Records from 1996 to 2026. Most recent: inspection, 11 February 2026.
Documentation record
Registered dimensions (L × B × D)121.6 ft × 26.0 ft × 11.5 ft
Registered tonnagegross 98 / net 67
ITC dimensions (L × B × D)121.6 ft × 26.0 ft × 11.5 ft
ITC tonnagegross 237 / net 70
BuilderSWIFTSHIPS INC · MORGAN CITY, LA, UNITED STATES · built 1996
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portCORPUS CHRISTI, TX
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 2 June 2026 · expires 30 June 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it237 - Convention (Subpart B), Gross Ton
98 - Regulatory (Subpart C or D), Gross Ton
70 - Convention (Subpart B), Net Ton
67 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 42
11 February 2026
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8309564
12 January 2026
Examination of Repairs · Vessel Attendance · Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8294861
7 November 2025
Administrative Inspection · Internal Structural Exam · In-Service Inspection · Drydock Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8265844
9 October 2025
Administrative Inspection · In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8250211
26 December 2024
Internal Structural Exam · Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8050991
8 January 2024
Administrative Inspection · Construction Oversight · Plan Review "T" Boat · Special Consideration
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7876961
12 December 2023
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7837962
14 November 2023
COI Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7824945
28 July 2023
Internal Structural Exam · In-Service Inspection · Deficiency Check · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7750932
10 February 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5812703
5 March 2014
Hull Examination · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4822116
21 July 2011
Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4097373
4 March 2010
Administrative Inspection · Re-Inspection · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3689792
17 April 2008
Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3186236
27 February 2008
Hull Examination · Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3154791
5 June 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2952339
29 May 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2946225
14 May 2007
Examination of Repairs · COI Inspection · Ballast Water Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2930282
19 April 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2910781
2 April 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2900277
8 August 2006
Hull Examination · Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2740282
3 July 2006
Damage Survey
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2699559
29 June 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2725398
29 June 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3390360
9 August 2005
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2447572
13 July 2004
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2131729
26 May 2004
MTSA/ISPS Verification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2086285
20 May 2004
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2073219
30 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1981773
29 August 2003
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1890872
14 August 2003
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1875774
6 May 2002
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1612416
22 April 2002
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1607852
18 April 2002
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1703888
10 May 2001
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1410561
6 July 2000
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1399421
6 June 2000
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1404988
8 May 1999
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1445475
5 May 1998
Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1431960
25 April 1997
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1443852
14 May 1996
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1083776
26 April 1996
Hull Examination · Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1461707
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 December 2024
Resolved
S and L all vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). Vessel's furthest aft bilge suction point in the engine room was not able to steadily receive suction while being tested and did not meet the 50 GPM requirement. Ensure all bilge suction meets the 50 GPM requirement to the satisfaction of the USCG Inspector.
46 CFR 182.25-1(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 February 2025
Resolved 13 February 2025
Resolution: Vessel tested aft engine bilge suction successfully.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 December 2024
Resolved
Covered metal trash containers shall be provided in lounge areas and the spaces shall be maintained to minimize fire and safety hazards and to preserve sanitary conditions. Vessel had plastic trashcans throughout accommodation spaces. Replace all plastic trashcans with metal trashcans to the satisfaction of the USCG Inspector.
46 CFR 177.30-7(d)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 February 2025
Resolved 13 February 2025
Resolution: Vessel replaced all plastic trashcans with metal trashcans.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 27 September 2024
Resolved
Hinged watertight doors are not permitted in bulkheads required by § 179.210 or § 179.212 unless the vessel will not proceed more than 20 nautical miles from shore and: The door separates a machinery space from an accommodation space and, in the judgment of the cognizant OCMI, the door will be kept closed except when a person is passing through the door.
Vessel has watertight doors at bulkhead 31 and 36 that separate machinery spaces. Vessel is permitted up to 20 nautical miles for the watertight door at bulkhead 20. The watertight door at bulkhead 31 must be removed by 30 July 2025. The watertight door at bulkhead 36 has been extended and must be removed by 31 December 2024.
46 CFR 179.330(a)(1)
Action required: 705 - Other - as specified
Due 31 December 2024
Resolved 23 December 2024
Resolution: Special consideration letter was issued allowing vessel to operate up to 200NM with 6 passangers,up to 20NM with 44 passangers, and engauge in the off shore oil industry up to 200NM offshore. See Special notes for details.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 August 2023
Resolved
A drydocking examination must be conducted while the vessel is hauled out of the water or placed in a drydock or slipway. The following work list items were noted:
-01 inset on the port bow
-01 inset on the stbd bow
-sounding tubes on the 1 and 2 p/s water tanks must be welded and connected to deck
-all sea valves being replaced
-forepeak reach rod connection
-bulkhead penetrations made watertight in the engine room
-03 cracked welds in the engine room
-replace wasted gaskets and chalk test
-bilge/fire main piping replacement tested
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 28 November 2023
Resolution: Verified all repairs satisfactory.
Construction/Loadline › Structures › Deck Plating
Issued 14 May 2007
Resolved
Aft port side deck fractured
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2007
Resolution: Insert installed, crack was above engine thrusters and not part of the hull envelope.
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 14 May 2007
Resolved
Owner of vessel was in the process of servicing #2 engine
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2007
Fire Fighting › Means of Escape › Doorways
Issued 14 May 2007
Resolved
Escape scuttles (manholes) were cracked.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2007
Resolution: Onwner purchased new hatches and installed them. All welds dye pent and verified by CG inspector
Fire Fighting › Fire Hoses › Condition
Issued 14 May 2007
Resolved
two fire hoses bad
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2007
Resolution: purchased new fire hoses
Construction/Loadline › Structures › Air Pipe
Issued 14 May 2007
Resolved
Repair cracked exhaust port side
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2007
Resolution: Owner installed insert at exhaust (dye pent welds)
Navigation › Piloting/Steering › Marine Charts
Issued 14 May 2007
Resolved
Vessel missing charts
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 May 2007
Resolution: Owner purchased charts and placed them onboard
Engineering › Bilge Water Management System › Not Operational
Issued 9 August 2005
Resolved
Generator room bilge alarm is broken.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 August 2005
Resolution: Received third party report stating the generator room bilge is repaired and working properly.
Engineering
Issued 14 August 2003
Resolved
Make permanent repairs to #3 (starboard inboard) mechanical seal for the jet drive.
Action required: 705 - Other - as specified
Due 29 August 2003
Resolved 29 August 2003
Resolution: Witnessed sat operation of #3 (stbd inboard) mechanical seal for the jet drive.
Lifesaving › Liferaft Equipment
Issued 14 August 2003
Resolved
Provide current hydrostatic releases to all liferafts. Vessel restricted to carrying 50 total persons until this is corrected.
Action required: 705 - Other - as specified
Due 29 August 2003
Resolved 29 August 2003
Resolution: Witnessed newly installed hydrostatic releases for all liferafts.
Lifesaving
Issued 14 August 2003
Resolved
Provide current hydrostatic release for EPIRB. Vessel is restricted to operating within 3 miles of land until this is corrected.
Action required: 705 - Other - as specified
Due 29 August 2003
Resolved 29 August 2003
Resolution: Inspected newly installed hydrostatic release for EPIRB.
Navigation
Issued 14 August 2003
Resolved
Provide current publications for the vessel (Coast Pilot [name withheld], Tide Tables, Current Tables).
Due 29 August 2003
Resolved 29 August 2003
Resolution: Witnessed new manuals.
Engineering
Issued 14 August 2003
Resolved
Prove proper operation of engine stop for #3 main engine from the pilot house.
Action required: 705 - Other - as specified
Due 29 August 2003
Resolved 29 August 2003
Resolution: Witnessed proper operation of engine stop for #3 main engine from pilot house.
Engineering
Issued 14 August 2003
Resolved
Make repairs and prove proper operation of #1 steering pump.
Action required: 705 - Other - as specified
Due 29 August 2003
Resolved 29 August 2003
Resolution: Witnessed operation of #1 steering pump.
Documentation
Issued 26 April 1996
Resolved
OBTAIN VALID FCC SAFETY CERTIFICATE, PROVIDE A COPY TO THE COGNIZANT OCMI.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996