GENMAR CONSTANTINE is a 1992 tank ship. The Coast Guard has recorded 73 inspections since 1996, most recently in November 2010, along with 25 deficiencies and 19 operational controls.

Records from 1996 to 2010. Most recent: inspection, 18 November 2010.

Built
1992
Last inspected
18 November 2010
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9041203 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
449717
Flag
PANAMA
—
Maury page id
psix-449717

Inspections, by type

…with no type recorded40
Years with a record 15 calendar years (1996–2010)
The 73 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 16 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it56021 - Convention (Subpart B), Gross Ton
56021 - Regulatory (Subpart C or D), Gross Ton
31560 - Convention (Subpart B), Net Ton
31560 - Regulatory (Subpart C or D), Net Ton
102335 - Dead Weight, Ton
117407 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspected as a tow unit · 5

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

GREG TURECAMO Towing Vessel · MISLE 156927 · 21 March 2007 · activity 2898219LYNNE MORAN Towing Vessel · MISLE 741035 · 21 March 2007 · activity 2898219CAPE KNOX Freight Ship · MISLE 431322 · 21 June 2002 · activity 1635432CAPE KENNEDY Freight Ship · MISLE 431323 · 21 June 2002 · activity 1635432EAGLE CHARLOTTE Tank Ship · MISLE 466603 · 6 August 2001 · activity 161241

Inspection history · 73

18 November 2010 COE-Dockside
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3893787
7 February 2010 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3676681
29 January 2010 Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3672417
20 January 2010 COE-Administrative
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3666731
17 January 2010 COE-Dockside
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3663802
3 January 2010 COE-Administrative
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3657896
26 April 2009 COE-Dockside
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3460992
7 April 2009 COE-Administrative
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3448176
23 March 2009 PII Safety Exam · COC-TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3438732
18 March 2009 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3435364
20 February 2009 Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3421585
11 April 2008 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3182235
29 March 2008 ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3173459
27 July 2007 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3012403
13 July 2007 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2993919
29 June 2007 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2977851
14 May 2007 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2930505
18 April 2007 In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2910814
21 March 2007 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2898219
20 March 2007 Ballast Water Examination · ISPS II Exam · COC-TVE Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2886575
25 January 2007 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2861790
27 October 2006 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2809474
10 May 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2646580
8 May 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2644276
10 March 2006 Deficiency Check · ISPS II Exam · COC-TVE Renew · Ballast Water Examination · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2599832
4 September 2005 ISPS II Exam
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2485661
11 August 2005 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2460517
28 July 2005 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2448589
15 June 2005 ISPS II Exam
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2393382
8 June 2005 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2384870
26 May 2005 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2393761
31 January 2005 PII Safety Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2283926
19 January 2005 Ballast Water Examination · COC-TVE Annual · ISPS III Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2275704
19 January 2005 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2276937
10 December 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2257342
10 December 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2308022
6 December 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2256680
12 September 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2194283
12 July 2004 ISPS II Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2130310
9 July 2004 ISPS II Exam · PII Safety Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2126881
21 May 2004 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2073816
5 May 2004 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2060110
27 February 2004 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2014554
16 January 2004 Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1987286
13 August 2003 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1875060
6 August 2003 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1868318
25 July 2003 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1856824
5 May 2003 Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1786857
18 March 2003 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1759035
2 February 2003 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1738635
13 January 2003 Annual Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1729664
14 December 2002 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1718848
21 July 2002 Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1649541
27 June 2002 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1637507
21 June 2002 Re-Inspection · Damage Survey · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1634584
21 June 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1635432
21 June 2002 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1642790
29 April 2002 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1610493
30 January 2002 Certificate of Compliance
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1482806
7 October 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 25815
6 August 2001 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 161241
6 June 2001 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 290853
26 January 2001 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 286548
25 January 2001 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 183701
13 January 2001 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 285887
13 January 2001 Tank Vessel Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1061122
16 January 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 273834
24 January 1999 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 424855
4 August 1998 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 418766
4 January 1998 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 411323
4 January 1998 Tank Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 785086
8 September 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 407739
9 December 1996 Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 398252

Deficiency record · 25

Deck/Cargo › Ballast › Tank
Issued 7 February 2010 Resolved
The Captain of the Port (COPT) Houston-Galveston has been notified that M/T GENMAR CONSTANTINE has a crack in the #2 port side water ballast tank. Prior to departure from the COPT Zone, vessel must submit proper documentation from the certificate issuing authority attesting to the permanent repair to the #2 port side water ballast tank.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 February 2010
Resolution: Received Class report attesting to the repairs made on the #2 port side water ballast tank. Report attached. Opcon released.
Operations/Management › Pollution › Control of Discharge of NLS Residues
Issued 29 January 2010 Resolved
Vessel reported on their Notice of Arrival that the ODME was malfunctioning.
Due 29 January 2010
Resolved 29 January 2010
Resolution: Recieved tech report attesting to ODME full operation. Testing of the ODME was performed in front of DNV the vessel''''s class society.
Deck/Cargo › Cargo Stowage › General
Issued 20 February 2009 Resolved
Vessel reported a crack between the #2 Port Segregated Ballast Tanks and the #2 Center Cargo Tank
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2009
Resolution: Received class report attesting to proper repairs of the affected tanks. OP Control removed
Fire Fighting › Fixed Deck Foam System › Piping
Issued 29 March 2008 Resolved
During heavy weather the foam monitor supply line cracked. Ships forced to put a temporary soft patch on the crack. Class needs to attend to approve repairs.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 29 March 2008
Resolved 30 March 2008
Resolution: Received class report attesting that the repairs will be permanently corrected by June 2008.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 29 March 2008 Resolved
The vapor control system block of the COC was not endorsed due to a faulty (PCB)- printed circuit board which causes the overfill alarm not to operate. Vessel cannot load cargo in the US until the overflow alarm has been corrected.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 April 2008
Resolved 11 April 2008
Resolution: Received confirmation that repairs have been made to circuit board and alarms now operational.
Lifesaving › Launching Appliances › Davit
Issued 10 March 2006 Resolved
Ascertain cause of malfunctioning davit as to cause damage to vessel's starboard lifeboat/reserve boat on March 10, 2006.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2006
Resolution: Recieved class report dated 3/10/06 IRT cause of damaged life/rescue boat.
Lifesaving › Lifeboat › Hull
Issued 10 March 2006 Resolved
Repair lifeboat holes (damage), repair must be approved by an approved repair facility.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 March 2006
Resolution: Recieved confirmation ( DNV class report# 17647) hat vsl has recieved two additional 25 man liferafts, so that permanent repairs can be completed at a later date.
Lifesaving › Launching Appliances › Davit
Issued 10 March 2006 Resolved
Repair and perform function test on port and starboard lifeboat davit system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2006
Resolution: Received class report dated 3/10/06 (DNV # 17647) citing that port side davit was tested satisfactorily and a condition was given to have stbd side fixed by 31MAY06.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 19 January 2005 Resolved
Upon leaving the dock the vessel experienced an engine control system failure. Vessel allowed to leave port with tugs escort.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 January 2005
Resolved 31 January 2005
Resolution: Received class report from DNV satisfying requirement.
Navigation › Collision/Grounding Avoidance
Issued 5 May 2004 Resolved
Secondary radar is inoperatable and repairs must be made prior to arrival at next U.S. port. LEGACY COMPONENT DESC: Radar
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 21 May 2004
Resolution: RECEIVED CLASS REPORT STATING RADAR IS REPAIRED.
Navigation › Collision/Grounding Avoidance › Radar
Issued 6 August 2003 Resolved
Vessel reported inoperable primary radar.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 August 2003
Resolved 6 August 2003
Resolution: Received Class report attesting to satisfactory repairs to primary radar.
Construction/Loadline › Hull
Issued 5 May 2003 Resolved
Vessel discovered crack in the sideshell at the starboard #4 and #5 ballast tanks and that the resulting damage may pose a threat to the vessel and the enviroment. Provide class report evaluating the extent and significance of the crack and provide a proposal addressing repairs to the hull. LEGACY COMPONENT DESC: Side Shell
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 5 May 2003
Resolution: Class report DNV 52303224 dated 04MAY03 attesting to the permanent repair.
Lifesaving › Immersion Suits
Issued 12 January 2003 Resolved
Inflation tubes dry rotted, and have come loose. Either repair or replace suits in 30 days. LEGACY COMPONENT DESC: Inflation tubes
Condition: Improper/Lack of Maintenance
Due 13 February 2003
Resolved 2 February 2003
Resolution: RECEIVED FAX FOR THE PURCHASE OF REPAIR KITS TO REPAIR IMMERSION SUITS. DEFICIENCY CLEARED.
Engineering › Diesel Engine (auxiliary)
Issued 27 June 2002 Resolved
The No.1 Generator has a defective turbocharger rotor. Vessel is prohibited from operating generator in U.S. waters until repaired to the satisfaction of class. LEGACY COMPONENT DESC: Turbocharger
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 June 2002
Resolved 20 July 2002
Resolution: received class report attesting to repairs made
Engineering › Diesel Engine (auxiliary)
Issued 27 June 2002 Resolved
All three generators are missing the drain pipe connection fitting for the fuel injection pump high pressure line retainer. LEGACY COMPONENT DESC: Injector (fuel injection)
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 July 2002
Resolved 20 July 2002
Resolution: received class report attesting to repairs made
Electrical › Electric Generation Source (service)
Issued 27 June 2002 Resolved
The No.3 Generator's auto load function not operating properly. Vessel prohibited from operating an unmanned engineroom in U.S. waters until repaired to satisfaction of class. LEGACY COMPONENT DESC: AUTO START
Action required: 705 - Other - as specified
Due 27 June 2002
Resolved 20 July 2002
Resolution: resolve corrected, condition of class issued for 30 Sept. 2002
Electrical › Electric Generation Source (service)
Issued 21 June 2002 Resolved
NO. 3 Generator has a faulty/inoperable reverse power relay. LEGACY COMPONENT DESC: Reverse Power Relay
Action required: 705 - Other - as specified
Due 22 June 2002
Resolved 27 June 2002
Resolution: Received DNV class report and tested sat.
Electrical › Electric Generation Source (service)
Issued 21 June 2002 Resolved
Provide class attestation of satisfactory operation of two generators prior to any cargo operations. LEGACY COMPONENT DESC: Power Requirement
Action required: 705 - Other - as specified
Due 22 June 2002
Resolved 27 June 2002
Resolution: Received DNV class report and tested sat.
Electrical › Electric Generation Source (service)
Issued 21 June 2002 Resolved
Provide class attestation of NO. 3 Generator's winding integrity and proper operation of reverse power relay prior to operating in US waters. LEGACY COMPONENT DESC: Power Requirement
Action required: 705 - Other - as specified
Due 22 June 2002
Resolved 27 June 2002
Resolution: Received DNV class report and tested sat.
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 21 June 2002 Resolved
NO. 3 Generator has a faulty/inoperable fuel control air solenoid.
Action required: 705 - Other - as specified
Due 22 June 2002
Resolved 27 June 2002
Resolution: Received DNV class report stating solenoid was replaced and tested sat.
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 21 June 2002 Resolved
NO. 2 Generator has a suspect/faulty fuel control air solenoid.
Action required: 705 - Other - as specified
Due 22 June 2002
Resolved 27 June 2002
Resolution: Received DNV class report stating solenoid was replaced and tested sat.
Construction/Loadline › Hull
Issued 21 June 2002 Resolved
All external damage to the hull as a result of this collision must be repaired to the satisfaction of class. Class imposed deadline of 09/02. LEGACY COMPONENT DESC: Hull Plating
Action required: 705 - Other - as specified
Due 30 September 2002
Resolved 14 December 2002
Resolution: RECEIVED CLASS REPORT FROM DNV STATING THAT ALL REPAIRS WERE MADE.
Lifesaving
Issued 13 January 2001 Resolved
IAW SOLAS 74/78 CHAPTER III REG 41 THE STARBOARD LIFEBOAT HAD 13 BAD FOOD RATIONS.
Condition: Unknown
Due 13 January 2001
Resolved 18 January 2001
Deck/Cargo
Issued 16 January 2000 Resolved
VESSEL IS RESTRICTED FROM LOADING PETROLEUM CARGO PRODUCTS IN U.S. WATERS UNTIL CARGO OVERFILL DEVICE, BOTH AUDIO AND VISUAL,ARE INSTALLED ON CARGO DECK AREA IAW 33 CFR 155.480 (b)(1) AND PROPER OPERATION IS APPROVED.
Condition: Unknown
Due 18 January 2001
Resolved 18 January 2001
Deck/Cargo
Issued 24 January 1999 Resolved
VESSEL IS RESTRICTED FROM LOADING PETEROLIUM CARGO PRODUCTS IN U.S. WATERS UNTIL CARGO OVERFILL DEVICE AUDIO AND VISUAL ALARM IS INSTALLED ON CARGO DECK AREA IAW 33 CFR 155.480(b)(1) AND PROPER OPERATION IS APPROVED.
Condition: Unknown
Due 20 January 2000
Resolved 20 January 2000