Records from 2005 to 2026. Most recent: inspection, 28 July 2026.
Inspection history · 113
28 July 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8453363
21 July 2026
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8313405
24 June 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8413187
16 June 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8420637
10 March 2026
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8313403
22 January 2026
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8325215
6 January 2026
MTSA Verification · Deficiency Check · In-Service Inspection · Administrative Inspection · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8291378
30 September 2025
Re-Inspection · MTSA Verification · Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8245032
24 September 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8241020
19 September 2025
In-Service Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8237680
19 September 2025
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8239544
5 September 2025
Deficiency Check · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8240558
27 August 2025
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8219725
21 August 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8214875
22 July 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8192089
24 May 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8142593
22 May 2025
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8139517
20 May 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8140446
12 March 2025
Load Line/Change of Employment · Examination of Repairs · Plan Review (Other than "T") · Deficiency Check · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8090366
3 March 2025
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8088697
22 February 2025
Damage Survey
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8082925
22 February 2025
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8083539
21 February 2025
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8082496
2 December 2024
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8042070
17 October 2024
Re-Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8020311
2 October 2024
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8013286
29 July 2024
Re-Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7967558
7 May 2024
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7907158
10 April 2024
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7893275
12 March 2024
MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7874297
14 November 2023
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7822225
12 October 2023
Load Line/Change of Employment · Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7807620
11 October 2023
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7821625
19 September 2023
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7795138
29 August 2023
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7778779
16 August 2023
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7770021
15 August 2023
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7774165
25 May 2023
MTSA Verification · Re-Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7695493
9 April 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7665400
30 March 2023
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7660278
6 February 2023
COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7632482
15 November 2022
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7595342
29 September 2022
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7572669
16 September 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7560310
22 June 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7484030
9 June 2022
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7473154
22 May 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7458063
28 March 2022
MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7419622
26 March 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7419619
16 March 2022
Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7412937
10 February 2022
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7394363
9 February 2022
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7391699
31 January 2022
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7388083
7 December 2021
Deficiency Check · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7364165
7 September 2021
Deficiency Check · MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7306720
15 June 2021
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7225669
6 April 2021
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7170642
1 April 2021
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7167067
1 April 2021
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7167493
15 December 2020
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7105127
20 November 2020
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7099031
17 November 2020
Administrative Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7097462
25 August 2020
Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7042636
16 June 2020
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6979586
11 June 2020
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6974728
26 March 2020
COI Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6931736
13 November 2019
Drydock Exam · Internal Structural Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6855144
31 October 2019
Load Line/Change of Employment · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6846241
22 October 2019
Special
Type not classified · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6839940
8 August 2019
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6776872
11 June 2019
Re-Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6710266
1 June 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6702454
25 April 2019
COI Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6670008
23 April 2019
Load Line/Change of Employment · Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6668239
28 January 2019
Examination of Repairs · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6621457
2 January 2019
Load Line/Change of Employment · Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6604939
3 December 2018
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6591339
13 November 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6579429
22 August 2018
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6518113
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6506017
11 July 2018
Administrative Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6476341
8 May 2018
Administrative Inspection · In-Service Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6408142
28 February 2018
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6366313
26 February 2018
MTSA Verification · COI Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6360208
28 November 2017
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6313480
21 November 2017
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6311040
27 October 2017
Plan Review (Other than "T") · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6384490
1 September 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6256999
23 August 2017
MTSA Verification · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6247585
19 July 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6214162
22 May 2017
Deficiency Check · Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6152060
31 March 2017
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6117577
28 March 2017
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6132508
22 March 2017
Administrative Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6108745
21 March 2017
VRP Drill · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6113194
28 February 2017
COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6095602
2 February 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6081502
10 January 2017
In-Service Inspection · MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6068194
21 September 2016
Deficiency Check · MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6005334
15 September 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6001659
8 September 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5995994
22 August 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5979865
7 June 2016
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5905918
26 May 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5887376
6 May 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5870449
15 April 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5854953
12 April 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5852368
19 March 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5836537
17 March 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5837611
9 March 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5829954
1 March 2016
COI Inspection · MTSA Verification · Deficiency Check · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5822696
10 February 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5812965
3 February 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5808789
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 24 June 2026
Resolved
At each annual inspection the passenger and crew quarters, toilet and washing spaces, galleys, serving pantries, lockers, etc., shall be examined by the inspector to be assured that they are in a sanitary condition. Vacuum pumps for the MSD tanks are inoperable. Vessel must ensure satisfactory sanitary conditions for passengers and crew. Vessel can depart without passengers to make effective repairs in Cape May.
46 CFR 71.25(a)
701a
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2026
Resolution: Vessel engineers were able to replace pump and MI verified repairs all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 June 2026
Resolved
The inspections and tests must ensure that the equipment and associated structure are in satisfactory operating conditions and fit for the service for which they are intended. The vessels bow thruster was discovered to be inoperable following maintenance the evening of June 15, 2026. The vessel is permitted to complete its scheduled operations on June 16, 2026. However, repairs must be completed and verified to the satisfaction of an attending Marine Inspector prior to carrying passengers after June 16, 2026.
46 CFR 61.01-1
Action required: 705 - Other - as specified
Due 17 June 2026
Resolved 17 June 2026
Resolution: ABS rep attended vessel and crew tested repairs in their presence. PTO replaced.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 March 2026
Resolved
Sprinkler Piping break. The system shall be so designed and arranged that overhead is effectively sprayed, and all portions of the deck are covered. Sprinkler piping in zone 3 car deck broke during testing. Submit repair proposal to satisfaction of OCMI. 46 CFR 76.23-10(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 March 2026
Resolution: Received photos and videos of proper repairs, pressure test and operational test.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 March 2026
Resolved
Where extinguishing systems or equipment are not required, but are installed, the system or equipment and its installation must meet the requirements of this part. Galley fire extinguishing system has been removed, but pull handle and label stating "In case of fire pull pin" are still installed. Remove activation site of former fire equipment. 46 CFR 76.01-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 1 April 2026
Resolution: Removed sign and activation site.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 10 March 2026
Resolved
Each side of each lifeboat and rescue boat bow must be marked in block capital letters and numbers with— The name of the vessel. Port rescue boat had wrong name labeled on boat. Correct name to the satisfaction of the marine inspector. 46 CFR 199.176(a)(1)(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 1 April 2026
Resolution: Boat relabeled
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 March 2026
Resolved
A voltage regulator and voltage regulator functional cut-out switch. Manual Voltage Regulators on #1 and #2 SSSDGs are inoperable. Investigate, make proper repairs and provide satisfactory testing in presence of MI. 46 CFR 111.30-25 (6)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 17 April 2026
Resolution: Received Technician report for repairs made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 March 2026
Resolved
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. While conducting PTSP on steering system, the following PTSP were inop. #1 and #2 Redundancy fault and #2 Steering system failure. Investigate and repair. Conduct testing in presence of attending MI. 46 CFR 61.40-6 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 17 April 2026
Resolution: PTSP was updated and sent to MSC for approval
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 March 2026
Resolved
The general construction of the vessel shall be such to minimize fire hazards. Both Main Diesel Engine air intake filters were saturated with oily residue. Replace filters. 46 CFR 72.03-5(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 1 April 2026
Resolution: Air filters replaced
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 March 2026
Resolved
Complete and simple instructions for the operation of CO2 system must be located at pull boxes. Each control valve to branch lines must be marked to indicate the related space served. Replace CO2 operating instructions at CO2 pull station to Engine Room. Current pull stations 1 & 2 are marked with marker. Make permanent marks for pull stations. 46 CFR 76.15-10 (h)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 1 April 2026
Resolution: Labels added
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 March 2026
Resolved
During each inspection the inspector shall examine bilges in machinery space to see that there is no accumulation of oil which might create a fire hazard. Inspector witnessed excess oil/oily water in bilge in Bow Thruster. Remove and clean oily water in bilge. 46 CFR 71.25-45
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 1 April 2026
Resolution: Bilge cleaned
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 March 2026
Resolved
Electrical installation on vessels must ensure protection of passengers, crew, other persons from electrical hazards. Open end wires were found in engine alarm panel box. Cap or remove wires. 46 CFR 111.01-1(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 March 2026
Resolved 1 April 2026
Resolution: Wires capped
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 10 March 2026
Resolved
Each system must have an alarm which— Automatically sounds and visually signals a loss of power to the system; EOT Failure alarm did not sound. Repair/replace to the satisfaction of the Marine Inspector. 46 CFR 113.35-5(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2026
Resolved 1 April 2026
Resolution: EOT alarm repaired
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 March 2026
Resolved
No flexible cord may be used except: As allowed under Sections 400.10 and 400.12 of NFPA 70; Vessel is using extension cords to install heat tape. Remove extension cords. 46 CFR 111.60-13(b)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2026
Resolved 1 April 2026
Resolution: Extension cord removed
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 10 March 2026
Resolved
Piping system designs must account for the effects of ship motion and flexure, including weight, yaw, sway, roll, pitch, heave, and vibration. CO2 piping on the car deck for the soda machine was secured by zip ties. Provide permanent securing devices. 46 CFR 56.07-10(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2026
Resolved 1 April 2026
Resolution: CO2 piping secured
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 10 March 2026
No resolution recorded
Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he deems necessary to be assured of the safety and seaworthiness of the vessel. The following items were discovered and must be addressed prior to credit drydock: foundation of both MESs look corroded- make available for inspection, multiple electrical fittings on deck were no longer watertight- conduct inspection of fittings and repair broken enclosures, muster stations do not match lifesaving plan- review plan and amend plan or signs, temporary repair was made to the 02 deck/bulkhead (forward section of salon to outdoor space and from salon to car deck)- make permanent repairs. 46 CFR 71.25-50
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 6 January 2026
Resolved
Each generator prime mover must have an overspeed device that is independent of the normal of the normal operating governor and adjusted so that the speed cannot exceed the maximum rated speed by more than 15%. Overspeed in #1 generator is inoperative. Make repairs and conduct tests to the satisfaction of MI.
46 CFR 111.12.1(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 January 2026
Resolution: Operator provided video evidence of repairs.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 6 January 2026
Resolved
During each inspection the inspector shall examine bilges in machinery space to see that there is no accumulation of oil which might create a fire hazard. Inspector witnessed excess oil/oily water in bilge in Bow Thruster. Remove and clean oily water in bilge to satisfaction of attending Marine Inspector.
46 CFR 71-25-45
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 29 January 2026
Resolution: MI verified clean bilge.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 January 2026
Resolved
A-60 boundary was missing lagging outboard on starboard and port side near overhead. Replace missing lagging.
46 CFR 72.05-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 12 January 2026
Resolution: MI verified properly installed lagging.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 January 2026
Resolved
Electrical installation on vessels must ensure maintenance of services necessary for safety under normal and emergency conditions. Battery cable connections in battery in box are corroded. Clean battery connections.
46 CFR 111.01-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 12 January 2026
Resolution: MI verified proper battery cable connections.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 6 January 2026
Resolved
Vessels must be equipped with independently drive fire pumps. Emergency fire pump in bow thruster room has small leak. Investigate and make proper repairs to fire pump to satisfaction of MI.
46 CFRE 76.10-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 12 January 2026
Resolution: MI verified proper operation of emergency fire pump.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 6 January 2026
Resolved
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. While conducting J/W test on Port MDE the low-pressure panel gauge in Engine Control room was inop. Investigate and repair panel gauge.
46 CFR 61.40-6(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 29 January 2026
Resolution: MI witnessed properly working low-pressure panel gauge.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 6 January 2026
Resolved
The generator set must shut down automatically upon loss of oil pressure, and overspeed. Shutdown Alarm indicator for EDG is inoperative. Investigate and make proper repairs and conduct tests in presence of Marine Inspector.
46 CFR 112.50.1(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 29 January 2026
Resolution: MI verified successful overspeed test.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 6 January 2026
Resolved
Following sprinkler heads were clogged during inspection. Starboard outboard forward sprinkler head, Middle Center aft 2 sprinkler head, Port side aft sprinkler head. Clean sprinkler heads and re-test to satisfaction of MI.
46 CFR 76.25.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 12 January 2026
Resolution: All sprinkler heads on car deck functioned properly in presence of attending MI.
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 6 January 2026
Resolved
Kept receiving redundancy error alarm on steering panel. Investigate and make proper repairs to satisfaction of Marine Inspector.
46 CFR 58.25-25
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 12 January 2026
Resolution: MI verified functioning redundancy error alarm.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 6 January 2026
Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Foam for foam applicator stored in car deck storage locker (as indicated on Fire Control Plan) was manufactured in 2002 with no subsequent testing. Replace or analyze foam to satisfaction of MI.
46 CFR 78-17-80(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 10 March 2026
Resolution: Replaced foam
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 6 January 2026
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Multiple holes were identified in vicinity of Fire Station #8 on car deck. Submit repair proposal and affect repairs to satisfaction of MI.
46 CFR 71.55-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 29 January 2026
Resolution: Repaired
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 6 January 2026
Resolved
All enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators. STBD galley vent exhaust damper lever was found incapable of securing damper. Affect repairs of the STBD galley vent exhaust damper to satisfaction of MI.
46 CFR 76.15-35
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 29 January 2026
Resolution: Repaired
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 6 January 2026
Resolved
Each davit, winch, fall, and other launching appliance must be thoroughly inspected and repaired, as needed, once each year. Identified multiple areas of wastage on both Port and STBD rescue boat davit systems. Both Port and STBD rescue boat davits shall be inspected and evaluated by an authorized service provider in the presence of an attending MI.
46 CFR 199.190(f)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2026
Resolved 23 April 2026
Resolution: Approved temporary repair. Must be replaced at next drydock and quarterly gauging conducted.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 30 September 2025
Resolved
Radio lifesaving appliance installations and arrangements must meet the requirements of 47 CFR part 80. Radio on rescue boat was inoperable. Repair or replace to the satisfaction of the Marine Inspector. 46 CFR 199.60(a)
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2025
Resolved 13 November 2025
Resolution: Operator replaced radio
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 September 2025
Resolved
The inspections and tests must ensure that the equipment and associated structure are in satisfactory operating conditions and fit for the service for which they are intended. Crew did not have T handle to operate steering in all conditions. Replace handle. 46 CFR 61.01-1(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2025
Resolved 13 November 2025
Resolution: Operator replaced T handle
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 30 September 2025
Resolved
It shall be the responsibility of the master to assure himself before leaving protected waters that all exposed cargo hatches of his vessel are closed and made properly tight. Steering hatches were leaking. Repair hatches to the satisfaction of the marine inspector. 46 CFR 78.17-35(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2025
Resolved 19 May 2026
Resolution: Hatches Repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 September 2025
Resolved
Each device must— Be free of design defects such as rough or sharp edges that may cause bodily injuries or that would allow toxic substances to escape to the interior of the vessel; Filter for sewage pump 2 was leaking. Repair to the satisfaction of the Marine Inspector. 33 CFR 159.95(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2025
Resolved 13 November 2025
Resolution: Operator replaced filter that was leaking
10 - Safety of Navigation › N/A - No Subsystem › Bridge operation
Issued 24 May 2025
Resolved
All vessels must have sufficient power for going astern to secure proper control of the ship in all normal circumstances. Vessels starboard engine astern throttle controls from navigation bridge would not function. Vessel throttles were astern and shaft was moving forward. Troubleshoot, provide casualty analysis, and conduct satisfactory repairs prior to movement.
46 CFR 77.03(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 May 2025
Resolution: Attended vessel and conducted satisfactory sea trials to test the operation of the STBD engine throttle control. All Sat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 May 2025
Resolved
Doors, other than those which are normally locked, such as from staterooms, fan rooms, lockers, etc., shall be of the self-closing type. Starboard, forward salon A class door closing mechanism has been taken off. Install closing mechanism to satisfaction of MI prior to carrying passengers. 46 CFR 72.05-25(b)(9)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2025
Resolution: Attended vessel and verified the satisfactory installation and operation of the closing mechanism on the STBD forward salon A class door.
11 - Life Saving Appliances › N/A - No Subsystem › Marine Evacuation System
Issued 22 May 2025
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Starboard MES has error causing auto-release function to be inoperable. Repair to satisfaction of [name withheld] repaired, train crew on manual deployment in case of emergency. 46 CFR 199.190 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2025
Resolved 6 June 2025
Resolution: Received report attesting to repair.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 22 May 2025
Resolved
Bulkheads or decks of the “A” Class shall be composed of steel or equivalent metal construction, suitably stiffened and made intact with the main structure of the vessel, such as shell, structural bulkheads, and decks. They shall be so constructed that, if subjected to the standard fire test, they would be capable of preventing the passage of smoke and flame for 1 hour. Insulation in the Engine Room and Bow Thruster space was missing. Repair to the satisfaction of the MI.
46 CFR 72.05-10(c)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 17 July 2025
Resolution: Replaced insulation
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 May 2025
Resolved
Each self-propelled vessel... must have an electric or mechanical engine order telegraph system from the navigating bridge to the engineroom. Port EOT did not properly work. Repair to the satisfaction of the MI. 46 CFR 113.35-3(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 27 August 2025
Resolution: Attended vessel and witness proper operation of EOT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 May 2025
Resolved
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. Vessel has 2 grounds (heater/fridge). Keep breaker/equipment secured until repaired to the satisfaction of the MI. 46 CFR 111.01-1(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 27 August 2025
Resolution: Ground of corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 22 May 2025
Resolved
The annual inspection shall include an inspection of the structure, boilers, and other pressure vessels, machinery and equipment. The inspection shall be such as to insure that the vessel... is in satisfactory condition and fit for the service for which it is intended. Lagging was missing from the #1 Generator. Repair to the satisfaction of the MI. 46 CFR 71.25-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 25 June 2025
Resolution: Replaced lagging
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 22 May 2025
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification and shall include the proper condition and operation of the survival craft and rescue boat launching appliances. Starboard rescue boat davit articulating rod cylinder is holed. Repair to satisfaction of MI. 46 CFR 199.45(b)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 5 September 2025
Resolution: Proper repairs were made and davit test conducted.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 May 2025
Resolved
The outlet at each fire hydrant must be provided with a cock or valve fitted in such a position that the fire hose may be removed while the fire main is under pressure. Fire stations #4 & #10 were found leaking. Repair to satisfaction of MI. 46 CFR 76.10-10 (f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 25 June 2025
Resolution: Repaired leaks
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 May 2025
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Two light switches and one junction box were found without covers in crew room. Additionally, dead end wires found in hotdog room. Install covers and secure dead end wires to satisfaction of MI. 46 CFR 111.01-1(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 25 June 2025
Resolution: Replaced covers and removed dead end wires
08 - Alarms › N/A - No Subsystem › General alarm
Issued 22 May 2025
Resolved
General emergency alarm signal must be located in ...public spaces, work spaces, ... General alarm speakers #2 and #10 are inoperable. Repair to satisfaction of MI. 46 CFR 113.25-9(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 25 June 2025
Resolution: Repaired speakers
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 22 May 2025
Resolved
Loudspeakers must be located to provide intelligible and audible one-way communication throughout the vessel. Fwd car deck speaker is inoperable. Repair to satisfaction of MI. 46 CFR 113.50-15(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 17 July 2025
Resolution: Replaced Speaker
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 22 May 2025
No resolution recorded
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work. Fire control plan is out-of-date and includes fixed fire system for galley. Make appropriate changes to fire control plan to satisfaction of MI. 46 CFR 71.65-10(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 22 May 2025
Resolved
The lights, means of making sound signals, and distress signals carried by the vessel shall also be subject to the above-mentioned inspection. Auto signaling system for ship's whistle is inoperable. Repair to satisfaction of MI. 46 CFR 71.25-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 25 June 2025
Resolution: Repaired system
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 22 May 2025
Resolved
Simple operating instructions with a block diagram, showing the change-over procedures for remote steering gear control systems and steering gear power units, permanently displayed on the navigating bridge and in the steering gear compartment. Vessel does not have instructions for emergency steering. Display instructions on bridge and locally to satisfaction of MI. 33 CFR 164.35(k)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2025
Resolved 25 June 2025
Resolution: Added instructions
10 - Safety of Navigation › N/A - No Subsystem › Bridge operation
Issued 20 May 2025
Resolved
All vessels must have sufficient power for going astern to secure proper control of the ship in all normal circumstances. During Sea Trials, vessels starboard engine astern throtte controls from navigation bridge and bridgewing would not function. Vessel throttles were astern and shaft was moving forward. Troubleshoot, repair, provide casulty analysis, and conduct satisfactory sea trials prior to departure.
46 CFR 77.03(a)
46 CFR 05-5(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 20 May 2025
Resolved 21 May 2025
Resolution: Cleared by Sector New York
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 22 February 2025
Resolved
The MI may inspect the steering gear more often as necessary. Vessel reported fire in the E/R and loss of port steering pump. Upon investigation, the fire was determined to be limited to the port steering gear panel. Vessel permitted to transit back to Cape May to affect repairs. Passengers are not permitted. 46CFR61.20-1
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 August 2025
Resolution: Steering repaired in drydock.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 17 October 2024
Resolved
Tests and inspections of the lifesaving equipment shall be carried out and shall include a demonstration of the proper condition and operation of the survival craft and rescue boat launching appliances. Port and starboard side remote brake release davit wires were found frayed and/or kinked. Additionally, starboard side davit limit switch cable kick pipe is holed. Replace wires and repair kick pipe to satisfaction of MI. 46 CFR 199.45 (b)(2)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 November 2024
Resolved 2 December 2024
Resolution: Verified installation of new wires and repair of kick pipe.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 October 2024
Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. Electrical wiring located at car deck overhead (amidships) was improperly and temporarily installed. Make permanent repairs prior to COI renewal inspection. 46 CFR 111.01-1 (2)
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Vessel installed permanently mounted junction box.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 October 2024
Resolved
The inspector shall examine all accessible parts of the vessel's hull, machinery, and equipment to be assured that it is in a satisfactory condition. Forward, starboard sea chest goose neck was extensively rusted and broken. Submit a repair proposal to our office. Once approved, make repairs prior to COI renewal. 46 CFR 71.30-5(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 2 December 2024
Resolution: Verified installation of new goose neck.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead strength
Issued 17 October 2024
Resolved
Bulkheads of “A” Class shall be so constructed that they would be capable of preventing the passage of smoke and flame for 1 hour. Open cable penetrations in "A" Class boundaries were identified on the starboard side of the bridge bulkhead and starboard side bulkhead of the crew lounge. Repair “A” Class boundaries to original fire protection standards prior to COI renewal inspection. 46 CFR 72.05-10 (c)(1)
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 28 July 2025
Resolution: cable penetration for Class A boundaries were corrected.
08 - Alarms › N/A - No Subsystem › Boiler alarm
Issued 17 October 2024
Resolved
All controls, safety devices, and other control system equipment must be tested and inspected to verify their proper design, construction, installation, and operation. The low water alarm on the boilers 1 and 3 and the high temperature alarm/shutdown on boilers 1, 2, and 3 did not work. Repair boilers to the satisfaction of the marine inspector. Complete prior to boiler operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Witnessed tests of all alarms/shutdowns.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 October 2024
Resolved
An electrical control used to shut down the automatic auxiliary boiler must be installed in accordance with § 58.01-25 of this subchapter. This device must stop the fuel supply to the fuel burning equipment. (The controls…must be suitably marked.) Boiler emergency stops were not properly labeled and did not match labels on corresponding boiler. Replace labels so emergency stop markings and boiler markings match and are easily identifiable. Complete prior to boiler operation.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Verified emergency stop labels match boiler labels.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 17 October 2024
Resolved
The lanterns must be capable of providing light for at least 3 hours. Battle lantern on the forward starboard side of the engine room is unable to remain lit on battery power. Repair battle lantern prior to COI renewal inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Verified battle latern is operational.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 17 October 2024
Resolved
Electric installations and electric equipment must be inspected to determine mechanical and electrical condition and performance. Flashing alarm light in bow thruster did not illuminate. Repair light prior to COI renewal inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Witnessed satisfactory test of flashing red light.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 October 2024
Resolved
The respective piping systems installed on ships must have the necessary...for safe and efficient operation of the vessel. Flexible hoses on the generators (oil blow by hose on the #1 generator and oil hose between the block and bearing on the #2 generator) were damaged. Repair or replace hoses prior to COI renewal inspection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 28 July 2025
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 2 October 2024
Resolved
The main steering gear and rudder stock must be capable of moving the rudder from 35° on either side to 35° on the other with the vessel at its deepest loadline draft and running at maximum ahead service speed. Vessel is only capable of moving rudder from 35 port to 30 starboard. Vessel must exhibit capability to move rudder to 35 degrees starboard.46 CFR 58.25-10(c)(2)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 October 2024
Resolved 4 October 2024
Resolution: Vessel exhibited full rudder capabilities of 35 degrees STBD to 35 degrees Port to the satisfaction of MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 July 2024
Resolved
MI observed the port shaft seal leaking and the bilge pocket filling up.
Vsl is required to repair/replace the shaft seal in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2024
Resolved 12 August 2024
Resolution: New machined plate installed and tested no leak.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 29 July 2024
Resolved
MI observed fire station #9 located fwd of the engine room was missing it fire axe.
Vsl is require to supply a fire axe for that station or amend the fire control plan within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2024
Resolved 12 August 2024
Resolution: Axe replaced
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 29 July 2024
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification and periodic inspection. MI observed numerous expired items in the first aid kit/bag at the operating station. Remove and replace expired items from medical kits onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2024
Resolved 12 August 2024
Resolution: new items were bought and expired items were removed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 29 July 2024
Resolved
All portable fire extinguishers and semi-portable fire extinguishing systems must be maintained in accordance with NFPA 10. MI observed rotted hose on CO2 extinguisher at starboard side engine room entrance (station 19). Replace hose to satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2024
Resolved 12 August 2024
Resolution: Extinguisher replaced
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 July 2024
Resolved
The sidelights of vessels of 20 meters or more in length shall be fitted with matt black inboard screens. Screens for port/starboard nav lights are no longer matt black. Repaint screens to satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2024
Resolved 12 August 2024
Resolution: Painted screens
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 7 May 2024
Resolved
Doors shall be of the self-closing type capable of closing against a 3 1/2 degree list, and such doors shall be numbered in accordance with §78.47-35 of this sub chapter; Port and starboard forward doors entering salon do not self-close, to be adjusted. Starboard aft door entering salon does not self-close, to be adjusted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2024
Resolved 14 May 2024
Resolution: Doors were adjusted accordingly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 May 2024
Resolved
The general construction of the vessel shall be such as to minimize fire hazards as is reasonable and practical; Fuel hose off of #1 generator is significantly chaffed, to be repaired or replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2024
Resolved 14 May 2024
Resolution: Replaced fuel hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 May 2024
Resolved
Emergency generators shall be operated under load for at least 2 hours, at least once in each month that the vessel is navigated; 2 hour load test has lapsed since last test in February 2024, to be retested.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2024
Resolved 14 May 2024
Resolution: Re-tested EGEN.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 May 2024
Resolved
Each distribution panel must have a directory attached to the inside of the cover, designating each circuit. Distribution panel L2 and L2A in boat deck galley missing circuit directory, to install blanks in lieu of electrical tape for circuits not in use.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2024
Resolved 14 May 2024
Resolution: Updated circuit directory.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 12 March 2024
Resolved
Each vessel must be provided with a sound-powered telephone system to communicate between the pilothouse and the steering-gear compartment. Sound powered phone in aft steering is inoperative. 46 CFR 58.25-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 March 2024
Resolved 7 May 2024
Resolution: Tested and operational
08 - Alarms › N/A - No Subsystem › General alarm
Issued 12 March 2024
Resolved
Each vessel must have a general emergency alarm system. General Alarm #10 on vehicle deck is inoperative. 46 CFR 113.25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 April 2024
Resolved 11 September 2024
Resolution: vsl adjusted #10 general alarm bell, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 August 2023
Resolved
The Marine Inspector may inspect the steering gear more often if necessary. Master reported vessel's steeringwas slow to respond to steering commands/steering geardid not match command. Vessel to prove proper operation of steering prior to departure/carriage of passengerss.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 August 2023
Resolution: Witnessed test of sat repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 May 2023
Resolved
Power-operated main and auxiliary steering gear must be separate systems that are independent throughout their length. Other systems and arrangements of steering gear will be acceptable if the Commanding Officer, Marine Safety Center, determines that they comply with, or exceed the requirements of, this subpart.
MI observed hydraulic fluid in the steering compartment.
During the test an over pressurization was noticed on both rudder seals and fittings causing leaks intermittently.
Vsl is required to submit a mitigation plan prior to carrying passenger until a repair plan has been made.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2023
Resolution: Accepted by ABS and receive mitigation plan.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 May 2023
Resolved
Each Circuit breaker must -(1) Meet the general provision of Article 240 of NFPA NEC 2002 or IEC 60092-202 (both incorporated by reference; see 46 CFR 110.10-1) as appropriate;(2) Meet subpart 111.55 of this part;
MI observed the #1 generator circuit break malfunctioning/did not close/catch when C/E closed the breaker.
Vsl is required to repair/replace break to the satisfation of class.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2023
Resolved 25 May 2023
Resolution: Accepted by ABS
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 May 2023
Resolved
All safety and relief valves for use on pressure vessels or piping systems shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the “maximum allowable working pressure” of the pressure vessel or piping system.
MI observed #2 and #3 air receiver relief valve, relieving pass the pressure vessels MAWP (250psi).
Require vsl to adjust/replace relief valve to the satisfaction of class.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2023
Resolved 25 May 2023
Resolution: Accepted by ABS
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 25 May 2023
Resolved
Where pressure-indicating gages are used, they shall be chosen to be compatible with the pressure to be indicated. The size of the visual display, the fineness of graduations, and the orientation of the display will be considered. In no case shall the upper range of the gage be less than 1.2 times nor more than 2 times the pressure at which the relieving device is set to function.
MI observed all 4 air receivers having a gauge more then 2 times greater then the relief valve setting. (setting 250psi/gauge 600psi.
Vsl is required to replace gauge to the satisfaction of class.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2023
Resolved 25 May 2023
Resolution: Accepted by ABS
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 25 May 2023
Resolved
The position of the rudder, if power operated, must be shown at the principle steering station. If there is non follow-up steering control at the alternate steering station, there must be a separate rudder angle indicator system for that station that is electrically independent from each other rudder angle indicator. Port and starboard rudder angle indicator does not match with rudder angle indicator in steering gear room. Hard port is off by 8-10 degrees and hard starboard is off by 3-5 degrees. Make correct repairs to satisfaction of class society.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2023
Resolved 25 May 2023
Resolution: Accepted by ABS
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 9 April 2023
Resolved
Each vessel must have a functioning gyro compass. Vessel reported an error with the gyro compass. As of 10APR23 Vessel will be limited to daylight operations only with a minimum of 2nm of visibility. Gyro compass shall be repaired to the satisfaction of the attending inspector. 33 CFR 164.35
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 April 2023
Resolution: Gyro repaired by technician. See attached report.
10 - Safety of Navigation › N/A - No Subsystem › Gyro compass
Issued 9 June 2022
Resolved
Inspector shall examine all equipment to be assured that it is in satisfactory condition. Vessel gyrocompass located in chart room displayed an alarm for an annual overhaul and is overdue.
46 CFR 71.30-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2022
Resolved 16 September 2022
Resolution: Tech servicing report submitted
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 9 June 2022
Resolved
Each vessel must have posters or signs displayed in the vicinity of each survival craft and launching appliances that give relevant instructions and can be easily seen. Vessel shall replace faded/illegible marine evacuation system (MES) placards and shall replace the faded emergency stickers displaying an arrow up to the MES station at forward & stbd car deck ladder wells.
46 CFR 199.90 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2022
Resolved 22 June 2022
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 9 June 2022
Resolved
Satisfactory means, permanently attached, shall be provided for closing the openings, of all vents. Several F/O containment hinged vent closures on the car deck were seized and in-op. vessel shall check all exposed vent tank closures and ensure their operation. 46 CFR 56.50-85(7)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2022
Resolved 22 June 2022
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 9 June 2022
Resolved
Accommodations provided for crew & officers shall be securely constructed and properly drained. Excessive water pooled up and sloshing from side to side in the work space aft of the lido bar and it was noted this is a common occurrence. 46CFR72.20-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2022
Resolved 22 June 2022
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 April 2022
Resolved
Electric installations on vessels must ensure protection of passengers, crew, and other persons from electrical hazards. A ground on the navigational panel was identified.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 April 2022
Resolved 22 June 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 5 April 2022
Resolved
Window located on the bridge is shattered.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 22 June 2022
Resolution: Window replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 April 2022
Resolved
Electric installations on vessels must ensure maintenance of services for safety under normal and emergency conditions. An oil leak was identified on teh EEDG.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 April 2022
Resolution: The oil hose was replaced. It was pressure tested at 1 1/2 times wp of engine.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 March 2022
Resolved
Lifesaving appliances and arrangements are subject to tests and inspections to ensure that appliances are in satisfactory condition and remain fit for service. Remote hand break wire pulleys were painted over and not moving. Replace inoperable pulleys to the satisfaction of attending Coast Guard Marine Inspector prior to carrying passengers.
46 CFR 199.45(c)(2)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 March 2022
Resolution: recieved video of operational pulleys
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 7 December 2021
Resolved
01 exterior light on the port side of lido bar was partially filled with water. Each light fixture in the weather must be watertight, inspect light & gasket to address/fix water intrusion.
46 CFR 111.75-20 (d)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 December 2021
Resolved 21 December 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2021
Resolved
All pressure vessels must be provided with protective
devices. Pressure relief device on potable water and
flush water pressure tanks are leaking.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 December 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2021
Resolved
Nonmetallic flexible hose used in a fuel oil system must
be in accordance with SAE J1942 and have factory
assembled SAE J1475 fittings. Flexible hose used to
prime RACORs is fitted with hose clamp and not J1475
fitting and it is unclear if the hose itself is J1942.
The hose was dripping fuel onto a hot surface which in
turn was smoking. Provide proposal for modification of
the arrangement to include approved hose and minimize
fire hazard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 December 2021
Resolved
Each battery box must have a watertight lining to a
height of at least 3 inches and be free of debris and
standing water/electrolyte. There is fluid in the bottom
of the bow thruster battery box, and the wooden shelf
under the box is wasted. It is unclear if the box is
allowing spilled electrolyte to pass through.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 December 2021
Resolved
Electrical equipment in locations requiring exceptional
degrees of protection must be enclosed to meet the
minimum degrees of protection... A junction box on the
starboard boat davit has a penetration that is open to
the weather.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 December 2021
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 7 December 2021
Resolved
Where liquid level indicating devices are attached to
the tank, they shall be of heat resistant materials
adequately protected from mechanical damage and provided
at the tank connections with devices which will
automatically close in the event of rupture. The
emergency generator sight class has a crack in it.
Additionally, the valves are not a type which will
automatically close.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 December 2021
Resolved 10 February 2022
Resolution: Replaced with sure site brand sight glass.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 7 December 2021
Resolved
Pipe hanger in the bilge, in way of port engine RACOR
has become unattached to supporting member.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 December 2021
Resolved 29 March 2022
Resolution: Cleared during dry dock.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 September 2021
Resolved
01 ring Life buoy on starboard forward 02 deck is cracked and 01 ring life buoy on port side bridge wing has retro & grab lines that are frayed and deteriorated. Vessel shall ensure buoys meet the Q-specification and are replaced.
46 CFR 199.170
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 September 2021
Resolved 15 September 2021
Resolution: provided pictures showing life buoys replaced and/or repaired
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 7 September 2021
Resolved
01 exterior light on the port side of lido bar was partially filled with water. Each fixture in the weather must be watertight, ispect light & gasket to address/fix water intrusion.
46 CFR 111.75-20 (d)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2021
Resolved 15 September 2021
Resolution: Light fixture was drained and new gasketing installed.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 7 September 2021
Resolved
01 overhead Light at the vessel Op Station and 01 overhead light in the chart room are missing covers. Spaces used by passengers or crew must be fitted with lighting that provides for a safe habitable and working environment Replace covers on the lights.
46 CFR 111.75-15 (c)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2021
Resolved 15 September 2021
Resolution: new light covers installed
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 15 June 2021
Resolved
All sprinkler system zones were tested for operational readiness. The following pipes and nozzles were deficient and must be repaired and retested:
-Inboard Zone 2 Pipe forward 3 nozzles were clogged
-Inboard Zone 4 Pipe aft nozzle was clogged
-Starboard Zone 6 pipe had little to no pressure
-Starboard Zone 5 pipe forward 2 nozzles were clogged
-Inboard Zone 3 pipe aft and fwd most nozzle were clogged
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2021
Resolution: Vessel rep provided video evidence
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 15 June 2021
Resolved
The port rescue boat was not stenciled with the vessel name. Ensure marking is applied.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2021
Resolved
Window heater element in the pilot house was taken out. Remove dead end wires or replace heater element.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2021
Resolved
Speaker in the pilothouse was not installed properly. Install the speaker or remove wires.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 April 2021
Resolved
22 Adult PFDs and 03 Child PFDs were taken out of service. Replace all lifejackets in their designated stowage areas.
Action required: 705 - Other - as specified
Resolved 23 April 2021
Resolution: Received documentation of cleared defs.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 6 April 2021
Resolved
General alarm bell #6 located on the vehicle deck was inoperable. Make repairs and prove proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 April 2021
Resolution: Received documentation of cleared defs.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 6 April 2021
Resolved
Multiple lifejacket boxes were without donning placards/instructions for lifejackets. Post emergency instructions at eeach box.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 April 2021
Resolution: Received documentation of cleared defs.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 6 April 2021
Resolved
Port side door to engine control room latch is in disrepair and jams; replace or repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 23 April 2021
Resolution: Resolved.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 April 2021
Resolved
Both lamps used to synchronize the generators are extinguished; replace lamps.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 23 April 2021
Resolution: Lamps replaced.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 6 April 2021
Resolved
Port main engine oil contact maker oil line has a drip; remedy drip.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 23 April 2021
Resolution: Repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2021
Resolved
Water supply piping and pumps recently installed; provide information regarding CG plan approval that took place.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 April 2021
Resolved 10 February 2022
Resolution: Temporary water quality package was installed w/ ABS oversight and is to be replaced in 2022 drydock period.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 April 2021
Resolved
Vessel crew reported soft grounding of the vessel. Make affected space available for CG inspection.
Action required: 705 - Other - as specified
Resolved 6 April 2021
Resolution: Inspected affected area. All sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 December 2020
Resolved
CO2 locker is not marked with warning. Each entrance to a space storing carbon dioxide cylinders must be conspicuously marked as follows:
"CARBON DIOXIDE GAS CAN CAUSE INJURY OR DEATH. VENTILATE THE AREA BEFOR EENTERING. A HIGH CONCENTRATION CAN OCCUR IN THIS AREA AND CAN CAUSE SUFFOCATION.” 46 CFR §78.47-11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2020
Resolved 12 January 2021
Resolution: Labels added
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 December 2020
Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. There are no instructions
indicating how to operate the CO2 system for the engine room. Post instructions for operating system. 46 CFR 76.15-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2020
Resolved 12 January 2021
Resolution: Instructions posted.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 December 2020
Resolved
There is a break glass station on the car deck in way of the CO2 station that is not marked and the crew did not know what was controlled by it. Determine use of this break glass and mark “In Case of Fire Break Glass to Stop *insert name of system*”46 CFR §111.103-7
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2020
Resolved 12 January 2021
Resolution: Labels added.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 15 December 2020
Resolved
Wood and accumulated sandblast debris in CO2 locker.
Perform housekeeping. 46 CFR 71.25-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2020
Resolved 12 January 2021
Resolution: Housekeeping was performed.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 15 December 2020
Resolved
Overhead light in Galley is detached from ceiling with the steel cable armor no longer connected to the fixture. Reattach light to ceiling and make cable armor electrically continuous with the fixture. 46 CFR 111.75-20
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2020
Resolved 12 January 2021
Resolution: Light was reattached and cable armor connection renewed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 December 2020
Resolved
Junction Box on port galley ventilation on upper passenger deck is missing cover. 46 CFR 111.87.1(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2020
Resolved 12 January 2021
Resolution: Missing cover replaced.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 15 December 2020
Resolved
Emergency generator keep warm "hot start" has non metallic flexible hose connected with hose clamps and the cord to the hot start is fraying at the entrance to the hot start. Renew electrical connection. Provide proposal for modification of this system to eliminate flexible hose or alternatively provide any previous CG/OEM approvals of this installation. 46 CFR 56.60-25 46 CFR 111.01-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 December 2020
Resolved 12 January 2021
Resolution: Hoses and fittings replaced and electrical connections renewed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 November 2020
Resolved
Vessel reported a groudning while underway in the Cape May, NJ channel. Make all potentially impacted voids available for inspection to determine damage prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 18 November 2020
Resolution: Received ABS report attesting to satisfactory underwater and internal damage survey.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 25 August 2020
Resolved
Salon deck fwd stbd door does not fully close and salon deck aft stbd door does not latch. Repair doors and prove proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2020
Resolved 28 August 2020
Resolution: Accepted company report that door was repaired and tested.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 August 2020
Resolved
02 lifejacket stowage boxes on boat deck (pt side fwd of rescue boat & stbd side fwd of rescue boat) are missing markings. Add markings to indicate lifejackets and child lifejackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2020
Resolved 25 August 2020
Resolution: Accepted company report that markings were added.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 August 2020
Resolved
Pipe heat wrap wiring exposed at overhead on car deck, port side. Remove wiring or lock out, tag out system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 September 2020
Resolved 26 August 2020
Resolution: Accepted company report and pictures. Extra cabling removed and other wiring properly secured to overhead.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 25 August 2020
Resolved
Ventilation stop station outside of EDG space is missing label and actuator plunger. Button is being depressed by a piece of rubber material between glass and button. Replace emergency stop to original configuration as manufactured. Affix nameplate that identifies the system controlled.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2020
Resolved 20 September 2020
Resolution: Accepted company report, pictures, and phone call: Wasted stop station replaced, installed signage, and tested proper operation of shutdown.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 August 2020
Resolved
Port rescue boat davit controller has been damaged from water ingress. Replace all electrical components to include knife switch, transformer, contactor and connectors.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 September 2020
Resolved 8 September 2020
Resolution: Accepted company report, pictures, and phone call: Compoments replaced and renewed. Equipment operational test completed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 July 2020
Resolved
Make permanent repairs to the identified wasted steel areas identified in the #2 void by the Winward 20058 gauging report prior to credit drydock/ISE. Vessel's crew shall monitor the identified area for condition prior to repairs.
Action required: 705 - Other - as specified
Resolved 22 February 2022
Resolution: Created worklist item at 2022 Dry dock.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 16 June 2020
Resolved
Galley supply vent on the lido deck is holed. Make proper repairs to maintain structural fire protection in accordance with approved fire plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2020
Resolution: Received def rectification.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 June 2020
Resolved
Port midship door is not closing on the passenger salon. Make repairs and prove proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 July 2020
Resolution: Received def rectification.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 16 June 2020
Resolved
Marine Cable Transit under the starboard bridge navigational panel does not appear to have sufficient foam to maintain fire boundary at bridge deck. Prove proper installation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 16 June 2020
Resolved
Remove compressed gas cylinder from the galley space.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 June 2020
Resolved
Dead end wires located in the overhead of the bridge. Properly terminate or remove.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 June 2020
Resolved
Dead end wires located under the port navigational panel. Properly terminate or remove.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 June 2020
Resolved
Dead end wires located in the ice machine in the galley. Properly terminate or remove.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 June 2020
Resolved
Dead end wires located next to the gaylord manual pull station. Properly terminate or remove.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2020
Resolution: Received def rectification.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 June 2020
Resolved
Lifejacket boxes were found without child PFD signage. Return signs to original position to ensure proper marking of child PFD stowage.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2020
Resolution: Received def rectification.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 7 April 2020
Resolved
The port fwd 02 deck, port side 02 deck, and stbd aft 02 deck doors to the passnger salon area did not latch properly. Make proper repairs and prove satisfactory operation to the attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 April 2020
Resolution: The fire doors were repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 April 2020
Resolved
The vessel reported that one of the three phases within the emergency bus was not operational causing several vital systems to be non-operational. The vessel shall provide the cause of the electrical failure, detail any repairs made, and prove operation of the emergency electrical circuit.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 April 2020
Resolution: Three transformers on the emergency bus were replaced.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 5 November 2019
Resolved
Air conditioner exhaust fan was penetrating fire boundary in "hot dog room" (space forward of outdoor bar). Remove exhaust fan and make bulkhead in A-0 class boundary complete. 46 CFR 72.05-10(c)(1)
Action required: 10 - Deficiency Rectified
Resolved 5 November 2019
Resolution: Cleared on the spot.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 November 2019
Resolved
Forward port salon door did not automatically close and latch secure. Adjust door closure mechanism to properly close and secure. 46 CFR 72.05-25(b)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 November 2019
Resolution: Received report that door is repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 November 2019
Resolved
Sotwage boxes located on the passenger deck were empty but marked with "lifejackets". Cover marking or stow lifejackets in boxes. 46 CFR 199.178(a)
Action required: 10 - Deficiency Rectified
Resolved 5 November 2019
Resolution: Cleared on the spot.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 11 June 2019
Resolved
Emergency lighting mounting bracket on the aft bridge deck is significantly wasted. This bracket must be renewed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 11 June 2019
Resolved
Dead end wiring was found in the aft control station compartment. Wiring must be removed or properly terminated.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 June 2019
Resolved
The port shaft tachometer at the aft control station is not functioning properly. Make repairs and prove proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 11 June 2019
Resolved
Electrical cable for the starboard Marine Evacuation System was on the deck and in way of passenger walking area. The cable must be secured.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 June 2019
Resolved
Hydro test or remove the fire suppression bottle used by the Gaylord hood system in the galley. Rust was observed on the bottom of the bottle and it is a hazard to personnel.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 June 2019
Resolved
The elevator was unable to operate. The vessel must prove proper operation of the elevator.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 July 2019
Resolution: Returned to proper operation.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 7 May 2019
Resolved
During the operational test of the bow thruster room CO2 system a leak was identified in the piping. Piping must be repaired and system must be retested prior to use of the bow thruster.
Action required: 705 - Other - as specified
Resolved 9 May 2019
Resolution: Identified leak to bow thruster room CO2 system was corrected by service technician. System was retested and functioned properly. [name withheld]
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 7 May 2019
Resolved
The port forward door to the passenger area did not close properly. Repair door and prove ability to close.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2019
Resolution: Middle and upper door hinges were replaced by ship's crew. Door now closes and latches properly. [name withheld]
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 May 2019
Resolved
The brackets for the portable extinguishers #15, 17, and 18 must be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 May 2019
Resolution: Wasted brackets for portable fire extinguishers #15,17,and 18 were renewed by service technician. [name withheld]
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 May 2019
Resolved
The securing line for the portable extinguisher located in the port forward ladderwell of the car deck is missing. Vessel must renew line.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 May 2019
Resolution: Securing line for portable fire extinguisher located in port forward ladderwell of car was renewed by service technician. [name withheld]
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 May 2019
Resolved
The benches and deck boxes where lifejackets are stowed must have signage designating the segregation of child and adult lifejackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2019
Resolution: Child life jackets stowed in deck benches now have signage segreating adult and child life jackets. [name withheld]
08 - Alarms › N/A - No Subsystem › General alarm
Issued 7 May 2019
Resolved
General alarm bells #5 and #11 did not function properly. Must repair and prove operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 May 2019
Resolution: General alarm bells #5 & 11 were repaired by ship's crews and now function properly. [name withheld]
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 7 May 2019
Resolved
Dead end wire was identified beneath the bridge console. Wiring must be removed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 May 2019
Resolution: Dead end wiring in portside bridge console was removed by ship's crew. [name withheld]
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 May 2019
Resolved
Identified several clogged sprinkler heads in each of the three zones on the car deck. Prove proper operation of all sprinkler heads on the vehicle deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 May 2019
Resolution: Sprinkler heads on car deck were removed, cleaned and flushed by ship's crew. All are now operational. [name withheld]
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 May 2019
Resolved
Prove proper operation of the bow-thruster room exhaust ventilation fan.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 May 2019
Resolution: Bow thruster room ventilation fan was repaired by ship's crew and now operates properly. [name withheld]
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 7 May 2019
Resolved
During the inspection, the attending MI found the atmospheric testing log has not been adequately maintained and Span gas for calibrating the 5-gas meter had expired. Per the managing companies policy, an annual audit must be completed with the last audit completed in May 2018. The vessel should utilize one log book to avoid missed entries and span gas must be ordered to ensure accurate calibration of the equipment. The results of the internal audit conducted for 2019 must be sent to the USCG for review.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 May 2019
Resolution: Received notification from [name withheld] that an internal audit was conducted on their confined space policy. Deficiency corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2018
Resolved
Low lube oil shutdown on the emergency diesel generator when tripped, takes several minutes to shutdown the engine. Rectify so engine saftey shutdown is in a resonable time.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 December 2018
Resolved 6 December 2018
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 4 December 2018
Resolved
Louver on the port side of the EDG space takes several minutes to fully close. Rectify system to function as intended.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 December 2018
Resolved 6 December 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 December 2018
Resolved
Prover proper operation of bow thruster and the following safety shutdowns and alarms; Overspeed, low lube oil, and high coolant temp.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 December 2018
Resolved 6 December 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2018
Resolved
Identified jacket water fitting on EDG was backing off and loose. Check and tighten loose fitting on EDG.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 December 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 December 2018
Resolved
Port main engine fuel line was excessively chaffed. Replace fuel line and provide adequate protection to the fuel line.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 December 2018
Resolved 6 December 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 4 December 2018
Resolved
Submit plans for approval to relocate the chaffed fuel line on the main port engine into a non-hazardous location.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2019
Resolved 20 December 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2018
Resolved
Prove proper operation of boiler safety shutdowns on the #1, #2, and #3 boilers prior to their operation.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 December 2018
Resolved 13 December 2018
Resolution: Resolved in seperate activity
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 December 2018
Resolved
Prove proper operation of safety relief valve on #3 air receiver.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 December 2018
Resolved 6 December 2018
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 December 2018
Resolved
Waster vents located in the engine control office were stuffed with rags due to closing device being broken. Replace vents to function as inteded.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 January 2019
Resolved 13 December 2018
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 4 December 2018
Resolved
Vessel is broadcasting: no IMO#, NAME with vessel type precursor. (Name must not include vessel type precursor for example F/V or M/V) and no dimension information.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2018
Resolved 20 December 2018
Resolution: Checked AIS status in VIVS, no errors.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 December 2018
Resolved
Vessel has distribution panels that are not properly marked as per regulation. The required circuit directories must be updated to match approved electrical plans.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2018
Resolved 9 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 December 2018
Resolved
Identified oil accumulation below the "main engine blower box" on the port & starboard main engines. Identify the cause of oil accumilation and rectify and leaks.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2018
Resolved 20 December 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 3 December 2018
Resolved
Replace MDE control air pressure gauge on aft conning station.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2018
Resolved 20 December 2018
Resolution: Gauge was replaced, ABS witnessed it function properly and identified no leaks.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 3 December 2018
Resolved
Insulation on stbd bridge wing searchlight cable is frayed and dry rotted. Replace searchlight cable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2018
Resolved 20 December 2018
Resolution: Cable was replaced in kind, tested in presence of ABS and functioned properly.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 13 November 2018
Resolved
Conduct repairs to the 10cm radar to the satisfactory of USCG MI.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2018
Resolved 13 November 2018
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: No IMO #, NAME with Vsl type precursor (NAME must not include Vsl type precursors, e.g. F/V, M/V), and no dimension information (AIS Antenna Position ABCD values equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 25 August 2020
Resolution: Verified on NAVCEN site vessel's AIS broadcasts are accurate.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 8 May 2018
Resolved
1. Rudder angle indicator at aft steering station is 5 degrees off of bridge indicator.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2018
Resolved 13 June 2018
Resolution: Received email from Port Engineer stating that the rudder angle indicator was recalibrated and corrected.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 26 February 2018
Resolved
1. Complete servicing for the fixed CO2 system that was started by Harris on 26Feb18. Items outstanding are:
- Replace/repair engine room time delay
- Replace control head O-rings as needed
- Repair/replace damaged/leaky control heads as identified
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 2 March 2018
Resolved 2 March 2018
Resolution: Recieved servicing report and statement from the Assistant Port Captain and Chief Engineer attesting to proper repairs & testing of the fixed CO2 system to include time delays.
Fire Fighting › Fire Pumps › Arrangement
Issued 28 November 2017
Resolved
The main fire pump is demonstrating intermittent reliability. Diagnose and repair pump and motor controller to the satisfaction of the MI.
Action required: 705 - Other - as specified
Due 5 December 2017
Resolved 29 November 2017
Resolution: Witnessed repeated proper operation of pump
Electrical › Electric Generation Source (emergency) › Generator
Issued 28 November 2017
Resolved
ML02: Prove proper operation of all alarms and shutdowns of Emergency Diesel Generator in accordance with manufacturer's recommendations in the presence of the attending MI.
Action required: 705 - Other - as specified
Due 5 December 2017
Resolved 29 November 2017
Resolution: Witnessed proper operation of all tests, alarms, and shutdowns.
Fire Fighting › Miscellaneous Items › Materials for Overboard Outlets
Issued 21 November 2017
Resolved
Make permanent repairs to pin hole leak in suction pipe for sprinkler pump. Until repairs are completed, temporary repairs must be maintained.
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 29 November 2017
Resolution: Witnessed satisfactory repairs to piping.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 23 August 2017
Resolved
Make permanent repairs to fuel oil leaks in the supply piping and valve between the emergency generator and fuel tank.
Condition: Improper/Lack of Maintenance
Due 31 August 2017
Resolved 31 August 2017
Resolution: Received email & pictures from the Port Engineer, valve was replaced and leaks repaired.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 23 August 2017
Resolved
Correct Fire Control Plan. Bulkhead and door around port forward locker on the vehicle deck is not an A-0 boundary.
Condition: Improper/Lack of Maintenance
Due 31 August 2017
Resolved 14 September 2017
Resolution: Recieved a PDF showing corrections to the fire control plan related to the port forward locker.
Communications › Internal Communications System › Sound-powered Telephone
Issued 22 May 2017
Resolved
JD01: Vessel shall be provided with an efficient means of communication between the wheelhouse and the engine room. Sound powered phone is in-operable. Repair/fix sound powered phone in engine room at the E-steering to be audible while engines are running.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 June 2017
Resolved 6 June 2017
Resolution: Witnessed proper operation of Sound powered phone.
Fire Fighting › Automatic Sprinkler System › Piping
Issued 21 September 2016
Resolved
AF01- Repair leaking sprinkler line on stbd side car deck, midship.
Condition: Improper/Lack of Maintenance
Due 21 October 2016
Resolved 17 October 2016
Resolution: Cropped and renewed wasted section of piping in the sprinkler system.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 21 September 2016
Resolved
AF02- Fire door in galley, leading to aft deck needs to open in the direction of escape. Also, remove holdback hook.
Condition: Improper Installation
Due 25 November 2016
Resolved 22 March 2017
Resolution: Installed a new fire door in the galley that opens outward in the direction of escape.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 21 September 2016
Resolved
AF03- Replace retro tape on starboard side Ledo Deck and Port bridge wing lifebuoys.
Condition: Improper/Lack of Maintenance
Due 21 October 2016
Resolved 17 October 2016
Resolution: Added new retro reflective tape to the 2 above mentioned lifebuoys.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 21 September 2016
Resolved
AF04- Remove extension cord to camera system in closet of the crew accommodation space.
Condition: Improper Installation
Due 21 October 2016
Resolved 17 October 2016
Resolution: Removed extension cord and added a new electrical outlet.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 21 September 2016
Resolved
AF06- Clear condensation so you can read the RPM gauges on both bridge wings.
Condition: Improper/Lack of Maintenance
Due 21 October 2016
Resolved 17 October 2016
Resolution: RPM gauges were cleaned and readable.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 21 September 2016
Resolved
AF07- Update Fire Control Plan to show aft galley fire door.
Condition: Invalid
Due 25 November 2016
Resolved 22 March 2017
Resolution: Verified that the fire control plan onboard reflected the newly installed Fire Door to the galley.
Electrical › Electric Generation Source (service) › Generator
Issued 21 September 2016
Resolved
#1 Generator tachomoeter inoperable, failed during parallel ops. Make repairs and perform operational test to satisfaction of CGMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 September 2016
Resolution: After trouble shooting, found that the oncoming generator voltage was set too low. The tachometer is powered off of the generator voltage, and will not operate if the voltage is too low. Corrected problem with additional trng.
Engineering › Diesel Engine (auxiliary) › Distributor (fuel injection)
Issued 21 September 2016
Resolved
#2 Generator fuel hose chaffed to inner metal line. Replace w/appropriate hoses, meet SAE 1942J to satisfaaction of CGMI.
Due 28 September 2016
Resolved 28 September 2016
Resolution: Vessel replaced fuel hose.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 21 September 2016
Resolved
Air damper in EDG room does not fully close. Adjust so damper fully closes on port side.
Due 23 September 2016
Resolved 23 September 2016
Resolution: Received video of air damper closing. All sat.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Piping
Issued 1 March 2016
Resolved
Repair leaks in car deck sprinkler system in way of zone 2. Demonstrate proper operation to the satisfaction of the attending CGMI.
Due 31 March 2016
Resolved 6 April 2016
Resolution: Vessel made proper repairs to car deck sprinkler lines and demonstarated proper operation.
Personnel › Training › Familiarization Training
Issued 1 March 2016
Resolved
Demonstrate proper operation of elevator, all safety functions, repair top window, renew operating instructions, and provide crew familiarization training. Operation to be to the satisfaction of attending CGMI.
Due 31 March 2016
Resolved 11 May 2016
Resolution: Vessel crew demonstarted proper operation of all elevator controls.