MAURY USCG vessel records Sign in
← All vessels

PLAYBOY TOO

PLAYBOY TOO is a 1969 commercial fishing vessel. The Coast Guard has recorded 77 inspections since 1985, most recently in January 2020, along with 133 deficiencies and 1 casualty investigation in 2011.

Records from 1985 to 2020. Most recent: inspection, 25 January 2020.

Built
1969
Last inspected
25 January 2020
Documentation
Expired · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDJ9634
Flag
UNITED STATES
368027910
Maury page id
psix-46246

Inspections, by type

…with no type recorded10
Years with a record 33 calendar years (1985–2020)
The 77 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 6 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Fishing Vessel class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)43.8 ft × 15.0 ft × 6.8 ft
Registered tonnagegross 32 / net 24
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderR & H MARINA · SEATTLE, WA, UNITED STATES · built 1969
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portWESTPORT, WA
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationExpired · issued 30 June 2004
Service, as the file records itCommercial Fishing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it32 - Regulatory (Subpart C or D), Gross Ton
24 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDJ9634MMSI 368027910 · active · compulsorily equipped · granted 20 March 2018, expires 20 March 2028
WCY2215MMSI 367340120 · expired · compulsorily equipped · granted 28 February 2008, cancelled 12 May 2018
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

GOLD RUSH Passenger (Inspected) · MISLE 47977 · 28 August 2015 · activity 5228740EL PATRON Passenger (Inspected) · MISLE 51266 · 28 August 2015 · activity 5228740

Inspection history · 77

25 January 2020 Type not recorded
No type recorded · Station Grays Harbor · USCG Northwest District (CGD-NW) · Activity 6896419
5 March 2019 Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6636555
1 October 2018 Administrative Inspection · Deficiency Check
Physical examination · Navigation Center · Activity 6552221
10 April 2018 Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6390236
19 December 2016 COI Inspection · Hull Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6061780
15 March 2016 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5836139
22 January 2016 Examination of Repairs
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 5808915
9 September 2015 Damage Survey
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 5720490
28 August 2015 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 5228740
19 January 2012 COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4228451
16 December 2011 Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4209791
8 December 2011 Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4132831
30 August 2011 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4142965
5 January 2011 Hull Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 3920287
16 December 2010 Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 3912544
10 March 2010 Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3692129
9 December 2009 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3642878
11 March 2009 Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3428445
24 February 2009 Hull Examination · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3422453
18 February 2009 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3415466
11 March 2008 In-Service Inspection · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3160252
6 February 2008 In-Service Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3149919
14 January 2008 Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3128796
21 February 2007 Deficiency Check · Examination of Repairs · Hull Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2871605
24 January 2007 COI Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2846692
1 March 2006 Annual Inspection · Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2615645
4 March 2005 Deficiency Check · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2299348
10 January 2005 Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2266688
31 March 2004 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 2033584
21 January 2004 Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1983562
12 March 2003 Deficiency Check · Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1755367
18 February 2003 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1743784
24 April 2002 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1608286
28 January 2002 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1475403
19 July 2001 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1069739
27 March 2001 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1060395
6 March 2001 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1405136
23 February 2001 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1058908
23 March 2000 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1048222
26 February 1999 Hull Examination · Examination of Repairs
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1395135
21 February 1999 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 159417
19 February 1999 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1469887
23 March 1998 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1368660
26 February 1998 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1388479
13 February 1998 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1111545
24 June 1997 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 777198
15 May 1997 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1106681
13 March 1997 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1106271
28 February 1997 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1104374
21 February 1997 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1374871
19 August 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1091923
13 June 1996 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1089112
29 May 1996 Damage Survey
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1419617
28 May 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 67752
20 February 1996 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1417886
8 March 1995 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1382916
28 February 1995 Re-Inspection · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1385401
12 April 1994 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1417629
18 March 1993 COI Inspection · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1353421
10 March 1992 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 949051
30 January 1992 Hull Examination · Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 947680
6 March 1991 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 915909
29 January 1991 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 923423
3 January 1991 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 930540
28 November 1990 Drydock Extension
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1232706
10 April 1990 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 919303
11 May 1989 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1202118
29 March 1989 Deficiency Check
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1343452
16 March 1989 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 889256
9 August 1988 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1343810
10 June 1988 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 889429
11 May 1988 Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 890502
21 March 1988 COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 985142
12 May 1987 Hull Examination · Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1333689
16 September 1986 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1011638
19 May 1986 Re-Inspection · Credit Drydock
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 985105
11 April 1985 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 982890

Deficiency record · 133

10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 1 October 2018 Resolved
MMSI: Vsl is broadcasting MMSI from expired FCC License, CLSN: Vsl is broadcasting Call Sign from expired FCC License,
Condition: Invalid
Action required: 705 - Other - as specified
Due 10 January 2019
Resolved 7 January 2019
Resolution: No longer listed on NAVCEN website, AIS not currently in service.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 10 April 2018 Resolved
Stow survival craft on board. 46 CFR 180.130
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 January 2020
Resolution: Removed requirement. Vessel change in service.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 April 2018 Resolved
Service portable and fixed firefighting equipment. 46 CFR 176.810(b)(1-2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 January 2020
Resolution: Removed requirement. Vessel change in service.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 10 April 2018 Resolved
Affix NOAA registration decal to EPIRB. 47 CFR 80.1061(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 January 2020
Resolution: Removed requirement. Vessel change in service.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 10 April 2018 Resolved
Schedule FCC inspector for expired Safety Radiotelephony Cert. 47 CFR 80.903
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 January 2020
Resolution: Removed requirement. Vessel change in service.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 10 April 2018 Resolved
Program new MMSI No. 368027910. Ref. CG-652 Alert 04-11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 January 2020
Resolution: Removed requirement. Vessel change in service.
Fire Fighting › Fire Bucket › Availability
Issued 15 March 2016 Resolved
Vessel was missing required fire buckets iaw 46 CFR 181.610.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 March 2016
Resolved 28 March 2016
Resolution: Received photograph of three fire buckets onboard the vessel from o/o.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 15 March 2016 Resolved
Life preserver was unserviceable due to damage iaw 46 CFR 180.71.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 March 2016
Resolved 28 March 2016
Resolution: Received photograph of Invoice for life preserver purchase, and new life preserver installed aboard vessel.
Construction/Loadline › Hull › Side Shell
Issued 9 September 2015 Resolved
Crop and renew 15’ plank from damaged area like in kind.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 October 2015
Resolved 22 January 2016
Resolution: Plank has been replaced like in kind.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 September 2015 Resolved
Replace all electrical cable affected by water ingress like in kind.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 9 October 2015
Resolved 15 March 2016
Resolution: Witnessed satisfactory in-kind replacement of electrical cable in starboard bow region. Cable services accommodation space heater and accommodation space lighting. Operations check complete, no discrepancies noted.
Fire Fighting › Remote Fuel Shutoff › General
Issued 19 January 2012 Resolved
Secure fuel shut-off reach rod to valve on stbd side of engineroom.
Action required: 705 - Other - as specified
Due 19 February 2012
Resolved 14 March 2012
Resolution: Reach rod is secured to valve.
Construction/Loadline › Structures › Scuttle
Issued 19 January 2012 Resolved
Renew latch on emergency exit.
Action required: 705 - Other - as specified
Due 19 February 2012
Resolved 14 March 2012
Resolution: Latch renewed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 19 January 2012 Resolved
Replace all expired medication in first aid kit.
Action required: 705 - Other - as specified
Due 19 February 2012
Resolved 14 March 2012
Resolution: All expired medications have been replaced.
Accommodation/Occupational Safety › Ventilation › General
Issued 19 January 2012 Resolved
Replace battery in smoke detector for accommodations.
Action required: 705 - Other - as specified
Due 19 January 2012
Resolved 14 March 2012
Resolution: Smoke detector is operational.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 19 January 2012 Resolved
Replace 01 lifejacket and 02 lifejacket lights. Passenger count is reduced to 25 and 2 crew.
Action required: 705 - Other - as specified
Due 19 February 2012
Resolved 14 March 2012
Resolution: Lifejacket and lights have been replaced.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 19 January 2012 Resolved
Conduct sea-trials and drills to the carriage of passengers.
Action required: 705 - Other - as specified
Due 19 February 2012
Resolved 14 March 2012
Resolution: Conducted satisfactory sea-trials.
Operations/Management › Casualty Reporting/Post-Casualty Actions › Notice of Marine Casualty
Issued 31 August 2011 Resolved
Prior to the carriage of passengers, drydock vessel to conduct damage survey with attending marine inspector
Action required: 705 - Other - as specified
Due 30 September 2011
Resolved 1 September 2011
Resolution: Damage survey and drydock has been completed.
Construction/Loadline › Hull › Side Shell
Issued 31 August 2011 Resolved
Provide repair proposal for damaged area to the satisfaction of attending marine inspector and prior to the carriage of passengers.
Action required: 705 - Other - as specified
Due 30 September 2011
Resolved 7 September 2011
Resolution: Repair proposal for damaged area was provided.
Construction/Loadline › Hull › Side Shell
Issued 31 August 2011 Resolved
Affect proper repairs to damaged area to the satisfaction of attending marine inspector and prior to the carriage of passengers.
Action required: 705 - Other - as specified
Due 25 November 2011
Resolved 8 December 2011
Resolution: Repairs completed.
Construction/Loadline › Hull › Hull Plating
Issued 5 January 2011 Resolved
Must conduct underway tests prior to carrying passengers and no later than March 15th, 2011. 46 CFR 176.500 (Post wood vessel drydock)
Due 15 March 2011
Resolved 9 March 2011
Resolution: Conducted underway tests.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 9 December 2009 Resolved
Vessel's name lettering on transom is loose in areas and is falling off. Owner will repair lettering to original.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 March 2010
Resolved 10 March 2010
Resolution: Painted on letters.
Engineering › Steering Gear System › Bracket/Clamp
Issued 9 December 2009 Resolved
Hydraulic steering system foundation block was found to be loose during steering gear test. Owner will refasten foundation block.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 March 2010
Resolved 10 March 2010
Resolution: refastened with additional lag bolts.
Construction/Loadline › Structures › Door
Issued 9 December 2009 Resolved
Latches not present on both port and starboard weathertight doors leading to pilot house/accomodation space.
Action required: 705 - Other - as specified
Due 15 March 2010
Resolved 10 March 2010
Resolution: Latches renewed
Fire Fighting › Ventilation Systems › Ducts
Issued 9 December 2009 Resolved
Means to secure the open waste ventilation system were absent. In case of fire in engine space, there would be no way to secure the ventilation and therefore the fixed fire fighting system would be ineffective.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2010
Resolved 10 March 2010
Resolution: Modified gunwhale vents and provided material to insert/seal.
Construction/Loadline › Penetrations › Gasket
Issued 24 February 2009 Resolved
Renew backer pads on port ruel pump hull valve. 46 CFR 176.25-5.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 March 2009
Construction/Loadline › Penetrations › Gasket
Issued 24 February 2009 Resolved
Renew backer pad on starboard main engine raw water suction valve. 46 CFR 176.25-5
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 March 2009
Operations/Management › Drills/Instruction › Not Conducted
Issued 24 February 2009 Resolved
Conduct underway sea trail with Coast Guard inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 March 2009
Engineering › Sea-water System (primary cooling) › Piping
Issued 18 February 2009 Resolved
Non-metallic flexible hose sections leading from sea valves to strainer are cracked. Replace hose in accordance with 46 CFR 182.720.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 24 March 2009
Resolution: Owner replaced non-metallic flexible hose sections in accordance with 46 CFR 182.720.
Lifesaving › Lifebuoys › Approval
Issued 18 February 2009 Resolved
Replace ring lifebuoy to meet minimum diameter of 24 inches in accordance with 46 CFR 180.70 and 46 CFR 160.050.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Navigation › Piloting/Steering › Marine Charts
Issued 18 February 2009 Resolved
Provide charts 18521,, 18504, & 18003 & Tide Tables & Current Tables in accordance with 46 CFR 184.420. Ensure charts are current and corrected.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Communications › Radio Communications › VHF Radiotelephone
Issued 18 February 2009 Resolved
Provide current Marine Radio Operators permit in accordance with 46 CFR 184.502.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 24 March 2009
Resolution: Owner provided proof to marine inspector that Marine Operator''s Permit was valid.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 18 February 2009 Resolved
Hydro-test BII CO2 portable fire extinguisher in accordance with 46 CRF 176.810 & NFPA 10.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 18 February 2009 Resolved
Replace worn and cracked fuel line in lazarette (flexible hose) in accordance with 46 CFR 182.720(e), hose must meet comply with SAE J1942 standards.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 18 February 2009 Resolved
Electrical outlet in engine room requires a cover in accordance with 46 CFR 183.210.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 24 March 2009
Resolution: Owner supplied and installed electrical outlet cover as required by 46 CFR 183.210.
Engineering › Steering Gear System › Rudder Bearing
Issued 18 February 2009 Resolved
Retighten upper rudder bearing carrier mounting bolts in accordance with 46 CFR 182.610.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 24 March 2009
Resolution: Upper rudder bearing carrier mounting bolts were tightened by the owner to the satisfaction of the marine inspector.
Engineering › Bilge Water Management System › Piping
Issued 18 February 2009 Resolved
Re-connect bilge piping located in fore-peak in accordance with 46 CFR 182.510.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 24 March 2009
Resolution: Owner reconnected bilge piping located in the fore-peak in accordance with 46 CFR 182.510.
Accommodation/Occupational Safety › Other Accommodation Spaces › Recreation Space
Issued 18 February 2009 Resolved
Replace broken glass, starboard side of accommodation space in accordance with 46 CFR 177.800.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 18 February 2009 Resolved
Repair exhaust line containing pin holes in accordance with 46 CFR 182.430.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Engineering › Bilge Water Management System › Piping
Issued 18 February 2009 Resolved
Replace plastic tubing in submersible bilge system in accordance with 46 CFR 182.520, hose should meet standards of 46 CFR 182.520 section (f).
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Stability › Freeing Ports › General
Issued 18 February 2009 Resolved
Replace missing backflow flappers on starboard side fore and aft most scuppers in accordance with 46 CFR 178.420 (d).
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Electrical › Lighting (service) › Lighting Fixture
Issued 18 February 2009 Resolved
Cover bare bulb light fixtures in engine room with proper guards in accordance with 46 CFR 183.410.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 18 February 2009 Resolved
Provide primary lifesaving equipment not on board at time of inspection, equipment removed for maintenance. When returned must meet requirements of 46 CFR 180.200.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 11 March 2009
Engineering › Fuel Oil Storage/Transfer System › Ventilation
Issued 18 February 2009 Resolved
Replace starboard foreword fuel tank vent screen with 30x30 mesh in accordance with 46 CFR 182.450(e).
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2009
Resolved 24 February 2009
Resolution: Starboard fuel tank vent screen was replaced with approved 30x30 mesh in accordance with 46 CFR 182.450(e).
Stability › Watertight Integrity › General
Issued 6 February 2008 Resolved
Complete post drydock wood boat seatrials to the satisfaction of the attending USCG Marine Inspector, prior to the carriage of passengers.
Due 1 April 2008
Resolved 11 March 2008
Lifesaving › Inflatable Buoyant Apparatus › Servicing
Issued 14 January 2008 Resolved
Provide proof of service and proper installation for 30 person IBA, prior to the carriage of passengers.
Due 14 February 2008
Resolved 11 March 2008
Communications › Alarms/Indicators › Fire Alarm
Issued 14 January 2008 Resolved
Install an UL approved smoke detector for the berthing area, prior to the carriage of overnight passengers.
Due 14 February 2008
Resolved 11 March 2008
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 14 January 2008 Resolved
Renew broken F/O tank cutout reach rod for port F/O tank, prior to the carriage of passengers.
Due 14 February 2008
Resolved 11 March 2008
Operations/Management › Drills/Instruction › Not Conducted
Issued 21 February 2007 Resolved
Conduct post wood boat drydock seatrials, prior to the carriage of passengers.
Due 21 March 2007
Resolved 14 March 2007
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 21 February 2007 Resolved
Renew aft cutlass bearing prior to the carriage of passengers, bearing shows excessive wear and shaft play.
Due 21 March 2007
Resolved 14 March 2007
Construction/Loadline › Hull › Side Shell
Issued 24 January 2007 Resolved
Provide for inspection, and provide plans for repair to punctured plank STBD side IVO head. Temp repairs have been made. Damage is approx 2.5 ft above the waterline. To be completed prior to credit drydock 04 MAR07 to the satisfaction of the attending marine inspector.
Due 4 March 2007
Resolved 21 February 2007
Electrical › Electric Supply System (service) › Overcurrent Device
Issued 24 January 2007 Resolved
Make repairs to damaged 120vac electrical system circuit breaker panel(after inverter), Prior to completion of credit drydock 04 MAR07.
Due 4 March 2007
Resolved 21 February 2007
Resolution: Renewed, wiring corrected by electrician.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 24 January 2007 Resolved
Tighten up STBD side and upper deck, deck rails (need new base sockets), prior to completion of credit drydock 04 MAR07.
Due 4 March 2007
Resolved 21 February 2007
Resolution: Deck rail mounting sockets renewed 9 on stbd side.
Documentation › Markings/Placards › Hull Identification Number (HIN)
Issued 24 January 2007 Resolved
Properly label vessel with vessel name (missing second "O"), prior to completion of credit drydock 04 MAR07.
Due 4 March 2007
Resolved 21 February 2007
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 1 March 2006 Resolved
Repair loading step port side prior to the carriage of passengers.
Due 1 April 2006
Resolved 15 March 2006
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 1 March 2006 Resolved
Tighten stbd side deck rail, prior to the carriage of passengers.
Due 1 April 2006
Resolved 15 March 2006
Lifesaving › Inflatable Liferafts › Not on Board
Issued 1 March 2006 Resolved
Reinstall liferaft after completion of service and prior to the carriage of passengers.
Due 1 April 2006
Resolved 15 March 2006
Documentation › Logs/Records › Drug Test Records
Issued 1 March 2006 Resolved
Provide proof of current drug testing enrollment, prior to the carriage of passengers.
Due 1 April 2006
Resolved 15 March 2006
Lifesaving › Lifebuoys › Serviceable
Issued 1 March 2006 Resolved
Renew or make proper repairs to the life ring buoy prior to the carriage of passengers.
Due 1 April 2006
Resolved 15 March 2006
Communications › Radio Communications › EPIRB
Issued 1 March 2006 Resolved
Provide proof of current NOAA registration, vessel restricted from operating on the high seas until corrected.
Due 1 April 2006
Resolved 15 March 2006
Electrical › Lighting (service) › Lighting Fixture
Issued 1 March 2006 Resolved
Remove fixture or provide proper UL approved guards for cabin light fixtures prior tot the carriage of passengers.
Due 1 April 2006
Resolved 15 March 2006
Stability › Unintentional Flooding › General
Issued 10 January 2005 Resolved
Seal (3) holes in bulkhead between aft steering and engine compartment.
Due 10 February 2005
Resolved 4 March 2005
Stability › Watertight Integrity › Coaming
Issued 10 January 2005 Resolved
Prove engineroom hatch coaming to be watertight to 12 inches high, make hatch cover weathertight. (hose test) to the satisfaction of the attending marine inspector.
Due 10 February 2005
Resolved 4 March 2005
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 10 January 2005 Resolved
Install "CREW ONLY" placards at each ladder to the upper deck.
Due 10 February 2005
Resolved 4 March 2005
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 10 January 2005 Resolved
Provide a proper bell for the vessel IAW COLREGS.
Due 10 February 2005
Resolved 4 March 2005
Navigation › Piloting/Steering
Issued 21 January 2004 Resolved
Provide current magnetic compass deviation table. LEGACY COMPONENT DESC: Compass Deviation Table
Due 1 March 2004
Resolved 31 March 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 21 January 2004 Resolved
Tighten all deck rails. LEGACY COMPONENT DESC: Deck Rail
Condition: Improper/Lack of Maintenance
Due 1 March 2004
Resolved 31 March 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 21 January 2004 Resolved
Repair broken deck rail on port side aft of cabin. LEGACY COMPONENT DESC: Deck Rail
Condition: Unknown
Due 1 March 2004
Resolved 21 January 2004
Accommodation/Occupational Safety › Occupational Safety
Issued 21 January 2004 Resolved
Renew broken window port side aft cabin with approved material.
Due 1 March 2004
Resolved 31 March 2004
Communications › Alarms/Indicators
Issued 21 January 2004 Resolved
Prove operation of all bilge alarms. LEGACY COMPONENT DESC: Bilge Alarm
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 March 2004
Resolved 31 March 2004
Communications › Radio Communications
Issued 21 January 2004 Resolved
Post FCC emergency comms instruction placard at the operating station.
Due 1 March 2004
Resolved 31 March 2004
Lifesaving › Lifejacket/PFD (Type I)
Issued 21 January 2004 Resolved
Renew one rejected adult life jacket. LEGACY COMPONENT DESC: Condition
Due 1 March 2004
Resolved 31 March 2004
Stability
Issued 21 January 2004 Resolved
Post signage on both sides of cabin restricting passengers and authorizing crew only on the upper deck.
Due 1 March 2004
Resolved 31 March 2004
Engineering › Fuel Oil Storage/Transfer System
Issued 12 March 2003 Resolved
Prove proper operation of the emergency fuel shut-off valves. LEGACY COMPONENT DESC: Valve
Due 22 March 2003
Resolved 24 March 2003
Engineering › Steering Gear System
Issued 12 March 2003 Resolved
Prove proper operation of the vessel's main steering system.
Due 22 March 2003
Resolved 24 March 2003
Engineering › Fuel Oil Storage/Transfer System
Issued 18 February 2003 Resolved
Install proper diesel fuel lines (port and starboard return lines in way of new tanks) Fuel lines must be ferrous material or approved non-metallic material meeting SAE-J1942 standards. 46CFR182.720 LEGACY COMPONENT DESC: Piping
Condition: Improper Installation
Due 18 March 2003
Resolved 12 March 2003
Resolution: Fuel lines were replaced with copper piping.
Electrical › Electric Supply System (service)
Issued 18 February 2003 Resolved
Remove electrical cable runs secured on fuel piping and properly support runs independently. Also properly secure cable runs displaced as a result of new fuel tank installations (bilge high level alarm in lazarette, tank grounding cables, and wash down pump). LEGACY COMPONENT DESC: Cable
Condition: Improper Installation
Due 18 March 2003
Resolved 12 March 2003
Resolution: Verified electrical cables were no longer secured to fuel piping. All were supported properly.
Communications › Alarms/Indicators
Issued 18 February 2003 Resolved
Repair or renew high level alarm in lazarette and prove proper operation. LEGACY COMPONENT DESC: Bilge Alarm
Condition: Unknown
Due 18 March 2003
Resolved 12 March 2003
Resolution: Verified proper operation of the lazarette high-level alarm.
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 28 January 2002 Resolved
Prove proper operation of engine shutdown with fixed fire extingushing agent. 46CFR181.410 To be completed prior to the carriage of passengers.
Condition: Unknown
Due 15 April 2002
Resolved 9 April 2002
Construction/Loadline › Penetrations
Issued 28 January 2002 Resolved
Seal holes in bulkhead between engine room and steering compartment. 46CFR176.610 To be completed prior to the carriage of passengers.
Due 15 April 2002
Resolved 9 April 2002
Engineering › Fuel Oil Service System
Issued 28 January 2002 Resolved
Provide proper bonding of the fwd port fuel tank. 46CFR182.440(b)4 Must be completed prior to the carriage of passengers. LEGACY COMPONENT DESC: Tank
Condition: Unknown
Due 15 April 2002
Resolved 9 April 2002
Construction/Loadline › Structures
Issued 28 January 2002 Resolved
Replace door leading into accommodations space. 46CFR177.500 Complete prior to the carriage of passengers. LEGACY COMPONENT DESC: Door
Condition: Damaged By Earlier Event
Due 15 April 2002
Resolved 9 April 2002
Electrical › Electric Supply System (service)
Issued 28 January 2002 Resolved
Properly secure inverter batteries in battery trays. 46CFR183.350 Must be completed prior to the carriage of passengers. LEGACY COMPONENT DESC: Battery Installation
Condition: Improper Installation
Due 15 April 2002
Resolved 9 April 2002
Operations/Management › Drills/Instruction
Issued 28 January 2002 Resolved
Conduct fire and man overboard drills prior to the carriage of passengers. LEGACY COMPONENT DESC: Fire
Condition: Unknown
Due 15 April 2002
Resolved 24 April 2002
Documentation
Issued 27 March 2001 Resolved
Place oil pollution placard in Engine Room as per MARPOL regulations.
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Navigation
Issued 27 March 2001 Resolved
As per 46CFR184.420, update current Coast Pilot & Light List.
Condition: Unknown
Due 10 April 2001
Resolved 10 April 2001
Electrical
Issued 26 February 1999 Resolved
PROVIDE PROPER SUPPORTS FOR ELECTRICAL WIRES IN CENTER COMPARTMENT.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Engineering
Issued 26 February 1999 Resolved
REATTACH FUEL TANK FILLER PORT BONDING STRAP.
Condition: Unknown
Due 30 March 1999
Resolved 30 March 1999
Construction/Loadline
Issued 26 February 1999 Resolved
PROVIDE PLANS FOR APPROVAL OF REPAIRS TO PORTSIDE HULL PLANKS. PLANS MUST BE APPROVED PRIOR TO COMMENCING REPAIRS.
Condition: Unknown
Due 24 March 1999
Resolved 24 March 1999
Accommodation/Occupational Safety
Issued 19 February 1999 Resolved
MARK DOOR LEADING TO EMERGENCY ESCAPE TO INDICATE THIS DOOR IS AN EXIT TO EMERGENCY ESCAPE.
Condition: Unknown
Due 19 February 1999
Resolved 19 February 1999
Lifesaving
Issued 19 February 1999 Resolved
INSTALL RETRO IN 6 LOCATIONS AROUND LIFEFLOAT TO COVER FRONT AND BACK SIDE.
Condition: Unknown
Due 19 February 1999
Resolved 19 February 1999
Lifesaving
Issued 19 February 1999 Resolved
PROPERLY MARK VESSEL NAME ON BOTH SIDES OF PFD'S AND SEPARATE CHILD PFD'S FROM ADULT PFD'S.
Condition: Unknown
Due 19 February 1999
Resolved 19 February 1999
Engineering
Issued 19 February 1999 Resolved
PROVIDE SECOND MEANS OF CONTROL FOR PROPULSION AND DEMONSTRATE OPERATION INPRESENCE OF COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 19 February 1999
Resolved 19 February 1999
Unknown
Issued 26 February 1998 Resolved
PROVIDE UP TO DATE CHARTS AND LIGHTLIST FOR AREA OF OPERATION PRIOR TO OPERATION.
Condition: Unknown
Due 26 February 1998
Resolved 26 February 1998
Unknown
Issued 26 February 1998 Resolved
PROVE PROPER OPERATION OF SSB RADIO PRIOR TO UPGRADING TO OCEANS ROUTE.
Condition: Unknown
Due 23 March 1998
Resolved 23 March 1998
Unknown
Issued 26 February 1998 Resolved
PROVIDE SAFETY RADIO CERTIFICATE THAT SHOWS SSB RADIO INSTALLATION.
Condition: Unknown
Due 26 February 1998
Resolved 26 February 1998
Lifesaving
Issued 21 February 1997 Resolved
PROVIDE LIFEJACKET DONNING INSTRUCTION PLACARD._x001C_
Condition: Unknown
Due 21 February 1997
Resolved 21 February 1997
Unknown
Issued 21 February 1997 Resolved
PROVIDE A COAST GUARD APPROVED FIRST AID KIT OR EQUIVALENT.
Condition: Unknown
Due 21 February 1997
Resolved 21 February 1997
Accommodation/Occupational Safety
Issued 21 February 1997 Resolved
TIGHTEN THE DECK RAILS TO PROVIDE ADEQUATE SUPPORT.
Condition: Unknown
Due 21 February 1997
Resolved 21 February 1997
Lifesaving
Issued 21 February 1997 Resolved
STENCIL THE VESSEL NAME ON THE EPIRB.
Condition: Unknown
Due 21 February 1997
Resolved 21 February 1997
Accommodation/Occupational Safety
Issued 21 February 1997 Resolved
STENCIL THE REQUIRED WARNINGS ON BOTH SIDES OF THE FORWARD ESCAPE HATCH.
Condition: Unknown
Due 21 February 1997
Resolved 21 February 1997
Lifesaving
Issued 21 February 1997 Resolved
PROVIDE A BRIGHT COLORED CONTAINER FOR THE DISTRESS FLARES.
Condition: Unknown
Due 21 February 1997
Resolved 21 February 1997
Construction/Loadline
Issued 21 February 1997 Resolved
PROVIDE A RETAINING CHAIN FOR THE STEERING COMPARTMENT HATCH COVER.
Condition: Unknown
Due 21 February 1997
Resolved 21 February 1997
Unknown
Issued 29 May 1996 Resolved
RENEW ALL DAMAGED ELECTRICAL WIRING AND EQUIPMENT, AND OTHER FIRE DAMAGED EQUIPMENT AS NECESSARY. THIS IS TO BE COMPLETED PRIOR TO OPERATION OF VESSEL.
Condition: Unknown
Due 29 May 1996
Resolved 29 May 1996
Unknown
Issued 28 February 1995 Resolved
Complete satisfactory underway test prior to carrying passengers for hire.
Condition: Unknown
Due 10 March 1995
Resolved 10 March 1995
Lifesaving
Issued 28 February 1995 Resolved
Permanently replace lifeline on life ringbuoy
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Lifesaving
Issued 28 February 1995 Resolved
Permanently attach waterlight to ring buoy.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Lifesaving
Issued 28 February 1995 Resolved
Permanently attach water light to buoyant apparatus
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Engineering
Issued 28 February 1995 Resolved
Permanently attach flame inpengiment disk to port and stbd fuel filters.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Electrical
Issued 28 February 1995 Resolved
Provide permanent cover for port and stbd battery boxes.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Construction/Loadline
Issued 28 February 1995 Resolved
MAKE PERMANENT REPAIRS TO FRACTURED FRAME ON STBD SIDE, SECOND COMPARTMENT AFT, ADJACENT HEAD.
Condition: Unknown
Due 9 March 1995
Resolved 9 March 1995
Lifesaving
Issued 18 March 1993 Resolved
PROVIDE FRESH FLASHLIGHT BATTERIES.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Fire Fighting
Issued 18 March 1993 Resolved
PROPERLY SERVICE ALL PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Accommodation/Occupational Safety
Issued 18 March 1993 Resolved
PROVIDE EMERGENCY CHECK OFF LIST.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Lifesaving
Issued 18 March 1993 Resolved
PROVIDE RING BUOY OF GOFT LINE AND LIGHT.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Lifesaving
Issued 18 March 1993 Resolved
PROVIDE WATER LIGHT FOR LIFEFLOAT.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Engineering
Issued 18 March 1993 Resolved
PROVIDE FLAME IMPINGEMENT BOWL FOR FUEL FILTER.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Lifesaving
Issued 18 March 1993 Resolved
PROVIDE 6 RED, 6 ORANGE FLARES.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Documentation
Issued 18 March 1993 Resolved
PROVIDE PROOF OF DRUG TESTING PROGRAM.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Documentation
Issued 18 March 1993 Resolved
PROVIDE OIL DISCHARGE PLACARD.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Engineering
Issued 18 March 1993 Resolved
TEST ENGINE OF BILGE SYSTEM.
Condition: Unknown
Due 29 March 1993
Resolved 29 March 1993
Documentation
Issued 30 January 1992 Resolved
CONDUCT SIMPLIFIED STABILITY TEST FOR EXPOSED WATERS.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Engineering
Issued 30 January 1992 Resolved
INSTALL FLAMEPROOF HOUSING FOR FOUR REMOTE FUEL SHUT-OFF HANDLES.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Documentation
Issued 30 January 1992 Resolved
OBTAIN CURRENT COPY OF SUBCHAPTER T.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Unknown
Issued 30 January 1992 Resolved
COMPLETE OPERATIONAL TEST OF PROPULSION, BILGE PUMPS, NAVIGATION GEAR, ELECTRICAL SYSTEMS AND STEERING SYSTEM.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Engineering
Issued 3 January 1991 Resolved
REPLACE MAIN ENGINE SEA SUCTION VALVE.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Construction/Loadline
Issued 3 January 1991 Resolved
MAKE VESSEL AVAILABLE FOR SEA TRIALS PRIOR TO CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Construction/Loadline
Issued 3 January 1991 Resolved
PROVE WATERTIGHTNESS OF ENGINE HATCH IN PRESENCE OF CG INSPECTOR.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Construction/Loadline
Issued 16 March 1989 Resolved
PROVIDE A GASKET FOR HATCH COVER LOCATED IN COLLISION BULKHEAD AND MAKE WATERTIGHT.
Condition: Unknown
Due 16 March 1989
Resolved 16 March 1989
Construction/Loadline
Issued 11 May 1988 Resolved
CONDUCT SEA TRIALS IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 11 May 1988
Resolved 11 May 1988
Fire Fighting
Issued 19 May 1986 Resolved
PROVIDE AN ADDITIONAL B-II FIRE EXTINGUISHER FOR PROTECTION OF OIL FIRED STOVE.
Condition: Unknown
Due 19 May 1986
Resolved 19 May 1986
Navigation
Issued 11 April 1985 Resolved
INSTALL AND DEMONSTRATE OPERATION OF ALL ELECTRONIC NAVIGATIONAL GEAR INCLUDING VHF.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985
Electrical
Issued 11 April 1985 Resolved
PROVIDE OVERCURRENT PROTECTION FOR RADAR WIRING ON PORT BATTERY.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985
Electrical
Issued 11 April 1985 Resolved
REMOVE UNUSED WIRING FROM STARBOARD SIDE OF ENGINE IN WAY OF BATTERY.
Condition: Unknown
Due 11 April 1985
Resolved 11 April 1985

Casualty record · 1

30 August 2011Routine · role: Involved in a Marine Casualty · activity 4142965
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.