Documentation record
Registered dimensions (L × B × D)116.5 ft × 26.2 ft × 11.4 ft
Registered tonnagegross 90 / net 61
ITC dimensions (L × B × D)116.5 ft × 26.2 ft × 11.4 ft
ITC tonnagegross 219 / net 65
BuilderBREAUX'S BAY CRAFT INC · LOREAUVILLE, LA, UNITED STATES · built 1995
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 8 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it219 - Convention (Subpart B), Gross Ton
90 - Regulatory (Subpart C or D), Gross Ton
65 - Convention (Subpart B), Net Ton
61 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 18 inspections, each with its date, unit and type; 18 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 18
23 April 2026
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8332895
7 April 2025
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8106668
3 April 2025
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8104786
4 September 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7995935
24 January 2024
Type not recorded
No type recorded · Station Grand Isle · USCG Heartland District (CGD-H) · Activity 7855511
1 November 2023
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7818893
24 October 2022
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7582645
10 August 2022
Hull Examination · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7529316
25 October 2021
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7338987
11 December 2020
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7110466
31 July 2020
Administrative Inspection · COI Inspection · Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7020792
13 September 2019
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6810602
16 October 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6562115
30 July 2018
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6490651
11 September 2017
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6264395
16 September 2016
Type not recorded
No type recorded · USCGC PELICAN (WPB 87327) · USCG Heartland District (CGD-H) · Activity 6002761
1 September 2016
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5989758
31 August 2016
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5989081
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 April 2025
Resolved
An interconnected detection and alarm system must be installed so that the actuation of the alarm in one area results in both audible and visual alarms in all areas required to be protected by the interconnected detection and alarm system. Fire alarms were not interconnected between crew/passenger accommodations (wireless) and engineering spaces (installed fire panel)
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2025
Resolved 2 May 2025
Resolution: Detectors installed in aux machinery space and crew quarters, test sat.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 16 April 2025
Resolved
Operation of transmitters of any ship station must be performed by a person holding a commercial radio operator license or permit of the class required. The relief captain has a restricted radio operator permit.
47 CFR 80.155
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2025
Resolved 9 May 2025
Resolution: Relief captain obtained an unrestricted radio operator permit.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 April 2025
Resolved
The hailing port and vessel name must be marked and clearly visible on the stern of the vessel; the markings must be in clearly legible letters of Latin alphabet not less than four inches in height. The hailing port and vessel name markings on the stern were under four inches.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2025
Resolved 2 May 2025
Resolution: Vsl name corrected.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 25 October 2021
Resolved
The watertight door shall meet the requirements of 46CFR179.360. The gasket in the accommodation space is not watertight and the door has holes.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 October 2021
Resolved 26 October 2021
Resolution: Received photographs.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 October 2021
Resolved
The minimum capacity of the fire pump shall be not less than 60 psi. The fire pump at the pump's outlet was less than 60 psi.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 October 2021
Resolved 26 October 2021
Resolution: Received photographs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 October 2021
Resolved
Each lifejacket carried on the vessel shall have al least 31 sq. inches of retro-reflective tape. There are 09 lifejackets that had inadequate ratio and were unserviceable. 46 CFR 180.25-25
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 October 2021
Resolved 26 October 2021
Resolution: Received photographs.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 25 October 2021
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] are several loose wires that are exposed with several hydraulic leaks, discovered in the pilothouse cabinet under the helm for the high clutch pressure gauge. 46 CFR 183.01-15
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 October 2021
Resolved 26 October 2021
Resolution: Received photographs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 October 2021
Resolved
Machinery installations shall comply with this part. The line over the #3 main was chaffed and a bracket on the #3 main was missing. 46 CFR 182.05-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 November 2021
Resolved 26 October 2021
Resolution: Received photographs.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 13 September 2019
Resolved
7 waterlight batteries were expires throughout the VSL
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2019
Resolved 19 September 2019
Resolution: VSL purchased new batteries for waterlights
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 13 September 2019
Resolved
VSL did not have a chart correction kit to update charts, needs to obtain a chart correction kit
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 September 2019
Resolved 19 September 2019
Resolution: VSL purchased chart correction kit
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 September 2019
Resolved
VSL Hailing port on stern of VSL was not visible
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 13 September 2019
Resolved 13 September 2019
Resolution: Deckhand Stenciled the hailing port of the VSL on the Stern
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 16 October 2018
Resolved
Life floats did not have dunnage between stacked floats
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2018
Resolved 14 November 2018
Resolution: Place dunnage between life floats
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 October 2018
Resolved
Reduction gear on port ctr main leaked
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2018
Resolved 14 November 2018
Resolution: Identify and rectify source of leak
Communications › Radio Communications › VHF Radiotelephone
Issued 11 September 2017
Resolved
VHF radio, DSC not operational.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 11 October 2017
Resolved 18 September 2017
Resolution: VHF Radio was connected to GPS to provide operable DSC.
Fire Fighting › Fire Hoses › Connections
Issued 11 September 2017
Resolved
In-line foam eductor for the carriage of Haz-mat was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 September 2017
Resolved 13 September 2017
Resolution: In-line foam eductor was repaired.
Engineering › Bilge Water Management System › Interface Detector
Issued 11 September 2017
Resolved
Rudder room bilge high water alarm, not working. Corroded wiring discovered causing problem.
*corrected on the spot*
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 September 2017
Resolved 11 September 2017
Resolution: Corroded electrical wiring for alarm was fixed on the spot.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 September 2016
Resolved
Exposed hazards such as rotating machinery must be properly protected by a guard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 September 2016
Resolved 1 September 2016
Resolution: Provided satisfactory proof of proper installation of guards.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 1 September 2016
Resolved
Vessels with multiple generators are required to have the generator circuit breakers to be interlocked.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 September 2016
Resolved 1 September 2016
Resolution: Provided satisfactory proof of proper installation.