MAURY USCG vessel records
← All vessels

GASCO HUKI KAI I

Built
1958
Last inspected
22 November 2022
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 22 November 2022
…with no type recorded34
Operational controls None recorded without a removal date
Years with a record 39 calendar years (1984–2022)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Tonnage
1256 - Regulatory (Subpart C or D), Gross Ton 1256 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-43521
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. Only barges and towing vessels are in this archive, so any other vessel type in the same activity does not appear here: these lists are a floor, not a complete manifest.

MIKI HANA Towing Vessel · MISLE 103081 · 19 September 2013 · activity 4719750

Inspection history · 107

22 November 2022 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7598528
15 December 2021 Periodic Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7368834
1 October 2020 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7069766
28 August 2019 Administrative Inspection · Cargo Tank Internal · Examination of Repairs · In-Service Inspection · Internal Structural Exam · MTSA Verification · Drydock Exam · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6791935
15 August 2018 Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6511137
28 September 2017 Internal Structural Exam · Administrative Inspection · Periodic Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6270411
28 July 2016 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5959781
9 September 2015 Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5234464
15 October 2014 COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4994956
11 September 2014 Drydock Exam · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4981241
13 February 2014 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4799667
2 October 2013 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4728455
19 September 2013 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4719750
3 October 2012 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4460409
14 October 2011 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4173181
31 August 2010 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3833481
12 January 2010 Permit to Proceed · Administrative Inspection · Drydock Exam · MTSA Verification · Internal Structural Exam · In-Service Inspection · Cargo Tank Internal · COI Inspection · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3686867
20 August 2009 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3571173
26 March 2009 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3440886
4 November 2008 MTSA/ISPS Verification · Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3357362
30 October 2008 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3354701
24 October 2008 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3355933
11 September 2008 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3322785
21 August 2008 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3305087
1 August 2008 MTSA Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3286397
24 July 2008 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3278221
29 October 2007 Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3087823
12 March 2007 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2886734
31 October 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2811424
18 May 2006 Annual Inspection · Internal Structural Exam · Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2652545
18 August 2005 COI Inspection · MTSA Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2465377
15 August 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2463617
13 September 2004 MTSA Verification · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2182737
20 November 2003 Periodic Inspection · Cargo Tank Internal
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1945518
25 September 2003 Administrative Inspection
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1913030
14 May 2003 Hull Examination · Internal Structural Exam
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1793807
29 July 2002 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1651627
9 November 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 772527
29 October 2001 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1414025
15 May 2001 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1393712
27 October 2000 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 487517
15 September 2000 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 822331
28 August 2000 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1365940
16 September 1999 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1039512
3 August 1999 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1378766
18 September 1998 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1434777
31 August 1998 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1398943
5 August 1998 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 800272
9 June 1998 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1127197
1 June 1998 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1408159
14 August 1997 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1364301
13 September 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1265096
20 August 1996 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355917
14 May 1996 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355789
2 May 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1359100
29 April 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1359095
29 February 1996 Plan Review "T" Boat
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 885588
15 December 1995 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1360345
23 October 1995 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 871881
31 August 1995 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1360236
18 May 1995 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1360019
7 October 1994 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1174865
1 September 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1444880
14 September 1993 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354472
13 April 1993 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 457429
30 December 1992 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 480491
6 October 1992 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1243730
24 September 1992 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 471639
17 September 1992 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1264948
4 September 1992 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 952138
5 May 1992 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 951963
13 February 1992 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 437412
11 December 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1257484
22 October 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1376843
17 October 1991 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1246055
28 August 1991 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 478040
8 August 1991 Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1244266
15 March 1991 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 444082
15 March 1991 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 532666
18 December 1990 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 505482
19 September 1990 Deficiency Check · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1230958
14 June 1990 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 478550
21 November 1989 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 540793
6 October 1989 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1194895
28 July 1989 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 331794
13 July 1989 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 443582
23 March 1989 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 460298
9 November 1988 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1342239
25 October 1988 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 453386
5 October 1988 Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1195554
2 August 1988 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1345158
20 July 1988 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 444256
6 January 1988 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 440225
23 September 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 509188
15 September 1987 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1008390
14 May 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 494255
4 December 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1335906
2 December 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1329745
7 November 1986 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1321939
11 October 1986 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1011284
22 September 1986 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1309949
4 September 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1029138
7 August 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1306559
31 March 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 499476
23 December 1985 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 995078
28 October 1985 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1301043
23 November 1984 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 976022

Deficiency record · 165

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 1 October 2020 Resolved
Each tank shall be fitted with or connected to one or more safety relief valves meeting subchapter Q specifications. Vessel is fitted with adequate safety relief valves but have standing water in the vent pipe above them due to lack of drainage. Remove water from vent pipes to allow unimpeded operation of safety relief valves.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 October 2020
Resolution: Vessel cleared drain holes and water was removed.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 24 October 2014 Resolved
Inspect operations remote shutdown to the satisfaction of the attending CG Marine Inspector/ABS Surveyor.
Action required: 705 - Other - as specified
Due 28 October 2014
Resolved 28 October 2014
Resolution: shut downs tested -sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 24 October 2014 Resolved
Conduct pressure leak tests on all six cargo tanks to the satisfaction of the attending CG Inspector/ABS Surveyor.
Action required: 705 - Other - as specified
Due 28 October 2014
Resolved 28 October 2014
Resolution: tanks checked under pressure- sat.
Pollution Prevention/Response › Prevention Equipment › Emergency Control Systems (tank barges)
Issued 3 October 2012 Resolved
Retrieval cable was found with several parted yarns. Vessel is to either replace in kind or remove since tow vessels carry a [name withheld].
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 October 2012
Resolution: Removed cable
Construction/Loadline › Hull › Transverse Frame
Issued 25 February 2010 Resolved
C & R buckled web of CVK at web frame #5
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Damaged section renewed.
Construction/Loadline › Hull › Stiffener
Issued 25 February 2010 Resolved
Repair fractured bottom long #2, stbd between #11 and #12 web frames.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Fracture vee''''d out and rewelded.
Construction/Loadline › Hull › Transverse Frame
Issued 25 February 2010 Resolved
Provide repair proposal for buckled web frame #4, port, below fwd port cargo tank.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Proposal provided and accepted. Repair was made during DD to include adjacent bottom longs, bottom plating and o/b vert frame up approx 5''''.
Construction/Loadline › Hull › Stiffener
Issued 25 February 2010 Resolved
Provide repair proposal for fractured bottom long #4, fwd of web frame #4, port below fwd port cargo tank.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Proposal provided and accepted. Repair was made during DD to include adjacent web frame #4, bottom plating and o/b vert frame up approx 5''''''''.
Construction/Loadline › Hull › Transverse Frame
Issued 25 February 2010 Resolved
Provide repair proposal for fractured welds on bottom longs #5 &#6 , port, below fwd port cargo tank.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Proposal provided and accepted. Repair was made during DD to include web frame #4, bottom plating and o/b vert frame up approx 5''''.
Construction/Loadline › Hull › Transverse Frame
Issued 25 February 2010 Resolved
Provide engineering survey to address/correct cracked welds on #4, port, vert frame IWO side longs 3-5 (from main deck)
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Proposal provided and accepted. Repair was made during DD to include renew frame up approx 5'''' along with adjacent bottom longs, bottom plating and web frame #4 below cargo tank.
Construction/Loadline › Hull › Bottom Plating
Issued 25 February 2010 Resolved
Provide gauging report for bottom plate fwd & aft of frame #12 IWO turn of bilge with particular attention to identified pits.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Six shots provided by Anawati and Assoc indicated max wastage of 15% for area in question. Within limits established by ABS rules for bottom plating.
Construction/Loadline › Hull › Bottom Plating
Issued 25 February 2010 Resolved
Provide gauging report for bottom plating IWO of frame #15 and bottom long #1 at turn of bilge with particular attention to identified pits.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Three shots provided by Anawati and Assoc indicated max wastage of 09% for area in question. Within limits established by ABS rules for bottom plating.
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 25 February 2010 Resolved
Provide gauging report for marked locations in forward middle cargo tank.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: report indicated pits to be within limits.
Construction/Loadline › Hull › Bottom Plating
Issued 25 February 2010 Resolved
Make area under stbd cargo tank available for inspection (remove all scale) IWO tank center and aft supports.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Area descaled and cleaned. Subsequent gauging revealed nothing in center of area but area aft of support in need of repair. O/O C&Rd 3''''''''x2'''''''' bottom plate IWO of 7&8 stbd longs aft of frame #12.
Construction/Loadline › Hull › Side Shell
Issued 25 February 2010 Resolved
Provide gauging report for marked locations IWO frame #11 on stbd side shell.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Report provided indicated nothing of note.
Construction/Loadline › Hull › Bottom Plating
Issued 25 February 2010 Resolved
Make area under fwd, port cargo tank available for inspection IWO of frame #4.
Action required: 705 - Other - as specified
Resolved 26 March 2010
Resolution: Area cleaned. Bottom plate and associated frames renewed as a result of DD external findings.
Construction/Loadline › Hull › Hull Plating
Issued 20 August 2009 Resolved
Conduct all required hull examinations (Hull, ISE, CTIE) prior to placing vessel back in service after completion of lay-up status.
Action required: 705 - Other - as specified
Due 18 August 2010
Resolved 31 March 2010
Resolution: All exams completed. Vessel re-activated. COI issued.
Construction/Loadline › Hull › Hull Plating
Issued 4 November 2008 Resolved
Make fwd rake and 20% of voids containing cargo tanks available for ISE and cargo tank external inspection. Sample cargo tank external exam and 20% sample ISE will determine suitability of granting ISE extension to harmonize with next credit hull exam.
Condition: Unknown
Action required: 705 - Other - as specified
Due 18 November 2008
Resolved 5 November 2008
Resolution: Conducted inspection of after void containing cargo tanks [20% of voids) and forward rake end for suitability to grant an extension of the ISE and cargo tank external exams to harmonize with next credit hull exam.
Stability › Watertight Integrity › General
Issued 18 May 2006 Resolved
Remove temporary patch and make proper repairs to bottom plate in #2 void space.
Condition: Damaged By Earlier Event
Due 17 August 2006
Resolved 17 August 2006
Resolution: Repairs completed.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 18 May 2006 Resolved
Make cargo tank safety relief valves available for inspection
Due 30 November 2006
Resolved 12 March 2007
Resolution: Cargo Tank Safety Relief Valves inspected this date
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 18 August 2005 Resolved
Per special note #2, safety relief valves were not inspected or lifted. This was postponed and will be done in conjunction with the next scheduled ISE.
Due 15 May 2006
Resolved 11 August 2006
Resolution: Cargo tank safety relief valve intervals changed to twice in five, not more than three.
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 18 August 2005 Resolved
Per special note #4, an external exam of the cargo tanks was not conducted at the COI. This was postponed and will be done in conjunction with the next ISE.
Due 15 May 2006
Resolved 11 August 2006
Resolution: Inspected at ISE.
Construction/Loadline › Hull
Issued 19 May 2003 Resolved
Fwd Rake/#1 Void: Crop and renew center section of transverse bulkhead between fwd rake and #1 void from bottom plate up 31" and approx 25" either side of keel (centerline). Note: ABS outstanding condition involving this same bulkhead. LEGACY COMPONENT DESC: Transverse Frame
Action required: 17 - Rectify deficiencies prior to departure
Due 20 May 2003
Resolved 8 June 2003
Construction/Loadline › Hull
Issued 19 May 2003 Resolved
#2 Void: Replace spurng bracket stbd fwd corner at the #3 side longitudinal. LEGACY COMPONENT DESC: Bracket
Action required: 17 - Rectify deficiencies prior to departure
Due 20 May 2003
Resolved 8 June 2003
Construction/Loadline › Hull
Issued 19 May 2003 Resolved
#2 Void: Crop and renew cracked bottom long #8 (from center), forward of frame 27 from frame 27 to 4' forward. Note: Bottom long #9 distorted to lesser degree. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 20 May 2003
Resolved 8 June 2003
Construction/Loadline › Hull
Issued 19 May 2003 Resolved
#2 Void: Crop and renew deformed and wasted bottom longitudnal #1 (from center at and 4' aft of frame 27. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 20 May 2003
Resolved 8 June 2003
Construction/Loadline › Structures
Issued 19 May 2003 Resolved
Prove proper seal of hatch to fwd rake. Rust and scale evident at foot of lader and along transverse bulkhead. LEGACY COMPONENT DESC: Manhole
Due 18 June 2003
Resolved 8 June 2003
Construction/Loadline › Hull
Issued 14 May 2003 Resolved
Void #1 (ABS Condition) Crop and renew transverse bulkhead from 30" either side of starboard longitudinal frame #3 (from center) and from the bottom up to the first seam weld approx 4' up from bottom shell. LEGACY COMPONENT DESC: Transverse bulkhead
Action required: 17 - Rectify deficiencies prior to departure
Due 20 May 2003
Resolved 8 June 2003
Deck/Cargo › Cargo Stowage
Issued 29 July 2002 Resolved
Replace retaining chains on tank ventilation stovepipes. LEGACY COMPONENT DESC: Cargo Tank Ventilation
Action required: 705 - Other - as specified
Due 28 August 2002
Resolved 13 August 2002
Deck/Cargo › Cargo Stowage
Issued 29 July 2002 Resolved
Prove proper operation of gooseneck ventilation cover to #1 cargo tank void. LEGACY COMPONENT DESC: Cargo Tank Void Ventilation
Action required: 705 - Other - as specified
Due 28 August 2002
Resolved 13 August 2002
Deck/Cargo › Cargo Stowage
Issued 29 July 2002 Resolved
Replace damaged temperature and pressure gauges at the #3 liquid vapor manifold. LEGACY COMPONENT DESC: Temperature/Pressure Gauges
Action required: 705 - Other - as specified
Due 28 August 2002
Resolved 13 August 2002
Construction/Loadline › Markings
Issued 29 July 2002 Resolved
Re-paint faded loadline markings especially port amidships. LEGACY COMPONENT DESC: Load Line Mark
Action required: 705 - Other - as specified
Due 28 August 2002
Resolved 13 August 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 29 July 2002 Resolved
Install second remote valve shut-down on opposite side of barge from existing station. To be installed outside of compressor compartment. LEGACY COMPONENT DESC: Emergency Shut-down
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 August 2002
Resolved 13 August 2002
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 29 July 2002 Resolved
Provide "Emergency Shutdown" placards that are visible from all areas of barge deck. LEGACY COMPONENT DESC: Emergency Shut-down
Action required: 705 - Other - as specified
Due 30 August 2002
Resolved 13 August 2002
Construction/Loadline
Issued 29 October 2001 Resolved
Re paint barge name on port and starboard bow.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Construction/Loadline
Issued 29 October 2001 Resolved
Adjust port/stbd watertight door "dogs".
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Deck/Cargo
Issued 29 October 2001 Resolved
Hydro test all (4) cargo hoses to 1.5xMAWP, stencil: MAWP/product name/dateof test/date of hose manufacture.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Construction/Loadline
Issued 29 October 2001 Resolved
Cargo pump room natural air vent cover (fwd): Replace wasted section.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Construction/Loadline
Issued 29 October 2001 Resolved
Cargo pump room natural air vent (aft): Repair wasted hole to original condition.
Condition: Unknown
Due 29 October 2001
Resolved 29 October 2001
Deck/Cargo
Issued 28 August 2000 Resolved
Prior to carrying cargo, prove the proper operation of cargo pumps_x001C_ emergency shutdown. IAW: 46 CFR 38.15.20.
Condition: Unknown
Due 28 August 2000
Resolved 28 August 2000
Construction/Loadline
Issued 3 August 1999 Resolved
Make permanent repairs to main deck in way of doublers to the satisfaction of the attending marine inspector and satisfy outstanding condition of class prior to 30SEP99.
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Deck/Cargo
Issued 31 August 1998 Resolved
Conduct annual hydrostatic test on all cargo piping and transfer hoses prior to loading cargo.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Electrical
Issued 31 August 1998 Resolved
Re-assemble explosion proof light on stern side of cargo pump room prior toloading cargo.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Deck/Cargo
Issued 31 August 1998 Resolved
Reinstall pressure relief valve piping prior to loading cargo.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Deck/Cargo
Issued 31 August 1998 Resolved
Replace or renew cracked hydraulic flexible hoses on emergency shut down system prior to loading cargo.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Navigation
Issued 31 August 1998 Resolved
Prove proper operation of all navigational lighting, prior to night operations.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Deck/Cargo
Issued 31 August 1998 Resolved
Reinstall valves in vapor piping system prior to loading cargo.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Electrical
Issued 31 August 1998 Resolved
Prove operation of red cargo night time transfer light prior to loading cargo.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Fire Fighting
Issued 31 August 1998 Resolved
Conduct annual servicing of protable fire extinguishers._x001C_ _x001C_
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Deck/Cargo
Issued 31 August 1998 Resolved
Prove proper operation of emergency shutdown for cargo operations prior to loading cargo.
Condition: Unknown
Due 31 August 1998
Resolved 31 August 1998
Deck/Cargo
Issued 9 June 1998 Resolved
Replace or repair 2 of 24 inoperable pressure relief valves prior to loading cargo in effected tanks.
Condition: Unknown
Due 9 June 1998
Resolved 9 June 1998
Construction/Loadline
Issued 20 August 1996 Resolved
PROVIDE GAUGINGS SUFFICIENT TO SHOW CONDITION OF RUSTED AREA OF HULL BOTTOMPLATE IN FORWARD HOLD, MIDSHIPS, AFT.
Condition: Unknown
Due 20 August 1996
Resolved 20 August 1996
Lifesaving
Issued 20 August 1996 Resolved
RENEW STENCIL ON WARNING SIGN AT GANGWAY; 46 CFR 35.30-1(b).
Condition: Unknown
Due 20 August 1996
Resolved 20 August 1996
Deck/Cargo
Issued 20 August 1996 Resolved
PROVIDE MARKINGS AT EMERGENCY STOP FOR CARGO COMPRESSOR,_x001C_ AND AT QUICK ACTING VALVE REMOTE CONTROLS.
Condition: Unknown
Due 20 August 1996
Resolved 20 August 1996
Deck/Cargo
Issued 20 August 1996 Resolved
LABEL CARGO PIPES / VALVES AT TANK CONNECTIONS AS "VAPOR" OR "LIQUID";_x001C_ 46 CFR 38.05-5(b).
Condition: Unknown
Due 20 August 1996
Resolved 20 August 1996
Deck/Cargo
Issued 20 August 1996 Resolved
PROVIDE SECOND REMOTE CONTROL LOCATION FOR THE QUICK CLOSING SHUTOFF VALVE'S HYDRAULIC SYSTEM; 46 CFR 38.10-1(j).
Condition: Unknown
Due 20 August 1996
Resolved 20 August 1996
Deck/Cargo
Issued 20 August 1996 Resolved
PROVIDE PRESSURE VESSEL MARKINGS FOR FORWARD STARBOARD CARGO TANK;_x001C_ 46 CFR 38.05-5(c).
Condition: Unknown
Due 20 August 1996
Resolved 20 August 1996
Construction/Loadline
Issued 2 May 1996 Resolved
REPAIR THE LEAKING HATCH COVERS TO THE FORWARD VOID.
Condition: Unknown
Due 2 May 1996
Resolved 2 May 1996
Construction/Loadline
Issued 31 August 1995 Resolved
REPAIR CRACKS IN SADDLES ON PORT SIDE: VOID NO. 1 PORT OUTBOARD FORWARD SADDLE AND VOID NO. 2 PORT OUTBOARD FORWARD ANR AFT SADDLE.
Condition: Unknown
Due 31 August 1995
Resolved 31 August 1995
Documentation
Issued 31 August 1995 Resolved
CORRECT DISCREPANCY BETWEEN LOAD LINE MARKINGS ON HULL AND CERTIFICATE.
Condition: Unknown
Due 31 August 1995
Resolved 31 August 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 15 between frames 6 and 7.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 14 between frames 6 and 8.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
C&R wasted longitudinal frame 10 between frames 5 and 6.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
REPAIR THE FOLLOWING CRACKED WELDS: A. FORWARD OF FRAME 4 AT LOGITUDINAL 4,B. AFT OF FRAME 4 AT LONGITUDINALS 4 AND 5, C. FWD FRAME 5 AT LONGITUDINALS3-7, 13 AND 21, D. ONE FOOT AFT OF FRAME 4 ON LONGITUDINAL 6 AT BOTTOM SHELL.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
REPAIR THE FOLLOWING INTERNAL STRUCTURAL FRACTURES: A. AFT OF FRAME 4 AT LONGITUDINAL 12 AND B. ONE(01) FOOT FORWARD OF FRAME 5 AT BASE OF LONGITUDINAL 6.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
C&R 2 feet of wasted longitudinal frame 7 just aft of frame 5.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW WASTED LONGITUDINAL FLANGE ON BOTH CENTER SUPPORT STIFFENERSFOR CARGO TANKS #1 AND #3 BETWEEN FRAMES 9 AND 10.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW LOWER 6"x 18" SECTION OF WASTED STANCHION AT FRAME 10 STARBOARD SIDE.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW WASTED LONGITUDINAL #20 LOCATED BETWEEN FRAMES 10 AND 11.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
GAUGE ALL LONGITUDINAL FRAMING BETWEEN FRAMES 5 FORWARD AND 13 AFT AND BETWEEN 8 LONGITUDINAL PORT AND 16 LONGITUDINAL STARBOARD. CROP AND RENEW ALL WASTAGE BEYOND 30% OF ORIGINAL.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW APPROXIMATELY FOUR FOOT OF WASTED AREA ON EACH LONGITUDINAL FRAME #5 AND 12 LOCATED BETWEEN FRAMES 14 FORWARD AND 15 AFT.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
REPAIR CRACKED WELD FORWARD OF FRAME 14 AT LONGITUDINAL FRAME 23.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
REPAIR FRACTURED LONGITUDINAL #4 JUST FORWARD OF FRAME 15.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW THE LOWER 6"x 24" SECTION OF WASTED LONGITUDINAL #12 LOCATEDJUST AFT OF FRAME 18.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW WASTED LONGITUDINALS #14 AND 15 LOCATED BETWEEN FRAMES #18 AND 19.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW WASTED LONGITUDINAL #12 LOCATED BETWEEN FRAMES #27 AND 28.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
C&R (crop and renew) wasted longitudinal frame 9 between frames 5 and 9.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 11 between frames 5 and 6.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 14 between frames 5 and 6.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 15 just aft of frame 5.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 10 just fwd of frame 7 and 1 foot of wasted longitudinal just aft of frame 7.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
CROP AND RENEW AS ORIGINAL DAMAGED SIDE SHELL AND ASSOCIATED FRAMING LOCATED ON THE STARBOARD SIDE FROM FRAME 2 FORWARD EXTENDING AFT TO FRAME 6ON BOTH THE "G" AND "H" STRAKES.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 10 just aft of frame 11.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 14 just aft of frame 11.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 15 from 5 feet fwd of frame 12 extending aft to frame 13.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 9 between frames 12 and 14.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 10 from 2 feet aft of frame 12 extending aft 2 feet fwd of frame 13.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 14 from frame 12 extending 2 feet aft of frame 13.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 12 from 5 feet fwd of frame 14 extending aft to frame 14.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 5 from 2 feet aft of frame 14 extending aft 2 feet fwd of frame 15.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 15 just fwd of frame 8.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 10 just aft of frame 8.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 13 between frames 8 and 9.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 15 just fwd of frame 9.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 12 from 1 foot fwd of frame 9 extending 1 foot aft of frame 10.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 13 from 1 foot fwd of frame 10 extending 4 feet aft of frame 10.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 14 from 1 foot fwd of frame 10 extending 3 feet aft of frame 10.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 5 feet of wasted longitudinal frame 15 just fwd of frame 10.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 4 feet of wasted longitudinal frame 15 just fwd of frame 11.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew wasted longitudinal frame 20 between frames 10 and 11.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Construction/Loadline
Issued 18 May 1995 Resolved
Crop and renew 2 feet of wasted longitudinal frame 9 just aft of frame 11.
Condition: Unknown
Due 18 May 1995
Resolved 18 May 1995
Deck/Cargo
Issued 1 September 1994 Resolved
DEMONSTRATE PROPER LIFTING OF COMPRESSOR DISCHARGE SIDE RELIEF VALVES._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Electrical
Issued 1 September 1994 Resolved
RENEW ARMORED CABLE TO LIGHT IN COMPRESSOR SPACE.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Electrical
Issued 1 September 1994 Resolved
PROVIDE DOCUMENTATION THAT COMPRESSOR MOTORS ARE APPROVED FOR USE IN HAZARDOUS LOCATIONS (CLASS I DIVISION 1)._x001C_ _x001C_
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Electrical
Issued 1 September 1994 Resolved
RENEW ARMORED CABLE TO PORT AND CENTER COMPRESSOR MOTORS.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Electrical
Issued 1 September 1994 Resolved
RENEW ARMORED CABLES ON AFT EXTERNAL BULKHEAD OF COMPRESSOR HOUSE, WHERE ARMOR SHEATH HAS CORRODED OFF.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Construction/Loadline
Issued 1 September 1994 Resolved
MAKE PROPER REPAIRS TO CRACK AT PORT FORWARD CORNER OF AFT RAKE DECK, AT JUNCTURE WITH SIDESHELL AND MAIN CARGO SPACE.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Electrical
Issued 1 September 1994 Resolved
RENEW GLOBE TO DECK LIGHT ON EXTERNAL SIDE OF AFT BULKHEAD OF COMPRESSOR HOUSE.
Condition: Unknown
Due 11 October 1994
Resolved 11 October 1994
Deck/Cargo
Issued 1 September 1994 Resolved
DEMONSTRATE PROPER LIFTING OF CARGO TANK SAFETY VALVES FOR ALL AFTER CARGO TANKS.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Construction/Loadline
Issued 1 September 1994 Resolved
CROP AND RENEW DECK AT PORT SIDE OF STERN NEAR SIDESHELL AT STERN_x001C_ SHEER, WHERE BUCKLED.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Navigation
Issued 1 September 1994 Resolved
PROVIDE AND PROVE PROPER OPERATION OF SUITABLE BULB FOR STERN LIGHT.
Condition: Unknown
Due 1 September 1994
Resolved 1 September 1994
Navigation
Issued 4 September 1992 Resolved
SHORE BATTERIES IN BATTERY BOX FOR STERN NAVIGATION LIGHT.
Condition: Unknown
Due 17 September 1992
Resolved 17 September 1992
Navigation
Issued 4 September 1992 Resolved
MAKE PERMANENT REPAIRS TO THE STERN NAVIGATION LIGHT BOX, TO INCLUDE A FLATBLACK BACKGROUND.
Condition: Unknown
Due 4 September 1992
Resolved 4 September 1992
Deck/Cargo
Issued 4 September 1992 Resolved
MAKE AVAILABLE FOR INSPECTION THE RELIEF VALVES TO PROPANE TANKS #1, #2, #3, AND #4.
Condition: Unknown
Due 5 October 1992
Resolved 18 September 1992
Deck/Cargo
Issued 17 October 1991 Resolved
RENEW CHAIN AND FREE THE FROZEN VALVE RISER COVER LOCATED AT THE PORT AFT RISER GROUP.
Condition: Unknown
Due 31 October 1991
Resolved 5 November 1991
Construction/Loadline
Issued 17 October 1991 Resolved
CROP AND RENEW THE BENT SECTION OF THE CENTER VERTICAL FRAME FORWARD OF THECOLLISION BULKHEAD.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Electrical
Issued 17 October 1991 Resolved
PROVE THE OPERATION OF THE MAIN ELECTRICAL BREAKER ON THE AFT BULKHEAD OF PUMP HOUSE.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
CROP AND RENEW THE WASTED SECTION OF LONGITUDINAL UNDERNEATH THE FORWARD PORT TANK AFT OF FRAME 9.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
CROP AND RENEW THE FOLLOWING STIFFENERS FOR THE BULKHEAD AT FRAME 16: STIFFENERS #1,2,3 AND 5 FROM THE PORT SIDE.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
CROP AND RENEW THE WASTED SECTION OF LONGITUDINAL IN THE WAY OF FRAME 10, UNDERNEATH THE FORWARD CENTER TANK AS MARKED.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Electrical
Issued 17 October 1991 Resolved
LABEL ALL ELECTRICAL PANELS ON THE AFT BULKHEAD OF THE PUMP HOUSE.
Condition: Unknown
Due 31 October 1991
Resolved 5 November 1991
Construction/Loadline
Issued 17 October 1991 Resolved
REPAIR THE FRACTURED WELD AT THE JUNCTION OF FRAME 18 AND THE 3RD SIDE SHELL STIFFENER ON THE PORT SIDE.
Condition: Unknown
Due 22 October 1991
Resolved 22 October 1991
Deck/Cargo
Issued 17 October 1991 Resolved
MAKE ALL VALVE RISERS WATERTIGHT TO PREVENT LEAKAGE INTO THE CARGO SPACES FROM THE OVERHEAD.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
STOP DRILL, GOUGE AND WELD THE CRACKED TANK SUPPORTS ON THE PORT SIDE AT FRAMES 14, 18 AND 27.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Deck/Cargo
Issued 17 October 1991 Resolved
LABEL THE EMERGENCY VALVE CLOSURE PANEL AND INDICATE THE DIRECTION OF CLOSURE.
Condition: Unknown
Due 31 October 1991
Resolved 5 November 1991
Construction/Loadline
Issued 17 October 1991 Resolved
GOUGE AND WELD THE FRACTURED WELD IN THE 3RD SIDE SHELL STIFFENER FROM THE BOTTOM ON THE STARBOARD SIDE BETWEEN FRAMES 24 AND 25 AS MARKED.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
HAUL OUT AND MAKE VESSEL READY FOR CREDIT DRYDOCK EXAM NO LATER THAN_x001C_ 30 APRIL 1992.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
CROP AND RENEW THE WASTED SECTION OF LONGITUDINAL UNDERNEATH THE PORT FORWARD TANK IN WAY OF FRAMES 11 AND 12 AS MARKED.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
GOUGE AND WELD THE FRACTURED WELD IN THE GUSSET ON THE PORTSIDE JOINING THE1ST STIFFENER ON THE COLLISION BULKHEAD WITH THE 4TH SIDESHELL STIFFENER ATIN WAY OF THE BOTTOM SHELL.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
GOUGE AND WELD THE CRACKED WELD AT FRAME 17 BETWEEN STIFFENERS 3 AND 4 ON THE STARBOARD SIDE AS MARKED.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
GOUGE AND WELD THE FRACTURED WELD AT FRAME 20 BETWEEN SIDE SHELL STIFFENERS3 AND 4 FROM THE BOTTOM ON THE STARBOARD SIDE.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
FAIR THE SHELL PLATING BETWEEN FRAMES 19 AND 20 ON THE PORTSIDE, AND RENEW THE 3RD LONGITUDINAL FROM THE BOTTOM.
Condition: Unknown
Due 22 October 1991
Resolved 22 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
GOUGE AND WELD THE CRACKED WELD ON THE PORTSIDE AT FRAME 21, THE 4TH LONGITUDINAL FROM THE BOTTOM.
Condition: Unknown
Due 22 October 1991
Resolved 22 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
GOUGE AND WELD THE CRACKED WELD AT FRAME 10 ON THE PORT SIDE, 3RD LONGITUDINAL FROM THE BOTTOM.
Condition: Unknown
Due 22 October 1991
Resolved 22 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
GOUGE AND WELD THE CRACKED WELD AT FRAME 23 PORT SIDE, THE 4TH LONGITUDINALFROM THE BOTTOM.
Condition: Unknown
Due 22 October 1991
Resolved 22 October 1991
Construction/Loadline
Issued 17 October 1991 Resolved
CROP AND RENEW THE LONGITUDINAL OUTBOARD OF THE AFTER PORT TANK IN WAY OF TRANSVERSE FRAMES # 14 AND 15 AS MARKED.
Condition: Unknown
Due 17 October 1991
Resolved 17 October 1991
Construction/Loadline
Issued 8 August 1991 Resolved
PORT, 18TH FRAME, 3RD LONG FROM BOTTOM, CROP AND WELD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
PORT, 18TH FRAME, TRANSVERSE SUPPORTING BRACKET-CROP AND WELD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
PORT, 21ST FRAME -CROP & WELD AND 3RD FRAME, 4TH LONG FROM BOTTOM-CROP & WELD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
PORT, 27TH FRAME-CROP AND WELD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
PORT, 14TH FRAME AND 5TH FRAME, CRACK IN SUPPORT BRACKET. CROP AND WELD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
PORT, 10TH FRAME, 3RD LONG FROM BOTTOM -CROP AND WELD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
FAIR CENTER GIRDER FORWARD OF COLLISION BULKHEAD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
FAIR COLLISION BULKHEAD.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
REMOVE WATER FROM FWD CARGO TANK AND LOCATE SOURCE OF LEAK.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 8 August 1991 Resolved
PORT, BETWEEN FRAMES 19 AND 20, FAIR SHELL PLATING AND RENEW 3RD LONGITUDINAL FROM BOTTOM.
Condition: Unknown
Due 8 August 1991
Resolved 8 August 1991
Construction/Loadline
Issued 19 September 1990 Resolved
SAFETY RELIEF VALVES SHALL BE TESTED IN THE PRESENCE OF A USCG MARINE INSPECTOR FOR TANK NOS. 4, 5, AND 6.
Condition: Unknown
Due 19 September 1990
Resolved 19 September 1990
Construction/Loadline
Issued 19 September 1990 Resolved
CROP AND RENEW WASTED SECTION OF AMIDSHIPS LONGITUDINAL UNDER NO. 5 CARGO TANK (BETWEEN 4TH AND 5TH FRAMES AFT OF FIRST PARTITION IN AFT VOID SPACE).
Condition: Unknown
Due 19 September 1990
Resolved 19 September 1990
Deck/Cargo
Issued 6 October 1989 Resolved
REPAIR OR REPLACE LEAKING GAUGE ON AFT PORT CARGO TANK GAUGE TUBE PRIOR TO CARRIAGE OF CARGO BUT IN NO CASE LATER THAN 24 OCT 89.
Condition: Unknown
Due 6 October 1989
Resolved 6 October 1989
Documentation
Issued 6 October 1989 Resolved
PROVIDE VALID ABS LOADLINE CERTIFICATE
Condition: Unknown
Due 6 October 1989
Resolved 6 October 1989
Deck/Cargo
Issued 6 October 1989 Resolved
CALIBRATE ALL CARGO PRESSURE AND TEMPERATURE GUAGES.
Condition: Unknown
Due 6 October 1989
Resolved 6 October 1989
Construction/Loadline
Issued 5 October 1988 Resolved
FREE THE AFT RAKE VENT CLOSURE.
Condition: Unknown
Due 5 October 1988
Resolved 5 October 1988
Deck/Cargo
Issued 5 October 1988 Resolved
OPEN THE PRESSURE RELIEF VALVES FOR NUMBER 1 PORT, 1 CENTER, AND 1 STBD CARGO TANKS FOR INSPECTION BY A MARINE INSPECTOR.
Condition: Unknown
Due 5 October 1988
Resolved 5 October 1988
Construction/Loadline
Issued 5 October 1988 Resolved
MAKE WELDED REPAIRS TO THE WASTED DECK IN WAY OF THE LADDER FOUNDATION ON THE AFT DECK.
Condition: Unknown
Due 5 October 1988
Resolved 5 October 1988
Deck/Cargo
Issued 5 October 1988 Resolved
TEST THE CARGO PUMP EMERGENCY SHUTDOWN PRIOR TO TRANSFER OF CARGO.
Condition: Unknown
Due 5 October 1988
Resolved 5 October 1988
Construction/Loadline
Issued 5 October 1988 Resolved
FREE THE FORWARD RAKE VENT CLOSURE.
Condition: Unknown
Due 5 October 1988
Resolved 5 October 1988
Construction/Loadline
Issued 5 October 1988 Resolved
BUILD UP THE HINGE PIN EARS ON THE PORT FORWARD CARGO SCUTTLE WITH WELD METAL.
Condition: Unknown
Due 5 October 1988
Resolved 5 October 1988
Construction/Loadline
Issued 5 October 1988 Resolved
FREE THE DOGS ON THE FORWARD RAKE SCUTTLE.
Condition: Unknown
Due 5 October 1988
Resolved 5 October 1988
Unknown
Issued 7 November 1986 Resolved
CLEAN AND PRESERVE CARGO TANK SIDES IN WAY OF RELIEF VALVES.
Condition: Unknown
Due 7 November 1986
Resolved 7 November 1986
Unknown
Issued 22 September 1986 Resolved
MAKE ALL CARGO TANKS AVAILABLE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Unknown
Issued 22 September 1986 Resolved
TEST ALL RELIEF VALVES ON CARGO TANKS 2 AND 5.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Unknown
Issued 22 September 1986 Resolved
TEST RELIEF VALVES ON 3 COMPRESSORS.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Electrical
Issued 28 October 1985 Resolved
REPAIR NO. 3 COMPRESSOR, RESET BUTTON ON CONTROLLER.
Condition: Unknown
Due 28 October 1985
Resolved 28 October 1985
Construction/Loadline
Issued 28 October 1985 Resolved
RENEW BOW HATCH GASKET FOR BOW RAKE VOID.
Condition: Unknown
Due 28 October 1985
Resolved 28 October 1985
Unknown
Issued 23 November 1984 Resolved
PROVE OPERATION OF CARGO COMPRESSOR RELIEF VALVE AND CARGO HANDLING EQUIPMENT.
Condition: Unknown
Due 23 November 1984
Resolved 23 November 1984

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.

Maury does not score, rate, or grade vessels. What Maury does not do · Glossary · Correct a record.