolved
Provide retro reflective tape in way of all three life ring buoys to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 3 October 2014
Resolved 16 January 2015
Resolution: Retro reflective tape was affixed to all three life ring buoys in accordance with IMO Resolution A.658(16).
Construction/Loadline › Hull › Stiffener
Issued 25 June 2013
Resolved
Remove to good metal and replace vertical stiffeners on collision bulkhead (Ohio end) void #1.
Action required: 705 - Other - as specified
Resolved 13 September 2013
Construction/Loadline › Hull › Transverse Frame
Issued 25 June 2013
Resolved
Remove and replace two (2) floor frames in void #2 closest to Kentucky end.
Action required: 705 - Other - as specified
Resolved 12 November 2013
Construction/Loadline › Hull › Weld
Issued 25 June 2013
Resolved
Identify and repair cracks in overhead lap weld in all voids. Suggest making a complete weld instead of skip weld.
Action required: 705 - Other - as specified
Resolved 12 November 2013
Construction/Loadline › Hull › Hull Plating
Issued 25 June 2013
Resolved
Back gouge or drill stop and weld crack in deck top of #4 void.
Action required: 705 - Other - as specified
Resolved 13 September 2013
Construction/Loadline › Hull › Transverse Frame
Issued 25 June 2013
Resolved
Remove and replace wasted floor frames as marked in void #4 closest to Kentucky end.
Action required: 705 - Other - as specified
Resolved 12 November 2013
Construction/Loadline › Hull › Stiffener
Issued 25 June 2013
Resolved
Remove to good metal and replace over head deck stiffener in void #4 as marked.
Action required: 705 - Other - as specified
Resolved 13 September 2013
Construction/Loadline › Hull › Stiffener
Issued 25 June 2013
Resolved
Remove and replace wasted over head deck stiffeners as marked in void #5.
Action required: 705 - Other - as specified
Resolved 13 September 2013
Construction/Loadline › Structures › Transverse Bulkhead
Issued 25 June 2013
Resolved
Back gouge or drill stop hole in Kentucky end collision bulkhead and weld.
Action required: 705 - Other - as specified
Resolved 23 September 2013
Construction/Loadline › Hull › Bracket
Issued 25 June 2013
Resolved
Remove and replace wasted frame near pulley mount in void #6.
Action required: 705 - Other - as specified
Resolved 23 September 2013
Construction/Loadline › Hull › Hull Plating
Issued 25 June 2013
Resolved
Adjust or modify cable penetration in void #6.
Action required: 705 - Other - as specified
Resolved 23 September 2013
Deck/Cargo › Mooring/Anchoring › Anchor Cable
Issued 18 June 2013
Resolved
Alternate all clips in way of the wire rope that is used to lower and raise the vehicle ramps.
Action required: 705 - Other - as specified
Due 18 July 2013
Resolved 12 November 2013
Resolution: There is conflicting information on how the clips should be attached. Clips have been on wire rope for several years with no slippage or failure.
Lifesaving › Lifebuoys › Serviceable
Issued 18 June 2013
Resolved
Provide retro reflective tape in way of all three life ring buoys to the satisfaction of an attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 18 July 2013
Resolved 3 September 2014
Resolution: Deficiency was never cleared from previous years inspection and was found in the same condition during the second annual inspection. Deficiency was re-written and owner/operator was given 30 days to correct.
Documentation › Certificates/Documents › Stability Letter
Issued 19 June 2012
Resolved
Provide and post a copy of the stability letter under glass in the wheelhouse of the LITTLE BOONE and ensure all pages of the stability letter are visible.
Action required: 705 - Other - as specified
Due 19 July 2012
Resolved 23 July 2012
Resolution: A copy of the stability letter was posted in the wheelhouse of the attending Towing vessel, the LITTLE BOONE.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 19 June 2012
Resolved
Provide retro reflective tape for a total of 16 adult life jackets and 2 children's life jackets. In addition make proper repairs to the torn seam on one adult life jacket.
Action required: 705 - Other - as specified
Due 19 July 2012
Resolved 23 July 2012
Resolution: All 16 adult and 2 child PFD''s were replaced with new ones.
Lifesaving › Lifebuoys › Serviceable
Issued 19 June 2012
Resolved
Make suitable repairs (plug holes) in all three life ring buoys to prevent penetration of water that would compromise the buoyant material.
Action required: 705 - Other - as specified
Due 19 July 2012
Resolved 23 July 2012
Resolution: Holes in all three life rings were filled with epoxy.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 19 June 2012
Resolved
Replace the wasted lanyard attached to the floating water light on one of the life ring buoys. Lanyard should be a minimum of 3 feet and no more than 6 feet long, made of a dark color if synthetic or be resistant to Ultraviolet light.
Action required: 705 - Other - as specified
Due 19 July 2012
Resolved 23 July 2012
Resolution: Wasted lanyard in way of the floating water light was replaced and properly affixed to the life ring buoy.
Electrical › Electrical Distribution System (service) › Wiring
Issued 19 June 2012
Resolved
Remove the plastic wire tie securing the electrical wire that supplies electrical power to the navigation lights from the LITTLE BOONE. The wiring is secured to the pad eye on the swivel of the barge.
Action required: 705 - Other - as specified
Due 19 July 2012
Resolved 27 July 2012
Resolution: Wire tie was removed and replaced with a metallic clamp.
Stability › Watertight Integrity › General
Issued 19 June 2012
Resolved
Provide captive chains for all watertight hatches of sufficient strength to prevent its loss.
Action required: 705 - Other - as specified
Due 19 July 2012
Resolved 23 July 2012
Resolution: Captive chains were provided on every watertight hatch.
Construction/Loadline › Hull › Stiffener
Issued 28 July 2008
Resolved
Bulkhead veriticals and framing around port and starboard areas of ramp cable ways are in need of attention in the collision bulkhead in the forward void (Kentucky End). Owner will provide a repair plan, work can be accomplished dockside.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 July 2013
Resolved 12 November 2013
Construction/Loadline › Hull › Side Shell
Issued 25 July 2008
Resolved
Pits along starboard side shell water line need cleaned and welded.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 July 2008
Resolved 28 July 2008
Construction/Loadline › Hull › Longitudinal Frame
Issued 25 July 2008
Resolved
4 bottom longitudinal frames are wasted and need replaced in the forward of the collision bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 July 2008
Resolved 28 July 2008
Electrical › Lighting (service) › Lighting Fixture
Issued 22 August 2003
Resolved
REPAIR ANCHOR LIGHT
Condition: Improper/Lack of Maintenance
Due 22 August 2003
Resolved 22 August 2003
Resolution: ANCHOR LIGHT BULB WAS CORRECTLY INSTALLED AND WORKING SATISFACTORILY
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 22 August 2003
Resolved
REPLACE ONE (1) ADULT PFD
Condition: Improper/Lack of Maintenance
Due 22 August 2003
Resolved 22 August 2003
Resolution: ONE (1) DEFECTIVE ADULT PFD REPLACED WITH NEW PFD
Construction/Loadline › Hull
Issued 17 July 2003
Resolved
Make permanent repairs to broken welds Port side shell, Ohio side forward compartment. LEGACY COMPONENT DESC: Side Shell
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 July 2003
Resolved 25 July 2003
Resolution: Side shell inserted 18"x24", hose tested insert test satisfactory.
Construction/Loadline › Hull
Issued 17 July 2003
Resolved
Make permanent repairs to broken welds to Port of centerline on longitudinal deck frames in Ohio side forward compartment. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 July 2003
Resolved 25 July 2003
Resolution: All welds ground out and rewelded.
Construction/Loadline › Hull
Issued 17 July 2003
Resolved
Make permanent repairs to fractures in deck around Port side void hatch for number two void. LEGACY COMPONENT DESC: Hull Plating
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 25 July 2003
Resolved 25 July 2003
Resolution: Hatch removed and 18"x24" insert installed, hose tested insert, test satisfactory.
Construction/Loadline › Hull
Issued 17 July 2003
Resolved
Make permanent repairs to broken welds to starboard of centerline on longitudenal deck frames in number three void. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 July 2003
Resolved 25 July 2003
Resolution: All welds ground out and rewelded.
Construction/Loadline › Hull
Issued 17 July 2003
Resolved
Make permanent repairs to broken welds on the first, second and third transverse deck frames from forward bulkhead in third void. LEGACY COMPONENT DESC: Transverse Frame
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 July 2003
Resolved 25 July 2003
Resolution: All welds ground out and rewelded.
Construction/Loadline › Hull
Issued 17 July 2003
Resolved
Make permanent repairs to holes in deck around starboard hatch in number six void. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 July 2003
Resolved 25 July 2003
Resolution: Hatch removed and 18"x24" insert installed, hose tested insert, test satisfactory.
Navigation
Issued 1 July 1992
Resolved
ON M/V LITTLE BOONE, INSTALL SAFETY (COTTER) PINS TO PROPERLY SECURE CROSS-OVER STEERING BAR JOINT PINS, NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 1 July 1992
Resolved 2 July 1992
Fire Fighting
Issued 1 July 1992
Resolved
PROVIDE ONE 50' X 1 1/2" LENGTH OF APPROVED FIRE HOSE WITH A NOZZLE ATTACHED, NOT LATER THAN THE COMPLIANCE DATE. THE NOZZLE CAN BE EITHER A 1/2" SOLID STREAM TYPE, OR A COAST GUARD APPROVED COMBINATION NOZZLE.
Condition: Unknown
Due 1 July 1992
Resolved 1 July 1992
Construction/Loadline
Issued 1 July 1992
Resolved
REWELD ALL FRACTURED WELDS WHERE UNDER-DECK FRAMES ATTACH TO DECK IN ALL VOID COMPARTMENTS, NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 1 July 1992
Resolved 1 July 1992
Navigation
Issued 1 July 1992
Resolved
ON M/V LITTLE BOONE, INSTALL "MARINE TYPE" TOWING LIGHT FIXTURES, NOT LATERTHAN THE COMPLIANCE DATE.
Condition: Unknown
Due 1 July 1992
Resolved 1 July 1992
Engineering
Issued 1 July 1990
Resolved
INSTALL FIXED BILGE PUMPS AND PIPING SYSTEM IN ACCORDANCE WITH 46 CFR 182.25 NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 1 July 1990
Resolved 1 July 1990
Electrical
Issued 1 July 1990
Resolved
INSTALL SIDELIGHTS AND STERNLIGHT TO COMPLY WITH INLAND NAVIGATION RULE NO.24: "LIGHTS FOR VESSELS BEING TOWED ALONG SIDE", NOT LATER THAN THE COMPLIANCES DATE.
Condition: Unknown
Due 1 September 1990
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Fire Fighting
Issued 1 July 1990
Resolved
PROVIDE FIRE PUMP WHICH HAS MINIMUM CAPACITY OF 60 PSI AT THE PUMP OUTLET NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 1 September 1990
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 1 July 1990
Resolved
REPLACE AFT NAVIGATION LIGHT WIRING WITH UL LISTED STRANDED CONDUCTOR TYPE,AND ENSURE CONNECTIONS ARE WATERTIGHT NOT LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 1 July 1990
Resolved 1 July 1990
Fire Fighting
Issued 1 July 1988
Resolved
REPAIR/REPLACE THE HAND FIRE/BILGE PUMP AS NECESSARY.
Condition: Unknown
Due 1 July 1988
Resolved 1 July 1988
Accommodation/Occupational Safety
Issued 1 July 1988
Resolved
INSTALL ADDITIONAL GUARDS IN THE RAIL OPENINGS ADJACENT TO THE ACCOMPANING TOWBOAT.
Condition: Unknown
Due 1 July 1988
Resolved 1 July 1988
Lifesaving
Issued 9 July 1986
Resolved
PROVIDE ON BOARD THE VESSEL TWO MORE 24" APPROVED, PROPERLY-MARKED LIFE RINGS.
Condition: Unknown
Due 9 July 1986
Resolved 9 July 1986
Lifesaving
Issued 9 July 1986
Resolved
THE VESSEL IS RESTRICTED TO THE CARRIAGE OF 28 ADULTS UNTIL TWO ADDITIONAL LIFE JACKETS ARE PLACED ON BOARD, INSPECTED, AND STAMPED.
Condition: Unknown
Due 9 July 1986
Resolved 9 July 1986
Construction/Loadline
Issued 10 July 1985
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 10 July 1985
Resolved 10 July 1985
Construction/Loadline
Issued 10 July 1985
Resolved
RUN CONTINUOUS WELD ALONG TOP OF COLLISION BULKHEAD AT KENTUCKY END OF VES-SEL.
Condition: Unknown
Due 10 July 1985
Resolved 10 July 1985
Construction/Loadline
Issued 10 July 1985
Resolved
MAKE PERMANENT REPAIRS TO TWO SMALL HOLES THROUGH HEADLOG STRENGTH MEMBER AT OHIO END APPROXIMATELY TWELVE INCHES (12") FROM WEST CORNER.
Condition: Unknown
Due 10 July 1985
Resolved 10 July 1985
Construction/Loadline
Issued 10 July 1985
Resolved
MAKE PERMANENT REPAIR TO SPLIT SEAM IN DECK KNUCKLE ON EAST SIDE OF OHIO CENTER COMPARTMENT BETWEEN NO. 2 AND NO. 3 FRAMES FROM CENTERLINE BULKHEAD.
Condition: Unknown
Due 10 July 1985
Resolved 10 July 1985
Construction/Loadline
Issued 11 April 1985
Resolved
REPLACE ALL THE PIVOT PINS ON BOTH LOADING RAMPS. THE VESSEL IS RESTRICTEDTO THE LOADING OF VEHICLES WITH A GROSS VEHICLE WEIGHT OF LESS THAN 12,000POUNDS UNTIL THESE PINS HAVE BEEN REPLACED.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985
Construction/Loadline
Issued 11 April 1985
Resolved
INSTALL AN ACCEPTABLE SAFETY SYSTEM TO PREVENT THE BARGE FROM BREAKING AWAY FROM THE TOWBOAT.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985
Construction/Loadline
Issued 11 April 1985
Resolved
PRESENT PLANS TO THIS OFFICE FOR THE DESIGN OF A SAFETY SYSTEM TO PREVENT THE BARGE BREAKING AWAY FROM THE TOWBOAT.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985