Records from 1985 to 2006. Most recent: inspection, 7 August 2006.
Inspection history · 89
7 August 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2738699
19 October 2005
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2636125
4 May 2005
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2349090
1 April 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2324573
28 February 2005
MTSA/ISPS Verification · Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2300798
13 December 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2258358
3 June 2004
MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2087545
13 May 2004
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2066897
2 March 2004
Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2017934
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996201
5 March 2003
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1753061
5 February 2003
Internal Structural Exam · COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1674885
10 July 2002
Drydock Extension
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1647711
29 March 2002
Periodic Inspection · In-Service Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1601341
16 January 2002
Deficiency Check · In-Service Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1601324
28 December 2001
In-Service Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1474388
21 December 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1477750
1 August 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 103728
20 June 2001
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1068643
9 June 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1481300
31 May 2001
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1406909
6 May 2001
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 49013
15 September 2000
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 824765
24 July 2000
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1468976
4 April 2000
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1391359
28 March 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1047536
28 May 1999
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1434862
19 March 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 162825
10 September 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 804617
11 August 1998
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 796100
27 May 1998
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1421520
4 May 1998
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 802552
25 August 1997
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1465330
19 June 1997
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1113708
14 January 1997
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1100382
30 September 1996
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1359263
9 September 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1385808
16 February 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1443663
4 January 1996
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 877871
1 September 1995
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 481188
23 August 1995
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1358856
18 August 1995
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1186013
12 June 1995
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1187246
13 July 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1177046
18 October 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1152291
31 August 1993
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1377040
29 July 1993
Permit to Proceed
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1450780
23 July 1993
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1455084
5 May 1993
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1440696
30 April 1993
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 133731
8 April 1993
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 116030
2 April 1993
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 93380
5 November 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1255723
22 September 1992
Permit to Proceed
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 936272
13 July 1992
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 947607
13 July 1992
Permit to Proceed
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1262811
6 June 1992
Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 351296
31 May 1992
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1339
8 May 1992
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 948219
4 March 1992
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 961191
26 February 1992
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1269533
8 February 1992
Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 457425
12 December 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1266419
22 October 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 934356
4 October 1991
Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 938411
4 October 1991
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 938601
27 September 1991
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1457038
25 June 1991
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 904601
7 June 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 929216
28 May 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1246012
6 May 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 222932
10 April 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1235724
8 April 1991
Deficiency Check · Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 926368
31 March 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 217287
21 March 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 50219
26 February 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1233278
25 February 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1228938
13 February 1991
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1218260
21 December 1990
Damage Survey
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1223322
18 December 1990
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 341400
3 December 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 927231
30 October 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 916542
22 February 1989
COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1199826
7 June 1988
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1200051
16 October 1986
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1010885
21 May 1986
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 989911
7 May 1986
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1303700
30 October 1985
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1301802
9 September 1985
COI Inspection · Credit Drydock
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 989185
Engineering › Steam Turbine (auxiliary) › Overspeed Device
Issued 28 February 2005
Resolved
The No. 2 steam turbine generator overspeed device failed to operate.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2005
Resolved 2 March 2005
Resolution: The overspeed device was overhauled and tested to the satisfaction of the attending marine inspector.
Engineering › Diesel Engine (auxiliary)
Issued 2 March 2004
Resolved
Test emergency generator overspeed shutdown prior to 10 MAR2004. LEGACY COMPONENT DESC: Overspeed Device
Due 10 March 2004
Resolved 24 March 2004
Resolution: Tested SAT.
Lifesaving › Lifeboat
Issued 2 March 2004
Resolved
Launch starboard lifeboat, test gravity brake and releasing gear. Make appropriate entries into the ships log and record of training and drills prior to 3APR2004
Due 3 April 2004
Resolved 19 March 2004
Resolution: Vessel lowered starboard lifeboat to water, tested winch brake and released boat. Boat operated at speed ahead and astern. Copy of log book attesting to the satisfactory test of the lifeboat provided to this office. Deficiency cleared.
Navigation
Issued 5 February 2003
Resolved
Replace magnetic compass or clean face and oil like substance so the numbers are visible. (Prior to departure.)
LEGACY COMPONENT DESC: Magnetic Compass
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 February 2003
Resolution: Compass face was readable from the bridge watch stander station.
Lifesaving › Lifebuoys
Issued 5 February 2003
Resolved
Replace the 3 water lights as specified:
(2) at bridge, (1) at 02 deck LEGACY COMPONENT DESC: Water light
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 February 2003
Resolution: Verified operation of water light.
Engineering › Gas Turbine (propulsion-reduction gear)
Issued 5 February 2003
Resolved
Test main turbine speed limiting governor and lube oil shutdown as soon as possible and provide report to cogninzant OCMI.
Due 5 March 2003
Resolved 5 March 2003
Documentation › Safety/Response Plans/Programs
Issued 5 February 2003
Resolved
Re-number fire station 5 & 6 (backwards on bridge deck) LEGACY COMPONENT DESC: Fire Control Plans
Due 5 March 2003
Resolved 5 March 2003
Resolution: 5&6 fire stations re-numbered
Documentation › Safety/Response Plans/Programs
Issued 5 February 2003
Resolved
Number all dampers as per fire control plan LEGACY COMPONENT DESC: Fire Control Plans
Due 5 March 2003
Resolved 5 March 2003
Resolution: Dampers numbered per FCP
Documentation › Safety/Response Plans/Programs
Issued 5 February 2003
Resolved
Boat deck re-number fire station 11 & 12 and extinguishers. LEGACY COMPONENT DESC: Fire Control Plans
Due 5 March 2003
Resolved 5 March 2003
Resolution: 11&12 fire stattions numbered.
Documentation › Safety/Response Plans/Programs
Issued 5 February 2003
Resolved
Re-label foscsle desk fire station as # 17. LEGACY COMPONENT DESC: Vessel Response Plan
Due 5 March 2003
Resolved 5 March 2003
Electrical › Lighting (service)
Issued 5 February 2003
Resolved
Replace the light bulbs on the water tight door remote control. LEGACY COMPONENT DESC: Lighting Fixture
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 February 2003
Resolution: Verified the control indicators. light were operational at the time.
Construction/Loadline
Issued 20 June 2001
Resolved
MAKE GOUGE & WELD REPAIRS TO CRACKED BULWARK STIFFENERS (PORT SIDE) AT VARIOUS LOCATIONS ALONG ENTIRE LENGTH OF VSL, & ROLLER CHOCK FOUNDATION ON PORT STERN.
Condition: Unknown
Due 20 June 2002
Resolved 5 February 2003
Engineering
Issued 19 June 1997
Resolved
Conduct the Design Verification Tests for Vital Systems according to MS approved procedure in presence of USCG inspector prior to departure from drydock location. 46 CFR 61.40-3.
Condition: Unknown
Due 19 June 1997
Resolved 19 June 1997
Engineering
Issued 19 June 1997
Resolved
Complete the following tests remaining from the Periodic Safety Test Procedure in presence of USCG inspector-a. Manual Boiler Trip. b. Feed PumpPressure regulation. c. Fuel oil pump pres. regulation. d. D. C. heater level control system. 46 CFR 61.40-6.
Condition: Unknown
Due 19 June 1997
Resolved 19 June 1997
Fire Fighting
Issued 23 August 1995
Resolved
REPAIR LEAKING HYDRANT AT F/S #34.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Engineering
Issued 23 August 1995
Resolved
RENEW HOLDED FLAME SCREEN IN WAY OF #8W F.O. VENT.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Engineering
Issued 23 August 1995
Resolved
FREE UP #1A DP. F.O.T VENT COVER.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Engineering
Issued 23 August 1995
Resolved
REPAIR/REPLACE FUEL OIL CONTAINMENT TO #1P DP F.O.T. VENT.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Construction/Loadline
Issued 23 August 1995
Resolved
REPLACE DOGS AS NEEDED THROUGHOUT MAIN DECK TO ALL CARGO HOLD MAN-WAYS.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Fire Fighting
Issued 23 August 1995
Resolved
RENEW/REPAIR 3/4" DRAIN GATE VALVE IN WAY OF FIRE MAIN AT AFTER END OF CARGO HLD #6S
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Construction/Loadline
Issued 23 August 1995
Resolved
PROVE OPERATION OF CARGO HLD #2 P/S BILGE WELLS UPON RETURN FROM SEA TRIALS. A SUTIABLE PORTABLE PUMP SHALL BE CARRIED IN CARGO HLD #2 DURING SCHEDULED SEA TRIALS.
Condition: Unknown
Due 23 August 1995
Resolved 30 August 1995
Construction/Loadline
Issued 23 August 1995
Resolved
DEMONSTRATE PROPER OPERATIONS OF SHAFT ALLEY WATERTIGHT DOOR FROM ALL STATIONS.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Construction/Loadline
Issued 23 August 1995
Resolved
PLUG STUFFING TUBES IN BHD BETWEEN DIESEL GENERATOR RM AND MACHINERY PARTS STORAGE RM.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Electrical
Issued 23 August 1995
Resolved
PROVIDE BLANKS TO ALL POWER PANELS IN WAY OF ENGINE RM LOWER LEVEL WHERE CIRCUIT BREAKERS ARE NOT BEING USED.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Construction/Loadline
Issued 23 August 1995
Resolved
PUMP ALL ENGINE RM BILGES OF OIL AND WATER IN ORDER TO TEST BILGE ALARMS.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Electrical
Issued 23 August 1995
Resolved
REPLACE BURNT GROUND INDICATING LIGHTS ON GENERATOR SWITCHBOARD.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Engineering
Issued 23 August 1995
Resolved
REPLACE FLAME INSPECTION MIRROR TO PORT BOILER.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Engineering
Issued 23 August 1995
Resolved
PROVIDE APPROVAL LTR FOR BOILER AUTOMATION PROCEDURES.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Engineering
Issued 23 August 1995
Resolved
PROVIDE FUEL OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Lifesaving
Issued 23 August 1995
Resolved
CONDUCT FIRE AND BOAT DRILL IN PRESENCE OF MARINE INSPECTOR UPON RETURN FROM SEA TRIALS.
Condition: Unknown
Due 23 August 1995
Resolved 30 August 1995
Electrical
Issued 23 August 1995
Resolved
RENEW WIRING TO TOW LIGHT.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Engineering
Issued 23 August 1995
Resolved
RENEW FUEL OIL CONTAINMENT DRAIN VALVE, PORTSIDE, JUST FWD OF HOUSE.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Fire Fighting
Issued 23 August 1995
Resolved
REPLACE CEILING PANELS IN WAY OF MAIN DECK STBD PASSAGEWAY NEAR CREWS LAUNDRY.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Unknown
Issued 23 August 1995
Resolved
REPLACE PILOTS LADDER.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Accommodation/Occupational Safety
Issued 23 August 1995
Resolved
UNPLUG FLOOR DRAIN IN AUX HOSPITAL SPACE HEAD AREA.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Fire Fighting
Issued 23 August 1995
Resolved
PROVIDE NOZZEL FOR F/S #33
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Electrical
Issued 23 August 1995
Resolved
REPAIR/REPLACE COVER TO J-BOX IN WAY OF OVERHEAD - WINDLASS MOTOR PUMP RM ABOVE CO2 BOTTLE BANK.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Navigation
Issued 23 August 1995
Resolved
RENEW/REPAIR LOWER STBD RUNNING LIGHT.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Lifesaving
Issued 23 August 1995
Resolved
PROVIDE ENGINEERS ALARM THAT CAN BE HEARD THROUGHOUT THE ENGINE ROOM.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Electrical
Issued 23 August 1995
Resolved
PERMANENTLY MOUNT VERTICAL WIRE RUNS TO FLOOD LGT, DECK LGT, AND RECEPTACLEIN WAY OF FWD FOCSLE BHD JUST FWD OF CARGO HLD #2.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Electrical
Issued 23 August 1995
Resolved
PERMANENTLY MOUNT WIRE RUNS TO DECK LGT AND RECEPTACLE, MAIN DECK IN WAY OF#3S CARGO HATCH FWD END.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Unknown
Issued 23 August 1995
Resolved
RENEW/REPAIR GASKET TO VENTILATOR COVER ADJACENT TO PROP WRENCH.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Engineering
Issued 23 August 1995
Resolved
PROVIDE POWER AVAILABLE INDICATOR AND POWER FAILURE ALARM/INDICATOR IAW BOILER AUTOMATION PROCEDURES APPROVED BY USCG 16SEP92.
Condition: Unknown
Due 26 September 1995
Resolved 4 January 1996
Electrical
Issued 23 August 1995
Resolved
REPLACE GLOBES TO LIGHTING AS NEEDED IN WAY OF ALL CARGO HOLDS.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Lifesaving
Issued 23 August 1995
Resolved
LIFE RINGS WITH WASTED LINES SHALL BE REPLACED THROUGHOUT THE VESSEL. NEW RINGS SHALL BE PROPERLY STENCILED.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Fire Fighting
Issued 23 August 1995
Resolved
PROVIDE A FIRE HOSE TO F/S #8.
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Accommodation/Occupational Safety
Issued 23 August 1995
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 23 August 1995
Resolved 31 August 1995
Engineering
Issued 18 October 1993
Resolved
Prove operation of the Control Power Failure / Trouble alarm as detailed inpages 1-4 of the Automation Test Procedures dated 16SEP93. Also prove operation of ABT as per item B1.
Condition: Unknown
Due 18 October 1993
Resolved 18 October 1993
Engineering
Issued 31 August 1993
Resolved
MUST HAVE C.G. APPROVED BOILER OPERATION TEST PROCEDURES ON BOARD VESSEL.
Condition: Unknown
Due 31 August 1993
Resolved 31 August 1993
Navigation
Issued 31 August 1993
Resolved
PROVIDE AUDIABLE ALARM SUITABLE FOR STEERING GEAR PANEL IN ENGINE ROOM.
Condition: Unknown
Due 31 August 1993
Resolved 31 August 1993
Engineering
Issued 31 August 1993
Resolved
PROOF OF AUTOMATION OPERATION OF PORT AND STBD BOILER.
Condition: Unknown
Due 31 August 1993
Resolved 31 August 1993
Engineering
Issued 31 August 1993
Resolved
REPLACE BOILER SIGHT GLASS ON PORT AND STBD BOILER.
Condition: Unknown
Due 31 August 1993
Resolved 31 August 1993
Construction/Loadline
Issued 31 August 1993
Resolved
PROPERLY LABEL BILGE MANIFOLD VALVES AND PROVE VALVES ARE CORRECTLY LABELED_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 31 August 1993
Resolved 31 August 1993
Fire Fighting
Issued 26 February 1992
Resolved
REPLACE THE TEMPORARY PIPE IN THE FIRE PUMP DISCHARGE BYPASS WITH A PIPE CONSTRUCTED IN ACCORDANCE WITH 46 CFR SUBCHAPTER F. COMPONENTS SHALL BE MILLED/MANUFACTURED TO THE APPLICABLE ASTM SPECIFICATION AND BE ACCOMPANIEDWITH MILL AND/OR MANUFACTURERS CERTIFICATES.
Condition: Unknown
Due 26 February 1992
Resolved 26 February 1992
Navigation
Issued 26 February 1992
Resolved
PROPERLY ADJUST THE MAGNETIC COMPASS AND PROVIDE A CURRENT DEVIATION TABLE.
Condition: Unknown
Due 26 February 1992
Resolved 26 February 1992
Engineering
Issued 26 February 1992
Resolved
CONDUCT AN ULTRASONIC TEST OF THE WELD FOR THE TEMPORARY REPAIR TO THE #1 DEEP TANK TOP PORT SIDE, OR MAKE THE TANK GAS FREE AND AVAILABLE FOR INSPECTION OF THE UNDERSIDE BY A MARINE INSPECTOR.
Condition: Unknown
Due 26 February 1992
Resolved 26 February 1992
Navigation
Issued 26 February 1992
Resolved
PROVE SATISFACTORY OPERATION OF THE "LOSS OF HYDRAULIC OIL PRESSURE" FOR THE PORT STEERING PUMP, WITH A MARINE INSPECTOR PRESENT.
Condition: Unknown
Due 26 February 1992
Resolved 26 February 1992
Electrical
Issued 26 February 1992
Resolved
PROVE SATISFACTORY OPERATION OF THE OVERSPEED AND LOW LUBE TRIPS AND THE LOW LUBE OIL AND HIGH WATER TEMP ALARMS FOR THE EMERGENCY GENERATOR WITH A MARINE INSPECTOR PRESENT.
Condition: Unknown
Due 26 February 1992
Resolved 26 February 1992
Navigation
Issued 12 December 1991
Resolved
PROVE PROPER OPERATION, TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR, OF BOTH GYRO-COMPASSES.
Condition: Unknown
Due 12 December 1991
Resolved 12 December 1991
Navigation
Issued 22 October 1991
Resolved
PROVE PROPER OPERATION OF VESSELS ARPA UNIT. INCLUDING BOTH RELATIVE AND TRUE DISPLAYS, TO THE SATISFACTION OF [name withheld]._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 October 1991
Resolved 22 October 1991
Construction/Loadline
Issued 4 October 1991
Resolved
PROVIDE TO SATISFACTION OF COGNIZANT OCMI AT NEXT CREDIT DRYDOCK OR NO LATER THAN 30NOV92 PERMANENT REPAIRS TO FOREPEAK BALLAST LINE IN #2 PORT DOUBLE BOTTOM BALLAST TANK FRAMES 63-64
Condition: Unknown
Due 4 October 1991
Resolved 4 October 1991
Construction/Loadline
Issued 27 September 1991
Resolved
MAKE PERMANENT REPAIRS TO LEAKING HULL RIVETS IN WAY OF #4 STBD BUNKER WINGTANK IN WAY OF FRAMES M-2 AND M-3 BELOW WATERLINE AND REPAIR 6" FUEL & BALLAST PIPING IN 2 PORT DOUBLE BOTTOM BETWEEN FRAMES 63 & 64.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Construction/Loadline
Issued 7 June 1991
Resolved
MAKE PERMANENT REPAIRS TO TO LEAKING HULL RIVETS IN #4 STBD BUNKER WING TANK IN WAY OF FRAMES M2 AND M3 BELOW THE WATER LINE. REPAIR REPAIR TO BE MADE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 7 June 1991
Resolved 7 June 1991
Engineering
Issued 7 June 1991
Resolved
MAKE PERMANENT REPAIRS TO TEMPORARY REPAIRED 6" BALLAST AND FUEL OIL TRANSFER PIPING IN NUMBER 2 PORT DOUBLE BOTTOM BETWEEN FRAMES 63 AND 64.
Condition: Unknown
Due 7 June 1991
Resolved 7 June 1991
Engineering
Issued 28 May 1991
Resolved
PROVE PROPER OPERATION OF BOILER AUTOMATION. BOILER AUTOMATION FAILED WHEN UNINTERUPTABLE POWER SOURCE FAILED. TO BE COMPLETED AT NEXT U.S. PORT TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 28 May 1991
Resolved 28 May 1991
Electrical
Issued 28 May 1991
Resolved
PROVER PROPER OPERATION OF MAIN CIRCUIT BREAKER FOR #3 GENERATOR. TO BE COMPLETED AT NEXT U.S. PORT TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 28 May 1991
Resolved 28 May 1991
Electrical
Issued 28 May 1991
Resolved
PROVE PROPER OPERATION OF AUTOMATIC VOLTAGE REGULATOR FOR #1 GENERATOR. TO BE COMPLETED AT NEXT U.S. PORT TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 28 May 1991
Resolved 28 May 1991
Construction/Loadline
Issued 10 April 1991
Resolved
MAKE PERMANENT REPAIRS TO LEAKING HULL RIVETS IN #4 STARBOARD BUNKER WING TANK IN WAY OF FRAMES M2 AND M3 BELOW THE WATER LINE. REPAIR TO BE MADE TOTHE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 10 April 1991
Resolved 10 April 1991
Construction/Loadline
Issued 8 April 1991
Resolved
MAKE PERMANENT REPAIRS TO TEMPORARILY REPAIRED 6" BALLAST AND FUEL OIL TRANSFER PIPING IN NUMBER 2 PORT DOUBLE BOTTOM BETWEEN FRAMES 63 AND 64.
Condition: Unknown
Due 8 April 1991
Resolved 8 April 1991
Engineering
Issued 21 December 1990
Resolved
MAKE PERMANENT REPAIRS TO THE RUPTURED FLOOR TUBE IN THE STBD BOILER.
Condition: Unknown
Due 21 December 1990
Resolved 21 December 1990
Documentation
Issued 18 December 1990
Resolved
Vessel had no Oil Transfer Procedures as required by 33CFR155.740.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Documentation
Issued 18 December 1990
Resolved
Vessel had no pollution placard as required by 33CFR155.450.
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Engineering
Issued 3 December 1990
Resolved
MAKE AVIALIBLE FOR INTERNAL INSPECTION OR HYROSTATIC TEST ALL (7) UNFIRED PRESSURE VESSELS
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Engineering
Issued 3 December 1990
Resolved
PROVE PROPER OPERATION OF ALL (7) PRESSURE VESSEL RELIEF VALVES.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Engineering
Issued 3 December 1990
Resolved
PROVE PROPER OPERATION OF OILY WATER SEPERATOR.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Fire Fighting
Issued 3 December 1990
Resolved
REPAIR THE LEAKY FIRE MAIN VALVE IN THE PORT DIESEL GEN. ROOM UPPER DECK.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Electrical
Issued 3 December 1990
Resolved
FIND AND REPAIR THE GROUND IN THE EMERGENCY SWBD 120V LIGHTING BUS.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Navigation
Issued 3 December 1990
Resolved
PRVIDE DEVIATION TABLES FOR NEW MAG. COMPASS.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Navigation
Issued 3 December 1990
Resolved
PROVIDE DOCUMENTATION OF COAST GAURD APPROVAL FROM MARINE SAFETY CENTER OF NEWLY INSTALLED SPERRY STEERING SYSTEM.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Lifesaving
Issued 3 December 1990
Resolved
PROVE PROPER OPERATION AND WEIGHT TEST PORT LIFEBOAT.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Electrical
Issued 3 December 1990
Resolved
PROVE PROPER OPERATION OF #3 SS GENERATOR OVERSPEED TRIP, LOW L/O TRIP AND REVERSE POWER RELAY.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Electrical
Issued 3 December 1990
Resolved
PROVIDE INSULATING MATTING IN FRONT OF AND BEHIND ELETRICAL SWITCHBOARDS INTHE DIESEL GEN ROOM.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Electrical
Issued 3 December 1990
Resolved
REPAIR AND PROVE PROPER OPERATION OF GENERAL ALARM WARNING LIGHT IN ENGINE ROOM.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Construction/Loadline
Issued 3 December 1990
Resolved
INSTALL SHAFT GAURDS ON E/R WTD HYDR. MOTOR.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Construction/Loadline
Issued 3 December 1990
Resolved
PROVE PROPER OPERATION OF INDICATOR LIGHTS OF THE BRIDGE FOR E/R SHAFT ALLEY WATER TIGHT DOOR.
Condition: Unknown
Due 3 December 1990
Resolved 3 December 1990
Documentation
Issued 16 October 1986
Resolved
UPDATE IOPP CERTIFICATE AND FORM A SURVEY TO INCORPORATE INSTALLATION OF NEW OILY WATER SEPARATOR.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Accommodation/Occupational Safety
Issued 16 October 1986
Resolved
DEMONSTRATE OPERATION OF WATER PRESSURE TANK RELIEF VALVE.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 16 October 1986
Resolved
PROVE SATISFACTORY OPERATION OF PORT AND STBD BOILER AUTOMATION. INCREASE THE VESSEL'S ENGINEROOM MANNING TO A 3 MAN WATCH UNTIL SATISFACTORY OPERATION IS DEMONSTRATED.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Lifesaving
Issued 16 October 1986
Resolved
CONDUCT FIRE AND BOAT DRILL IN PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Lifesaving
Issued 16 October 1986
Resolved
REINSTALL PROPERLY SERVICED INFLATABLE LIFE RAFTS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Lifesaving
Issued 16 October 1986
Resolved
RENEW CHEEK PLATE BRACKETS TO SEA PAINTER PAD EYES BOTH FORE AND AFT OF BOTH PORT AND STBD LIFEBOATS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Accommodation/Occupational Safety
Issued 16 October 1986
Resolved
REPAIR AND PROVE SATISFACTORY OPERATION OF QUARTERS EMERGENCY VENT SHUT DOWN FROM REMOTE ON BRIDGE.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
PROPERLY REALIGN AND REPAIR DOGS AND GASKETS TO WATERTIGHT HATCH COVER ON FO'CSLE DECK TO UPPER HAWSER LINE ROOM.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
REWELD CRACK IN FILLET WELD AFT BULKHEAD STBD SIDE AT JUNCTION OF OVERHEAD OF C.T.M.G. ROOM.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
PROPERLY STOP CRACK AND REWELD CRACK IN TANK TOP STBD SIDE #1 F.O. DEEP TANK.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Accommodation/Occupational Safety
Issued 16 October 1986
Resolved
REPAIR OR REPLACE FROZEN BALL CHECK VALVES OF VENT GOOSENECKS AS NEEDED.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Electrical
Issued 16 October 1986
Resolved
REPLACE MISSING OR BROKEN GLASS COVERS OR CAGES TO DECK LIGHTING AND CARGO HOLD LIGHTING AS NEEDED.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Lifesaving
Issued 16 October 1986
Resolved
PROVE SATISFACTORY OPERATION OF RELEASING MECH. OF BOTH PORT AND STBD LIFEBOATS.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 16 October 1986
Resolved
RENEW OVERSPEED TRIP ASSEMBLY ON COFFIN TURBINE FEED PUMPS WITH A FACTORY PRESET OVERSPEED TRIP ASSEMBLY. FACTORY TEST OF OVERSPEED ASSEMBLY MUST BEWITNESSED BY A USCG INSPECTOR.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Electrical
Issued 16 October 1986
Resolved
REPAIR EMERGENCY DIESEL GENERATOR FREQUENCY METER SWITCH AND DEMONSTRATE PROPER PRERFORMANCE TO USCG INSPECTOR.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Electrical
Issued 16 October 1986
Resolved
DEMONSTRATE PROPER PERFORMANCE OF EMERGENCY GENERATOR ROOM AIR LOUVERS UPON GENERATOR SHUT DOWN.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Fire Fighting
Issued 16 October 1986
Resolved
REPAIR FIRE PUMP RELIEF VALVE IN SHAFT ALLEY.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Fire Fighting
Issued 16 October 1986
Resolved
REPAIR APPROXIMATELY 1/4 INCH HOLE IN FIRE MAIN PIPING ON SUCTION SIDE OF FIRE PUMP IN SHAFT ALLEY.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 16 October 1986
Resolved
REPAIR ALL SECTIONS OF BILGE SUCTION MAIN PIPING WITH SOFT PATCHES IN BILGES OF LOWER LEVEL ENGINEROOM. FOUR PATCHES NOTED.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 16 October 1986
Resolved
RENEW ALL SALT WATER COOLING SYSTEM RUBBER EXPANSION JOINTS. (4 MAIN, 1 AUXILARY).
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Electrical
Issued 16 October 1986
Resolved
DEMONSTRATE PROPER OVERSPEED TRIP OF EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 16 October 1986
Resolved
PROVE SATISFACTORY OPERATION OF NEW OILY WATER SEPARATOR.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Unknown
Issued 21 May 1986
Resolved
PROVIDE [name withheld] OF TRIM AND STABILITY BOOKLET AFTER REMOVALOF 845 TONS OF FIXED BALLAST FROM NO. 7 CARGO HOLD.
Condition: Unknown
Due 21 May 1986
Resolved 21 May 1986
Construction/Loadline
Issued 9 September 1985
Resolved
PROVIDE COPY OF HULL GAUGINGS TAKEN DURING AUG85 YARD AVAILABILTY TO [name withheld] NO LATER THAN 30 SEPT85.
Condition: Unknown
Due 9 September 1985
Resolved 9 September 1985
Engineering
Issued 9 September 1985
Resolved
REMOVE OR MAKE FUNCTIONAL PILOTHOUSE THROTTLE SYSTEM,INCLUDING AUTOMATIC ROLLOVER AND TURBINE SPEED CONTROL SYSTEM WITHIN 60 DAYS(10 NOV85).NOTIFY [name withheld] OF INTENTIONS AND COMPLETION OF WORK.
Condition: Unknown
Due 9 September 1985
Resolved 9 September 1985