Records from 1998 to 2025. Most recent: inspection, 15 April 2025.
Inspection history · 49
15 April 2025
Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8099875
8 October 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8015581
25 March 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7884818
16 March 2024
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7921414
20 February 2024
Damage Survey · Administrative Inspection · Plan Review (Other than "T") · Deadweight Survey
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7857884
2 August 2023
Administrative Inspection · Construction Oversight · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7758519
26 January 2023
Administrative Inspection · Internal Structural Exam · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7624594
21 November 2022
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7597922
21 December 2021
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7371225
8 December 2020
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7104539
25 October 2019
Administrative Inspection · Annual Inspection · Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6842187
27 March 2019
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6650421
26 October 2018
MTSA Verification · COI Inspection · Security Plan Amendment Review - VSP · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6568136
18 January 2018
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6342625
22 December 2017
Internal Structural Exam · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6327873
31 October 2017
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6298310
18 November 2016
Periodic Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6043765
30 December 2015
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5788778
23 November 2015
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5768949
17 April 2015
Administrative Inspection
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5105049
20 November 2014
MARPOL Annex I Examination · Drydock Exam · Annual Inspection · MARPOL Annex VI Survey · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5026918
5 November 2013
COI Inspection · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4747261
27 August 2013
MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4698306
3 July 2013
MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4640594
2 July 2013
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4640647
18 September 2012
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4449157
11 January 2012
MTSA/ISPS Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4223052
22 December 2011
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4213289
9 November 2011
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4194395
20 September 2011
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4152810
12 November 2008
MARPOL Annex I Examination · COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3361682
14 July 2008
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3267866
15 November 2007
Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3099344
7 February 2007
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2868280
2 February 2007
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2865901
10 January 2007
Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2936492
8 May 2006
MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2643890
21 March 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2606620
15 November 2005
Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2535159
3 November 2004
Internal Structural Exam · COI Inspection · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2234227
3 February 2004
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1999487
25 November 2003
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1954835
4 November 2003
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1941982
19 November 2002
Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1707465
16 October 2001
Re-Inspection · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1074572
27 October 2000
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1452725
6 April 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1050100
2 November 1999
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1469607
5 November 1998
Initial Certification · Hull Examination · MARPOL Annex II Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1368929
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 8 October 2024
Resolved
#1 Void stbd center, aft bulkhead in front of ladder, through hole into void #2; crop and renew.
Action required: 705 - Other - as specified
Resolved 22 October 2024
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 8 October 2024
Resolved
#2 Void port center, behind ladder, clad weld crop and renew.
Action required: 705 - Other - as specified
Resolved 22 October 2024
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 8 October 2024
Resolved
In Void 05P, docking plug is suspect. Conduct vacuum box test on docking plug to confirm watertightness.
Action required: 705 - Other - as specified
Resolved 22 October 2024
Resolution: Prior to ISE credit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 March 2024
Resolved
Specific tests and inspections shall be made by the
inspector.For marine engineering equipment see
subchapter F, for electrical Engineering equipment see
subchapter J. Two new 100KW Generators were installed and a 42KW removed, test installation to satisfaction of
attending USCG MI, prove over current protection is
satisfactory for downstream conductor(s).
Action required: 60 - Rectify deficiencies prior to movement
Due 25 March 2024
Resolved 27 March 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 March 2024
Resolved
In the event of alterations involving the safety of the
vessel, the applicable plans shall be submitted for
approval covering the proposed work except as modified
by § 91.45–1. The general scope of the plans shall be as
noted in § 91.55–5. Added FOSS PAM, changed electrical
installation, replaced generators not in kind. Obtain
approved; barge electrical one-line plan for the
modified section, General Arrangement plan, FCP, & Sea
Fastening plan that reflect new PAM and generator(s).
The PAM installations have been inspected to plans as
submitted. PAM is missing fasteners on the aft inboard corner, weld fasteners to corner as per Fastening Plan. New Generator one-line has not been submitted, generator testing prior to ops is covered by separate 835.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 16 May 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 25 March 2024
Resolved
Each hatch exposed to the weather must be watertight. Nuts missing/loose on ballast tank hatches. Tighten/replace nuts to ensure hatches remain watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 27 March 2024
08 - Alarms › N/A - No Subsystem › General alarm
Issued 25 March 2024
Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter J. Prove proper operation of the general alarm system in the PAM on the aft port side deck. Lockout/tag out PAM, Correct prior to usage.
Action required: 705 - Other - as specified
Due 25 March 2024
Resolved 27 March 2024
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 25 March 2024
Resolved
There shall be at least two means of escape from all general areas accessible where the crew may be quartered or normally employed. Emergency escape for the upper standard feeeder PAM is held in place with a nylon strap. Provide a suitable fastening device that will not easily fail as a turnbuckle/chain or similar to secure.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 April 2024
Resolved 27 March 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 21 March 2024
Resolved
Crop and renew aprox. 4'x7' section of side shell and side shell longitudinals #3 and #4 in bay #3 in #2 stbd void where inset and damaged prior to next credit drydock.
Action required: 705 - Other - as specified
Due 30 November 2024
Resolved 22 October 2024
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 20 March 2024
Resolved
A survey, either general or partial, according to the circumstances,shall be made every time an accident
occurs or a defect is discovered which affects the safety of the vessel. Gas free and make safe for workers certified by a Marine Chemist the #2 stbd void. Make #2 stbd void available for inspection by a USCG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Due 20 March 2024
Resolved 21 March 2024
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 2 August 2023
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with Sub-chapter J (Electrical Engineering) of this chapter. Provide MSC approved electrical plans to OCMI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2023
Resolved 5 March 2024
01 - Certificates & Documentation › 013 - Documents › Shipboard working arrangements
Issued 2 August 2023
Resolved
No repairs or alterations affecting the safety of the vessel may be made without OCMI notification, plans are
required for all modification not in-kind. Provide USCG MSC approval for new Barge Master PAM (constructed after 2016), Obtain CG# from local OCMI for existing Barge Master PAM (constructed prior to 2016).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2023
Resolved 17 October 2024
Resolution: New PAM not approved insufficient structures. Accepted for SEC SE NE Zone for current South Fork Project NMT 50NM FROM SHORE AND OCCUPIED ONLY WHILE MOORED TO AN INSTALLATION VESSEL. BOTH NEW AND OLD PAMS ISSUED CG#S TO DOCUMENT ALLOWED USE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 August 2023
Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., shall be in compliance with Sub-chapter F. Install generator set racor fuel filter switch approved type (metal lower bowl or attached with metal flame impingement shield).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 September 2023
Resolved 6 October 2023
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 February 2023
Resolved
Marine Inspector identified deflected frame and gusset in #3 stbd void forward.
Submit plan proposal for repairs.
Action required: 705 - Other - as specified
Due 30 November 2024
Resolved 22 October 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 February 2023
Resolved
Marine Inspector identified deflected frame, tripping bracket, and side shell on the aft port and stbd corners of the barge.
Submit plan proposal for repairs.
Action required: 705 - Other - as specified
Due 30 November 2024
Resolved 22 October 2024
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 2 February 2023
Resolved
Marine Inspector identified washed out welds in #6 STB tank on the bottom shell between the 3rd and 4th transverse frames on the inboard side of the space, and in the #2 STB void on the bottom shell near the bottom of the aft ladder.
Submit plan proposal for repairs.
Action required: 705 - Other - as specified
Due 30 November 2024
Resolved 22 October 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 December 2021
Resolved
Coamings and hatchway covers to exposed hatchways on decks above the superstructure deck shall comply with the requirements of the assigning authority. 01 Hatch cover was found to be missing a stud, preventing it from being completely secured to the deck and watertight.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 January 2022
Resolved 31 December 2021
Resolution: Repaired studs on manhole covers.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 8 December 2020
Resolved
Vessels carrying oil as secondary cargo must carry appropriate equipment and supplies for the containment and removal of on-deck oil cargo spills of at least one-half barrel.
Containment kit was wasted and water soaked.
Replace containment kit equipment and supplies.
Rectify w/in 7days.
33 CFR 155.220 (a)
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 December 2020
Resolved 9 December 2020
Resolution: A new spill kit spill kit was ordered and placed into service by operator.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 19 November 2019
Resolved
Before issuing a certificate or placement of load line marks on a vessel, the assigning and issuing authorty shall make an intitial or periodic survey of the vessel as requied by this subchapter. ABS shall complete the load line survey and ensure the load line markings are completed.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 19 December 2019
Resolved 10 December 2019
Resolution: ABS issued Load line Certificate and hull markings were completed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 26 October 2018
Resolved
The port and stbd fore and aft draft marks are no longer painted below the 9ft mark. Ensure all draft marks are appropriately painted in contrasting color to the hull.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 November 2018
Resolved 7 November 2018
Resolution: Painted Draft Marks
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 26 October 2018
Resolved
The port side draft mark, draft line, and deck line are no longer painted. Ensure all marks and lines are painted in accordance with 46 CFR 42.13-40.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 November 2018
Resolved 7 November 2018
Resolution: Painted Markings
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 26 October 2018
Resolved
Several void hatch covers have broken studs. Replace as appropriate: Void 2P, Void 3S (aft), Void 4S (aft), and Void 6S (fwd).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 November 2018
Resolved 7 November 2018
Resolution: Replaced all missing studs
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 30 December 2015
Resolved
8ft draft mark on the bow is being rubbed off and needs to be repainted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 30 December 2015
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 December 2015
Resolved
Navigation lights need a flat black backing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 30 December 2015
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 30 December 2015
Resolved
Hatch cover for 7stbd and 6port need to be resealed and all bolts tightened down.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 30 December 2015
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 30 December 2015
Resolved
Rails need to be refitted with 3 courses instead of 2. Replace or repair 3 stanchiopns that were taken off for cargo ops.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 30 December 2015
Deck/Cargo › Holds/Tanks › Watertight Door
Issued 30 December 2015
Resolved
Replace or repair stbd watertight door forward line locker.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2015
Resolved 30 December 2015
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 23 November 2015
Resolved
8ft draft mark on the bow is being rubbed off and needs to be repainted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 December 2015
Resolved 30 December 2015
Resolution: Resolved, refer to Activity number 5788778.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 November 2015
Resolved
Navigation lights need a flat black backing.
Action required: 705 - Other - as specified
Due 23 December 2015
Resolved 30 December 2015
Resolution: Resolved, refer to Activity number 5788778.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 23 November 2015
Resolved
Hatch cover for 7 stb and 6 port need to be resealed and all bolts tightened down.
Action required: 705 - Other - as specified
Due 23 December 2015
Resolved 30 December 2015
Resolution: Resolved, refer to Activity number 5788778.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 23 November 2015
Resolved
Rails need to be refitted with 3 courses instead of 2. Replace or repair 3 stanchions that were taken off for cargo ops.
Due 23 December 2015
Resolved 23 November 2015
Deck/Cargo › Holds/Tanks › Watertight Door
Issued 23 November 2015
Resolved
Replace or repair starboard watertight door forward line locker.
Action required: 705 - Other - as specified
Due 23 December 2015
Resolved 30 December 2015
Resolution: Resolved, refer to Activity number 5788778.
Deck/Cargo › Cargo Stowage › General
Issued 23 November 2015
Resolved
Remove all debris, standing water, and flammbale material from the forward line locker.
Due 23 December 2015
Resolved 30 December 2015
Resolution: Resolved, refer to Activity number 5788778.
Construction/Loadline › Hull › Hull Plating
Issued 10 January 2007
Resolved
Attended vessel to conduct internal structure examination. During the examination the marine inspector noted sixty deficiencies throughout vessel which is contained in detail in vessel/misle narrative. (see for detatails)
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2007
Resolved 2 February 2007
Resolution: Attended vessel and conducted follow-up examination of repairs on the Memphis Bridge. All repairs were conducted to the satisfaction of the attending Marine Inspector.
Navigation › Collision/Grounding Avoidance
Issued 19 November 2002
Resolved
Stern navigation light inoperative, make permanent repairs. LEGACY COMPONENT DESC: Navigation Lights
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 November 2002
Resolved 19 November 2002