Records from 1985 to 2025. Most recent: inspection, 9 September 2025.
Inspection history · 75
9 September 2025
COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8229209
24 June 2025
Drydock Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8166567
10 June 2024
Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7911671
2 February 2024
Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7861734
14 May 2023
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7709824
30 March 2023
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7659597
22 March 2023
In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7655533
29 November 2022
Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7601024
23 March 2022
COI Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7416235
7 February 2022
Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7392232
4 June 2021
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7215542
15 December 2020
Hull Examination · Examination of Repairs · Administrative Inspection · Internal Structural Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7111967
16 September 2020
Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7059418
25 June 2020
Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6986271
23 January 2020
Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6895010
21 June 2019
Annual Inspection · Administrative Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6720805
18 June 2018
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6447806
30 January 2018
Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6355231
20 March 2017
DAPI Audit · Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6108164
14 July 2016
Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5940168
1 March 2016
Internal Structural Exam · Drydock Exam · Hull Examination · Examination of Repairs
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5829405
22 August 2015
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 5227574
15 July 2015
Deficiency Check · Annual Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5184937
27 July 2011
Type not recorded
No type recorded · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 4103943
12 July 2011
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 4078603
26 March 2010
Examination of Repairs
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3756991
18 December 2009
Examination of Repairs
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3654443
17 March 2009
Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3435230
27 June 2008
Damage Survey
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3249689
26 June 2008
Type not recorded
No type recorded · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3252875
10 June 2008
Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3232472
9 April 2007
COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 2904483
8 August 2006
Annual Inspection
Physical examination · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 2739130
31 May 2005
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2362556
7 January 2005
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2270660
9 April 2004
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2034601
29 May 2003
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1797705
30 January 2003
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1734489
28 February 2002
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1489969
16 March 2001
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1453863
26 January 2001
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1393606
20 April 2000
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1373092
25 March 1999
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1429136
25 February 1999
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1437499
21 April 1998
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 789710
27 March 1998
Plan Review "T" Boat · Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1368681
7 April 1997
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1404338
31 March 1997
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1462559
28 March 1996
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1079438
31 March 1995
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1145039
27 March 1995
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1135019
12 April 1994
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1166954
25 March 1994
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1166465
10 May 1993
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 828962
2 April 1993
COI Inspection · Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1146203
3 June 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 170795
6 April 1992
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1255385
16 January 1992
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1263532
24 April 1991
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1230872
3 April 1991
Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1225929
16 April 1990
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 924722
21 September 1989
Drydock Extension
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 890701
1 May 1989
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 889263
19 May 1988
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1043836
28 March 1988
Examination of Repairs · Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1346604
15 June 1987
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1336458
23 May 1987
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1335254
7 April 1987
Examination of Repairs · Hull Examination
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1004228
9 May 1986
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1294938
18 April 1986
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 999435
30 January 1986
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1305019
15 October 1985
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 987988
18 June 1985
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1293622
21 May 1985
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 981680
24 April 1985
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1293657
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 9 September 2025
No resolution recorded
As appropriate, for the intended voyage all vessels must carry adequate and up-to-date charts & pubs. All charts need to be updated.
Action required: 50 - Rectify deficiencies w/in 30 days
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 24 June 2025
No resolution recorded
STBD bow planks at FR4 and FR5 found rotted. Prior to haul out around October 2025, owner must submit repair plan to satisfaction of OCMI.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 June 2025
No resolution recorded
Overhead deck support FR7 in Tank space found cracked. Prior to haul out around late October 2025, owner must submit repair plan to the satisfaction of OCMI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 December 2025 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 June 2025
No resolution recorded
Port side fuel tank inboard aft most bottom support frame found rotted in Tank space. Prior to haul out around October 2025, owner must submit repair plan to the satisfaction of OCMI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 December 2025 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 June 2025
No resolution recorded
The bilge water levels and water intrusion in the fore-peak is excessive. This space does not have and is not required to have a bilge high level alarm or a bilge pump. A bilge high alarm must be installed in the space until repairs can be made. Prior to haul out around October 2025, owner must submit repair plan to the satisfaction of OCMI.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 December 2025 — due date passed with no resolution recorded
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 10 June 2024
Resolved
Vessel shall install bilge high level alarms in all compartments with visual and audible alarms in the pilot house.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2024
Resolution: Deficiency cleared
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 10 June 2024
Resolved
Vessel shall ensure the fuel shut off valves are operational from outside the space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2024
Resolution: Fuel Shut off valves working properly
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2024
Resolved
Vessel has an exhaust leak somewhere in it's dry exhaust
Identify/secure the source of the leak.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2024
Resolution: Exhaust leak has been fixed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 June 2024
Resolved
Demonstrate proper operation of the vessel's bilge
system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 July 2024
Resolution: Installed electric bilge pumps tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 June 2024
Resolved
Vessel is required 1 ring life buoy. Ensure the throw
line is at least 60' and of adequate type.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2024
Resolution: Ring buoy is properly outiffted with 60' line
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 June 2024
Resolved
Vessel's fire suppression system (pre-engineered) over-ride system is inoperable.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 June 2024
Resolution: Witnessed satisfactory operation
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 10 June 2024
Resolved
Vessel's oil pressure gauge isn't working properly.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: Deficiency cleared
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 June 2024
Resolved
Supervisory training for DAPI needs to be completed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 June 2024
Resolution: Supervisory training is completed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 10 June 2024
Resolved
All compartment hatches need to be watertight. Each of them are missing the gasket material.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2024
Resolution: Tested hatch, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 April 2023
Resolved
Machinery and equipment installed on each vessel must be installed and maintained in such a manner as to afford adequate protection from causing a fire, explosion, machinery failure, and personnel injury; the main engine has an oil leak which is leaking into the cooling system as evident by the cooling water reservoir.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2023
Resolved 4 May 2023
Resolution: Oil Cooler replaced and cooling system flushed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 April 2023
Resolved
Fuses must be of the cartridge type only and UL listed; the fuse block under the operating console is of the blade type.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 4 May 2023
Resolution: Fuse block replaced
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 April 2023
Resolved
An adult life jacket must be provide for each person carried on board the vessel; five life jackets have been condemned due to their deteriorated condition. The vessel is restricted to the carriage of no more than 50 persons, 48 of which may be passengers, until corrected.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 4 May 2023
Resolution: Life jackets replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 March 2022
Resolved
46 CFR 180.71- A life jacket must be provided for each person the vessel is authorized to carry as indicated on the COI; seven life jackets were condemned due to being in a deteriorated condition. The vessel is restricted to 48 total persons until rectified.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 April 2022
Resolved 5 April 2022
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 June 2021
Resolved
Vesselâs fire plug on STBD side is
missing valve handle; install valve handle
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2021
Resolved 21 June 2021
Resolution: Vessel now has handle attached to fire station via wire to prevent tampering by pax.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 7 June 2021
Resolved
Spaces aft of collision bulkhead must have
bilge alarm.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2021
Resolved 21 June 2021
Resolution: New bilge alarm was installed
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 June 2021
Resolved
battery connections must be of terminal
type; battery charger is connected by
means of spring connectors.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2021
Resolved 21 June 2021
Resolution: Battery cahrge was removed
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 25 June 2020
Resolved
Propulsion machinery shall be suitable in design, type and condition for the hull in which it is installed without exceeding design limitations; the shaft stuffing box hose is worn and no longer serviceable.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2020
Resolution: Replaced in kind.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 25 June 2020
Resolved
A vessel of at least 26 feet in length must be provided with a visual and audible alarm, at the operating station, which indicates high water level in required spaces; the bilge alarm in the forward void is not operational.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2020
Resolution: Replaced the float switch.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 25 June 2020
Resolved
A vessel must carry a first aid kit, approval number 160.041, or a kit with an equivalent contents; some items in the existing kit are expired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 August 2020
Resolved 15 September 2020
Resolution: Replaced with new kit.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 June 2020
Resolved
Twist on type connectors may not be used for facilitating a conductor splice unless installed IAW 183.340 (i) (1); the float switch for the fuel tank bilge alarm is installed with twist on connectors.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2020
Resolved 15 September 2020
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 18 June 2018
Resolved
Replace 60 ft lifeline on lifebuoy with UV resistant line.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 July 2018
Resolution: Line properly replaced.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 18 June 2018
Resolved
Install lagging to dry exhaust on all interior bare portions.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 July 2018
Resolution: Exhaust lagging has been installed and secured.
Fire Fighting › Fire Pumps › Suction Valve
Issued 18 June 2018
Resolved
Make repairs to remote rod for fire pump suction selection valve.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 July 2018
Resolution: Repairs to reach rod have been made and tested.
Lifesaving › Lifebuoys › Serviceable
Issued 18 June 2018
Resolved
Make repairs to lifebuoy grabline.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 July 2018
Resolution: Permenant whipping has been applied to grab line.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 28 March 2017
Resolved
Vsl has 50 serviceable type I PFD's. Provide 05 additional adult PFD's. Passenger count limited to 48 with 2 crew.
Due 28 March 2017
Resolved 28 March 2017
Resolution: Prior to departure from second vsl inspection 5 serviceable Type I PFD were provided and labeled in the MI's presence.
Operations/Management › Drills/Instruction › Fire
Issued 28 March 2017
Resolved
Provide documentation of monthly fire extinguisher checks.
Due 28 April 2017
Resolved 15 June 2017
Resolution: Monthly fire extinguisher maintenance is now being recorded in log book.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 28 March 2017
Resolved
Provide 2nd portable light at operating station.
Due 28 April 2017
Resolved 15 June 2017
Resolution: Verified two operating portable lights onboard.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 14 July 2016
Resolved
Provide the proper quantity of aspirin for the first aid kit.
Due 28 July 2016
Resolved 26 August 2016
Engineering › Bilge Water Management System › Pump
Issued 14 July 2016
Resolved
Provide the vessel with a hand bilge pump capable of pumping 5 GPM.
Due 28 July 2016
Resolved 26 August 2016
Engineering › Pressure Vessel › Marking and Stamping
Issued 14 July 2016
Resolved
Provide proof that the air receiver is ASME certified.
Due 14 August 2016
Resolved 15 June 2017
Fire Fighting › Fire Pumps › Arrangement
Issued 15 July 2015
Resolved
The fire pump is not operational due to a misalignment of the pump pulley with the engine pulley and the drive belt will not stay in place. Make the necessary repairs and prove proper operation.
Action required: 705 - Other - as specified
Due 22 July 2015
Resolved 21 July 2015
Construction/Loadline › Structures › Transverse Bulkhead
Issued 12 July 2011
Resolved
Properly plug all opening in the forward and aft engineroom bulkheads.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 July 2011
Resolved 19 July 2011
Lifesaving › Buoyant Apparatus › Retroreflective Material
Issued 12 July 2011
Resolved
Replace reflective tape on six adult lifejackets. Vessel restricted to carriage of 43 adult passengers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 July 2011
Resolved 19 July 2011
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 July 2011
Resolved
Properly terminate dead end wires under bridge consol.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 July 2011
Resolved 19 July 2011
Lifesaving › Lifeboat Equipment › First Aid Kit
Issued 12 July 2011
Resolved
Replace all expired items in first aid kit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2011
Resolved 19 July 2011
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 12 July 2011
Resolved
Remove all combustible waste receptacles.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 August 2011
Resolved 16 April 2012
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 9 April 2007
Resolved
Annual service due on operating station B-II ext.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 April 2007
Resolution: Annual Service condcuted on all fire extinguishers
Fire Fighting › Fire Hydrants › Condition
Issued 9 April 2007
Resolved
Replace inoperable valve handle on fire station stbd side.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 April 2007
Resolution: Fire station handle tested and is operating properly
Lifesaving › Lifebuoys › Serviceable
Issued 9 April 2007
Resolved
Replace un-servicable life-ring.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 April 2007
Resolution: Life Ring replaced
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 April 2007
Resolved
Remove dead-end wiring from engine room.
Condition: Unknown
Due 4 May 2007
Resolved 26 April 2007
Resolution: All dead end wiring properly connected or removed
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 April 2007
Resolved
Remove dead-end wiring from pilot house.
Condition: Unknown
Due 4 May 2007
Resolved 26 April 2007
Resolution: All dead end wiring removed or connected properly
Communications › Public Address System › Cable Run
Issued 9 April 2007
Resolved
Replace wire nuts on pa system loud-hailer with approved wire connections.
Condition: Improper Installation
Due 4 May 2007
Resolved 26 April 2007
Resolution: Wire nuts on PA system replaced with suitable connectors
Documentation › Certificates/Documents › Certificate of Inspection
Issued 8 August 2006
Resolved
Owner/Operator failed to make vessel ready for inspection within 90 days of the anniversary dated noted on Certificate of Inspection
Action required: 705 - Other - as specified
Due 9 August 2006
Resolved 9 August 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 August 2006
Resolved
Dead end wires to inoperable pump
Action required: 705 - Other - as specified
Due 9 August 2006
Resolved 9 August 2006
Resolution: Wires removed
Engineering › Bilge Water Management System
Issued 13 March 2002
Resolved
REPAIR BILGE PIPING IN THE SEWAGE COMPARTMENT. LEGACY COMPONENT DESC: Piping
Condition: Damaged By Earlier Event
Due 18 March 2002
Resolved 14 March 2002
Lifesaving
Issued 27 March 1998
Resolved
REPLACE WORN, NONADHESIVE OR NONREFELCTIVE RETRO MATERIAL ON APPROXIMATELY 75% OF PFDS AS NECESSARY.
Condition: Unknown
Due 27 March 1998
Resolved 27 March 1998
Construction/Loadline
Issued 25 March 1994
Resolved
DOUBLE CLAMP ALL FLEXABLE HOSE CONNECTIONS IN BILGE AND FUEL SYSTEM.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Construction/Loadline
Issued 25 March 1994
Resolved
RENEW TO GOOD WOOD, THE ROTTED DECK PLANK, STARBOARD SIDE, AFT.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Engineering
Issued 25 March 1994
Resolved
REFASTEN THE FORWARD SHAFT BEARING SUPPORT AT THE AFT ENGINE ROOM BULKHEAD.
Condition: Unknown
Due 25 March 1994
Resolved 25 March 1994
Accommodation/Occupational Safety
Issued 2 April 1993
Resolved
PROVIDE SOLID BULWARK OR EQUIVALENT PRIOR TO CARRYING PASSENGERS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 5 April 1993
Resolved 5 April 1993
Accommodation/Occupational Safety
Issued 6 April 1992
Resolved
INSTALL FIXED TOILET AND MSD. VESSEL IS RESTRICTED TO RUNS OF THIRTY MINUTES OR LESS UNTIL INSTALLATION IS COMPLETED.
Condition: Unknown
Due 6 April 1992
Resolved 6 April 1992
Accommodation/Occupational Safety
Issued 24 April 1991
Resolved
INSTALL SOLID BULWARK OR EQUIVALANT ON THE SIDE RAILS, AMIDSHIPS, PORT AND STARBOARD FROM THE DECK TO THE TOP RAIL COURSE.
Condition: Unknown
Due 24 April 1991
Resolved 24 April 1991
Construction/Loadline
Issued 3 April 1991
Resolved
REFASTEN ALL SISTERED SIDE FRAMES IN THE FORE PEAK.
Condition: Unknown
Due 3 April 1991
Resolved 3 April 1991
Lifesaving
Issued 16 April 1990
Resolved
PROVIDE (5) FIVE ADDITIONAL ADULT, TYPE I PFD'S TO REPLACE THOSE REJECTED. VESSEL IS RESTRICTED TO A TOTAL OF (57) FIFTY-SEVEN PERSONS UNTIL THIS REQUIREMENT IS CLEARED.
Condition: Unknown
Due 16 April 1990
Resolved 16 April 1990
Lifesaving
Issued 1 May 1989
Resolved
PROVIDE 8 ADULT LIFEJACKETS FOR INSPECTION, VESSEL RESTRICTED TO A MAXIMUM OF 54 TOTAL PERSONS UNTIL COMPLETED.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Accommodation/Occupational Safety
Issued 23 May 1987
Resolved
MAKE PERMANENT REPAIRS TO LEG SUPPORTS FOR PASSENGER DECK SEATS.
Condition: Unknown
Due 23 May 1987
Resolved 23 May 1987
Fire Fighting
Issued 23 May 1987
Resolved
CO2 EXTINGUISHER NEED SERVICING
Condition: Unknown
Due 23 May 1987
Resolved 23 May 1987
Electrical
Issued 23 May 1987
Resolved
MAKE PERMANENT CONNECTION FOR STBD RUNNING LIGHT WIRE.
Condition: Unknown
Due 23 May 1987
Resolved 23 May 1987
Construction/Loadline
Issued 7 April 1987
Resolved
RENEW 10 HULL PLANKS, 8 ON STBD SIDE & 2 ON PORT SIDE, AS MARKED BY CG INSPECTOR DUE TO ROT.
Condition: Unknown
Due 7 April 1987
Resolved 7 April 1987
Construction/Loadline
Issued 7 April 1987
Resolved
RENEW FRAMES 15 THROUGH 49 ON STARBOARD SIDE DUE TO ROT.
Condition: Unknown
Due 7 April 1987
Resolved 7 April 1987
Construction/Loadline
Issued 7 April 1987
Resolved
RENEWED 6 HULL PLANKS ON PORT SIDE DUE TO ROT.
Condition: Unknown
Due 7 April 1987
Resolved 7 April 1987
Construction/Loadline
Issued 7 April 1987
Resolved
RENEW HORN TIMBER DUE TO DETERIORATION.
Condition: Unknown
Due 7 April 1987
Resolved 7 April 1987
Lifesaving
Issued 18 April 1986
Resolved
DURING THE 2ND RE-INSPECTION DTD 18 APRIL 86, 09 NINE LIFE PRESERVERS WERE REJECTED DUE TO BROKEN STRAPS AND DETERIOATION, SUBJECT VESSEL RESTRICTED TO CARRY NOT MORE THAN 53 PASSENGERS UNTIL 09 NINE SERVICIBLE LIFE PRESER- VERS ARE ONBOARD AND WITNESSED BY A COAST GUARD INSPECTOR.
Condition: Unknown
Due 18 April 1986
Resolved 18 April 1986
Lifesaving
Issued 24 April 1985
Resolved
REJECTED 12 LIFE PRESERVERS AND 4 REPLACED.
Condition: Unknown
Due 24 April 1985
Resolved 24 April 1985
Construction/Loadline
Issued 24 April 1985
Resolved
RENEW ALL WASTED FRAME FASTENINGS IN FORE PEAK.
Condition: Unknown
Due 24 April 1985
Resolved 24 April 1985