Records from 2011 to 2025. Most recent: inspection, 1 October 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 21
1 October 2025
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8244760
30 September 2025
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8250594
24 January 2025
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8069315
27 February 2024
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7871274
27 February 2024
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7872634
23 January 2024
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7853628
21 March 2023
Deficiency Check · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7651550
3 March 2023
In-Service Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7644942
27 October 2022
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7585478
6 December 2021
Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7361832
19 October 2021
Administrative Inspection · Examination of Repairs · Drydock Exam · Internal Structural Exam · Permit to Proceed
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7335973
13 January 2021
In-Service Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7125361
21 February 2020
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6904796
4 February 2020
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6902524
4 February 2020
Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6903496
12 February 2019
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6624734
15 January 2019
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6610796
22 December 2017
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6327809
21 February 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6092533
30 January 2017
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6079947
11 January 2016
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5794981
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 January 2024
Resolved
Vessels shall be provided a dependable source of emergency power and lighting necessary for the safety of the passengers and/or crew in an emergency. Both Port and Starboard ER did not have sufficient emergency lighting at the top near the door to see handrails or door handle to exit.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2024
Resolution: Vessel rep emailed pictures on illumination for P&S ER.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 January 2024
Resolved
Distribution panels shall be protected against accidental contact. Vessel had an electrical blank missing in the Port ER panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 29 January 2024
Resolution: Vessel rep sent picture of installed electrical blank.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 23 January 2024
Resolved
In each crew berthing area and wash area, the owner or operator must display information in a visible location regarding sexual assault and sexual harassment, retaliation, and drug and alcohol usage and the procedures and resources to report crimes, including sexual assault and sexual harassment IAW 46 USC 11101 and CVC Policy Letter 23-04. Vessel had not yet equipped each berthing areas and wash area.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 22 May 2025
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 23 January 2024
Resolved
Vessels shall maintain a master key control system,
control access and use of master keys, and observe specific information handling protocols as
required IAW 46 USC 3301 and CVC Policy Letter 23-06. The company did not have a policy for the Master Key for the vessel or authorized persons.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 February 2024
Resolved 22 May 2025
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 21 March 2023
Resolved
Vessel required to have a stern light visible from at least 2 miles. Stern light was extinguished and inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 March 2023
Resolved 7 April 2023
Resolution: Bulb replaced
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 March 2023
Resolved
Electric installations on vessel's must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Breaker panel on the bridge and O2 deck level had a missing blank and missing nameplates. 46 CFR 111.01 (a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2023
Resolved 7 April 2023
Resolution: Blanks and nameplated replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 March 2023
Resolved
The Officer in Charge, Marine Inspection, (OCMI) may issue a permit to proceed to another port for repair to a vessel, if in his or her judgment it can be done with safety, even if the COI has expired or is about to expire. Vessel is authorized a one way transit from Port of New Iberia, LA to Port Fourchon, LA to make permanent repairs to the vessel's pads. Vessel is to follow approved Sail Plan during this voyage. If vessel must deviate from approved Sail Plan they must notify the nearest OCMI as soon as practicable. Upon arrival to Port Fourchon, LA vessel shall notify MSU Houma Command Duty Officer at [phone withheld].
46 CFR 91.05-1(a)
Condition: Invalid
Action required: 15 - Rectify deficiencies by next port
Resolved 10 March 2023
Resolution: Vessel arrived in Port Fourchon to complete repairs and scheduled inspection.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 September 2022
Resolved
OCMI may issue a permit to proceed to another port for repair if the vessel can complete the trip safely.
MSU Morgan City OCMI has issued a permit to proceed to the lift boat MAN O WAR, ON 1045921, granting a one time transit from Bollinger Amelia Repair in Amelia, LA to Marine Industrial Fabricators (MIF) in New Iberia, LA. This transit shall be conducted IAW the transit/vessel relocation plan submitted by All Coast to MSU Morgan City. The vessel must make notifications to MSD Lafayette upon arrival. This Permit to Proceed will only be valid until the vessels arrival at MIF in New Iberia.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 2 October 2022
Resolved 21 March 2023
Resolution: Vessel Arrived in port fourchon and completed COI.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 October 2021
Resolved
During exam deterioration to the hull plating or structural members is discovered, the OCMI may require the vessel to be During exam deterioration to the hull plating or structural members is discovered, the OCMI may require the vessel to be drydocked or otherwise taken out of service to assess the extent of the damage to affect permanent repairs.
Holes were found in the hull of the vessel in 5 locations. Significant hull metal wastage was observed on over 50% of the hull plating. Require hull to be blasted to bare metal for a better assessment.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 November 2021
Resolved 14 September 2022
Resolution: Hull was blasted and UT grid conducted. This resulted in 75% hull plating replacment was conducted. See activity 7335973.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 October 2021
Resolved
During an exam if deterioration to the hull plating or structural members is discovered, the OCMI may require the vessel to be drydocked or otherwise taken out of service to assess the extent of the damage to affect permanent repairs.
ISE found many frames, longitudinals, and angels in every tank/void wasted or broken. These were called out and marked with green spray paint. These must be cropped and renewed in kind.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 November 2021
Resolved 30 September 2022
Resolution: Repairs were made to internal structures. All spaces were pressure tested, SAT. See activity 7335973.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 October 2021
Resolved
No repairs affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without knowledge of the [name withheld] noted in excess of 10 doubler plates used on the hull interior and exterior. Remove doublers. Crop and renew hull plating in these areas.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 10 November 2021
Resolved 14 September 2022
Resolution: All doublers were removed and hull plating was replaced. See activity 7335973.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 October 2021
Resolved
Liftboat jacking systems, liftboat legs, liftboat leg pads, and arrangements for supply of water to fire mains, as well as the items listed by §126.430 of this subchapter, will normally be inspected during an inspection for certification and periodic inspection to determine whether the liftboat is in satisfactory condition and fit for the service intended. Vessel has not completed "leg-to-can" and the "can-to-pad" connection welds IAW CG Policy Letter 07-02.
46 CFR 134.120
Visual inspection of the leg rack on the STBD leg showed a crack running down the rack to leg weld about 4', then extending across the rack, and back down the other side of the rack to leg weld 4'. Vessel must complete the 10 year inspection to prove the legs structural integrity.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 November 2021
Resolved 21 March 2023
Resolution: Vessel arrived in Port Fourchon and completed COI inspection.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 January 2021
Resolved
There must be ground detection for each ship's service power system and power distribution system. The vsl starboard ground detection was not functioning for the either switchboard. 46 CFR 111.05-21
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2021
Resolved 18 February 2021
Resolution: Vsl provided video evidence that the vsl starboard ground detection was functioning for both switchboards.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 January 2021
Resolved
Fuel systems must have non metallic hoses installed meeting SAE J1942. Port engine generator fuel hose was not in serviceable condition. 46 CFR 56.60-25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 February 2021
Resolved 27 January 2021
Resolution: Vsl replaced non-met hose.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 January 2021
Resolved
Each switchboard must be installed meeting requirements of IEEE 45-2002. Vsl switchboard door was falling off. 46 CFR 111.30-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 February 2021
Resolved 27 January 2021
Resolution: Vsl secured door iaw IEEE.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 January 2021
Resolved
Non-conductive mats must be installed in front of switchboards for personnel protection and must extend the entire length and width. No switchboards in either engine room had appropriate non-conductive mats installed.46 CFR 111.30-11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 February 2021
Resolved 12 February 2021
Resolution: Vessel provided photographic evidence of new electrical mats.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 January 2021
Resolved
Cables should be supported to prevent undue sagging and the distance between supports should not exceed 610mm.
Cables in both engine rooms were no longer supported by cable supports. IEEC 45-2002 25.5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 February 2021
Resolved 27 January 2021
Resolution: Vsl supported cables iaw Sub-J
Deck/Cargo › Mooring/Anchoring › Anchoring Arrangement
Issued 22 December 2017
Resolved
Visual inspection identified a crack @ rack butt port leg at approx 45ft. NDT (wet mag)conducted prior to completion of inspection. [name withheld] confirmed that the rack Butt had a crack. Submit repair proposal for permanent repairs.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 27 December 2017
Resolved 4 January 2018
Resolution: Rack repaired NDT Passed
Engineering › Engine Controls (Electric/Electronic) › Circuit Board
Issued 22 December 2017
Resolved
Door on STBD E/R Shaft tach box for STBD engine will not close.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 27 December 2017
Resolution: Door closed
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 22 December 2017
Resolved
Reset button on controller for #1 Air Compressor missing leaving an opening in front of controller.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 December 2017
Resolved 27 December 2017
Resolution: Reset button replaced
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 22 December 2017
Resolved
Bulkhead sealant @ penetration going into STBD E/R and A-60 insulation missing in fiddley between machinery/Accommodation space.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 22 December 2017
Resolved 27 December 2017
Resolution: Penetration sealed and insulation replaced.
Operations/Management › Drills/Instruction › Fire
Issued 22 December 2017
Resolved
Failed fire drill. Drill started of bad because the crewmember that reported the fire gave incorrect location. The drill continued to get worst when the vent closures to isolate the space could not be closed. Perform satisfactory fire drill.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 22 December 2017
Resolved 29 December 2017
Resolution: Witnessed Fire Drill
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 22 December 2017
Resolved
Prove proper operation of vent closures prior to operation. During Fire drill an attempt to close most failed, including a broken dogs and seized hinges.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 22 December 2017
Resolved 29 December 2017
Resolution: Verified closures during Fire Drill
Construction/Loadline › Structures › Scuttle
Issued 22 December 2017
Resolved
Replace and prove proper operation of port scuttle from Engineroom (will not open and center bushing cracked).
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 22 December 2017
Resolved 29 December 2017
Resolution: Scuttle replaced and tested for proper operation.
Construction/Loadline › Structures › Deck Plating
Issued 22 December 2017
Resolved
Deck Plating above STBD E/R at forward super structure is wasted leaking water in engine room. C/R to good metal.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 December 2017
Resolved 29 December 2017
Resolution: Insert C/R witnessed NDT.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 21 February 2017
Resolved
Provide valid load line certificate issued by class.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2017
Resolved 23 February 2017
Resolution: Class Issued LoadLine Cert
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 February 2017
Resolved
Complete dry dock / ISE call out items to attain dry dock credit.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2017
Resolved 23 February 2017
Resolution: Hull credit was given after call outs were completed.
Fire Fighting › Fire Pumps › Arrangement
Issued 21 February 2017
Resolved
Replace nonoperational fire main pressure gauge on stbd fire pump and gauge located on bridge.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2017
Resolved 23 February 2017
Resolution: All firemain pressure gauges were operational
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 21 February 2017
Resolved
Show proper operation of port shaft tachometer.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2017
Resolved 23 February 2017
Resolution: Fully operational
Electrical › Electric Generation Source (service) › Panelboard
Issued 21 February 2017
Resolved
Replace synchroscope and test reverse power relay in presence of USCG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2017
Resolved 23 February 2017
Resolution: Crew replaced synchroscope and tested reverse power replay in the presence of MI
Electrical › Electric Generation Source (service) › Generator
Issued 21 February 2017
Resolved
Provide proper operating KW gauge on #2 generator.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2017
Resolved 23 February 2017
Resolution: Ship's crew replaced gauge.
Engineering › Fuel Oil Service System › Hose
Issued 21 February 2017
Resolved
Replace leaking fuel oil line on #1 Generator.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2017
Resolved 23 February 2017
Resolution: Fuel line was replaced
Engineering › Fuel Oil Service System › Hose
Issued 21 February 2017
Resolved
Replace wasted fuel oil line on crane prime mover prior to crane operation.
Action required: 705 - Other - as specified
Due 21 February 2017
Resolved 23 February 2017
Resolution: Fuel line was replaced
Lifesaving › Rescue Boat › Construction
Issued 21 February 2017
Resolved
Replace wasted workboat cradle prior to 2018 annual inspection.
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 19 February 2019
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 21 February 2017
Resolved
Clean generator windings on both generators prior to 2018 annual inspection.
Action required: 705 - Other - as specified
Due 1 March 2018
Resolved 19 February 2019
Engineering › Generator (propulsion/auxiliary-electric) › Overcurrent Devices Circuitry
Issued 11 January 2016
Resolved
Overspeed device was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 January 2016
Resolved 12 January 2016
Resolution: Adjusted and tested.
Fire Fighting › Structural - A Class Divisions › Flammable Liquids Storage Spaces
Issued 11 January 2016
Resolved
Small paint locker on upper deck was wasted in several areas. Crew to repair locker.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 January 2016
Resolved 12 January 2016
Resolution: Wasted areas were renewed with same thickness steel.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 11 January 2016
Resolved
Fiddley ventilation heater enclosure was severely wasted exposing electrical components. Crew to repair/renew.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 January 2016
Resolved 12 January 2016
Resolution: Enclosure repaired.