Records from 1985 to 2009. Most recent: inspection, 3 July 2009.
Inspection history · 54
3 July 2009
Deficiency Check · Damage Survey · Spot Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3522158
5 June 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3228055
8 February 2008
COI Inspection · Hull Examination · MTSA Verification · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3134243
1 June 2007
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2952049
17 May 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2936334
15 May 2007
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2931355
28 April 2006
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2634900
23 February 2006
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2590490
12 February 2006
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2584506
26 July 2005
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2439439
9 May 2005
Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2352851
10 September 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2192436
20 July 2004
MTSA Verification · Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2135257
30 June 2004
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2116026
6 April 2004
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2234588
30 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1999726
19 November 2003
Administrative Inspection
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1951325
29 July 2003
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1861700
14 January 2003
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1734983
9 December 2002
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1716515
26 July 2002
Deficiency Check · Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1670802
22 February 2002
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1494340
13 July 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1067638
30 April 2001
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1391568
1 October 1999
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1122154
10 December 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 813225
23 April 1998
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1388539
7 May 1997
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1411430
4 August 1996
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 33378
29 April 1996
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1463240
14 March 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 118574
28 April 1995
Re-Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1470410
30 June 1994
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1463839
22 September 1993
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1157556
6 August 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 846682
9 July 1993
Hull Examination · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1409008
22 July 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1456070
2 July 1992
Examination of Repairs · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1408902
19 July 1991
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 940018
22 October 1990
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 916620
22 June 1990
COI Inspection · Inclining Experiment · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1246148
11 June 1990
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 931498
17 May 1989
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 893793
12 April 1988
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1038907
25 September 1987
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1318577
7 June 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1028873
10 April 1987
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1316468
6 February 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1014787
6 February 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1014893
6 February 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1014897
30 October 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1012413
13 September 1986
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1314114
6 November 1985
Persons In Addition to Crew
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 990034
21 March 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1288940
Construction/Loadline › Structures › Deck Plating
Issued 3 July 2009
Resolved
2ft x 10 ft of deck plate, Forecastle, IWO 3 ft aft of stem, from bulwarks to 2ft inboard starboard side. buckled due to collision.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 13 July 2009
Resolution: repaired
Construction/Loadline › Hull › Hull Plating
Issued 3 July 2009
Resolved
4 ft x 19ft bulwark hull plating, forecastle, strb side, 3 ft aft of stem, 3 ft of deflection due to collision.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 13 July 2009
Resolution: Repaired
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 July 2009
Resolved
Longitudinal flange beam, strb chain locker 3/8" x 5" x 14ft x 10.6 ft crop and renew, main structural long beam. Wasted beyond limits.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 13 July 2009
Resolution: Repaired
Construction/Loadline › Hull › Stiffener
Issued 3 July 2009
Resolved
4 ea 3/8" x 3" x 10" Flange beam stiffeners, strb bulwarks, forecastle.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 13 July 2009
Resolution: Repaired
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 3 July 2009
Resolved
26ft of handrail capping the bulwarks, strb side forecastle, crop and renew, 3" - sch80 pipe.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 14 July 2009
Resolution: repaired
Construction/Loadline › Hull › Stiffener
Issued 3 July 2009
Resolved
Aft most verticle stiffner/angle, strb side chain locker, wasted beyond limit. crop and renew, 3/8" x 3" x 4" x 10.6 ft.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 13 July 2009
Resolution: Repaired
Construction/Loadline › Hull › Stringer
Issued 3 July 2009
Resolved
10ft of overhead stringer, strb side, chain locker, buckled due to collision. 3/8" x 3" x 5"
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 July 2009
Resolved 13 July 2009
Resolution: repaired
Construction/Loadline › Penetrations › Weld
Issued 3 July 2009
Resolved
Hawser pipe starboard chain locker, weld fracture on foundation, gouge and reweld if possible, if not crop and insert.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 13 July 2009
Resolution: repaired
Engineering › Steering Gear System › Linkage
Issued 1 June 2007
Resolved
Replace cotter pins on port steering ram and rudder arm.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2007
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 1 June 2007
Resolved
Remove all combustible materials and aerosol cans from engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2007
Engineering › Generator (propulsion-electric) › Indicator Circuitry
Issued 1 June 2007
Resolved
Replace or repair both generator tachometers.
Action required: 705 - Other - as specified
Due 1 July 2007
Resolved 29 June 2007
Fire Fighting › Ventilation Systems › Ducts
Issued 1 June 2007
Resolved
Clean vent screen just aft of anchor windlass.
Action required: 705 - Other - as specified
Due 1 July 2007
Resolved 4 June 2007
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 15 May 2007
Resolved
Make permanent repairs to bulkhead wastage separating the potable water and dirty oil tanks.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 May 2007
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 23 February 2006
Resolved
Complete a post casualty damage survey, inspection of repairs and systems operation verification of all equipment damage in flooding of the engine room resulting from a propulsion shaft coupling failure.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 March 2006
Resolution: [name withheld] completed a satisfactory repair inspection.
Construction/Loadline › Hull › Stiffener
Issued 20 July 2004
Resolved
Crop and renew addtional side stiffeners as required.
Due 20 August 2004
Resolved 28 July 2004
Construction/Loadline › Hull
Issued 9 December 2002
Resolved
PROCEED IMMEDIATELY TO FIRST WAVE, PELICAN ISLAND, GALVESTON, TEXAS TO AFFECT REPAIRS TO THE PORT AND STARBOARD #3 AND #4 BALLAST TANKS.
Due 15 December 2002
Resolved 14 January 2003
Construction/Loadline
Issued 9 December 2002
Resolved
PROVIDE [name withheld], A REPAIR PROPOSAL.
Due 15 December 2002
Resolved 14 January 2003
Construction/Loadline
Issued 9 December 2002
Resolved
PRIOR TO MAKING REPAIRS, MAKE AVAILABLE PORT AND STARBOARD #3 AND #4 BALLAST TANKS FOR INSPECTION.
Due 15 December 2002
Resolved 14 January 2003
Operations/Management
Issued 9 December 2002
Resolved
VESSEL IS PROHIBITED FROM OPERATION.
Due 15 December 2002
Resolved 14 January 2003
Electrical
Issued 4 September 2002
Resolved
Prove proper operation of ground fault detection system.
Due 13 September 2002
Resolved 31 October 2002
Construction/Loadline
Issued 26 July 2002
Resolved
Crop and renew hause pipe starboard anchor.
Due 26 August 2002
Resolved 4 September 2002
Resolution: Hause pipe renewed.
Construction/Loadline
Issued 26 July 2002
Resolved
Remove water from steering gear room.
Due 26 August 2002
Resolved 4 September 2002
Construction/Loadline
Issued 26 July 2002
Resolved
Guage aft bulkhead of steering gear room.
Due 26 August 2002
Resolved 4 September 2002
Resolution: Cited guaging report. Issued requirement to crop and renew bulkhead. New requirement listed with this case.
Construction/Loadline
Issued 26 July 2002
Resolved
Guage inner bulkheads (longitudinal) of #2 and #3 ballast tanks. Requirement extended from 26 August inspection.
Due 4 November 2002
Resolved 31 October 2002
Construction/Loadline
Issued 26 July 2002
Resolved
Crop and renew longitudinal frame forward of rudder post port side.
Due 26 August 2002
Resolved 4 September 2002
Resolution: Witnessed sat repair.
Construction/Loadline
Issued 26 July 2002
Resolved
Crop and renew bracket port side steering gear room.
Due 26 August 2002
Resolved 4 September 2002
Resolution: Witnessed sat repair.
Construction/Loadline
Issued 26 July 2002
Resolved
Crop and renew starboard stack as identified.
Due 26 August 2002
Resolved 4 September 2002
Resolution: Witnessed sat repair.
Construction/Loadline
Issued 26 July 2002
Resolved
Crop and renew bulkhead @ frame 69 steering gear room (rudder room).
Due 4 November 2002
Resolved 31 October 2002
Resolution: Conducted air testing of new bulkhead, sat.
Documentation
Issued 30 April 2001
Resolved
PROVIDE APPROVED VESSEL PLANS TO THE COAST GUARD TO THE SATISFACTION OF THECOGNIZANT OFFICER IN CHARGE MARINE INSPECTION.
Condition: Unknown
Due 30 April 2001
Resolved 30 April 2001
Fire Fighting
Issued 23 April 1998
Resolved
SERVICE AND PROVIDE REPORT, ALL FIRE EXTINGUISHERS.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Construction/Loadline
Issued 23 April 1998
Resolved
REMOVE ALL UNUSED STANDOFFS IN TUNNEL.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Deck/Cargo
Issued 23 April 1998
Resolved
MAKE PERMANENT REPAIRS TO FLAME SCREEN ASSEMBLIES AS NEEDED.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PROPERLY LABEL ALL BREAKERS ON SWITCHBOARD.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
REMOVE ALL OIL AND DEBRIS FROM ENGINE ROOM BILGE.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Fire Fighting
Issued 23 April 1998
Resolved
PROVIDE TWO ADDITIONAL LENGTHS (50') OF 1 1/2" FIRE HOSE.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
SECURE ALL LOOSE DECK PLATES.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
REPAIR HOLES AND RELINE WITH LEAD OR EQUIVALENT, ALL BATTERY BOXES IN ENGINE ROOM.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
MAKE PERMANENT REPAIRS TO DIRTY OIL DISCHARGE PUMP CONTROLLER.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROVIDE OR SUBMIT FOR APPROVAL, ALL AUTOMATION TEST PROCEDURES
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Engineering
Issued 23 April 1998
Resolved
REMOVE PETCOCKS FROM STARBOARD GENERATOR FUEL OIL FILTER.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PROVIDE ADDITIONAL MATTING IN FRONT OF SWITCHBOARD.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Documentation
Issued 23 April 1998
Resolved
PROVIDE STCW CERTIFICATES OR FOREIGN EQUIVALENT FOR LIFEBOATMEN (2 EA).
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Documentation
Issued 23 April 1998
Resolved
PROVIDE CURRENT EDITIONS OF 46 CFR SUBCHAPTERS F AND W AND 33 CFR PARTS _x001C_ 1-124.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Deck/Cargo
Issued 23 April 1998
Resolved
HYDRO TEST ALL CARGO TRANSFER HOSES.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Navigation
Issued 23 April 1998
Resolved
REMOVE UNUSED STEERING SELECTOR AND/OR AUTO PILOT SWITCHES.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Navigation
Issued 23 April 1998
Resolved
PROVE PROPER OPERATION OF STEERING SYSTEM IN ALL MODES, FROM ALL STATIONS. VESSEL NOT TO SAIL UNTIL ITEM IS CLEARED.
Condition: Unknown
Due 8 May 1998
Resolved 8 May 1998
Navigation
Issued 23 April 1998
Resolved
PROVIDE UPDATED CHARTS OF ALL OPERATING AREAS. CHARTS MUST BE FROM RECOGNIZED SOURCE.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Fire Fighting
Issued 23 April 1998
Resolved
PROVIDE PROPER BRACKETS FOR FIRE EXTINGUISHERS AND PROPERLY MARK SAME.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PROPERLY LABEL ALL DISTRIBUTION PANELS AND SWITCHBOARD IN ACCORDANCE WITH 46 CFR SUBCHAPTER J.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PROVE PROPER OPERATION OF STARBOARD GENERATOR GOVERNOR.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROPERLY STENCIL ALL FIRE STATIONS.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROPERLY STENCIL ALL RING BOUYS AND LOCATIONS.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
REMOVE GEAR AND PARTS FROM ESCAPE TRUNKS.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
MAKE PERMANENT REPAIRS TO FORWARD BLOWER CONTROLLER IN STARBOARD ESCAPE TRUNK FROM ENGINE ROOM.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
REMOVE CARPET HANGING OVER FLYWHEEL ON STARBOARD MDE. REPLACE SEAL IF NECESSARY TO PREVENT SLINGING OIL.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PLUG ALL KNOCKOUTS WHICH HAVE BEEN REMOVED FROM CONTROLLERS AND ELECTRICAL BOXES AND NOT UTILIZED.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROPERLY MOUNT POTABLE WATER PUMP.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROVIDE 3 EACH ADDITIONAL LIFE PRESERVERS W/ LIGHTS. VESSEL IS LIMITED TO 11 PERSONS IN ADDITION TO CREW UNTIL THIS ITEM IS CLEARED.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROVIDE CLIPS FOR ATTACHING WATERLIGHTS TO RING BOUYS.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
RENEW LIFTING STRAP ON RESCUE BOAT.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
RENEW OARLOCKS ON RESCUE BOAT.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
MAKE REPAIRS TO ALLOW PROPER PLACEMENT OF BOAT PLUG.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROVIDE 5 EA. ADDITIONAL DISTRESS FLARES APPROVED UNDER 46 CFR 160.136.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Fire Fighting
Issued 23 April 1998
Resolved
PROVIDE AND POST WATCH QUARTER AND STATION BILL IN SPANISH.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
POST EMERGENCY INSTRUCTIONS IN ENGLISH AND SPANISH.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PROVIDE PROPER GLOBES AND CAGES THROUGHOUT VESSEL.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PROVIDE COVERS FOR VANITY LIGHTS IN ALL ACCOMODATION SPACES.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Fire Fighting
Issued 23 April 1998
Resolved
PROVIDE MEANS TO START FIREPUMP AND GUAGE FOR FIREMAIN PRESSURE IN PILOT HOUSE.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
HYDRO TEST AND REFILL SCBA BOTTLES.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROVIDE ADDITIONAL SCBA WITH EXTRA BOTTLE.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Lifesaving
Issued 23 April 1998
Resolved
PROVIDE TWO FIREMANS OUTFITS IAW 46CFR96.35-10.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Electrical
Issued 23 April 1998
Resolved
PROVE PROPER OPERATION OF STARBOARD GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Construction/Loadline
Issued 23 April 1998
Resolved
MAKE PERMANENT REPAIRS TO KNIFE EDGES ON BOTH ENGINE ROOM ESCAPE HATCHES.
Condition: Unknown
Due 23 April 1998
Resolved 23 April 1998
Documentation
Issued 7 May 1997
Resolved
PROVIDE DOCUMENTATION THAT PROVIDES A STABILTY REVIEW AND WEIGHT LIMITATIONS OF CARGO PLACED ON NEW ELEVATED DECK (AFT OF HOUSE). NO CARGO IS TO BE CARRIED ON THIS DECK UNTIL CLEARED.
Condition: Unknown
Due 7 May 1997
Resolved 7 May 1997
Documentation
Issued 9 July 1993
Resolved
UPDATE OIL TRANSFER PROCEDURES IN ACCORDANCE WITH 33 CFR 155.750.
Condition: Unknown
Due 9 August 1993
Resolved 9 September 1993
Electrical
Issued 9 July 1993
Resolved
REPAIR OR REPLACE REVERSE POWER RELAY. THE MANUAL LOCK-OUT BAR IS TO REMAININ PLACE AND GENERATORS ARE NOT TO BE PARALLELED UNTIL REPAIRS ARE MADE.
Condition: Unknown
Due 9 July 1993
Resolved 9 July 1993
Deck/Cargo
Issued 13 September 1986
Resolved
VESSEL SHALL NOT CARRY ANY BULK CARGO UNTIL RELIEF VALVES ARE INSTALLED ON THE BULK TRANSFER SYSTEM.
Condition: Unknown
Due 13 September 1986
Resolved 13 September 1986