Inspection history · 99
28 July 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8453504
14 July 2026
Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8313439
23 June 2026
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8313436
1 December 2025
Administrative Inspection · In-Service Inspection · Plan Review (Other than "T")
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8275559
10 September 2025
Administrative Inspection · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8230118
30 May 2025
Re-Inspection · MTSA Verification · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8148411
26 April 2025
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8120479
3 April 2025
In-Service Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8105108
29 March 2025
In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8101798
25 March 2025
MTSA Verification · Deficiency Check · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8099065
20 March 2025
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8097004
4 March 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8087919
4 November 2024
Re-Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8029219
30 September 2024
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8011876
12 August 2024
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7979809
6 June 2024
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7929435
31 May 2024
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7924217
14 May 2024
MTSA Verification · Deficiency Check · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7911515
29 April 2024
Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7903297
26 March 2024
COI Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7885010
7 November 2023
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7818897
15 August 2023
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7769174
2 July 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7729476
17 June 2023
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7716977
16 May 2023
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7690671
8 May 2023
Administrative Inspection · Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7684258
14 April 2023
Plan Review (Other than "T")
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7686954
20 March 2023
Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7654128
16 March 2023
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7652453
31 October 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7586431
20 October 2022
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7581189
18 October 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7579509
18 October 2022
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7580400
22 September 2022
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7568176
7 June 2022
Re-Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7470662
1 April 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7422623
16 March 2022
MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7405736
2 March 2022
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7404632
8 February 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7392392
13 December 2021
Re-Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7367431
9 November 2021
In-Service Inspection · Plan Review (Other than "T") · Construction Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7348275
14 September 2021
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7323548
1 July 2021
Administrative Inspection · Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7256231
2 June 2021
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7213064
14 May 2021
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7197146
11 March 2021
MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7154027
28 January 2021
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7132914
28 January 2021
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7132926
24 November 2020
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7101473
25 September 2020
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7064878
21 September 2020
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7062422
8 September 2020
Deficiency Check · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7053594
18 July 2020
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7011895
1 June 2020
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6965402
2 March 2020
COI Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6918753
19 November 2019
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6849339
21 October 2019
Damage Survey · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6839105
30 August 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6802360
22 August 2019
Deficiency Check · Re-Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6791310
16 August 2019
Damage Survey · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6785279
5 June 2019
Deficiency Check · MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6703668
20 April 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6670349
11 March 2019
Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6640408
28 February 2019
In-Service Inspection · COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6633304
17 December 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6598979
26 November 2018
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6586951
12 October 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6560108
4 September 2018
Administrative Inspection · MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6532031
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6505946
5 June 2018
Re-Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6434093
1 May 2018
Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6403108
21 April 2018
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6394875
9 April 2018
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6389685
14 March 2018
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6371870
6 March 2018
COI Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6363766
21 February 2018
In-Service Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6360426
15 November 2017
Examination of Repairs · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6308649
8 November 2017
Load Line/Change of Employment · Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6303055
30 September 2017
Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6214049
14 September 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6266724
6 September 2017
MTSA Verification · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6259942
1 September 2017
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6256900
28 August 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6286908
6 June 2017
Periodic Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6166702
11 May 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6143841
25 April 2017
Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6132465
28 March 2017
Administrative Inspection · COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6104234
2 February 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6081502
29 November 2016
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6049757
22 November 2016
Administrative Inspection · Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6046614
8 November 2016
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6045827
17 October 2016
In-Service Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6030535
18 August 2016
Deficiency Check · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5977482
20 July 2016
Examination of Repairs · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5952227
27 June 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5921278
18 June 2016
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5915218
7 June 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5905743
30 May 2016
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5901564
16 May 2016
MTSA Verification · DAPI Audit · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5876486
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 14 July 2026
Resolved
All doors shall be capable of operation from either side by 1 person. The handicap buttons on both port/starboard salon doors are not functional. Provide operational evidence of handicap buttons prior to September 1, 2026.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2026
Resolved 3 August 2026
Resolution: Repaired doors
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 July 2026
Resolved
The failsafe state must be evaluated for each subsystem, system, or vessel to determine the least critical consequence. There is no opolicy indicating if generators should be run in manual or auto and if the generators should be set to air or electric start first. Create policy for how generators should be run while underway prior to August 1, 2026.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2026
Resolved 3 August 2026
Resolution: Policy created
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 14 July 2026
Resolved
All alarms must be provided with a means to test audible and visual annuciatiors. Engine Room Control alarm test is only shwoing visual and not sounding audible alarm. Provide means to test audible alarm prior to September 1, 2026.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2026
Resolved 3 August 2026
Resolution: Replaced circuit board
02 - Structural Conditions › N/A - No Subsystem › Spaces in cargo areas
Issued 23 June 2026
Resolved
The respective piping systems installed on ships and barges must have the necessary pumps, valves, regulation valves, safety valves, relief valves, flanges, fittings, pressure gages, liquid level indicators, thermometers, etc., for safe and efficient operation of the vessel. Liquid was actively leaking into void 5. Identify cause of leak and repair to the satisfaction of the MI. 46 CFR 56.01-1(b) 701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 July 2026
Resolution: ABS attended and verified leaks were repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Marine Evacuation System
Issued 23 June 2026
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Port and starboard MESs are not currently onboard. Install MESs and provide servicing certificates to satisfaction of MI. 46 CFR 199.190 701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2026
Resolution: MESs isntalled and servicing certs provided
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 June 2026
Resolved
At each inspection for certification and periodic inspection the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as they feel necessary to check safe operation. Adapter to test generator L/O PSTP was not available. Procure adapter prior to 1AUG26. 46 CFR 61.20-3(a) 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 14 July 2026
Resolution: Received adapter
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 June 2026
Resolved
Passenger vessels exceeding 100 gross tons constructed on or after July 1, 1935, and emergency systems for all ships, must use fuel that has a flashpoint exceeding 110 °F for internal combustion engine units. Such vessels must carry a sufficient quantity of fuel to supply the emergency electrical system. Fuel transfer pump was not operational. Repair to the satisfaction of the MI prior to 1AUG26. 46 CFR 58.50-1(b) 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 3 August 2026
Resolution: Cleared e-stop
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 June 2026
Resolved
On vessels required to have a final emergency power source by § 112.05-5(a) of this chapter, the following emergency lighting and power loads must be arranged so that they can be energized from the final emergency power source: Each load under § 112.15-1. Emergency light in engine room, prior to entering the boiler space was not working. Repair to the satisfaction of the MI prior to 1AUG26. 46 CFR 112.15-5(a) 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 14 July 2026
Resolution: Light Replaced
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 June 2026
Resolved
All piping, valves, and fittings shall meet the applicable requirements of subchapter F (Marine Engineering) of this chapter. Fire stations #1 and #7 were found with leaking valve packing. Repair to satisfaction of MI prior to 01AUG26. 46 CFR 76.10-15(a) 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 28 July 2026
Resolution: Fire stations no longer leaking
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 23 June 2026
Resolved
Doors in bulkheads required to be Class A-60, A-30, or A-15 shall be of hollow steel or equivalent metal construction solidly filled with approved structural insulation capable of meeting the requirements for a Class A-15 bulkhead. Port side crow’s nest fire door and starboard side 02 deck amidships fire doors are not self-closing. Repair to satisfaction of MI prior to 01AUG26. 46 CFR 72.05-25(b) 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 3 August 2026
Resolution: Repaired doors
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 23 June 2026
Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work. Port side, aft food storage room has been converted to an emergency gear locker with associated equipment relocated into the space. Update fire control plan to satisfaction of MI prior to 01AUG26. 46 CFR 71.65-10 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 3 August 2026
Resolution: Updated FCP
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 June 2026
Resolved
Previously approved installations may be retained as long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Fixed fire fighting system in galley has been removed for years but pull station remains. Remove pull station to satisfaction of MI prior to 01AUG26. 46 CFR 76.05-20 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 3 August 2026
Resolution: Removed pull station
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 June 2026
Resolved
All electrical engineering details and installations shall be designed and installed in accordance with subchapter J (Electrical Engineering) of this chapter. Dead end wires were found in the emergency gear locker and port side car deck overhead. Remove wires or properly terminate in junction box/equipment to satisfaction of MI prior to 01AUG26. 46 CFR 70.25-1 705c
Action required: 705 - Other - as specified
Due 1 August 2026
Resolved 28 July 2026
Resolution: Wires properly secured.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 June 2026
No resolution recorded
Electric installations and electric equipment must be inspected at the inspection for certification and periodic inspection to determine mechanical and electrical condition and performance. Emergency lighting covers on the 03 deck and starboard forward stairwell are broken. Repair/replace to satisfaction of MI prior to 01AUG26. 46 CFR 110.30-5 705c
Action required: 705 - Other - as specified
Due 1 August 2026 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 10 September 2025
Resolved
Subdivision bulkheads shall be watertight. MI witness rusted through hole in bow thruster space starboard side forward overhead leading to outside. Provide repair proposal for approval from OCMI.
46 CFR 72.01-25(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2025
Resolved 21 April 2026
Resolution: Repairs verified complete by attending DI
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 September 2025
Resolved
An electric wiring must be installed to prevent any person from accidentally contacting energized parts. MI found dead end wire that was hot. de-energize wire, tag-out breaker. Remove wire ccompletely or cap off ends. 46 CFR 111.05-3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2025
Resolved 11 September 2025
Resolution: Recieved photo of wires stowed in junction box.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 2 September 2025
Resolved
On vessels required to have a final emergency power source by § 112.05-5(a) of this chapter, the following emergency lighting and power loads must be arranged so that they can be energized from the final emergency power source:
(b) The machinery, controls, and alarms for each passenger elevator.111.91-1 Power, control, and interlock circuits.
Each electric power, control, and interlock circuit of an elevator or dumbwaiter must meet ASME A17.1. Missing required illuminated signal marked Elevator Emergency Power.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2025
Resolved 13 November 2025
Resolution: Operator installed light
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 2 September 2025
Resolved
171.111 Penetrations and openings in watertight bulkheads in vessels of 100 gross tons or more.(a) Except as provided in paragraph (f) of this section, each opening in a watertight bulkhead must have a means to close it watertight. The four valves in the engine room's aft bulkhead leading to the steering gear flat were all found open. One of the selfclosing valves was missing its valve body cap.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 September 2025
Resolved 30 September 2025
Resolution: Valve was repaired
14 - Pollution Prevention › 141 - MARPOL Annex I › Standard discharge connection
Issued 2 September 2025
Resolved
155.410 Pumping, piping and discharge requirements for non-oceangoing ships of 100 gross tons and above.(a) No person may operate a non-oceangoing ship of 100 gross tons and above that is fitted with main or auxiliary machinery spaces in the navigable waters of the United States unless:
(1) The ship has at least one pump installed to discharge oily mixtures through a fixed piping system to a reception facility;
(2) The piping system required by this section has at least one outlet that is accessible from the weather deck;
(3) Each outlet required by this section has a shore connection that is compatible with reception facilities in the ship's area of operation; and
(4) The ship has a stop valve for each outlet required by this section.
(b) Paragraph (a) of this section does not apply to a ship that has approved oily-water separating equipment for the processing of oily mixtures from bilges or fuel oil tank ballast. The OWS had been removed. No Standard Discharge Connection was fitted.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2025
Resolved 1 December 2025
Resolution: Received written exemption from CG-OES.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 June 2025
Resolved
All doors, except those that are kept normally closed, shall be of a type which are capable of release from the control station and from a position at the door. The release mechanism shall be so designed that the door will automatically close in the event of disruption to the control system. The aft galley fire door closes when operated, but fails to seal or latch securely. 46CFR72.05-25(b)(9)(ii)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2025
Resolution: Received a video showing the latching of the door when released from the local button; sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 June 2025
Resolved
The system shall be so designed and arranged that the overhead is effectively sprayed and all portions of the deck are covered. Sprinkler heads at the ends of zones 1 and 4 (forward of the car deck) failed to discharge water when activated. 46 CFR 76.23-10
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 September 2025
Resolution: Piping was cleared. Witnessed sat test.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 June 2025
Resolved
Sufficient illumination must be provided by the emergency lighting source under emergency conditions to effect damage control procedures and to provide for safe egress from each space. Emergency lights were inoperable in the following locations: 1. Lido Bar (port side) 2. Port and starboard ladderwells on the 03 deck. 46 CFR 111.75-15(c)(2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2025
Resolution: Received photos of the emergency lights working properly; sat.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 June 2025
Resolved
All electrical appliances, including, but not limited to, cooking equipment, dishwashers, refrigerators, and refrigerated drinking water coolers, must meet ANSI/UL safety and construction standards or equivalent standards under § 110.20-1 of this chapter. Also, this equipment must be suitably installed for the location and service intended. Three separate leaks were identified on the galley water heater's piping. Mineral buildup was observed at the leak points. 46 CFR 111.77-3
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2025
Resolution: Received photos to support the removal of mineral build-up; sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 June 2025
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Identified 03 issues with 3 life rings: 1. The life ring located on the port bridge wing had a dry-rotted grab line. 2. The light fixture associated with the aft starboard car deck life ring was non-operational. 3. The retroreflective tape on the forward starboard life ring was peeling off. 46 CFR 199.190 (a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 June 2025
Resolution: Received photos that they replaced grab line, replaced light fixture and replaced reflective tape; sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2025
Resolved
Each space used by passengers or crew must be fitted with lighting that provides for a safe habitable and working environment under normal conditions. Cracked overhead lights were identified in the cleaning gear locker and at the aft starboard ladderwell on the car deck. 46 CFR 111.75-15 (c)(1)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 September 2025
Resolution: Light covers were replaced. Lights were not in a hazardous area or area subject to damage.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2025
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. The electrical wiring in the car deck overhead (forward, portside) and under the port bridgewing lacked proper support and were hanging loose.. 46 CFR 111.01-1 (2)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2025
Resolved 10 September 2025
Resolution: Temporary wire supports were added adjacent to wasted supports. Remaining supports are planed to be renewed in November drydock.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 3 June 2025
Resolved
Any insulation installed for heat and comfort, refrigeration (including air conditioning), or for any other purpose, and all material incidental to its installation, shall be approved Incombustible Materials. In the trash room, an overhead drainage pipe was found wrapped in tape and lacking insulation. Make permanent repairs prior to credit drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Insulation was replaced. Insulation was only thermal.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 June 2025
Resolved
Doors in “B” Class bulkheads shall meet the following requirements: Door frames shall be of rigid construction, and shall provide at least a 1/2 inch doorstop at the sides and top. The door sill of the aft storeroom was heavily deteriorated/corroded. CFR 72.05-25 (c)(6)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2025
Resolved 30 April 2026
Resolution: Door and frame replaced.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 3 June 2025
Resolved
It is the intent of this subpart to provide such markings as are necessary for the guidance of the persons onboard in case of emergency…Posted CO2 Operating Instructions referenced Bow Thruster/Engine Room stop valve #14. There were three valves marked #14. One of these was marked #15 which was crossed out and handwritten #14. The C/E believed one of these was marked in error.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 September 2025
Resolution: Fire Service Technician attended vessel and corrected labeling error.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 3 June 2025
Resolved
Cylinders used for containing hazardous ship stores that are compressed gasses must be… (4) …maintained and retested in accordance with 49 CFR 173.34. Two Emergency Escape Breathing devices were stamped with a hydrostatic test date of 2012. 46 CFR 147.60 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2025
Resolved 17 September 2025
Resolution: Recieved doumentary evidence that new EEBD bottles were purchased, recieved and installed aboard.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 June 2025
Resolved
Carbon dioxide cylinders forming part of a fixed fire extinguishing system must be retested at least every 12 years… The Emergency Generator CO2 bottle was stamped with a hydro date of 3/12. 46 CFR 147.65
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2025
Resolved 13 November 2025
Resolution: Operator replaced bottle
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2025
Resolved
Motor Controllers(h)(2) Contain a durable heat-resistant elementary wiring diagram of the controller fixed to the inside of its door. The diagram indicated a Heater Circuit, but the heater circuit was not noted. 46 CFR 111.70-3
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 September 2025
Resolution: Diagram was revised.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 3 June 2025
Resolved
Each opening in a watertight bulkhead must have a means to close it watertight. The stbd side of the companionway leading to the bow thruster space had a ½” hole just above the main deck but below the watertight doors sill. 46 CFR 171.111
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 September 2025
Resolution: Weld repaired, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 26 April 2025
Resolved
Vessel self reported that during mooring operations in Cape May, New Jersey the secondary electronic bow thruster tripped breaker and became non operational. Provide proof of rectification and causal analysis to Coast Guard satisfaction.
Prior to Credit Dry Dock.
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Administrativey cleared. Reviewed tech report which found the system satisfactory. Owner reported satisfactory operation since the report was completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 March 2025
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules. While mooring in Lewes, DE the vessel was unable to bring up RPMs on the port engine while going astern.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 March 2025
Resolved 22 April 2025
Resolution: The attending MI witnessed satisfactory operation of the main propulsion system.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 March 2025
Resolved
At each annual inspection, the inspector must ensure that the following tests and inspections of fire detection and extinguishing equipment have been conducted: Fixed fire extinguishing systems must be checked as noted in table 71.25-20(a)(2)... Carbon Dioxide: Test time delays, alarms, and ventilation shutdowns with carbon dioxide, nitrogen, or other nonflammable gas as stated in the system manufacturer's instruction manual. The installed System for this vessel is Kidde Marine CO2 which specified that "the tested delay period must fall in the range minus zero percent and plus 20 percent of the factory rated value (-0%, +20%). This range is based on the guidance provided in NFPA 12:20000 Standards on Carbon Dioxide Extinguishing Systems. The bow thruster is designed with a 60-second CO2 time delay. During the inspection, the time delay malfunctioned twice, with the first attempt lasting 91 seconds and the second 81 seconds (+20%: 72 seconds). Replace the CO2 time delay to meet the manufacturer's specified requirements.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 April 2025
Resolution: Conducted the testing for the bow thruster's time delay; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 March 2025
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification and periodic inspection, and shall include, as applicable, a demonstration of- (3) the
proper condition of flotation equipment such as lifebuoy The life ring on the O2 deck (starboard side) was found to have dry-rotted grab lines.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 15 April 2025
Resolution: Vessel replaced with new life ring; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 March 2025
Resolved
The control system must be designed for automatic shutdown of the engine with actuation of audible and visible alarms at shutdown. Automatic shutdown must occur under the following conditions: Low lubricating oil pressure. #2 SSDG satisfactorily alarmed but failed to shutdown during loss of L/O pressure test.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2025
Resolved 15 April 2025
Resolution: conducted the loss of lube oil shutdown test for the # 2SSDG; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 25 March 2025
Resolved
All safety and relief valves for use on pressure vessels or piping systems must be designed to meet the protection and service requirements for which they are intended and must be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel. #4 P/V relief valve leaked air during operational testing and lifted at 252 psi, exceeding the MAWP (250 psi) of the pressure vessel.
Action required: 10 - Deficiency Rectified
Resolved 25 March 2025
Resolution: Crew replaced valve, retested all sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 March 2025
Resolved
All portable fire extinguishers and semi-portable fire extinguishing systems must be maintained in accordance with NFPA 10. #28 CO2 portable fire extinguisher hose was worn and degraded.
Action required: 10 - Deficiency Rectified
Resolved 25 March 2025
Resolution: Crew replaced hose
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2025
Resolved
The annual inspection shall include an inspection of the structure, boilers, and other pressure vessels, machinery and equipment. The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations… is in satisfactory condition and fit for the service for which it is intended. Port and starboard shaft alleys underneath shaft seals had water accumulation in the bilge. Correct shaft seal leakage prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Administratively cleared following inspection. No active leakage was noted on multiple consectutive inspections.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 25 March 2025
Resolved
A main transverse watertight bulkhead may not have non-watertight penetrations below the bulkhead deck. ½” pinhole in bulkhead found on starboard side of ladder well entrance into forward bow thruster space. Correct prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Weld repaired sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2025
Resolved
The annual inspection shall include an inspection of the structure, boilers, and other pressure vessels, machinery and equipment. The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations… is in satisfactory condition and fit for the service for which it is intended. Minor hydraulic leak found on #1 steering system pump around seal, creating a small pooling. Correct prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Administratively cleared after inspection. No oil found IWO steering pump during multiple consectutive inspections.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 March 2025
Resolved
The annual inspection shall include an inspection of the structure, boilers, and other pressure vessels, machinery and equipment. The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations… is in satisfactory condition and fit for the service for which it is intended. Minor hydraulic leak found on forward hydraulic bow thruster DCV, creating a small pooling. Correct prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Adminsitratively cleared following inspection. Inspected system while in operation and no active leaks were observed.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 25 March 2025
Resolved
Bulkheads or decks of the “A” Class shall be composed of steel or equivalent metal construction, suitably stiffened and made intact with the main structure of the vessel, such as shell, structural bulkheads, and decks. 03 welded over pad eyes on main vehicle deck were deteriorated and had holes deep between ½” – 1” on the aft third of along the centerline. Correct prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Administratively cleared. Deck did not have any pad eyes. This was believed to be deteriorated filler the owner used to fill unused tie downs on their own accord.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 March 2025
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Marine Vessel Rules. The port side bridge wing controls were reported inoperable.
46 CFR 58.05-1(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 March 2025
Resolution: Technician replaced port side bridge wing throttle with spare. Operational test proved satisfactory operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 November 2024
Resolved
At each inspection for certification and periodic inspection the marine inspector must conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as they feel necessary to check safe operation. Crew reported overspeed on #2 Generator does not shutdown generator or alarm. Repair overspeed protection to the satisfaction of the marine inspector.46 CFR 61.20-3(a)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 November 2024
Resolved 18 December 2024
Resolution: Operator repaired overspeed.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 November 2024
Resolved
The sidelights of vessels of 20 meters or more in length shall be fitted with matt black inboard screens. Screens for port/starboard nav lights are no longer matte black. Repaint screens to the satisfaction of MI. 33 CFR 84.05
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 November 2024
Resolution: Marine Inspector physically verified that the inboard screens were painted matte black.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 4 November 2024
Resolved
Structural I-beams on the car (main) deck were found separated from the outer bulkhead (curtain) with broken welds and signs of corrosion behind the beams. Vessel is required to determine the condition of the structural beams (UT shots) and submit a repair proposal to the satisfaction of the MI based on the findings.46 CFR 71.30-5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 December 2024
Resolved 12 February 2026
Resolution: Affected H-Beams cropped and renewed. MISLE 8283539.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 4 November 2024
Resolved
Bulkheads of “A” Class shall be so constructed that they would be capable of preventing the passage of smoke and flame for 1 hour. Open cable penetrations in "A" Class boundaries and multiple holes were identified on the starboard side of the bridge bulkhead. Repair “A” Class boundaries to original fire protection standards prior to COI renewal inspection. 46 CFR 72.05-10 (c)(1)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 25 March 2025
Resolution: MI inspected during COI inspection; sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 November 2024
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. The electrical wiring in the car deck overhead (forward, amidships) lacked proper support and was hanging loose. Additionally, the drainage piping along the centerline amidships was missing insulation. Make permanent repairs prior to COI renewal inspection.
46 CFR 111.01-1 (2)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 25 March 2025
Resolution: MI inspected during COI inspection; sat
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 November 2024
Resolved
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. All emergency stops near the entrance to engine room are extremely corroded. Repair or replace to the satisfaction of the marine inspector by next inspection. 46 CFR 61.20-3(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 18 December 2024
Resolution: Operator replaced emergency stops. Tested emergency stops; all SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 4 November 2024
Resolved
The main steering gear and rudder stock must be—Of adequate strength for and capable of steering the vessel at maximum ahead service speed, which must be demonstrated to the satisfaction of the cognizant Officer in Charge, Marine Inspection. Both rotary vane rudder post seals were leaking hydraulic oil. Repair to the satisfaction of the marine inspector prior to credit drydock. 46 CFR 58.25-10(c)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Administratively cleared after inspection. Rudder post seals are a water barrier. Oil leaks were historicaly normal for this vessel and consistent with industrial hydraulic norms.
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 4 November 2024
Resolved
An inspection of passenger and crew quarters, toilet and washing spaces, serving pantries, galleys, etc., shall be made, in general, at least once in every month. The decking in the handicapped accessible cubicle of the male toilet (main deck) was found to be uneven and deteriorated, posing safety hazards for both crew and passengers. Repair or replace to the satisfaction of the marine inspector by next inspection. 46 CFR 71.45-1 (a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 25 March 2025
Resolution: MI inspected during COI inspection, sat
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 4 November 2024
Resolved
Plans and specifications required... Fire control diagram showing location and type of all required fire-screen insulation, including main fire zone and
subdivisions and enclosures. The onboard Fire Control Plan was a preliminary version and had not been approved. Additionally, there were several handwritten amendments that had not been verified by the Class or the Coast Guard. Replace with approved version of FCP. 46 CFR 71.65-5 (d)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 6 November 2024
Resolved 5 November 2024
Resolution: Vessel installed the approved version prior to departure of [name withheld] verified that FCP is approved and updated.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 12 August 2024
Resolved
Doors shall have a latch with a minimum throw of 3/4 inch which can be operated from either side of the door.
A-60 Boundary doors to Engineering Operating Station do not remain shut. Make permanent repairs to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2024
Resolved 30 September 2024
Resolution: Door latch was repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2024
Resolved
Materials used in the manufacture of tubing, pipes, valves, flanges, and fittings shall be selected from those specifications that appear in 46 CFR 56.60-1, Table 56.60-1(a) or 46 CFR 56.60-2, Table 56.60-2(a); or they may be selected from the material specifications of section I or section VIII of the ASME Boiler and Pressure Vessel Code. Observed Port main engine leaking air at the starter. Vessel is required to repair/replace starter or associated parts to the satisfaction of the attending marine inspector/surveyor.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2024
Resolved
All safety and relief valves for use on pressure vessels or piping systems shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel. Two (02) relief valves for air receivers (#1 & #4) failed to relieve at setpoint. Two (02) safety relief valves for air receivers (#2 & #3) did not reseat after testing. Vessel is required to replace all four (04) relief valves on each air receiver in 30 days to the satisfaction of the attending marine inspector/surveyor.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 May 2024
Resolution: Witnesse test of relief valves
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 May 2024
Resolved
Each generator prime mover must have an overspeed device that is independent of the normal operating governor and adjusted so that the speed cannot exceed the maximum rated speed by more than 15 percent. Observed 2190 RPM during overspeed test of #2 generator. Generator is rated for 1800 RPM and should not exceed 2070 RPM for overspeed. Vessel is required to make repairs/adjust the governor
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 June 2024
Resolution: Overspeed Switch was renewed, replaced and tested sat.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 14 May 2024
Resolved
Except as otherwise provided for in this section, these requirements are applicable to the following fluid power and control systems: (1) Steering apparatus, main and auxiliary, including bow thruster systems. Port and starboard electric bow thrusters are wired in reverse order; To service to ensure operational readiness.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 May 2024
Resolution: Witness proper operation of electric bow thruster.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 May 2024
Resolved
The items contained in first-aid kit shall be as listed in Table 160.041-4(b). Expired medicine identified in the first-aid kit located on the bridge; To replace expired contents.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 March 2024
Resolved
In addition to the emergency power sources required under part 112 of this chapter, each self-propelled vessel and each mobile offshore drilling unit must have at least two electric generating sources. The no. 1 generator failed the operational test. Repair and demonstrate proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 March 2024
Resolution: Witnessed proper operation of SSDG underload, and overspeed trip.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 March 2024
Resolved
Fluid power motors and pumps installed on vessels subject to inspection shall be certified by the manufacturer as suitable for the intended use. Such suitability shall be demonstrated by operational tests conducted aboard the vessel which shall be witnessed by a marine inspector. Aft air compressor failed operational test. Repair and demonstrate proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 March 2024
Resolution: Witnessed proper operation of aft compressor
11 - Life Saving Appliances › N/A - No Subsystem › Marine Evacuation System
Issued 26 March 2024
Resolved
Within 12 months of each subsequent servicing, except when servicing is delayed until the next scheduled inspection of the vessel, provided the delay does not exceed 5 months. Port side MES last serviced 17MAR2023. Conduct required servicing/place serviced equipment onboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2024
Resolved 19 April 2024
Resolution: Verified new, servied MES was installed onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 26 March 2024
Resolved
The proper condition and operation of the survival craft and rescue boat launching appliances at loads ranging from light load to full load, except that any portion of the load test conducted in connection with replacement or end-for-ending of a fall since the vessel's last inspection or reinspection, need not be repeated. STBD side aft davit sheave seized several times throughout the rescue boat recovery. Repair davit to satisfaction of MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2024
Resolved 10 April 2024
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 26 March 2024
Resolved
The frequency of the tests and inspections required by this section must be: for vessels, annually or as part of the biennial and mid-period inspections. Fuel piping hydrostatic test is due (last completed 27MAR2023). Conduct test to satisfaction of MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2024
Resolved 10 April 2024
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 March 2024
Resolved
All doors, except those that are kept normally closed, shall be of a type which are capable of release from the control station and from a position at the door. Port, aft fire door for main salon failed to close upon activation of door release. Additionally, fire door between galley and food stores is missing self-closing mechanism. Repair fire doors to satisfaction of MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2024
Resolved 19 April 2024
Resolution: Verified closing devices were repaired/installed in required locations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 March 2024
Resolved
All safety and relief valves for use on pressure vessels or piping systems shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel or piping system. The No. 1 & No. 3 relief valve setting on the air receivers exceeded the MAWP of 250 psi.
Action required: 10 - Deficiency Rectified
Resolved 26 March 2024
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 7 November 2023
Resolved
Tests of the lifesaving equipment shall be carried out during each re-inspection and shall include a demonstration of the proper condition and operation of rescue boats. The aft fall wire sheave of the port rescue boat did not rotate during launch witnessed during inspection. Make operational prior to carrying passengers. 46 CFR 1999.45(b)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2023
Resolution: Crew removed aft sheave and discovered excessive grit build up. Crew cleaned sheave, regreased with an approved lubricant, and reassembled. Davit tested satisfactorily.
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 2 July 2023
Resolved
Each vessel must have the following: Gyrocompass. Vessel reported gyrocompass power failure. Vessel must comply with the following restrictions until a technician's report has been reviewed and accepted by a CG marine inspector:
(1)Transit must be made with visibility of two nautical miles or greater.
(2)Daylight hour transit only.
Action required: 705 - Other - as specified
Resolved 4 July 2023
Resolution: Received tech report attesting to proper operation of gyrocompass.
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 17 June 2023
Resolved
Each vessel must have the following: Gyrocompass
Vessel reported a gyrocompass that has a 15 degree error/offset.
Vessel must comply to the following restrictions until the tech report has been review by a CG marine inspector.
? The inoperable equipment shall be blanked out to prevent inadvertent use.
? Vessel must have an operable magnetic compass & current deviation table. Vessel shall
not steer using auto pilot with gyrocompass inputs.
? Vessel transit must be made with visibility of two nautical miles (NM) or greater, in
addition to favorable visibility reports over the intended route. If visibility decreases below
two nautical miles, vessel shall anchor at first available safe anchorage and contact this
office.
? Daylight hour transit only.
? Repair of inoperable equipment and a copy of the Technician or Certificating Authority report attesting to proper operation must be accepted by CG
33 CFR 164.35(d)
705 C
Action required: 705 - Other - as specified
Due 17 June 2023
Resolved 22 June 2023
Resolution: Received tech report.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 May 2023
Resolved
Containers and other similar stowage locations for lifesaving equipment must be marked correctly. 08 life jacket stowage boxes had incorrect donning of life jacket placards. Provide correct donning placards. 46CFR199.70
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Recieved email with pictures and documentation of new placards.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 May 2023
Resolved
Each lifebuoy must be marked in block captial letters with name of the vessel and name of the port. Both forward port and stbd life buoys on boat deck need to be restenciled. 46 CFR 199.70(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Received photos of new stencil of buoys.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 16 May 2023
Resolved
All watertight doors shall be operated locally by manual power and are in operable condition. Stbd side aft fire door on O2 deck does not close completely. Adjust door to close completely
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Recieved email that door was adjusted and tested.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 May 2023
Resolved
Electrical Insulation on vessels must ensure protection from passengers and crew from electrical hazards. Galley air handler room cover was missing from electrical box allowing exposed wires. Provide cover for electrical box. 46 CFR 111.01-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Recieved pictures of electrical box covered
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 May 2023
Resolved
NO1 Air Receiver relief valve lifted at 260 PSI exceeding MAWP. Replace relief valve on No1 air receiver.
46 CFR 77.03-1
46 CFR 54.15-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Replaced relief valve.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 16 May 2023
Resolved
Portable Extinguisher #24 on aft ladder well leaving engine room did not have annual service. Service or replace with serviced extinguisher of the same rating. 46 CFR 71.25-20(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Recieved document of relief valve was replaced and tested
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 16 May 2023
Resolved
During inspection found hydraulic oil on steering pedestal. Clean and remove accumulated hydraulic oil. 46 CFR 71.25-45
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Recieved documetation of grease removed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 May 2023
Resolved
Drain plug found missing from M/E Raycor Fuel filters. Install plug to filter drain. 46 CFR 77.03-1
45 CFR 56.50-60(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Drain plug replaced
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 May 2023
Resolved
Heat tape electrical boxes found not properly secured on aft car deck. Properly mount electrical boxes. 46 CFR 77.05-1(a)
46 CFR 111.81-1(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Heat taped replaced and secured
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 May 2023
Resolved
Port and stbd shaft well bilge pumps found not properly mounted. Properly mount or remove pumps. 46 CFR 71.30-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2023
Resolved 26 May 2023
Resolution: Pumps mounted corrrectly.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 30 March 2023
Resolved
Means shall be provided for closing all openings to the space protected from outside such space... The construction shall be such that openings in the upper portion of the space can be closed off... by permanently installed means. STBD stack of upper louver was inoperable.
46 CFR 76.15-35(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2023
Resolution: Recieved clear video of louver operating properly.
11 - Life Saving Appliances › N/A - No Subsystem › Marine Evacuation System
Issued 30 March 2023
Resolved
Each marine evacuation system must be capable of deploying as designed. Associated life-rafts to port and starboard MES were not rigged properly.
46 CFR 70.28-1
46 CFR 199.145(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2023
Resolution: Recieved report from Marine Safety Corp attesting to the proper stowage of both MESs.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 30 March 2023
Resolved
All lifesaving appliances and arrangements must be in accordance with Sub-chapter W. Life-saving equipment placarding was absent or painted over throughout vessel.
46 CFR 70.28-1
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2023
Resolution: Recieved pictures showing proper placarding
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 30 March 2023
Resolved
All lifesaving appliances and arrangements on passenger vessels must be in accordance with Sub-chapter W. Each side of each rescue boat bow must be marked
with - the name of the vessel. Starboard side rescue boat name was stenciled incorrectly.
46 CFR 70.28-1
46 CFR 199.176(a)(1)(i)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2023
Resolution: Recieved confirmation that stbd rescue boat has been restenciled with proper name.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 30 March 2023
Resolved
The installation of all electrical systems shall be in accordance with the requirements of Sub-chapter J. Each general emergency alarm signal must have an electrically operated bell. 02 general alarm signals located on the 03 deck aft of the pilothouse were inoperable.
46 CFR 77.05-1(a)
46 CFR 113.25-12(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2023
Resolved 6 April 2023
Resolution: Both general alarm bells have been repaired and tested
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 March 2023
Resolved
The installation of all electrical systems shall be in accordance with the requirements of Sub-chapter J. 02 emergency lights on the 03 port-side aft stairwell were inoperable.
46 CFR 77.05-1 (a)
46 CFR 112.43-7(a)(4)(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2023
Resolved 6 April 2023
Resolution: E-lights were repaired and tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 March 2023
Resolved
Each vessel must carry a life-jacket for each person on board. Vessel was missing 26 life jackets. Vessel is restricted to 851 passengers until 26 life-jackets are on board and marked IAW Sub-chapter W.
46 CFR 70.28-1
46 CFR 199.70(b)(1)/(3)
Action required: 705 - Other - as specified
Resolved 6 April 2023
Resolution: 26 lifejackets were replaced, marked, and stowed properly.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 31 October 2022
Resolved
All items on the following worklist from DD/ISE will be complete and or addressed with local OCMI prior to COI inspection and the carrying of passengers. The current COI expired 16 march 2023.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 April 2023
Resolution: Most of the items listed have been rectified aside from the items requiring plan review. The OCMI has awareness of these items and will be managed in a separate plan review activity.
11 - Life Saving Appliances › N/A - No Subsystem › Means of recovery of life saving appliances
Issued 7 June 2022
Resolved
The electric installation of each electric power-operated winch must meet requirements of this subpart. Vessel was unable to recover port side rescue boat due to loss of power to the motor controller.
Code 705: Prior to commercial operations
Action required: 705 - Other - as specified
Resolved 9 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 June 2022
Resolved
machinery must meet applicable standards. Vessel's #1 generator's low lube oil shutdown was inoperable.
Code 705: Prior to commercial operations
Action required: 705 - Other - as specified
Resolved 9 June 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2022
Resolved
Electric installations on vessels must ensure protection of passengers, crew, and the vessel from electrical hazards. Dead end wire identified under the helm at the operating station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2022
Resolved 1 April 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2022
Resolved
Electric installations on vessels must ensure protection of passengers, crew, and the vessel from electrical hazards. Identified ground on 440v panel located in the 2nd deck crew area.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2022
Resolved 1 April 2022
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2022
Resolved
Electric installations on vessels must ensure protection of passengers, crew, and the vessel from electrical hazards. Exterior outlet located on the 2nd deck, port side is missing a cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2022
Resolved 1 April 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 March 2022
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the port. Markings on the the lifebuoy located on the 3rd deck, stbd side has faded and no longer legible.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2022
Resolved 1 April 2022
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 March 2022
Resolved
Fire main valve located on the 3rd deck, stbd side and the fire main valve on the 2nd deck, stbd side were leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2022
Resolved 1 April 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 16 March 2022
Resolved
Navigation light within the portable assembly was deemed inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2022
Resolved 1 April 2022
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 March 2022
Resolved
Wooden planks were identified within the fiddly in the stack space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 March 2022
Resolved 1 April 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 March 2022
Resolved
Each life jacket must be approved IAW 160.155, 160.176, 160.177. Identified 16 life jackets of not the approved type and 02 life jackets no longer serviceable.
Action required: 705 - Other - as specified
Due 18 March 2022
Resolved 16 March 2022
Resolution: vessel provided new type 1 pfds prior to CG departure.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 February 2022
Resolved
Auxiliary machinery vital to the main propulsion system must be provided in duplicate. Vessel reported that while conducting main engine start-ups, one of the vessel's start air compressors was inoperable. Vessel is permitted to operate for the remainder of today (08FEB2022) and be taken OOS at the conclusion its required routes. Vessel must provide a casual analysis and complete proper repairs.
Action required: 705 - Other - as specified
Resolved 11 February 2022
Resolution: Received class/ABS report
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 13 December 2021
Resolved
Port side salon door did not close when the bridge pressed the closure button. Repair closure device so door closes when that bridge button is activated.
46 CFR 72.05-25(b)(9)(ii)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2021
Resolved 21 December 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 December 2021
Resolved
Fan room #1 below the wheelhouse is missing structural fire protection insulation. Replace insulation that was removed.
46 CFR 72.05-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 December 2021
Resolved 22 December 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 September 2021
Resolved
Generator (1) had build up of grease and soot on the insulation. Ensure machinery is maintained to minimize fire hazards.
46 CFR 72.03-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2021
Resolved 14 September 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 September 2021
Resolved
The fan room by the 03 deck lido bar is missing insulation near the vent. Replace insulation with approved material.
46 CFR 72.05-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 October 2021
Resolved 21 September 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 14 September 2021
Resolved
Port fire door in crow’s nest was found to be not fully self-closing. Make adjustments and prove proper operation of the port crow's nest door. 46 CFR 72.05-25(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2021
Resolved 15 September 2021
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 3 June 2021
Resolved
During the inspection, 03 fire doors were found to be not fully self-closing. Make adjustments and prove proper operation of the starboard crow's nest door, port forward passenger salon door, and starboard aft passenger salon door.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 June 2021
Resolution: Received deficiency rectification report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 June 2021
Resolved
#2 generator loss of lube oil alarm and shut down were not operative.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 June 2021
Resolution: Failure caused by loose nut that caused solenoid failure. Failed solenoid replaced.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 March 2021
Resolved
Salon deck stbd midship door and port and stbd Crows Nest Lounge doors do not fully close. Make repairs and prove proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 March 2021
Resolution: Received def recs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 March 2021
Resolved
Dead end wire identified in the aft section of the pilothouse. Remove wire.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 24 March 2021
Resolution: Received def recs.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 16 March 2021
Resolved
Overhead vent cover in the galley is missing. Replace cover.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 March 2021
Resolution: Received def recs.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 11 March 2021
Resolved
Steel vertical pipe penetrating the middle of the galley has a temporary repair in place. Make permanent repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 March 2021
Resolution: Received def recs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 January 2021
Resolved
Troubleshoot and make repairs to #2 generator. Vessel is restricted from carrying passengers until
satisfactory repairs are made and verified in the presence of attending marine inspector or ABS surveyor and class report received by local OCMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 January 2021
Resolution: Received report from ABS.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 24 November 2020
Resolved
All bulkheads or decks of the "A" class shall be composed of steel or equivalent metal construction. The fan room on deck 3, classified as an A class boundary, has an opening on the starboard side bulkhead which does not have a proper A class closure. This is currently an opening in bulkhead with no means to maintain A Class fire boundary. Make repairs to meet current fire control plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 January 2021
Resolved 14 May 2021
Resolution: Installed damper cover and louvers
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 November 2020
Resolved
Crows nest lounge starboard door has cracked glass in the window. Make repairs and prove structural fire protection.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 January 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 November 2020
Resolved
Piping systems shall be completed to conform to requirements of the regulations and engineering design. Fuel sensing line on the port main engine was observed to be experiencing excessive vibration. Install hanger or other means to secure piping and prevent damage from vibration.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 December 2020
Resolved 12 January 2021
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 November 2020
Resolved
Vessel is required to have lights in the machinery space with a temporary emergency power source to allow essential operations. Battle lantern in aft section of engine room is not operational and requires repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 December 2020
Resolved 12 January 2021
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 November 2020
Resolved
All portable fire extinguishers shall be maintained in accordance with NFPA 10. Two extinguishers in the bowthruster space have not been serviced since 2019. Provide proof of servicing, have these extinguishers serviced, or replaced in kind.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 December 2020
Resolved 12 January 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 November 2020
Resolved
Piping systems shall be completed to conform to requirements of the regulations and engineering design. Aft generator exhaust system insulation was blackened from a suspected exhaust leak. Investigate source of exhaust leak and make repairs accordingly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 December 2020
Resolved 12 January 2021
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 8 September 2020
Resolved
Salon deck aft doors (02) and Crows Nest Lounge port and starboard doors do not fully close. Make repairs and prove proper operation. 46 CFR 72.05-25
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2020
Resolved 24 November 2020
Resolution: Verified closure.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 8 September 2020
Resolved
No fire stop within 03 electrical cable deck penetrations: 02 under port bridge equipment console and 01 next to bridge radar station. Make repairs and prove structural fire protection. 46 CFR 72.05-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2020
Resolved 28 September 2020
Resolution: Accepted company report, pictures, and phone conversation: Proper fire stop installed in penetrations.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 8 September 2020
Resolved
Crows Nest Lounge stbd door has a cracked glass. Make repairs and prove structural fire protection. 46 CFR 72.05-25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 October 2020
Resolved 24 November 2020
Resolution: Renewed glass cracked. Issued additional def.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 18 July 2020
Resolved
Vessel has 06 inop general alarms, 03 on the vehicle deck and 03 on #3 deck. Repair and show proper operation in presence of attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 July 2020
Resolution: Witnessed operation of general alarms.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 March 2020
Resolved
The CO2 system for the diesel driven bow thruster did not properly function. Make repairs and prove satisfactory test prior to operating the diesel driven bow thruster.
Action required: 705 - Other - as specified
Resolved 24 March 2020
Resolution: Virtual CO2 testing conducted to the satisfaction of the viewing MI.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 March 2020
Resolved
The CO2 system time delays failed for both the engine room and bow thruster rooms. Make proper repairs and prove satisfactory testing of the CO2 room prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 17 March 2020
Resolution: Engine room CO2 system tested to the satisfaction of marine inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 March 2020
Resolved
180 adult lifejackets and 6 children lifejackets were taken out of service due to unsatisfactory condition. The ferry is limited to 697 adult passengers and 82 children passengers until new and approved life jackets are supplied in their proper containers.
Action required: 705 - Other - as specified
Resolved 17 March 2020
Resolution: Verified new lifejackets placed on vessel with proper markings.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 March 2020
Resolved
Centerline door to the crow's nest area is broken. Repair door to maintain proper fire boundary.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 March 2020
Resolution: Verified proper operation of the door.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 19 November 2019
Resolved
Identified 03 holes on port side bulkhead of galley (class A fire boundary). Make repairs to the bulkhead to ensure a Class A fire boundary per ship's fire control plan. 46 CFR 92.05-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 December 2019
Resolution: Repairs were made to the bulkhead.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 19 November 2019
Resolved
Identified aft centerline door for crow's nest lounge does not properly latch. Adjust door so it latches when self closing. 46 CFR 72.05-25(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 December 2019
Resolved 28 January 2020
Resolution: New hinge installed.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 19 November 2019
Resolved
Identified forward port door for main salon deck does not latch properly. Adjust door so it latches when self-closing. 46 CFR 72.05-25(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 December 2019
Resolution: The self-closing device was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 19 November 2019
Resolved
Two forward emergency lights on main salon deck, by the ladderwells are inoperative. Repair or replace emergency lights. 46 CFR 111.75-15(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 December 2019
Resolution: Repairs were made to the light fixtures.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 19 November 2019
Resolved
Identified hole on aft bulkhead of the Lido Bar. Make repair to the bulkhead to ensure a Class A fire boundary per ship's fire control plan. 46 CFR 92.05-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 December 2019
Resolution: The hole was filled to meet class A boundary classification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 November 2019
Resolved
Remove dead end wires identified below the operation station. 46 CFR 111.60-1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 December 2019
Resolution: Wires were removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 19 November 2019
Resolved
Make proper repairs to holed fuel tank vent pipe on stbd side car deck. 46 CFR 56.50-85(a)(6)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 December 2019
Resolution: A new vent pipe was fitted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 November 2019
Resolved
The rail that houses the pyrometer cabling has become
dislocated from the starboard main engine and is loose
on the port main engine. Secure the rail as
intended. 46 CFR 58.05-1 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 December 2019
Resolved 18 December 2019
Resolution: The wires are rail were secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 November 2019
Resolved
#1 SSDG L/O low pressure shutdown was not functioning due to failed solenoid. Repaired completed and rectified prior to end of inspection.
Action required: 10 - Deficiency Rectified
Due 19 November 2019
Resolved 19 November 2019
Resolution: Failed solenoid on flapper was replaced prior to completion of inspection.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 August 2019
Resolved
03 fire doors in the upper passenger area did not close and latch properly. Make adjustments and repairs and prove proper operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 August 2019
Resolved
03 fire doors in the main passenger area did not close and latch properly. Make adjustments and repairs and prove proper operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 29 August 2019
Resolved
Rescue boats did not have appropriate vessel name markings. Properly mark the boats and prove to the satisfaction of an attending CG marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 29 August 2019
Resolved
Fire extinguisher brackets #19, 20, and 25 located on the car deck were wasted. Renew brackets and prove to the satisfaction of an attending CG marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 August 2019
Resolved
Lagging on overhead pipe on car deck was damaged and removed. Replace/renew and prove to the satisfaction of an attending CG marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2019
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 5 June 2019
Resolved
Public address system did not function. Make repairs and prove proper operation prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2019
Resolution: Technician reported the system is working.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 June 2019
Resolved
03 doors entering the salon on the 03 deck did not latch properly when closing. Make repairs and prove operation to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 June 2019
Resolved
The starboard aft door entering the salon on the 02 deck did not latch properly when closing. Make repairs and prove operation to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 June 2019
Resolved
Re-stencil life ring buoy on the port side of the 03 deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 June 2019
Resolved
Repair cracked window on the aft bridge door.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 June 2019
Resolved
Replace expired water light battery on the aft part of the vehicle deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 June 2019
Resolved
Ensure child-sized PFD’s are stowed separately from
adult PFD's and appropriately mark the stowage of them.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 June 2019
Resolved
The bow thruster battery charger 120v connection was found chaffed and needs to be hard wired into the electrical system. The electrical cables from the start batteries to the starter need to be proven to be of adequate size and type.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 June 2019
Resolved
The elevator was unable to operate. The vessel must prove proper operation of the elevator.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
Resolution: Elevator returned to service.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 5 June 2019
Resolved
The heaving line on the port stern can not be hung on electrical wiring. The heaving line shall be removed or relocated.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 6 March 2019
Resolved
Submit a repair proposal to make repairs or renew 03 watertight doors on the main deck. Both access doors to the engine room and bow thruster space.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2019
Resolved 5 April 2019
Resolution: Vessel performed maintenance on 3 WTD's, replaced the gaskets, and performed a chalk test to ensure they closed properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 March 2019
Resolved
Submit a repair proposal to make permanent repairs to the port steering shaft packing gland.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2019
Resolved 5 April 2019
Resolution: Dorchester Shipyard installed additional retainers for the port side packing gland on the steering shaft stopping the leak. Plan on reworking the rudder posts, packing, and gland during the next dry dock in February 2021.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 6 March 2019
Resolved
Replace missing insulation in engine room bulkhead around #1 air receiver and #2 SSDG.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2019
Resolved 5 April 2019
Resolution: Replaced missing insulation in e/r.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 6 March 2019
Resolved
Prove proper operation of 02 fire doors located on the 02 level and crow's nest.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2019
Resolved 5 April 2019
Resolution: Adjusted doors to close properly.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 28 November 2018
Resolved
Replace all missing fire protection insulation in eng room overhead. 46 CFR 72.05-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 December 2018
Resolved 13 December 2018
Resolution: Vessel replaced all missing fire protection insulation in engine room.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 28 November 2018
Resolved
Properly re-install the eng room overhead soft patch to make it water tight.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 November 2018
Resolution: Received pictures of the overhead installation.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 November 2018
Resolved
Vessel has electrical panels that are not properly marked as per regulations. the directories must be updated to approved electrical drawings and have correct information including the EDG. circuit protected, amp of breaker. 46 CFR 111.40-11, 46 CFR 111.30-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 28 February 2019
Resolution: Engineers properly labeled all electrical panels throughout the vessel.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 November 2018
Resolved
Vessel must properly conduct regular monthly portable fire extinguisher checks and document on fire extinguisher cards. 46 CFR 76.50
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 December 2018
Resolution: Vessel emailed paperwork showing that they check every fire extinguisher onboard monthly and log it.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 November 2018
Resolved
Submit plan review documents for newly installed bridge equipment including Radar, GPS, Garmin, FLIR, Navigation Lights, and Navigation light panel IAW 46 CFR 71.55-1.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 December 2018
Resolved 11 April 2019
Resolution: Received plan review documents. Vessel POC will be forwarding the documents to MSC for review.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 November 2018
Resolved
Fire screen door 1 has holes in it from previous bolt installation. Seal and repair door to meet class A-60 Equivalent IAW 46 CFR 72.05-25(b)(1).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 December 2018
Resolution: Vessel submitted pictures and a spec sheet showing that they filled the fire door with 3M Fire Barrier Sealant and then put steel bolts through the door to seal it.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 October 2018
Resolved
During transit, engineer identified auxiliary generator temperature was overheating. Provide causal factors and actions taken to rectify issue.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 15 October 2018
Resolved 15 October 2018
Resolution: Received and accepted signed statement attesting to repairs.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: No IMO #, NAME with Vsl type precursor (NAME must not include Vsl type precursors, e.g. F/V, M/V), and no dimension information (AIS Antenna Position ABCD values equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 28 February 2019
Resolution: Vessel corrected AIS information.
Navigation › Collision/Grounding Avoidance › Radar
Issued 9 April 2018
Resolved
AF01: Repair 10cm (s-band) radar prior to sailing on 12Apr18. Send tech report/email to the email below attesting to the proper repair and operation of 10cm radar.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 11 April 2018
Resolved 11 April 2018
Resolution: Port Captain sent tech report from Sperry Marine attesting to the proper repair and operation of the 10cm radar.
Engineering › Diesel Engine (auxiliary) › Block
Issued 6 March 2018
Resolved
Clean and inspect both ships service generators to include rotors, stators, exciters and megging. Provide a condition assessment report with recommended long term maintenance; for example, timeframe for deep cleaning and dipping.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 30 April 2018
Resolution: Both generators were cleaned, inspected with satisfactory resistance and capacitance readings completed by Bay Diesel. Air Gap readings were also taken. (Reports included in vessel docs).
Engineering › Thrusters › Seal
Issued 6 March 2018
Resolved
Repair/replace leaking wave tank for the Omni-thruster exhaust.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2018
Resolved 18 April 2018
Resolution: Received email documentation & pictures from the Asst Port Captain containing repair details to the Wave Suction tank in Omni-Thruster room. A new tank was built in-house using 1/4" steel plate. The tank has been installed and fully insulated.
Engineering › Bilge Water Management System › Pump
Issued 6 March 2018
Resolved
Repair/replace butterfly suction valve for the electric bilge pump. Valve is difficult to operate.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 April 2018
Resolved 14 March 2018
Resolution: Engineers removed the valve, serviced it, and reinstalled. Witnessed proper operation of the valve.
Engineering › Bilge Water Management System › Piping
Issued 6 September 2017
Resolved
Make permanent repairs to holed/corroded 1 1/2" close nipple in the bilge discharge piping in way of the bilge pump recirculation line.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 September 2017
Resolved 14 September 2017
Resolution: Recieved email from the Port Engineer documenting repairs; piping was replaced and a new valve was installed.
Engineering › Bilge Water Management System › Piping
Issued 6 September 2017
Resolved
Bilge suction piping for aft peak tank in way of the manifold is holed. Verify the integrity of all bilge suction piping & manifolds located below the chiller units in the engine room & make permanent repairs as necessary.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2017
Resolved 13 October 2017
Resolution: Manifold and piping were thickness gauged with no areas of concern noted. Repairs were carried out in way of the the leaking pipe usng proper materials and quailfied welders.
Electrical › Electric Generation Source (emergency) › Generator
Issued 6 June 2017
Resolved
Emergency Diesel Generator failed to take load after CO2 shutdown test was completed. EDG restarts were attempted but it could not automatically take the load. EDG must automatically take load.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2017
Resolution: Chief Engineer & shore side electricians troubleshoot e-panel, found blown 5 amp fuse, replaced. Proved proper operation.
Engineering › Pressure Vessel › Pressure Gauge
Issued 6 June 2017
Resolved
#2 Air receiver safety valve relieved 10 psi over the tank MAWP. Prove proper operation of safety valve at 250 psi.
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 6 June 2017
Resolution: Chief engineer & shore side techs replaced safety valve, valve relieved over 250 psi. Replaced pressure gauge & retested, safety valve relieved at 250 psi. Gauge was out of cal. All sat.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 8 November 2016
Resolved
Remove connected surge protectors and prove adequate electrical installation in food court area.
Due 8 December 2016
Resolved 14 March 2017
Resolution: Surge protectors removed.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 8 November 2016
Resolved
Repair or replace self-closing fire door on 02 deck aft starboard.
Due 8 December 2016
Resolved 5 January 2018
Resolution: Replaced door in kind
Fire Fighting › Firemans Outfit › Boots
Issued 8 November 2016
Resolved
Provide proper sized fireman boots for crew members.
Due 8 December 2016
Resolved 14 March 2017
Resolution: Proper sized boots were provided for crew members.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 18 August 2016
Resolved
Separate child lifejackets from adult lifejackets
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 25 August 2016
Resolution: Separated child lifejackets from adult lifejackets
Fire Fighting › Structural - A Class Divisions › Doors
Issued 18 August 2016
Resolved
Provide auto closure on aft galley door.
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 14 September 2016
Resolution: Provided auto closure on aft galley door.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 18 August 2016
Resolved
Remove holdback hoods from all galley fire doors
Action required: 705 - Other - as specified
Due 18 September 2016
Resolved 14 September 2016
Resolution: Removed holdback hoods from all galley fire doors
Engineering › Pressure Vessel › Relief Valve
Issued 18 August 2016
Resolved
#2 Air receiver safety relief vlave failed to re-seat fully. Repair/replace valve and prove proper ops to CGMI.
Due 18 September 2016
Resolved 14 September 2016
Resolution: op test sat.
Engineering › Pressure Vessel › Piping
Issued 18 August 2016
Resolved
#2 air receiver inlet vlave leaks by. Repair/replace valve, prove proper operation to CGMI.
Due 18 September 2016
Resolved 14 September 2016
Resolution: Valve had no leak by, the air receivers were cross connected at the outlet valves, which made it appear the inlet valve leaked by.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 18 August 2016
Resolved
Bow thruster room watertight door does not stay dogged down when bow thruster forced ventilation is on. Adjust/repair door. Prove proper operations to CGMI.
Due 18 September 2016
Resolved 14 September 2016
Resolution: door adjusted.
Engineering › Diesel Engine (propulsion-reduction gear) › Injector (fuel injection)
Issued 18 June 2016
Resolved
Complete causal analysis on shutdown of port engine while in Lewes, DE. Submit findings to Sector Delaware Bay prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2016
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (hydraulic)
Issued 30 May 2016
Resolved
Vessel suffered propulsion casualty due to a low low l/o pressure on PORT MDE reduction gear. Vessel is to investigate cause and effect repair. Vessel to conduct PSTP in presence of USCG Marine Inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 June 2016
Resolution: Installed new alarm set points as per manufacturer recommendation. PSTSP conducted with SAT reults.
Navigation › Piloting/Steering › Maneuvering Information Fact Sheet
Issued 16 May 2016
Resolved
Provide updated pilot card/vessel maneuvering characteristics for vessel following engine repower IAW 33CFR164.35.
Action required: 705 - Other - as specified
Due 30 May 2016
Resolved 20 May 2016
Navigation › Piloting/Steering › Magnetic Compass
Issued 16 May 2016
Resolved
Provide valid compass deviation card for vessel's compass IAW 46CR77.11.
Due 30 May 2016
Resolved 8 November 2016
Fire Fighting › Structural - A Class Divisions › Doors
Issued 16 May 2016
Resolved
Remove hold back hooks on forward self closing fire doors in salon IAW 46CFR72.05-25.
Action required: 705 - Other - as specified
Due 30 May 2016
Resolved 20 May 2016
Documentation › Certificates/Documents › Stability Letter
Issued 16 May 2016
Resolved
Provide approved/valid stability letter IAW 46CFR78.12-1.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2016
Resolved 20 May 2016
Fire Fighting › Structural - A Class Divisions › Cargo Spaces (moderate fire risk)
Issued 16 May 2016
Resolved
Vessel must reinstall missing structural fire protection insulation in Engine Room overhead STBD side outboard #2SSDG, PORT side at side shell and overhead.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2016
Resolved 20 May 2016
Resolution: Insulation installed. SAT.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 May 2016
Resolved
Vessel must remove dead end wiring to old PORT and STBD MDE prelubrication pumps.
Action required: 705 - Other - as specified
Due 30 May 2016
Resolved 20 May 2016
Resolution: Wiring removed. SAT.
Engineering › Reduction Gearing/Clutches › Oil Spray
Issued 16 May 2016
Resolved
Prove proper operation of PORT MDE reduction gear Low Lube Oil Alarm.
Action required: 705 - Other - as specified
Due 30 May 2016
Resolved 20 May 2016
Resolution: Verified alarm using DVT/PSTP. Alarm point 12 psi. SAT.