Records from 1984 to 2026. Most recent: inspection, 7 July 2026.
Inspection history · 393
7 July 2026
Re-Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8313420
8 May 2026
Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8369153
28 April 2026
Deficiency Check · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8313423
31 March 2026
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8338704
16 December 2025
Re-Inspection · Administrative Inspection · MTSA/ISPS Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8284449
16 October 2025
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8254124
2 September 2025
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8225446
1 June 2025
Damage Survey
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8149261
12 May 2025
MTSA Verification · Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8133049
9 May 2025
Excursion Permit
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8131821
8 March 2025
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8090387
27 January 2025
Deficiency Check · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8073005
13 January 2025
Deficiency Check · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8062573
29 October 2024
Deficiency Check · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8020361
2 October 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8013311
4 August 2024
Administrative Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7974290
26 July 2024
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7967564
28 June 2024
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7949793
1 June 2024
Damage Survey
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7924913
1 June 2024
Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7931863
21 May 2024
Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7916547
8 May 2024
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7909077
30 April 2024
MTSA Verification · Re-Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7903768
3 March 2024
Damage Survey · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7873226
3 March 2024
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7873234
30 January 2024
COI Inspection · MTSA/ISPS Verification · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7852495
12 December 2023
Load Line/Change of Employment · Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7838249
1 November 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7818509
18 October 2023
Administrative Inspection · Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7811091
14 October 2023
Administrative Inspection · Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7808412
5 September 2023
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7784801
8 August 2023
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7763321
30 May 2023
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7700891
3 May 2023
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7680352
14 April 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7668846
31 January 2023
COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7625406
22 December 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7612054
29 November 2022
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7600690
31 October 2022
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7591184
15 September 2022
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7560409
23 June 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7484762
2 June 2022
Re-Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7466036
20 April 2022
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7434935
31 March 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7422329
31 January 2022
COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7388324
29 November 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7359041
9 November 2021
In-Service Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7348767
13 July 2021
COI Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7328737
11 November 2020
Drydock Exam · Internal Structural Exam · Plan Review (Other than "T")
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7093663
2 November 2020
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7083086
11 August 2020
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7029755
15 June 2020
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6977611
27 February 2020
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6916981
6 February 2020
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6905010
15 January 2020
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6889802
23 December 2019
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6878253
21 November 2019
Special
Type not classified · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6860184
12 November 2019
Damage Survey · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6854536
30 October 2019
Administrative Inspection · Deficiency Check · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6844824
30 July 2019
Re-Inspection · Deficiency Check · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6767002
5 July 2019
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6741883
29 May 2019
Deficiency Check · MTSA Verification · Administrative Inspection · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6697248
12 April 2019
Administrative Inspection · Examination of Repairs · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6661085
9 April 2019
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6660567
1 April 2019
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6653514
6 February 2019
MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6618246
21 December 2018
Administrative Inspection · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6601639
20 November 2018
MTSA Verification · Deficiency Check · Re-Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6583532
19 September 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6544519
7 September 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6535175
9 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6505715
9 August 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6506213
7 August 2018
Deficiency Check · Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6502763
31 July 2018
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6497150
31 July 2018
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6524597
29 May 2018
Deficiency Check · MTSA Verification · Administrative Inspection · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6423694
8 March 2018
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6368198
6 February 2018
Load Line/Change of Employment · MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6346478
30 January 2018
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6346448
6 December 2017
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6319620
14 November 2017
MTSA Verification · In-Service Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6305945
27 August 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6252903
27 August 2017
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6254725
15 August 2017
MTSA Verification · In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6237317
21 July 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6216162
16 May 2017
In-Service Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6147150
21 February 2017
MTSA Verification · COI Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6092515
2 February 2017
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6081502
13 December 2016
Re-Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6057792
17 October 2016
Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6030546
14 September 2016
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6002534
30 August 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5987510
18 August 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5976264
3 August 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5961507
12 July 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5938176
14 June 2016
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5906564
3 May 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5868219
8 March 2016
Load Line/Change of Employment · Underwater Inspection in lieu of Drydock · Internal Structural Exam · Damage Survey · Plan Review (Other than "T")
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5845575
23 February 2016
Deficiency Check · DAPI Audit · MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5820523
14 January 2016
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5803452
18 December 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5784570
16 December 2015
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5782692
3 December 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5774877
19 October 2015
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5744569
1 September 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5232299
19 August 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5220911
6 August 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5208086
13 July 2015
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5183474
28 October 2014
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5013371
21 October 2014
Re-Inspection · DAPI Audit · MTSA Verification · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5008398
13 August 2014
Plan Review (Other than "T")
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5006283
14 June 2014
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4915159
5 June 2014
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4897376
25 July 2012
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4390271
22 July 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4386500
10 July 2012
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4374824
4 July 2012
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4367552
3 July 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4365908
29 June 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4361300
27 June 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4358197
23 June 2012
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4357621
22 June 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4352013
22 June 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4359858
20 June 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4350216
14 June 2012
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4343793
24 January 2012
DAPI Audit · Periodic Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4230446
13 January 2012
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4224215
14 December 2011
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4207996
10 September 2011
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4140947
17 August 2011
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4117451
9 August 2011
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4110692
2 August 2011
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4103873
27 July 2011
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4096304
20 July 2011
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4089414
11 July 2011
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4077957
2 July 2011
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4069431
9 February 2011
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3942166
18 January 2011
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3928193
11 January 2011
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3924680
23 November 2010
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3897701
1 November 2010
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3883892
26 October 2010
Periodic Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3878056
2 September 2010
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3840332
18 March 2010
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3698271
20 February 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3684610
4 February 2010
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3675635
26 January 2010
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3669457
5 January 2010
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3670609
11 December 2009
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3648715
11 December 2009
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3650188
20 July 2009
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3540145
8 April 2009
COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3444264
30 October 2008
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3354241
10 October 2008
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3344262
26 September 2008
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3333127
1 July 2008
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3271664
16 June 2008
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3238737
13 March 2008
MTSA Verification · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3163064
20 February 2008
Hull Examination · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3150231
18 January 2008
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3151687
26 November 2007
Damage Survey
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3104475
23 October 2007
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3084675
19 July 2007
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2999564
24 May 2007
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2967907
23 May 2007
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2951015
24 April 2007
Re-Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2914022
6 February 2007
COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2867016
17 January 2007
In-Service Inspection · Permit to Proceed · Load Line/Change of Employment
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2857340
8 October 2006
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3611461
26 September 2006
Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2786210
12 July 2006
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2710546
11 July 2006
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2708346
6 June 2006
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2672196
15 April 2006
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2625216
6 April 2006
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2617596
17 March 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2604209
12 January 2006
COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2564720
10 November 2005
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2536604
20 October 2005
MTSA Verification · Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2517708
18 July 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2431012
20 June 2005
Re-Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2398937
13 January 2005
MTSA Verification · COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2273795
16 September 2004
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2192432
1 June 2004
Quarterly Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2080661
27 February 2004
Administrative Inspection
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2014217
18 February 2004
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2008357
10 February 2004
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2004716
4 February 2004
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1990893
30 January 2004
Security Plan Review - ASP
Administrative · Commandant (CG-FAC) · Activity 2000571
3 December 2003
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1956788
13 November 2003
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1957428
30 October 2003
Quarterly Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1938778
14 August 2003
Quarterly Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1874853
22 May 2003
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1799299
15 April 2003
Quarterly Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1773530
25 February 2003
Examination of Repairs
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1755862
20 February 2003
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1740091
14 November 2002
Quarterly Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1705031
5 September 2002
Quarterly Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1670510
2 August 2002
Damage Survey · Administrative Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1655739
29 May 2002
Quarterly Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1622734
5 February 2002
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1481683
8 November 2001
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1075951
24 September 2001
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1426664
19 September 2001
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1074019
17 August 2001
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 61468
14 August 2001
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1069683
12 June 2001
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1065269
18 March 2001
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1641
6 February 2001
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1058402
31 January 2001
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1061136
26 October 2000
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 7626
30 August 2000
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1415443
24 August 2000
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1053162
31 May 2000
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1050139
6 April 2000
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 817123
24 February 2000
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 816259
18 November 1999
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 810294
22 October 1999
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1350400
14 September 1999
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1191878
31 August 1999
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1113587
18 June 1999
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 878394
25 May 1999
Re-Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 798804
29 March 1999
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1132019
25 February 1999
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 797010
25 February 1999
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 798214
3 December 1998
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1453535
15 October 1998
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 803033
3 September 1998
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 798598
18 May 1998
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 791584
23 April 1998
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1473329
21 April 1998
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1123951
21 March 1998
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 139421
23 February 1998
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 780312
19 November 1997
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 774105
18 September 1997
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 777388
10 June 1997
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 776066
9 June 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1979
4 June 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 19069
6 March 1997
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 70862
27 February 1997
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1091963
27 February 1997
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1100794
17 December 1996
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1094560
24 October 1996
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1435820
17 October 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1155335
4 October 1996
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1146460
30 September 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 835054
14 September 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 28056
7 September 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 87614
18 August 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 58495
17 August 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 100330
10 August 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 141705
20 July 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 156210
13 June 1996
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1087352
31 May 1996
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 49985
19 March 1996
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 885881
16 January 1996
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1188052
13 December 1995
Re-Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1190228
11 December 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 877191
16 November 1995
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1441010
26 October 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1186324
12 October 1995
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1189893
13 September 1995
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1193510
29 July 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 87157
25 July 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 20772
8 July 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 164320
8 June 1995
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 872462
23 May 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 10824
18 May 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 126578
5 May 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 27407
4 April 1995
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1154866
22 March 1995
COI Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1178459
16 February 1995
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 844584
9 February 1995
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 837605
4 January 1995
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 667051
8 December 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1150234
3 November 1994
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 862465
22 September 1994
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1171446
10 September 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 18631
10 September 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 214902
22 August 1994
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 869596
16 August 1994
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 868802
19 May 1994
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 858054
9 February 1994
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 851985
23 December 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1161064
3 December 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 848988
26 November 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1158480
16 November 1993
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 830686
28 September 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 846363
21 September 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 121066
10 September 1993
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1140444
12 July 1993
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 186786
3 June 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 840176
6 May 1993
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1150153
1 April 1993
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1146619
4 March 1993
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 838875
9 February 1993
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 829432
2 December 1992
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1133283
29 November 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 73148
19 November 1992
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1136847
9 November 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1268388
9 September 1992
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 957059
18 August 1992
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 940510
18 May 1992
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1268295
7 May 1992
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1259696
7 April 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1258411
30 March 1992
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1255636
19 February 1992
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 948289
4 February 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 949776
4 February 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1259099
2 January 1992
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 961297
30 December 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 948036
11 December 1991
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1373704
2 December 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1251674
27 November 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1249880
23 October 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1253719
18 September 1991
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1004949
11 June 1991
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 898077
27 March 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 900286
15 March 1991
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1239314
19 February 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 912296
3 January 1991
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 927561
25 October 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 922916
14 September 1990
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1224873
28 June 1990
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1226976
5 April 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 915229
5 April 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 916625
16 March 1990
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1228504
6 March 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 918435
21 February 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 928945
6 February 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1211740
25 January 1990
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1236512
4 January 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 899863
4 January 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 926854
14 December 1989
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 909973
13 October 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 895943
28 September 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1326653
15 September 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1016293
21 August 1989
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1036041
28 July 1989
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1044124
14 July 1989
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1202293
14 July 1989
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1305252
20 June 1989
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1344431
17 May 1989
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1341662
16 March 1989
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 965764
20 December 1988
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1032559
18 November 1988
Damage Survey
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1206732
3 October 1988
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1196541
26 September 1988
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1045197
5 July 1988
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1036535
20 June 1988
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 930769
7 June 1988
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1197377
9 May 1988
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1205477
16 March 1988
COI Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1296424
11 January 1988
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1010630
7 January 1988
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1010628
6 January 1988
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1318302
16 December 1987
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1022671
6 November 1987
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1329975
6 November 1987
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1332631
23 October 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1321376
8 September 1987
Deficiency Check · Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1004707
21 July 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1329700
13 July 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1325557
29 June 1987
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1010493
22 May 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1025556
20 March 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1329507
10 March 1987
COI Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1324864
27 February 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1316090
27 January 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1314562
9 January 1987
Re-Inspection · Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1007088
28 October 1986
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1012827
22 September 1986
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1314721
9 June 1986
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1305247
12 May 1986
Credit Drydock
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 989867
23 April 1986
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 998675
4 April 1986
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1305655
11 March 1986
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 997422
10 March 1986
COI Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 997419
8 November 1985
Credit Drydock
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1302214
11 October 1985
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 996369
4 October 1985
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 985182
21 September 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1297042
16 August 1985
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 991181
30 July 1985
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 984607
25 June 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1290062
21 June 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 983026
2 May 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 981484
26 April 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 979882
8 March 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1290184
15 February 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 977818
15 February 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1286924
16 November 1984
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 976084
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 July 2026
Resolved
Each inflatable lifesaving appliance and marine evacuation system must be serviced—Within 12 months of each subsequent servicing. Starboard side MES was last serviced in May 2025. Conduct required servicing within 14 days.
46 CFR 199.190(g) 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 July 2026
Resolved 22 July 2026
Resolution: Received servicing report.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 28 April 2026
Resolved
During steering gear testing with control transferred to the engine room, the local rudder angle indicator displayed 10 degrees port while the bridge tiller positioned midship. Evaluate, repair to ensure it accurately and reliably reflects the true position of the rudder at all steering control stations.
46 CFR 58.25-10(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2026
Resolution: Witnessed successful steering test and functional rudder angle indicator.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 28 April 2026
Resolved
MI observed a broken electrical conduit and broken windows in “Hot Dog Room” which is an A boundary per approved Fire Control Plan. Repair to satisfaction of MI.
46 CFR 72.05-10(c)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2026
Resolved 12 June 2026
Resolution: MI received images of corrected electical condiut and fixed broken windows.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 April 2026
Resolved
During inspection, the remote reach rod for the port fuel tank shutoff valve was found inoperative. Make repairs and demonstrate proper operation to the satisfaction of attending MI.
46 CFR 58.01-25
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2026
Resolved 22 July 2026
Resolution: Verified with previous inspector that item has been rectified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 April 2026
Resolved
Vessel reported during testing, the starboard shore power circuit breaker failed to trip when transferring electrical load from shore power to ships service generator. Make proper repairs to shore power breaker and test to verify that the shore power breaker automatically trips to satisfaction of MI.
46 CFR 111.30-25
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2026
Resolved 22 July 2026
Resolution: Verified with previous inspector that item has been rectified.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 December 2025
Resolved
Electric installations on vessels must ensure: Maintenance of services necessary for safety under normal and emergency conditions. Battery connections to the emergency generator were damaged and had no insulation in spots. Repair/replace to the satisfaction of MI.
46 CFR 111.01-1(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 December 2025
Resolution: Vessel replaced battery cables.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 16 December 2025
Resolved
Indication of the rudder angle must be provided both at the main steering station in the pilothouse and in the steering-gear compartment. The rudder-angle indicator must be independent of control systems for steering gear. Indicator marking in the steering gear space (starboard side) was damaged and not accurate. Repair to the satisfaction of MI.
46 CFR 58.25-25(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2026
Resolved 30 April 2026
Resolution: MI verified properly marked rudder-angle indicator
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 December 2025
Resolved
Each self-propelled vessel, except as provided in paragraph (d) of this section, must have an electric or mechanical engine order telegraph system from the navigating bridge to the engine room. Port EOT was not working properly. Repair to the satisfaction of MI.
46 CFR 113.35-3(a)
46 CFR 113.35-3(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2026
Resolved 27 February 2026
Resolution: Repaired EOT
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Lighting (Working spaces)
Issued 16 December 2025
Resolved
All electrical equipment must be designed and installed to operate for the particular location and environment in which it is to be used. Vessel has heater in the engine room that is not designed for marine environment. Instructed operator to not use while underway. Operator is notifying all crew that it must be secured while underway.
46 CFR 111.01-19(a)
Action required: 10 - Deficiency Rectified
Resolved 16 December 2025
Resolution: Operator notified crew they cannot use heater underway.
11 - Life Saving Appliances › N/A - No Subsystem › Marine Evacuation System
Issued 16 December 2025
Resolved
Containers, brackets, racks, and similar stowage locations for lifesaving equipment must be marked with symbols in accordance with IMO Res. A.760(18) indicating the device stowed in that location. Multiple MES lifesaving placards on deck #3 were missing or completely wasted. Replace placards to satisfaction of MI.
46 CFR 199.178(a)
46 CFR 199.178(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2025
Resolved 30 April 2026
Resolution: Verified replaced lifesaving placards.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 December 2025
Resolved
Doors shall be of the self-closing type capable of closing against a 3 ½ degree list. Starboard side aft salon fire door and both port and starboard amidships fire doors would not close and latch. Repair fire doors/frames to satisfaction of MI.
46 CFR 72.05-25(b)(9)(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2026
Resolved 27 February 2026
Resolution: Repaired fire doors
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 December 2025
Resolved
It shall be the duty of the owner or master to see that the vessel's firefighting equipment is at all times ready for use and all such equipment is provided, maintained, and replaced as indicated. Flexible hose coming off the #9 CO2 cylinder for the engine room fixed CO2 system was found cracked. Replace hose to the satisfaction of MI.
46 CFR 78-17-80(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2026
Resolved 27 January 2026
Resolution: Fire Servicing Company Replaced Hose
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 16 December 2025
Resolved
Each passenger vessel must have a public address system capable of broadcasting separately or collectively to the following stations: accommodation spaces and service spaces. Public address speaker in Hot Dog Room was inoperable during testing. Repair or replace speaker to satisfaction of attending MI.
46 CFR 113.50-10(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2026
Resolved 27 February 2026
Resolution: Repaired PA
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 16 December 2025
No resolution recorded
Each davit, winch, fall, and other launching appliance must be thoroughly inspected and repaired, as needed, each year. Wastage was identified on the port side rescue boat davit at the forward deck connection. Submit repair proposal for approval and complete repairs to satisfaction of MI prior to credit drydock.
46 CFR 199.190(f)(2)
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 September 2025
Resolved
Each prime mover must shutdown automatically upon lost of lubrication pressure to the generator. Vessel #1 SSDG did not shut down when conducting low lube oil pressure test. Make corrections to satisifaction of ABS/MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 October 2025
Resolution: Tested generator- shutdown and alarm worked
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 September 2025
Resolved
All marine engineering details such as piping shall be designed, constructed, and installed in accordance with subchapter F. Raw water hose to starboard shaft was leaking. Make repairs to satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 October 2025
Resolution: Hose replaced
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 1 June 2025
Resolved
Master reported a 7 degree difference in rudder angle in the follow-up steering mode. Provide evidence of fully functioning steering gear system in follow-up mode prior to next voyage.
Action required: 705 - Other - as specified
Due 1 June 2025
Resolved 3 June 2025
Resolution: Vessel's steering gear was tested following the reset of the rudder angle indicator potentiometer. Steering was tested satisfactorily from all stations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 May 2025
Resolved
The emergency power source must meet Table 1 to 112.05-5 and have the capacity to supply all loads at a unity (1.0) service factor, that are simultaneously connected to it... Emergency generator was unable to meet full operational tests. Repair emergency generator to the satisfaction of the marine inspector.
46 CFR 112.05-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2025
Resolved 22 May 2025
Resolution: Witnessed satisfactory tests following repairs
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 16 May 2025
Resolved
Starboard rescue boat block aft stanchion had a 4” crack comprising the ability to launch the rescue boat due to damaged stowage arrangement. Vessel has temporary repairs to the satisfaction of the attending [name withheld] a permanent repair plan to the satisfaction of the MI.
46 CFR 199.220
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2025
Resolved 16 December 2025
Resolution: New cradle installed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 14 May 2025
Resolved
MI found oil accumulation in the bilge of the engine room along 26’ of the centerline at 1” pooling.
46 CFR 71.25-45
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2025
Resolution: Vessel removed oil from bilges
11 - Life Saving Appliances › N/A - No Subsystem › Stowage of rescue boats
Issued 14 May 2025
Resolved
Starboard rescue boat block aft stanchion had a 4” crack comprising the ability to launch the rescue boat due to damaged stowage arrangement. Submit a repair plan to the satisfaction of the MI.
46 CFR 199.220
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2025
Resolution: Vessel made temporary repairs.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 14 May 2025
Resolved
Remote fuel shut off valve on vehicle deck was seized and labeling was painted over.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2025
Resolution: Operator repair and MI tested operation of valve.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 14 May 2025
Resolved
Pressure relief valve on #1 air receiver leaked air not fully reseating.
46 CFR 54.15-5(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2025
Resolution: Replaced PRV and tested, all SAT
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 14 May 2025
Resolved
Second step from 02 deck to 03 deck on the port staircase was cracked and buckled making it unsafe for passenger egress. Repair prior to use of staircase.
46 CFR 72.05-20 (i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2025
Resolved 16 May 2025
Resolution: New step installed
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 14 May 2025
Resolved
3 holes were found in the 01 deck beneath the elevator. 2’ x 3’ deck plating was cropped and renewed by ships crew without CG oversight. Vessel must perform satisfactory NDT for conducted repairs the attending MI prior to reinspection.
46 CFR 71.55-5 (a)
Action required: 705 - Other - as specified
Resolved 16 October 2025
Resolution: NDT conducted and was SAT
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 14 May 2025
Resolved
Port amidships door on 02 deck leading to the open deck was missing latch hardware and was unable to remain shut as a fire boundary. Repair prior to reinspection.
46 CFR 72.05-25 (b)
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Verified repaired latch. Sat.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 14 May 2025
Resolved
MI witnessed on the vehicle deck a bent welding rod acting as a support bracket for the drain line from the 01 deck as an unauthorized repair. Repair prior to reinspection.
46 CFR 71.55-1 (a)
Action required: 705 - Other - as specified
Resolved 16 May 2025
Resolution: Installed appropriate support bracket
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 14 May 2025
Resolved
Retro-reflective tape on 02 life rings on the stern and the port rescue boat had nonapproved tape. Replace with Type II retro-reflective material meeting subpart 164.018. Replace tape prior to reinspection.
46 CFR 78.47-45
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: Verified replaced retro. Sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 May 2025
Resolved
#15 CO2 extinguisher had severe corrosion prompting doubt for cylinder integrity and efficacy in an emergency. Replace extinguisher prior to reinspection.
46 CFR 76.50-10
Action required: 705 - Other - as specified
Resolved 16 May 2025
Resolution: Replaced with new extinguisher.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 May 2025
Resolved
The emergency power source must meet Table 1 to 112.05-5 and have the capacity to supply all loads at a unity (1.0) service factor, that are simultaneously connected to it... Emergency generator is not operational. Repair emergency generator to the satisfaction of the marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2025
Resolution: Vessel made temporary arrangements to reduce risk and deficiency is changed to repair in 14 days.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 May 2025
Resolved
Remote fuel shut off valve on vehicle deck labeling was painted over. Prior to reinspection.
46 CFR 56.50-60 (d)(1)
Action required: 705 - Other - as specified
Resolved 22 May 2025
Resolution: Valve labeled
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 12 May 2025
Resolved
Each valve must close with a right-hand (clockwise) motion of the handwheel or operating lever as seen by one facing the end of the valve stem. Start air bypass valve for port engine was missing hand wheel. Prior to reinspection.
46 CFR 56.20-9 (a)
Action required: 705 - Other - as specified
Resolved 22 May 2025
Resolution: Valve handle installed
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 January 2025
Resolved
The general requirement for doors, other than watertight doors, are as follows:(1) All doors shall be capable of operation from either side by 1 person. The forward galley door is inoperable due to a faulty closing mechanism, which prevents it from sealing/closing properly in the event of an emergency. Repair the door to the satisfaction of MI.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2025
Resolved 4 February 2025
Resolution: CG personnel attending vessel witnessed proper operation of fire door.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 January 2025
Resolved
Ground indicators must: Be at the vessel's ship's service generator distribution switchboard for the normal power, normal lighting, and emergency lighting systems. Ground detectors on the emergency switchboard were stuck in the pressed position. Repair or replace ground detectors on the emergency switchboard.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2025
Resolved 27 January 2025
Resolution: Operator replaced ground detector buttons.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 13 January 2025
Resolved
Rescue boats must be stowed—( (1) To be ready for launching in not more than 5 minutes. During the inspection, the rescue boat was unable to start due to a dead battery. Replace the battery with a functional one to the satisfaction of the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 January 2025
Resolved 21 January 2025
Resolution: Replaced the battery and tested the rescue boat; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 13 November 2024
Resolved
UT thickness measurements show over 50% wastage of the structural components of the starboard rescue boat davit near the deck connection. Vessel is required to submit a repair proposal for approval prior to commencing work. Once satisfactory repairs have been made, davit must be subjected to weight test to the satisfaction of attending MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 November 2024
Resolution: Verified repairs, witnessed testing.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 29 October 2024
Resolved
Excessive oil was found in the bilge along the centerline. Dispose of oil to the satisfaction of MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 November 2024
Resolution: oil was removed from bilge
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 29 October 2024
Resolved
Ventilation dampers for the engine room are missing bushing around damper rods. Vent duct for engine room is holed below damper. Galley damper cannot close fully and EDG damper handle is broken. Repair fire dampers and vent ducts to satisfaction of MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 November 2024
Resolution: witnessed proper operation of fire dampeners
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 October 2024
Resolved
Structural components of the rescue boat davits show signs of wastage near the deck connection. A third party servicing company is required to evaluate the serviceability of the rescue boat davits. Provide findings to MI.
46 CFR 199.190 (f)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 November 2024
Resolved 13 November 2024
Resolution: Received UT report for davit. Cleared def, issued new def for repairs and testing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 29 October 2024
Resolved
#1 SSDG failed to shutdown during loss of lube oil pressure PSTP. Repair and retest to satisfaction of MI.
46 CFR 111.12-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 November 2024
Resolved 5 November 2024
Resolution: Witnessed lube oil shutdown of #1 SSDG.
10 - Safety of Navigation › N/A - No Subsystem › Bridge operation
Issued 29 October 2024
Resolved
During testing of emergency steering at the operating station, it was found that the instructions do not accurately reflect the actions of the operator during an emergency steering situation. Update and correct instructions to satisfaction of MI.
33 CFR 164.35 (k)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 November 2024
Resolved 20 November 2024
Resolution: Emergency steering instructions updated and posted on bridge.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 29 October 2024
Resolved
Open penetrations were found through A Class bulkheads at the starboard side operating station, galley/galley store room bulkhead, and galley store room/cleaning store room bulkhead. Repair penetrations to original structural fire protection standards to the satisfaction of MI.
46 CFR 72.05-10(c)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 November 2024
Resolved 5 November 2024
Resolution: Open penetrations were filled.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 29 October 2024
Resolved
Operating station front window is cracked. Replace window to satisfaction of MI prior to reinspection.
46 CFR 71.30-5(a)
Action required: 705 - Other - as specified
Due 1 August 2025
Resolved 16 October 2025
Resolution: Window was replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 October 2024
No resolution recorded
During testing crew identified cracks/holes in tubes and water intrusion into multiple fire tubes and burner tube. Hydrotest was unsat due to damage. Replace boiler tubes or submit plans for repair prior to boiler operation.
46 CFR 61.05-10 (c)
Action required: 705 - Other - as specified
Due 1 August 2025 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 29 October 2024
Resolved
During emergency steering test in engine room control on steering pumps #1 and #2, the pumps hunted from tiller commands. Retest steering to the satisfaction of the MI prior to reinspection.
46 CFR 61.20-1
Action required: 705 - Other - as specified
Resolved 21 January 2025
Resolution: Tested steering. All SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 October 2024
Resolved
Safety relief valve for air receiver #2 did not reseat after testing. Replace safety relief valve to satisfaction of MI prior to reinspection.
46 CFR 54.15-10
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: New relief valve installed and tested.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 29 October 2024
Resolved
Starboard battle lantern forward of the main engine is inoperable. Repair/replace battle lantern prior to reinspection.
46 CFR 112.39-3 (b)
Action required: 705 - Other - as specified
Resolved 5 November 2024
Resolution: Battle lantern is operable.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 29 October 2024
Resolved
The starboard main engine tachometer sensor cable had worn insulation and exposed wiring. Repair to satisfaction of MI prior to reinspection.
46 CFR 111.05-3
Action required: 705 - Other - as specified
Resolved 5 November 2024
Resolution: Cable was replaced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 October 2024
Resolved
CO2 portable extinguisher #6 outside EDG space had a worn hose and broken handle. Replace hose and handle for CO2 extinguisher or replace the extinguisher prior to reinspection.
46 CFR 71.25-20 (a)(1)
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Hose replaced on extinguisher.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 October 2024
Resolved
Stuffing tube in EDG space must be fitted and secured to the kick pipe prior to reinspection.
46 CFR 111.81-3
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Stuffing tube fitted and secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 October 2024
Resolved
Port main engine’s audible signal did not stop when engine calls matched from PHC signal. Repair/ replace EOT and conduct retest of port main engine EOT to the satisfaction of MI prior to reinspection.
46 CFR 113.35-3 (a)
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: EOT repaired and tested in presence of MI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 October 2024
Resolved
Power converter in EDG space had flexible cord installation. Replace installation with hard-wired configuration prior to reinspection.
46 CFR 111.60-13 (b)
Action required: 705 - Other - as specified
Resolved 5 November 2024
Resolution: replaced with hard wire.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 29 October 2024
Resolved
Sprinkler piping in zone 5 was found clogged rendering two nozzles inoperable. Additionally, two nozzles in zone 1 were found clogged. Repair/replace to normal ops prior to reinspection.
46 CFR 76.05-20
Action required: 705 - Other - as specified
Resolved 20 November 2024
Resolution: Nozzles unclogged and tested satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 October 2024
Resolved
The inspector shall examine all accessible parts of the vessel's hull, machinery, and equipment to be assured that it is in a satisfactory condition. Structural I-beams on the car (main) deck were found separated from the outer bulkhead (curtain) with broken welds and signs of corrosion behind the beams. Vessel is required to determine the condition of the structural beams (UT shots) and submit a repair proposal to the satisfaction of the MI based on the findings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 November 2024
Resolved 20 February 2025
Resolution: Verified repairs.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 August 2024
Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford adequate precaution against hazards that might endanger the vessel and the persons being transported. While underway, vessel had a soft grounding near South Crow Shoal near Cape May Point, NJ. Vessel to have damage survey completed by MI, prior to carrying passengers.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2024
Resolution: Inspected all voids/spaces, steering and propulsion systyems
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 July 2024
Resolved
Each boiler, including superheater, reheater, economizer, auxiliary boiler, low-pressure heating boiler, and unfired steam boiler, must be available for examination by the marine inspector at intervals specified by Table 61.05-10, and more often if necessary, to determine that the complete unit is in a safe and satisfactory condition. Vessels refractory on boiler degraded. Repair to the satisfaction of attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 August 2024
Resolved 2 October 2024
Resolution: Verified refractory repairs to boiler.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 26 July 2024
Resolved
The general requirement for doors, other than watertight doors, are as follows:(1) All doors shall be capable of operation from either side by 1 person. Port side amidships salon door on the upper deck is inoperable due to a broken closing mechanism. Repair to the satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 August 2024
Resolution: Confirmed work order completed by 3rd party company Assa Abloy
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 26 July 2024
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification and periodic inspection. MI observed numerous expired items in the first aid kit/bag at the operating station. Remove and replace expired items from medical kits onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 September 2024
Resolution: expired items replaced in first aid kit.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 1 June 2024
Resolved
The MI may inspect the steering gear more often if necessary. Master reported main steering pump blowing fuses. MI verified auxilliary pump operational remotely, and #1 main steering pump operational locally. Vessel to prove proper operation of steering prioer to carrying passengers. 46CFR61.20-1 701C
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 June 2024
Resolved 5 June 2024
Resolution: Renewed Spool valve solenoid. Re-positioned Feedback Unit linkage on tiller arm. Witnessed sat test of steering.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 May 2024
Resolved
The main steering gear must be operable from the pilothouse by mechanical, hydraulic, electrical, or other means. This gear and its components must give full followup control of the rudder. Vessel experienced a steering reduction with unknown cause. Identify cause of reduction, and repair to the satisfaction of the attending marine inspector prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 May 2024
Resolution: Received ABS tech report & attended vessel to conduct steering checks on system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 April 2024
Resolved
Fuel piping hydrostatic test is due (last completed 27APR2023). Conduct test or provide proof of test to satisfaction of the MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2024
Resolved 7 May 2024
Resolution: Verified hydro completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 April 2024
Resolved
Heating boiler out of service and not available for inspection. Make repairs and conduct tests to the satisfaction of the MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 7 May 2024
Resolution: Witnessed operation and test of alarms/shutdowns
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 April 2024
Resolved
Insulation missing from steam piping in engine room directly above potable water pump motor controller. Install insulation on steam piping to the satisfaction for the MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2024
Resolved 7 May 2024
Resolution: Verified install of lagging on steam piping
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 3 March 2024
Resolved
AIS Class A device. The following vessels must have on board a properly installed, operational Coast Guard type-approved AIS Class A device: A self-propelled vessel that is certificated to carry more than 150 passengers. Vessel reported AIS not providing required information for course/speed to radar.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 March 2024
Resolution: Tech investigated and found NMEA distribution supply breaker secured. Breaker was energized and system tested sat.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 3 March 2024
Resolved
AIS Class A device. The following vessels must have on board a properly installed, operational Coast Guard type-approved AIS Class A device: A self-propelled vessel that is certificated to carry more than 150 passengers. Vessel reported AIS not providing required information for course/speed to radar.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 April 2024
Resolution: Witness proper operation of AIS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 January 2024
Resolved
Prime movers must meet section 58.01 and 46 CFR 58.10. Jacket water high temp sensors are damaged and not working on both SSDGs. Repair/replace sensors and complete test of alarm to the satisfaction of the attending MI. 46 CFR 111.12-1(a) 13102
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 12 September 2024
Resolution: J/W temp sensors replaced and tested by EMS.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 30 January 2024
Resolved
The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with sub chapter F. Inspector found residual water in steering room, due to minor leakage of rudder post packing. Remove residual water and tighten packing to the satisfaction of the attending MI. 46 CFR 77.03-1(a) 02105
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 30 April 2024
Resolution: attended vessel and inspected steering gear compartment. No water in space and packing was adjusted.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 30 January 2024
Resolved
Each navigation light indicator panel must visually and audibly signal the failure of each light. Several navigation light failure alarms were inoperative. 46 CFR 111.75-17(b) 10109
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 30 April 2024
Resolution: Wtinessed proper operation of all lights on indicator panel
08 - Alarms › N/A - No Subsystem › General alarm
Issued 30 January 2024
Resolved
Each vessel must have a general emergency alarm system. Two newly installed general alarm sounding devices on the vehicle deck and on the passenger deck are not sounding. 46 CFR 113.25 08101
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 22 February 2024
Resolution: New General alarms were not functioning because volume setting was turned down all the way. Alarms satisfactorily retested in presence of MI.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo Securing Manual
Issued 30 January 2024
Resolved
On vehicular ferries, suitable chains, cables, or other barriers shall be installed at the ends of the vehicle runways. One wire rope on the aft cargo net has only 50% of the strands remaining next to the sewage. 46 CFR 78.40-1 06101
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 22 February 2024
Resolution: Barrier wire rope replaced
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 January 2024
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port marked on the stern of the vessel. Markings on vehicle deck lifebuoys are faded and need renewing. 46 CFR 199.70(a)(2) 11117
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 22 February 2024
Resolution: New lettering satisfactorily stenciled on.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 January 2024
Resolved
Inspection of lifesaving appliances for certification shall ensure the proper condition of lifebuoys. The plug on the starboard bridge wing is damage. Repair or renew this life buoy. 46 CFR 199.45(a)(3) 11117
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 22 February 2024
Resolution: Plug in lifebuoy satisfactorily repaired.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 30 January 2024
Resolved
The fire control plan shall be kept up to date. Add the crew lifejackets in the 02 Deck Galley concession area and the 03 Deck snack bar to the fire control plan. 46 CFR 78.45-1(a)(4) 07122
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2024
Resolved 30 April 2024
Resolution: Fire Control plan was updated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 October 2023
Resolved
Periodic tests and inspection shall be made of the main and auxiliary machinery, boilers, and other equipment as prescribed in this part. Master reported loss of port side thruster while transiting from Cape May, NJ to Lewes, DE. Vessel to prove proper operation of thruster prior to departure/carriage of passengers. 46 CFR 61.01-1 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 October 2023
Resolved 16 October 2023
Resolution: Witnessed test of proper operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 April 2023
Resolved
All marine engineering such as piping, valves, fittings, etc.. shall be designed and installed IAW the provisions of Sub-chapter F. Vessel reported a fuel leak coming from the supply line to the #2 generator located at the threaded connection where it meets a steel threshold. Prior to movement, proper repairs must be completed to the satisfaction of ABS and Coast Guard.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 14 April 2023
Resolution: ABS Class report recieved. Pipe repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 31 January 2022
Resolved
Lifeboat and rescue boat release gear must be operationally tested under a load of 1.1 times the total mass of the survival craft. The port side rescue boat releasing gear must be tested prior to commercial operations.
Action required: 705 - Other - as specified
Resolved 8 February 2022
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 31 January 2022
Resolved
Portside forward salon (4-5 speakers) PA system speakers are not operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 November 2021
Resolved
Vessel reported that bow thruster had become inoperative. Provide causative analysis of failure and make repairs. Vessel is restricted from further movement upon arrival at the Cape May Ferry terminal following a single voyage from the Lewes Ferry terminal.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 21 December 2021
Resolution: Received communication from DRBA engineer stating actions taken to rectify bow thruster failure.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 October 2021
Resolved
Each credentialed crew member shall become familiar with the relevant characteristics of the vessel appropriate to his or her duties and responsibilities prior to assuming those duties and responsibilities. After an extensive dry dock, re-power, and installation of a new automation system the vessel masters on board were not confident they could safely operate the vessel due to lack of training. Also, there was no training plan provided that outlined the subsequent training of all crew members that did not already participate in the vessel sea trials after completion of the dry dock period. Provide OCMI with a training plan to familiarize all crew with vessel operations affected by changes made during the dry dock period. Every crew member that has not received training is restricted from operating the vessel with passengers until evidence of completion of training has been provided to the OCMI. 46 CFR 15.405
Action required: 705 - Other - as specified
Due 19 October 2021
Resolved 21 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 19 October 2021
Resolved
Each boiler must be available for examination by the marine inspector at intervals specified by Table 61.05-10. Auxiliary boiler is overdue for inspection and is restricted from use until required inspections are completed. 46 CFR 61.05-10 (a)
Action required: 705 - Other - as specified
Due 19 October 2021
Resolved 29 November 2021
Resolution: Boiler has been inspected and subject to operational tests of safeties.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 October 2021
Resolved
All piping, valves, and fitting shall meet applicable requirements in sub chapter F. Sprinkler system valve in E/R leaking significantly.
46 CFR 76.23-20
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 November 2021
Resolved 30 November 2021
Resolution: valve replaced
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 October 2021
Resolved
All piping, valves, and fitting shall meet applicable requirements in sub chapter F. The following car deck sprinkler system heads were inoperable during an Op test; first 3 heads on the forward port branch of zone 1, the first forward head on inboard branch of zone 2, and first forward two heads on zone 5. 46 CFR 76.23-20
Action required: 17 - Rectify deficiencies prior to departure
Due 2 November 2021
Resolved 30 November 2021
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 October 2021
Resolved
Furniture shall be constructed of entirely approved incombustible materials. Vessel is not in full compliance of structural fire protection standards outlined in 46 CFR Subchapter H. Submit detailed repair/compliance plan to address the installation of non-compliant furniture to the Marine Safety Center within 30 days of issuance of the 2021 COI.
46 CFR 72.05-55(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 November 2021
Resolved 30 November 2021
Resolution: Plan submitted to MSC
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 October 2021
Resolved
An inspection shall be made whenever any important repairs or alterations are undertaken. Vessel is required to be in full regulatory compliance of structural fire protection standards prior to issuance of a valid 2022 COI.
46 CFR 71.55-5
Action required: 705 - Other - as specified
Due 19 October 2022
Resolved 1 February 2022
Resolution: vessel has to be in compliance by the 3rd quarterly insepction of 2022
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 29 June 2020
Resolved
No fire stop within the marine cable transit under the port bridge equipment console. Make repairs and prove structural fire protection in accordance with 46 CFR 72.05-10.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 July 2020
Resolution: Received def rectification.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 29 June 2020
Resolved
No fire stop within the marine cable transit in the mustang suit closet in the crew lounge. Make repairs and prove structural fire protection in accordance with 46 CFR 72.05-10.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 July 2020
Resolution: Received def rectification.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 29 June 2020
Resolved
Port rescue boat davit aft sheave was not rotating while lowering the boat. Make repeairs and prove proper operation of the davit. Vessel must not use the port rescue boat until repairs are made. 46 CFR 77.06-1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 29 June 2020
Resolved
Port security gate/access door to the bridge was locked on both sides. Make repairs and prove proper operation. 46 CFR 72.10-5
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 July 2020
Resolution: Received def rectification.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 June 2020
Resolved
Semi portable extinguisher cylinders in engine room are more than 12 years past the required hydrostatic testing date. Prove hydrostatic testing of cylinders and flexible connections. Flexible connections to be tested to 1000 psig. Complete prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2020
Resolution: Received proof of new cylinders, control heads and hoses installed by Associated Fire Protection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 29 June 2020
Resolved
Exhaust lagging in stack space of both main engines are contaminated with oil presenting a fire hazard. Provide cause of oil contamination and corrective action. Replace lagging in kind.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 July 2020
Resolution: Received proof of new insulation installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 June 2020
Resolved
120v receptacle powering the E lighting on fwd bulkhead stbd side engine room showed reverse polarity when tested with circuit tester.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2020
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 June 2020
Resolved
Aft embarkation light at stbd rescue boat has damaged outer insulation. Replace cable in kind; Electrical tape is not a suitable repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 June 2020
Resolved
Port rescue boat davit has wasted cable hangers and Jbox
with damaged stuffing tube. Renew/replace in kind.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2020
Resolved 6 July 2020
Resolution: Received def rectification.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 June 2020
Resolved
#2 SSDG has oil dripping onto the electrical connections of a sensor (inboard side of engine). Make provisions to protect sensor from oil.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 July 2020
Resolved 6 July 2020
Resolution: Received def rectification.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 February 2020
Resolved
Vessel crewmembers reported exhaust in the port main engine crankcase. Identify cause of the exhaust and make repairs to the satisfaction of an attending marine inspector prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 March 2020
Resolution: Received class report.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 February 2020
Resolved
During function testing of the vessel's CO2 system, a leak was detected in the pressure alarm line. The time delay was also over the allowable 66 seconds. Make repairs to the damaged CO2 line and conduct pressure testing of the repaired line in the presence of an attending marine inspector. Upon successful completion of the pressure testing, conduct a full operational test of the CO2 system prior to movement.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 February 2020
Resolution: Operational test satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 18 February 2020
Resolved
The "Lido Bar" door does not properly self close. Make proper repairs to door to ensure proper operation within a fire boundary.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 February 2020
Resolution: Door closes properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 February 2020
Resolved
Motor controllers for the starboard lifeboat and hot start in the engine room have loose box connectors/stuffing tubes. Repair or replace box connectors/ stuffing tubes to provide adequate enclosure ingress protection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2020
Resolved 24 March 2020
Resolution: Received documents from POC stating the cause of the ground was located and rectified.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 February 2020
Resolved
Multiple receptacles in the salon area do not have a grounding pole. Prove proper installation of a grounding pole in all receptacles that operate at 100 volts or more.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 March 2020
Resolved 24 March 2020
Resolution: Received documents from POC stating the cause of the ground was located and rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 February 2020
Resolved
The vessel reported excessive vibration on the #1 SSDG while testing. An analysis of the cause of the vibration and any corrective action taken shall be submitted to the CG. Proper operation of the #1 SSDG shall be proven to the attending CG inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 25 February 2020
Resolution: Received class report attesting to satisfactory testing of SSDG.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 October 2019
Resolved
Aft bridge window is cracked and sealed with duct tape. Replace window to required fire boundary standard. 46 CFR 72.05-30(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2019
Resolved 20 February 2020
Resolution: Window has been replaced.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 October 2019
Resolved
Forward port salon door does not close properly. Repair latch and prove proper operation. 46 CFR 72.05-25(b)(9)
Action required: 10 - Deficiency Rectified
Resolved 30 October 2019
Resolution: Crew changed out the door closer. Tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 30 October 2019
Resolved
Port rescue boat was improperly marked. Mark both sides of the rescue boat bow with the vessel's name in block capital letters. 46 CFR 199.176(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2019
Resolved 21 November 2019
Resolution: Received photograph and report of proper vessel labeling on rescue boat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 October 2019
Resolved
prove proper operation of the #2 SSDG overspeed shut-down.
Action required: 10 - Deficiency Rectified
Due 30 October 2019
Resolved 30 October 2019
Resolution: Overspeed corrected prior to USCG departure.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 October 2019
Resolved
re-condition and properly attach wire connections, fuses, and ensure the motor controller boxes are weather tight for the rescue boat davits.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 November 2019
Resolved 21 November 2019
Resolution: Received photographs and report of repairs to motor control box.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 October 2019
Resolved
ensure all electrical panel boards have a directory with rating or setting of overcurrent devices. the panels should be fitted per approved drawings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2019
Resolved 9 January 2020
Resolution: Received report that all have been reviewed against approved drawings.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 July 2019
Resolved
Port side passenger salon door does not latch properly and has a hole in it. Repair latch and fill hole to ensure fire boundary is maintained.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2019
Resolution: Repaired latch and filled hole with fire rated material.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 July 2019
Resolved
Fire extinguisher brackets numbers 12 and 13 are rusted through. Renew brackets to ensure proper mounting.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2019
Resolution: Replaced brackets.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 July 2019
Resolved
Door handle on stbd fwd salon door is in need of repair. Repair and prove proper operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 August 2019
Resolution: New door handle installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 July 2019
Resolved
Stbd side life ring buoy near crew room needs new SOLAS tape.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 August 2019
Resolution: New SOLAS tape applied.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 July 2019
Resolved
The port MDE F/O cross over hose was found chaffed and needs to be replaced. 46 CFR 56.60-25(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2019
Resolved 19 August 2019
Resolution: new hose was installed, due to receive piping mod per manufacture.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 July 2019
Resolved
There is a ground on the E-circuit. The vessel noted the ground was on the mast light. 46 CFR 111.05-21
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2019
Resolved 20 August 2019
Resolution: ground was corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 July 2019
Resolved
The vessel noted the seal for the electric bilge pump needs replaced. proper maintenance must be preformed. 46 CFR 56.50-55
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2019
Resolved 20 August 2019
Resolution: Pump seal was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 30 July 2019
Resolved
The ECR and Pilot house port MDE shaft Tach is not correct. the proper shaft RPM must be reported to control stations. 46 CFR 6.35-5(b)(3)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2019
Resolved 20 February 2020
Resolution: Inspectors verified new tachometer during Feb 2020 COI inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 July 2019
Resolved
The #1 SSDG was found with excessive amounts of oil leaking from the frw end and unattached hose clamps. the vessel shall find the cause of oil leak and make repairs. hose clamps shall be reattached. 46 CFR 58.10-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 August 2019
Resolved 20 August 2019
Resolution: leak and clamps were corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 July 2019
Resolved
The vessel reported the #2 SSDG was ubale to supply power to the bus. The vessel shall prove proper operation of the #2 SSDG.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2019
Resolved 26 June 2020
Resolution: Received ABS report attesting to satisfactory testing of SSDG.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 29 May 2019
Resolved
Two window heater units on the bridge are not connected properly. Remove wiring or properly install window heaters.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: Reconnected heaters.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 29 May 2019
Resolved
Remove dead end wiring in the aft control station box.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: Removed wiring.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 29 May 2019
Resolved
Prove proper operation of the over-speed trip on the #1 SSDG. 46 CFR 62.35
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: DRBA mechanics verified trip set at 2035 RPM.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 May 2019
Resolved
Find source and make repairs to mitigate the oil leak on the #2 SSDG seen on the outboard frw corner. 46 CFR 72.03-5
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2019
Resolution: Tightened front cover bolt on #2 SSDG.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 May 2019
Resolved
Either hydro or remove the fire suppression bottle used by the Gaylord hood system in the galley. Rust was observed on the bottom of the bottle and it is a hazard to personnel. 46 CFR 76.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 June 2019
Resolution: Cylinder removed from vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 April 2019
Resolved
Vessel reported starboard main engine failure while departing Cape May terminal. Provide statement attesting to cause of shutdown and repair proposal. Vessel may transit back to the Cape May terminal with a tug assist.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 1 April 2019
Resolved 1 April 2019
Resolution: See Activity
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 November 2018
Resolved
Vessel's generators are arranged for parallel operations. the arrangement is required to have either reverse power or reverse current trips. Vessel must prove proper operation of this safety. Vessel must not operate in a parallel condition until proven.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2018
Resolved 15 January 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 20 November 2018
Resolved
Vessel must demonstrate CO2 shut down and alarm of the EDG engine and space.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 November 2018
Resolved 21 November 2018
Resolution: Received email from Port Engineer and Port Captain attesting to the proper operation of the EDG shutdowns.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 November 2018
Resolved
The AMR valve on the bilge manifold is leaking. Vessel must repair or replace this valve.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2018
Resolved 28 November 2018
08 - Alarms › N/A - No Subsystem › Boiler alarm
Issued 20 November 2018
Resolved
The hot water boiler in the engine space could not be operated. Vessel must demonstrate proper operation of all safety controls prior to operating.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 December 2018
Resolved 28 November 2018
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 20 November 2018
Resolved
The following areas must have CO2 signage: CO2 soda storage, CO2 cylinder firefighting storage, and the maine engine and EDG spaces.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 December 2018
Resolved 15 January 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 September 2018
Resolved
Conduct repairs to #1 SSDG and perform satisfactory test of overspeed and low lube oil shutdowns.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 September 2018
Resolved 20 September 2018
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 9 August 2018
Resolved
Vsl is broadcasting: NAME with Vsl type precursor (NAME must not include Vsl type precursors, e.g. F/V, M/V) and incomplete dimension information (AIS Antenna Position “X” equals 0).
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2018
Resolved 15 January 2019
Electrical › Electrical Distribution System (service) › Cable
Issued 29 May 2018
Resolved
Throughout the vessel's weather deck, metallic armor or sheathing is deteriorated and non-continuous. Replace or repair identified cables.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 June 2018
Resolved 15 June 2018
Resolution: Received email from Port Engineer with pictures showing they replaced the identified bad cable with new armored cable.
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 6 February 2018
Resolved
Prove proper operation of the emergency generator under load.
Action required: 60 - Rectify deficiencies prior to movement
Due 7 February 2018
Resolved 7 February 2018
Resolution: Received confirmation/documentation that the governor was adjusted and the EDG was run under 80KW load for 1 hour with good pressures and temperatures.
Electrical › Electric Generation Source (service) › Generator
Issued 6 February 2018
Resolved
Prove proper operation of jacket water alarms for both ship's service generators.
Action required: 705 - Other - as specified
Due 15 March 2018
Resolved 29 May 2018
Resolution: Chief Engineer proved proper operation of jacket water alarms for their generators.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 6 February 2018
Resolved
01- Prove proper operation of newly installed sprinkler system to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 March 2018
Resolved 31 May 2018
Resolution: Received email from Port Engineer with a signed statement from him, the Port Captain, the Cheif Engineer and the Captain attesting to the proper operation of the sprinkler system.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 6 February 2018
Resolved
02- Replace broken starboard shaft tachometer on bridge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 March 2018
Resolved 29 May 2018
Resolution: Verified that the starboard shaft tachometer was functioning properly.
Engineering › Pressure Vessel › Tubing
Issued 6 December 2017
Resolved
Make permanent repairs to crack in the fire box/flue in way of the tube sheet in the heating boiler.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 December 2017
Resolved 8 December 2017
Resolution: Recieved documentation to include a repair plan, welder quals, approved procedures, as well as pictures documenting the repairs and hydrostatic test.
Accommodation/Occupational Safety › Heating › Metal Protection
Issued 14 November 2017
Resolved
Make permanent repairs to the wasted cabinet structural supports for the 4 Mitsubishi Heat Pumps located on the car deck.
Condition: Improper/Lack of Maintenance
Due 2 March 2018
Resolved 29 May 2018
Resolution: Vessel corrected deficiency in dry dock.
Navigation › Piloting/Steering › Gryo Compass Repeater
Issued 14 November 2017
Resolved
KB01 Port bridge wing rudder angle indicator is obscured and cannot be read. Replace port bridge wing rudder angle indicator as original.
Action required: 705 - Other - as specified
Due 28 November 2017
Resolved 21 November 2017
Engineering › Steering Gear System › Rudder Stock
Issued 15 August 2017
Resolved
Remove Hydraulic/water mixture in the steering void and clean as necessary. Further evaluate steering system & rudder post seals to ensure any leakage is identified and if necessary, repairs made.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 23 August 2017
Resolution: Received email & pictures from the Port Engineer, void cleaned and all fitings/packing tightened with no apparent leaks.
Electrical › Electric Supply System (service) › Battery Installation
Issued 15 August 2017
Resolved
Clean & inspect battery boxes for Emergency Generator & General Alarm Batteries.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2017
Resolved 23 August 2017
Resolution: Received email & pictures from the Port Engineer, batteries were inpsected and boxes were cleaned.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 15 August 2017
Resolved
Either replace the #15 CO2 fire extinguisher on the car deck (midway stbd side) or have the extinguisher serviced by an authorized servicing facility.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 August 2017
Resolved 23 August 2017
Resolution: Received email from the Port Engineer that the CO2 extinguisher has been replaced.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 21 February 2017
Resolved
DC01: Aux steering breaker trip is inoperable. Prove breaker trip operation to attending MI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 6 April 2017
Resolution: Observered proper operation of breaker trip.
Electrical › Electric Generation Source (service) › Generator
Issued 21 February 2017
Resolved
DC02: Prove proper operation of Gen paraleling and reverse power relays.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 May 2017
Resolved 6 April 2017
Resolution: Witnessed gens in paralel.
Communications › Alarms/Indicators › General Alarm
Issued 13 December 2016
Resolved
Prove proper operation of #6 general alarm bell.
Action required: 705 - Other - as specified
Due 27 December 2016
Resolved 10 January 2017
Resolution: General alarm bell functions properly. The leads from the pilot house were damaged and replace. All sat
Fire Fighting › Structural - A Class Divisions › Doors
Issued 13 December 2016
Resolved
Prove proper operation of self closing fire doors on O2 deck.
Action required: 705 - Other - as specified
Due 27 December 2016
Resolved 20 December 2016
Resolution: Doors were adjusted and now properly close. All sat
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 13 December 2016
Resolved
Make enginer room bilges available for isnpection. Bilges contained approx 4 inches of oil.
Action required: 705 - Other - as specified
Resolved 20 December 2016
Resolution: Bilges were cleaned and inspected. No additional pitting noted in engine room. All sat.
Lifesaving › Launching Appliances › Falls
Issued 14 September 2016
Resolved
Service rescue boat falls in accordance with manufacturer's recommendations.
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Falls were greased.
Fire Fighting › Structural Fire Protection - General › Accommodation Space Protection
Issued 14 September 2016
Resolved
Repair fire stop penetration in forward port bulkhead leading to accomodation space/salon.
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: The fire stop penetrations were filled with Duck Seal.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 14 September 2016
Resolved
Remove daisy-chained surge protectors at WIFI station outside galley.
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Daisy chain removed.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 14 September 2016
Resolved
Replace water light line on forward port side ring buoy.
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 17 October 2016
Resolution: Water light replaced.
Construction/Loadline › Hull › Hull Plating
Issued 22 April 2016
Resolved
Vessel must make engine room bilges clean and available for quarterly visual inspections to monitor hull repairs and ensure further corrosion of hull plating does not occur. Condition of bilges should be documented at via photograph at inspections. Vessel is to provide results of corrosion survey to determine the cause of hull plate wastage to USCG Marine Inspectors for review.
Due 22 April 2017
Resolved 17 May 2017
Resolution: Vessel completed ISE/Drydock, bilges cleared, MI satisfied vessel meets requirement.
Construction/Loadline › Hull › Hull Plating
Issued 22 April 2016
Resolved
Prep, prime and paint areas discussed in : bow thruster bilges and bilges in voids 3,5,6, and 7.
Due 31 March 2017
Resolved 17 May 2017
Resolution: Completed to satisfaction of MI
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 22 April 2016
Resolved
Repair crack in upper longitudinal in void#1 and fwd and after ladders in void#4.
Due 31 March 2017
Resolved 17 May 2017
Resolution: Corrected to satisfaction of MI
Construction/Loadline › Structures › Manhole
Issued 22 April 2016
Resolved
Repair wasted area around starboard access hatch to void #7.
Due 31 March 2017
Resolved 17 May 2017
Resolution: Reapaired to satisfaction of MI
Construction/Loadline › Hull › Keel Plate
Issued 31 March 2016
Resolved
During vessel's ISE, MIs witnessed excessive pitting and deteriorated welds in way of keel. An area approximately 12'x30' was marked by USCG and ABS to under go ultrasonic testing. Results show significant wastage of seam welds and bottom shell plating in the sample area as much as 75%. Vessel is restricted from carrying passengers until a plan is approved by a USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 April 2016
Fire Fighting › Automatic Sprinkler System › Piping
Issued 23 February 2016
Resolved
Repair car deck sprinkler system leaks IVO Zone 3 FR 82 and FR 85. Prover proper operation of sprinkler heads IVO Zone 2 FR 50 and Zone 5 FR 45.
Action required: 705 - Other - as specified
Due 8 March 2016
Resolved 9 March 2016
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 23 February 2016
Resolved
Provide proof of hydrostatic testing for galley dry chemical system.
Due 8 March 2016
Resolved 23 February 2016
Resolution: Tagged out bottle and removed it from service.
Engineering › Steering Gear System › Motor
Issued 23 February 2016
Resolved
Prove proper operation of main and auxiliary steering gear overload alarms to satisfaction of CGMI.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 6 April 2016
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 23 February 2016
Resolved
Replace T-fittings on fixed CO2 system w/ appropriate fittings.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 March 2016
Resolved 6 April 2016
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 16 December 2015
Resolved
Make starboard side midships door in salon self closing.
Due 16 December 2015
Resolved 16 December 2015
Resolution: Adjusted door hinge. All sat.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 16 December 2015
Resolved
Remove hold backs from all exterior salon doors so as to make them self-closing.
Due 16 December 2015
Resolved 16 December 2015
Resolution: Hold back hooks were unscrewed from bulkhead.
Fire Fighting › Self-contained Breathing Apparatus › Air Bottle
Issued 16 December 2015
Resolved
02 EEBD's in ECR are outside hydro dates. Porvide 02 EEBD's within test dates to satisfaction of CGMI.
Due 30 December 2016
Resolved 14 January 2016
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Drum Safety
Issued 16 December 2015
Resolved
Main boiler failed to start, safeties not demonstrated. Demonstrate proper operation of safties to satisfaction of CGMI prior to operation.
Due 16 December 2015
Resolved 14 January 2016
Engineering › Diesel Engine (propulsion-direct drive) › Air-flex Clutch
Issued 21 October 2014
Resolved
Vessel made a repair to the port astern clutch without reporting or seeking permission prior to repair. Port clutch air tubes reported leaking air on Oct 6th and wasn't repaired until Oct 21st. Vessel operated almost every day in between with passengers onboard. Vessel must complete an underway sea trial with Coast Guard Marine Inspectors to prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 October 2014
Resolution: MI attended vsl and performed cold check of the Port MDE clutch with positive results (clutch held 95 PSI while in operation). Then a check was performed on the Port MDE clutch running and underload, all sat.
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 21 October 2014
Resolved
Vessel cannot demonstrate reverse power protection. Vessel to investigate problem, report findings, make repairs and demonstrate proper operation to the Coast Guard. 46CFR111.12-11
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 October 2014
Resolution: MI attended vsl and performed a check and test of the reverse power relay protection system for both SSDGs, all sat.
Fire Fighting › Ventilation Systems › Ducts
Issued 21 October 2014
Resolved
Manually operated damper shall be capable of shutting off the passage of air. Port side galley vent damper was found inoperable. Repair to satisfaction of CG MI.
Action required: 705 - Other - as specified
Due 4 November 2014
Resolved 23 October 2014
Resolution: Damper was visually inspected and tested manually by MI, all sat.
Engineering › Sea-water System (primary cooling) › Piping
Issued 10 July 2012
Resolved
Vessel needs to install double hose clamps on jacket water piping to and from the raw water cooler on both generators. Vessel experienced separation of piping and hose during high temperature evolution with generator due to misalignment of valve.
Condition: Damaged By Earlier Event
Due 24 July 2012
Resolved 19 July 2012
Resolution: Deficiency cleared.
Electrical › Electric Generation Source (service) › Generator
Issued 4 July 2012
Resolved
Vessel is identify the cause of the casualty and prove satisfactory operations of the #2 generator prior to carrying passengers to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 July 2012
Resolution: Marine Inspector tested generator with full load and bow thrusters running. Test satisfactory.
Electrical › Electric Generation Source (emergency) › Generator
Issued 9 August 2011
Resolved
Emergency generator would not start during routine test u/w from Lewes, DE to Cape May, NJ
Action required: 705 - Other - as specified
Resolved 17 August 2011
Resolution: E-generator was started and test run SAT.
Engineering › Steering Gear System › Solenoid Valve
Issued 20 July 2011
Resolved
Vessel reported that hydraulic oil was discovered to be bypassing the main solenoid valve causing oil to bypass the valve resulting inoil loss from secondary steering hydraulic tank into main steering hydraulic tank. Crew is to ensure that adequate oil level is maintained prior to each voyage. Solenoid valve to be replaced and steering tested to satisfaction of MI.
Action required: 705 - Other - as specified
Due 27 July 2011
Resolved 13 October 2011
Resolution: soleniod valve was replaced and steering was tested, oil level has been maintained to adequated level. All Sat.
Communications › Internal Communications System › Sound-powered Telephone
Issued 12 July 2011
Resolved
Ensure proper operation of the aft vehicle deck audible signal for the sound powered phone.
Condition: Improper/Lack of Maintenance
Due 26 July 2011
Resolved 12 July 2011
Resolution: Corrected while still conducting the inspection; all sat.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 12 July 2011
Resolved
Provide plan to adequately illuminate both the port and starboard side embarkation stations and operating instructions under emergency lighted conditions to marine inspector.
Condition: Improper Installation
Due 9 August 2011
Resolved 10 August 2011
Resolution: Identified suitable location for viewing the lifesaving appliance operating instructions at night under emergency lighting conditions
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 12 July 2011
Resolved
Repalce deteriorated CO2 system hoses, total of 6 hoses, to the satisfaction of attending MI.
Due 26 July 2011
Resolved 17 August 2011
Resolution: Identified hoses were replaced.
Navigation › Piloting/Steering › Gyro Compass
Issued 2 July 2011
Resolved
Prove proper operation of the gyro and repeaters. A report from a qualified service technician shall be provided indicating the extent of any repairs made and must include a statement that the gyro is functioning properly.
Action required: 705 - Other - as specified
Due 25 July 2011
Resolved 17 August 2011
Resolution: Gyro and repeaters were all reading the same.
Engineering › Diesel Engine (auxiliary) › Cylinder Liner
Issued 18 January 2011
Resolved
Prove Proper Operation of #1 Service Generator
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2011
Resolution: Witnessed satisfactory test following repairs.
Construction/Loadline › Hull › Transverse Frame
Issued 1 November 2010
Resolved
Frames 151, 152, and 153 in the aft void found to be wasted and in need of replacement.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Resolution: Witnessed SAT repairs to all wasted steel in aft void.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 27 October 2010
Resolved
CO2 bottle for emergency generator room CO2 system is not mounted at least 2 inches off the deck. Vessel is required to mount the bottle at least 2 inches off the deck.
Action required: 705 - Other - as specified
Due 15 April 2011
Resolved 11 January 2011
Resolution: 835 rescinded after further consideration with no action taken to the vessel.
Electrical › Lighting (service) › Lighting Fixture
Issued 27 October 2010
Resolved
Most warning lights on main panel from helm station are out and unable to be tested or shown to be working.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 10 November 2010
Resolved 23 November 2010
Resolution: Witnessed all alarms in light panel were working properly.
Fire Fighting › Automatic Sprinkler System › Piping
Issued 27 October 2010
Resolved
Replace 2 identified pipes in sprinkler system. System was working but rusted through in one spot and the threads were broken in another spot.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 April 2011
Resolved 23 November 2010
Resolution: Valves were changed out and sprinklers were tested - all sat.
Accommodation/Occupational Safety › Washroom/Toilet › Washbasin
Issued 20 July 2009
Resolved
wasted piping in sink drain to overboard. piping is in the engine room overhead, it has soft patch on it currently.
Condition: Unknown
Action required: 705 - Other - as specified
Due 20 August 2009
Resolved 10 November 2009
Resolution: Deficiency cleared at quarterly inspection 10Nov2009.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 20 July 2009
Resolved
EDG CO2 shutdown to include louver operation; prove proper operation.
Condition: Unknown
Action required: 705 - Other - as specified
Due 5 August 2009
Resolved 10 November 2009
Resolution: Deficiency cleared at quarterly inspection 10Nov2009.
Engineering › Steam Boiler (auxiliary/waste heat) › Water Drum/Header
Issued 20 July 2009
Resolved
both aux boilers are over due to be hyro tested; both were due on 5 June 2009.
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 August 2009
Resolved 10 November 2009
Resolution: Deficiency cleared at quarterly inspection 10Nov2009.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 20 July 2009
Resolved
OWS is tagged out and inoperable, prove proper operation prior to use.
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 August 2009
Resolved 10 November 2009
Resolution: Deficiency cleared at quarterly inspection 10Nov2009.
Engineering › Steam Boiler (auxiliary/waste heat) › Air Heater
Issued 10 October 2008
Resolved
Bioler was not operating properly.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 October 2008
Resolution: proved proper operation.
Engineering › Generator (propulsion/auxiliary-electric) › Indicator Circuitry
Issued 10 October 2008
Resolved
No audible alarm was operating for the emergency generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 October 2008
Resolution: Alarm was corrected and witnessed by MI.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 13 March 2008
Resolved
5-10 degree deviation between bridge and aft steering station rudder angle indicator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2008
Resolved 25 March 2008
Resolution: Observed all steering stations reading the same.
Construction/Loadline › Hull › Hull Plating
Issued 26 November 2007
Resolved
Repair damage to Starboard side aft quarter to the satisfaction of class, or attending marine inspector at next dry dock.
Action required: 705 - Other - as specified
Due 29 February 2008
Resolved 18 January 2008
Operations/Management › Drills/Instruction › Not Conducted
Issued 6 February 2007
Resolved
Prove proper operation of both rescue boats and conduct MOB drill to include placing boat in water.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 March 2007
Resolved 21 February 2007
Resolution: Completed succeful MOB drill with stbd rescue boat, port boat engine tested in cradle. All sat.
Fire Fighting › Fire Hoses › Condition
Issued 6 February 2007
Resolved
Properly pressure test all fire hoses.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 March 2007
Resolved 21 February 2007
Resolution: all sat.
Fire Fighting › Fire Hydrants › Condition
Issued 6 February 2007
Resolved
Prove proper operation of all hydrants.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 March 2007
Resolved 21 February 2007
Resolution: All sat.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 6 February 2007
Resolved
Prove proper operation of vehicle deck sprinkler system.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 March 2007
Resolved 21 February 2007
Resolution: Tested sat.
Electrical › Electric Supply System (service) › Cable
Issued 6 February 2007
Resolved
Provide proper metal supports to wiring in way of reduction gears on port and starboard MDEs and on overhead above heating circ pumps.
Action required: 705 - Other - as specified
Due 6 March 2007
Resolved 21 February 2007
Resolution: Completed
Engineering › Fuel Oil Service System › Valve
Issued 6 February 2007
Resolved
Label FO shut-off on port side of car deck.
Action required: 705 - Other - as specified
Due 6 March 2007
Resolved 21 February 2007
Resolution: Completed.
Engineering › Steering Gear System › Piping
Issued 6 February 2007
Resolved
Provide support to steering system hydraulic piping in lazerette.
Action required: 705 - Other - as specified
Due 6 March 2007
Resolved 1 March 2007
Resolution: Attended vessel, eight (8) additional support brackets added to provide support to steering system hydraulic piping.
Engineering › Steam System (auxiliary) › Piping
Issued 11 July 2006
Resolved
System was down for hydrostatic testing. Due for safety device operation verification.
Action required: 705 - Other - as specified
Resolved 14 November 2006
Resolution: Tested safety controls on both boilers. sat
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 8 May 2006
Resolved
33U.S.C.1321(j)(5)(G)-The vessel owner/operator has not provided certification ensuring that response resources are capable of responding to the maximum extent practicable, to a worst case discharge
33U.S.C.1321(j)(5)(D)(iii)-The NTVRP does not identify a classified oil spill removal organization (OSRO) or provide an OSRO contract for the remote COTP zones (Guam, AK COTP zones)
Due 8 June 2006
Resolved 11 March 2009
Resolution: NTVRP #04239 provided satisfactory certification statement and removed the remote COTP zones as intended areas of operation from the NTVRP. Vessel issued IOA, expires 03/12/2011.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 6 April 2006
Resolved
During operational test of the OWS system found leak in OWS inlet piping. Issued 835 to prove proper operation of OWS. Vessel must retain slops onboard or discharge to a shore facility until OWS is operable.
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 May 2006
Resolved 14 November 2006
Resolution: Repaired, tested during quarterly exam.
Electrical › Electric Generation Source (service) › Generator
Issued 18 January 2006
Resolved
Make proper repairs to 32v safety circuit for #1 SSDG.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 January 2006
Resolution: Received fax from [name withheld], DRBA Port Engineer, stating modifications complete and each SSDG was satisfactorily tested for overspeed and loss of lube oil.
Accommodation/Occupational Safety › Ventilation › General
Issued 12 January 2006
Resolved
Properly repair/replace the #1 passenger supply vent fan. (Extended date, unit on order)
Action required: 705 - Other - as specified
Resolved 14 November 2006
Resolution: Tested and inspected, all sat.
Electrical › Electric Generation Source (service) › Generator
Issued 12 January 2006
Resolved
Submit plans for modification of SSDG safety circuit to 24v from 32v.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 January 2006
Resolution: Received plans on 18Jan06 and examined on 19Jan06.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 12 January 2006
Resolved
Prove proper operation of fixed CO2 fire extinguishing system for E/R.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 March 2006
Resolution: Hiller Systems Inc, completed all tests after replacing faulty regulator valve.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 20 October 2005
Resolved
LOW LUBE OIL PRESSURE SENSOR IS NOT SHUTTING THE #1 SSDG DOWN. mAKE SYSTEM OPERABLE.
Due 20 October 2005
Resolved 20 October 2005
Resolution: LUBE OIL PRESSURE SWITCH WAS REPLACED AND TEST SAT.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 4 February 2004
Resolved
Replace 150 psi fittings on CO2 system in Emergency Generator space with fittings rated for 300 psi. LEGACY COMPONENT DESC: Piping
Due 4 March 2004
Resolved 4 February 2004
Resolution: Replaced fittings. Inspected sat.
Fire Fighting
Issued 4 February 2004
Resolved
Conduct Hydostatic test on APC bottle in galley.
Due 4 March 2004
Resolved 4 February 2004
Resolution: Conducted sat test.
Engineering › Fuel Oil Service System
Issued 4 February 2004
Resolved
Install door or new closure device on emergency generator emergency fuel shutoff.
Due 4 March 2004
Resolved 10 February 2004
Resolution: Installed new cabinet and door for emergency generator emergency fuel shut-off.
Fire Fighting
Issued 4 February 2004
Resolved
Replace rotted fire axe sleeve at fire station #6.
Due 4 March 2004
Resolved 10 February 2004
Resolution: Replace rotted fire axe sleeve. Inspected sat.
Fire Fighting
Issued 4 February 2004
Resolved
Tighten packing of leaking fireplugs at fire stations 1, 5, 6, and 10.
Due 4 March 2004
Resolved 10 February 2004
Resolution: Energized firemain system and inspected sat fire station. No leaking observed at fireplugs.
Construction/Loadline › Penetrations
Issued 30 October 2003
Resolved
Crop and renew wasted oil fill tube on stbd main deck. LEGACY COMPONENT DESC: lub oil fill tube
Condition: Improper/Lack of Maintenance
Due 30 November 2003
Resolved 5 January 2004
Documentation › Safety Management System
Issued 30 October 2003
Resolved
Renew damage and missing rescue boat launching instructions and IBA launching instructions at both port and stbd stations. LEGACY COMPONENT DESC: operating instructions
Condition: Improper/Lack of Maintenance
Due 30 November 2003
Resolved 5 January 2004
Electrical › Lighting (service)
Issued 30 October 2003
Resolved
Resecure fastenings of main deck light fixture port side aft. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper/Lack of Maintenance
Due 30 November 2003
Resolved 5 January 2004
Pollution Prevention/Response › Prevention Equipment
Issued 30 October 2003
Resolved
Clean and remove all debris from engine room bilges. LEGACY COMPONENT DESC: Engine room bilges
Condition: Improper/Lack of Maintenance
Due 30 November 2003
Resolved 13 November 2003
Resolution: ENGINE ROOM BILGE CLEANED, ALL DEBRIS REMOVED.
Documentation › Safety Management System
Issued 30 October 2003
Resolved
Procure and post local operating instuctions for both port and stbd steering systems in the engine room. LEGACY COMPONENT DESC: Steering instructions
Condition: Improper/Lack of Maintenance
Due 30 November 2003
Resolved 13 November 2003
Resolution: LOCAL OPERATING INSTRUCTIONS POSTED FOR BOTH PORT AND STBD STEERING SYSTEMS IN ENGINE ROOM.
Engineering › Diesel Engine (auxiliary)
Issued 14 August 2003
Resolved
Repair and prove proper operation of #1 Ships service generator lube oil shut down device.
Due 14 September 2003
Resolved 30 October 2003
Pollution Prevention/Response › Prevention Equipment
Issued 14 August 2003
Resolved
Prove proper operation of the installed oily water separator. LEGACY COMPONENT DESC: Oily Water Separator (15 ppm)
Due 14 September 2003
Resolved 30 October 2003
Electrical › Electric Generation Source (emergency)
Issued 14 August 2003
Resolved
Prove proper operation of the CO2 shutdown device on the emergency generator.
Due 14 September 2003
Resolved 30 October 2003
Electrical › Lighting (emergency)
Issued 14 August 2003
Resolved
Install an emergency light in the galley at the CO2 system local operating station.
Due 14 September 2003
Resolved 5 January 2004
Deck/Cargo
Issued 14 August 2003
Resolved
Repair the portside ventilation closure for the bow thruster ventilation and prove water tightness.
Due 14 September 2003
Resolved 30 October 2003
Electrical › Electric Supply System (service)
Issued 15 April 2003
Resolved
Replace the cracked rubber grommets on both port and stbd rescue boat controllers.
Condition: Unknown
Due 15 May 2003
Resolved 30 October 2003
Electrical
Issued 15 April 2003
Resolved
Provide a schematic drawing for the void boiler controller.
Due 15 May 2003
Resolved 14 August 2003
Engineering › Shafting/Propeller Arrangements
Issued 20 February 2003
Resolved
REPLACE DAMAGE PORT PROPELLER PRIOR TO CARRYING PASSENGERS.. LEGACY COMPONENT DESC: Propeller (fixed pitch)
Condition: Unknown
Due 28 February 2003
Resolved 28 February 2003
Resolution: PORT PROPELLER REPLACED.
Electrical › Electrical Distribution System (service)
Issued 20 February 2003
Resolved
PROPERLY LABEL ALL MISC. CONTROLLERS IN E/R, TO INCLUDE FIRE PUMP, SPRINKLER PUMP, AIR COMPRESSOR, BOILER CIRC. PUMP ETC. LEGACY COMPONENT DESC: Switchboard
Condition: Improper/Lack of Maintenance
Due 31 March 2003
Resolved 15 April 2003
Electrical › Electric Supply System (service)
Issued 20 February 2003
Resolved
SUBMIT PLAN WITH ELECTRICAL DRAWING FOR ENGINE ROOM ENTRY GATES.
Condition: Improper Installation
Due 31 March 2003
Resolved 15 April 2003
Engineering › Diesel Engine (auxiliary)
Issued 20 February 2003
Resolved
REPLACE MISSING BULB COVERS ON E. GEN CONTROL BOX. LEGACY COMPONENT DESC: Control Box Bulb Covers
Condition: Improper/Lack of Maintenance
Due 31 March 2003
Resolved 15 April 2003
Electrical › Electrical Distribution System (emergency)
Issued 20 February 2003
Resolved
SECURE OPEN HOLES IN BATTERY CHARGER CONTROLLER LEGACY COMPONENT DESC: Panelboard
Condition: Unknown
Due 31 March 2003
Resolved 15 April 2003
Electrical › Electric Generation Source (emergency)
Issued 20 February 2003
Resolved
REPAIR GROUNDED CIRCUIT ON E. GEN. HOT START BREAKER. LEGACY COMPONENT DESC: Circuit Breaker
Condition: Unknown
Due 31 March 2003
Resolved 15 April 2003
Navigation › Piloting/Steering
Issued 20 February 2003
Resolved
REPAIR/REPLACE WIRING STAND-OFFS IN STEERING COMPARTMENT. LEGACY COMPONENT DESC: Steering Comp. Wiring Stand-Offs
Condition: Unknown
Due 31 March 2003
Resolved 20 February 2003
Communications › Visual Communication
Issued 20 February 2003
Resolved
PROVIDE WARNING INSTRUCTIONS FOR E. GEN GOVERNOR SPEED SWITCH. LEGACY COMPONENT DESC: Warning Instructions
Condition: Unknown
Due 31 March 2003
Resolved 15 April 2003
Operations/Management › Pollution
Issued 20 February 2003
Resolved
REMOVE PLASTIC GARBAGE CANS THROUGHOUT VESSEL AND REPLACE W/STEEL/ALUMINUM. LEGACY COMPONENT DESC: Control of Garbage
Condition: Placed in Improper Service
Due 31 March 2003
Resolved 15 April 2003
Resolution: Only the trash cans on the car deck have been replaced with steel cans. Steel cans are required by regulation throughout the vessel. In an effort to work with industry this 835 will be cleared but the steel trash can issue will be revisted in the futue
Fire Fighting › Firemans Outfit
Issued 4 September 2002
Resolved
THE FIRE FIGHTING BOOTS PROVIDED TO THE CREW WERE EXTREMELY LARGE AND POSED A SAFETY HAZARD TO THE VESSEL PERSONNEL DURING FIRE DRILL. LEGACY COMPONENT DESC: Boots
Condition: Placed in Improper Service
Due 5 October 2002
Resolved 24 September 2002
Resolution: Provided proper fire fighting boots for fire team.
Lifesaving › Lifejacket/PFD (General)
Issued 4 September 2002
Resolved
THREEE (3) FORWARD LIFEJACKET STOWAGE PLACARDS WERE WORN. LEGACY COMPONENT DESC: Lifejacket Stowage Placard
Condition: Unknown
Due 5 October 2002
Resolved 24 September 2002
Resolution: Posted new life jaket stowage placards.
Lifesaving › Inflatable Liferafts
Issued 6 February 2002
Resolved
Prior to 28 Feb 021, service all port side IBA's. No passenger operations shall be condutced after 28 Feb 02 without servicing being performed.
Due 28 February 2002
Resolved 30 May 2002
Resolution: All port side IBA''s serviced.
Navigation
Issued 8 November 2001
Resolved
PROVIDE NEW COMPASS DEVIATION CARD.
Condition: Unknown
Due 8 December 2001
Resolved 10 December 2001
Construction/Loadline
Issued 24 September 2001
Resolved
REPLACE WASTED OVERHEAD TRANSVERSE SECTION IN AFTPEAK VOID, IWO OF FIRST OVERHEAD TRANSVERSE UPON ENTERING TANK.
Condition: Unknown
Due 24 September 2001
Resolved 24 September 2001
Fire Fighting
Issued 19 September 2001
Resolved
REPAINT CO2 LOCAL VALVE HANDELS ON FIXED CO2 SYSTEM.
Condition: Unknown
Due 19 September 2001
Resolved 19 September 2001
Electrical
Issued 19 September 2001
Resolved
PMS ENGINE ALARM BATTERY BOXES, CLEAN OUT AND PRSERVE INTERIOR.
Condition: Unknown
Due 19 September 2001
Resolved 19 September 2001
Lifesaving
Issued 12 June 2001
Resolved
PRIOR TO 30 AUGUST 2001, SERVICE ALL STBD SIDE IBA'S. NO PASSENGER OPERATION AFTER 30 AUGUST 2001 WITHOUT PROPER LIFESAVING SERVICING.
Condition: Unknown
Due 12 June 2001
Resolved 12 June 2001
Lifesaving
Issued 6 February 2001
Resolved
PRIOR TO 28FEB01, PERFORM ANNUAL SERVICING OF ALL IBA'S. THIS IS A NO SAILITEM AFTER 28FEB01 IF SERVICING HAS NOT BEEN PERFORMED.
Condition: Unknown
Due 28 February 2001
Resolved 6 March 2001
Fire Fighting
Issued 24 August 2000
Resolved
REPLACE OR REMOVE (3) KINKED CO2 HOSES.
Condition: Unknown
Due 24 August 2000
Resolved 24 August 2000
Lifesaving
Issued 24 August 2000
Resolved
PROVIDE DOCUMENTATION OF MOST RECENT FALL RENEWAL.
Condition: Unknown
Due 24 September 2000
Resolved 31 August 2000
Engineering
Issued 24 February 2000
Resolved
REPAIR OR REMOVE ALL NON-REQUIRED OUT OF COMMISSION GAUGES AND OR METERS LOCATED ON THE NAVIGATION BRIDGE.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Lifesaving
Issued 24 February 2000
Resolved
PROPERLY SECURE OR REMOVE COIN MACHINE LOCATED IN THE 02 DECK ACCOMMODATIONSPACE.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Fire Fighting
Issued 24 February 2000
Resolved
REPAIR OR REPLACE THE GENERAL ALARM BELL ON THE 03 DECK, MOUNTED ON THE EMERGENCY GENERATOR ENCLOSURE.
Condition: Unknown
Due 24 February 2000
Resolved 24 February 2000
Electrical
Issued 14 September 1999
Resolved
INSTALL COVER ON ELECTRICAL POWER BOX IN GALLEY STORE ROOM.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Electrical
Issued 14 September 1999
Resolved
REPAIR THE AUDIBLE ALARMS FOR THE HIGH J/W AND LOW L/O PRESSURE SWITCHES FOR THE EMERGENCY GENERATOR.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Electrical
Issued 14 September 1999
Resolved
REMOVE AND REWIRE THE CONNECTIONS CONTAINING WIRE NUTS FOR THE #1 AND #2 MAIN ENGINE SERVO MOTORS.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Fire Fighting
Issued 14 September 1999
Resolved
LABEL AND MOUNT BRIDGE GENERAL QUARTERS ALARM BELL AND LABEL ALARM BELL IN CREWS LOUNGE.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Fire Fighting
Issued 14 September 1999
Resolved
MATCH THE ENGINE ROOM CO2 RELEASE OPERATING INSTRUCTIONS TO THE RELEASE VALVES.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Lifesaving
Issued 14 September 1999
Resolved
LABEL EMERGENCY EGRESS HATCH IN BOW THRUSTER ROOM.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Documentation
Issued 14 September 1999
Resolved
MATCH THE CREWS MUSTER CARDS TO THE VESSELS STATION BILL.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Lifesaving
Issued 14 September 1999
Resolved
INVENTORY AND UPDATE THE FIRST AID KIT.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Electrical
Issued 14 September 1999
Resolved
CALIBRATE THE VOLTAGE METERS FOR THE #1 SSDG AND #2 SSDG TO MATCH ON THE MAIN SWBD.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Fire Fighting
Issued 14 September 1999
Resolved
REPAIR THE START WINDINGS/ CONTROLLER FOR THE MAIN FIRE FIRE PUMP.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Documentation
Issued 14 September 1999
Resolved
POST ALL REQUIRED DOCUMENTS AT THE OPERATING STATION.
Condition: Unknown
Due 14 September 1999
Resolved 14 September 1999
Lifesaving
Issued 25 May 1999
Resolved
PROVIDE LAUNCHING INSTRUCTIONS FOR BOTH IBA'S.
Condition: Unknown
Due 25 June 1999
Resolved 14 June 1999
Documentation
Issued 25 May 1999
Resolved
PRIOR TO OPERATING VESSEL PROVIDE A VALID RADIO TELEPHONE CERTIFICATE.
Condition: Unknown
Due 1 June 1999
Resolved 14 June 1999
Engineering
Issued 25 May 1999
Resolved
PROVE PROPER OPERATION OF BOILER AND ALL BOILER SHUT DOWNS PRIOR TO OPERATING SEASON.
Condition: Unknown
Due 25 May 1999
Resolved 25 May 1999
Lifesaving
Issued 25 May 1999
Resolved
LABEL GENERAL QUARTERS ALARM BELLS ON 02 DECK
Condition: Unknown
Due 25 June 1999
Resolved 14 June 1999
Electrical
Issued 25 May 1999
Resolved
REPAIR WATER LEAK/ELECTRICAL HAZARD IN GAYLORD HOOD CONTROL CABINET.
Condition: Unknown
Due 25 June 1999
Resolved 14 June 1999
Construction/Loadline
Issued 25 February 1999
Resolved
REPAIR LEAKING BILGE MANIFOLD VALVE FOR AFT PEAK.
Condition: Unknown
Due 25 March 1999
Resolved 26 February 1999
Fire Fighting
Issued 25 February 1999
Resolved
CONDUCT AND LOG SPRINKLER TEST.
Condition: Unknown
Due 15 March 1999
Resolved 15 March 1999
Fire Fighting
Issued 25 February 1999
Resolved
LOG AND PROVE FIRE AND MAN OVERBOARD DRILLS.
Condition: Unknown
Due 15 March 1999
Resolved 15 March 1999
Electrical
Issued 25 February 1999
Resolved
PROVIDE APPROVED PLANS FOR THE SHORETIE INSTALLATION.
Condition: Unknown
Due 25 February 1999
Resolved 25 February 1999
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #8 C/R OVHD ANGLE FRAMES AT FWD END OF TANK AFT OF LADDER.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #8 C/R UPPER & LOWER FLANGES ON LONG ON THE STBD SIDE AT FWD END.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
C/R BOTTOM WEB FRAME FLANGES AT FRAMES 151-153 IN AFT PEAK TANK.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
C/R FLANGES AT CVK BRKTS AT FRAMES 151-152 IN AFT PEAK TANK.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
C/R OVHD FRAME ANGLES AT FRAME 152 IN AFT PEAK TANK.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #1 V/W CRACK IWO OVHD FR 16 AND SLOPING FRAME AT CONNECTING BRACKET APPROX 6" LONG.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #1 V/W CRACKS ON PORT & STBD SIDES AT FR 22 AT UPPER WEB FRAME CONNECTING WITH OVHD FRAMES.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #2 V/W 4" CRACK BETWEEN PORT OB OVHD LONG GIRDER AND FWD VERTICAL STIFFENER.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
C/R VENT TRUNKS, LOCATED ON MAIN DECK PORT & STBD SIDE, TO GOOD METAL.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #7 C/R BOTTOM WEB FRAME FLANGES OF FWD TWO (2) BOTTOM WEBS AND AFT TWO(2) BOTTOM WEBS.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #2 WELD LAPPED ANGLED CONNECTION BETWEEN BOTTOM SHELL FRAME AND AFT OBLEG OF PORT IB POTABLE WATER TANK.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #7 C/R OVHD ANGLE FRAME FWD END OF TANK AFT OF LADDER.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Construction/Loadline
Issued 3 December 1998
Resolved
VOID #8 C/R BOTTOM WEB FRAME FLANGES FWD 2 BOTTOM WEBS AND THE 2 FRAMES FROM AFT BHD.
Condition: Unknown
Due 3 December 1998
Resolved 3 December 1998
Engineering
Issued 3 September 1998
Resolved
PRIOR TO OPERATING BOTH BOILERS CONDUCT OPERATIONAL TESTS INCLUDING ALARMS & SHUTDOWNS.
Condition: Unknown
Due 3 September 1998
Resolved 3 September 1998
Engineering
Issued 23 February 1998
Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR.
Condition: Unknown
Due 25 February 1998
Resolved 25 February 1998
Lifesaving
Issued 23 February 1998
Resolved
PROVIDE SERVICING REPORT FOR 3 STARBOARD AND ONE UPPER PORT IBA. TWO HAVEPOPPED SEAMS, TWO HAVE PAINTER PLUGS POPPED IN.
Condition: Unknown
Due 13 April 1998
Resolved 13 April 1998
Construction/Loadline
Issued 10 June 1997
Resolved
PRIOR TO CARRYING PASSENGERS, MAKE PERMANENT REPAIRS TO HULL PLATING AND INTERNALS IWO OF STEM PORT SIDE.
Condition: Unknown
Due 18 June 1997
Resolved 18 June 1997
Lifesaving
Issued 17 December 1996
Resolved
PROVIDE PROOF OF SERVICEABILITY OF TWO EXPOSED IBA CANNISTERS, TOTAL PERSONS ON BOARD RESTRICTED TO 412.
Condition: Unknown
Due 27 December 1996
Resolved 27 December 1996
Fire Fighting
Issued 17 December 1996
Resolved
PROVE PROPER OPERATION OF THE HEAT ACTIVATED DEVICE FOR THE EMERGENCY GENERATOR CO2 SYSTEM.
Condition: Unknown
Due 17 December 1996
Resolved 17 December 1996
Lifesaving
Issued 13 December 1995
Resolved
REPLACE RETRO REFLECTIVE TAPE ON 17 ADULT AND 2 CHILD PFD'S.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Lifesaving
Issued 13 December 1995
Resolved
REPLACE ONE WATERLIGHT WITH OPERATIONAL UNIT.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Navigation
Issued 13 December 1995
Resolved
REPAIR RUDDER ANGLE INDICATOR ON AFT STEERING STATION TO MATCH THE SAME AS THE RUDDER ANGLE INDICATOR ON THE BRIDGE.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Fire Fighting
Issued 13 December 1995
Resolved
SWITCH IDENT PLATES ON BRIDGE FOR #1 AND #2 REMOTE VENT SHUTDOWNS.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Engineering
Issued 13 December 1995
Resolved
REPAIR SOLENOID VALVE FOR OWS OVERBOARD DISCHARGE.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Construction/Loadline
Issued 13 December 1995
Resolved
UNCLOG DECK DRAIN IN STEERING COMPARTMENT.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Electrical
Issued 13 December 1995
Resolved
REPLACE NON OPERATIONAL E-LIGHT ON CAR DECK, AFT SECTION, STARBOARD SIDE.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Electrical
Issued 13 December 1995
Resolved
ADJUST OVERSPEED TRIP FOR #1 S/S GENERATOR.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Engineering
Issued 13 December 1995
Resolved
REPAIR LUBE OIL LEAK IWO FWD CYLINDER ON STBD MAIN DIESEL ENGINE.
Condition: Unknown
Due 14 December 1995
Resolved 14 December 1995
Documentation
Issued 16 November 1995
Resolved
PROVIDE APPROVED COPIES OF LIFESAVING EQUIPMENT ARRANGMENT AND FIRE CONTROLPLANS.
Condition: Unknown
Due 16 November 1995
Resolved 16 November 1995
Engineering
Issued 13 September 1995
Resolved
PRIOR TO OPERATING THE HOTEL BOILER CONDUCT OPERATIONAL TESTS TO INCLUDE ALL ALARMS, SHUTDOWNS AND RELIEF VALVE SETTING.
Condition: Unknown
Due 13 September 1995
Resolved 13 September 1995
Engineering
Issued 13 September 1995
Resolved
PRIOR TO OPERATING THE VOID BOILER CONDUCT OPERATIONAL TESTS TO INCLUDE ALLALARMS, SHUTDOWNS AND RELIEF VALVE SETTING.
Condition: Unknown
Due 13 September 1995
Resolved 13 September 1995
Engineering
Issued 8 June 1995
Resolved
OPEN ALL VALVES ON BOILERS FOR EXAMINATION BY A MARINE INSPECTOR. CONDUCT HYDRO ON BOILERS, TEST LOW WATER ALARM.
Condition: Unknown
Due 27 June 1995
Resolved 27 June 1995
Construction/Loadline
Issued 8 June 1995
Resolved
RENEW GASKET TO SCUTTLE IN ENGINE ROOM.
Condition: Unknown
Due 16 June 1995
Resolved 16 June 1995
Engineering
Issued 8 June 1995
Resolved
PRIOR TO OPERATING BOILERS CONDUCT OPERATIONAL TEST, INCLUDING ALL ALARMS AND SAFETIES TO THE SATISFACTION OF ATTENDING COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 27 June 1995
Resolved 27 June 1995
Engineering
Issued 8 June 1995
Resolved
RENEW CHECK VALVE OR PROVIDE DOCUMENTATION VALVE MEETS REQUIREMENTS OF 46CFR 56.50-75.
Condition: Unknown
Due 21 June 1995
Resolved 21 June 1995
Lifesaving
Issued 22 March 1995
Resolved
PLACE PROPERLY SERVICED USCG APPROVED LIFERAFTS ON BOARD PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 22 March 1995
Resolved 22 March 1995
Fire Fighting
Issued 22 March 1995
Resolved
UNCLOG #1 ZONE SPRINKLER HEADSON SATRBOARD SIDE FORWARD.
Condition: Unknown
Due 3 April 1995
Resolved 3 April 1995
Engineering
Issued 22 March 1995
Resolved
PROVIDE CALIBRATED ENGINE SHAFT TACHOMETERS.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Engineering
Issued 19 May 1994
Resolved
PRIOR TO PUTTING BOTH BOILERS IN SERVICE, MAKE INTERNALS ACCESSIBLE FOR EXAMINATION AND CONDUCT HYDROSTATIC TESTS TO THE SATISFACTION OF AN ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 19 May 1994
Resolved 19 May 1994
Engineering
Issued 19 May 1994
Resolved
PRIOR TO PUTTING BOTH BOILERS IN SERVICE, DEMONSTRATE PROPER OPERATION OF ALL ALARMS AND SHUTDOWNS.
Condition: Unknown
Due 19 May 1994
Resolved 19 May 1994
Navigation
Issued 9 February 1994
Resolved
RENEW THE MAGNETIC COMPASS DEVIATION TABLE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 9 February 1994
Resolved 9 February 1994
Electrical
Issued 9 February 1994
Resolved
INSTALL EMERGENCY LIGHTS ON THE BOILER FLAT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1994
Resolved 16 February 1994
Construction/Loadline
Issued 9 February 1994
Resolved
RENEW THE THREADS ON THE AFT PORT VOID VENT ON THE CAR DECK (2ND FORWARD OFSTERN)._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1994
Resolved 16 February 1994
Fire Fighting
Issued 9 February 1994
Resolved
CONDUCT A FIRE DRILL._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1994
Resolved 16 February 1994
Engineering
Issued 9 February 1994
Resolved
REPAIR THE LEAKING NOZZLE ON THE WAYWOFF BOILER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1994
Resolved 16 February 1994
Electrical
Issued 9 February 1994
Resolved
MARK THE EMERGENCY LIGHTS ON BOTH BOAT DECKS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1994
Resolved 16 February 1994
Fire Fighting
Issued 9 February 1994
Resolved
CONDUCT AN OPERATIONAL TEST OF THE CARDECK SPRINKLER SYSTEM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1994
Resolved 16 February 1994
Unknown
Issued 9 February 1994
Resolved
REPAIR THE PA SPEAKER ON THE FORWARD END OF THE EMERGENCY GENERATOR ROOM._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 February 1994
Resolved 16 February 1994
Fire Fighting
Issued 9 February 1994
Resolved
REPAIR THE BROKEN FIRE DAMPER HANDLE ON THE #1 EXHAUST VENT IN THE EMERGENCY GENERATOR ROOM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 February 1994
Resolved 10 February 1994
Lifesaving
Issued 16 November 1993
Resolved
CHANGE THE FUEL IN THE MOTORIZED LIFEBOAT._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 November 1993
Resolved 16 November 1993
Lifesaving
Issued 16 November 1993
Resolved
STRIP AND OVERHAUL BOTH LIFEBOATS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 November 1993
Resolved 16 November 1993
Electrical
Issued 16 November 1993
Resolved
MAKE PROPER REPAIRS TO LOW LUBE OIL AND HIGH TEMPERATURE VISUAL AND AUDIBLEALARMS OF EMERGENCY GENERATOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 November 1993
Resolved 16 November 1993
Electrical
Issued 16 November 1993
Resolved
MAKE PROPER REPAIR TO THE STARBOARD ELECTRIC SHORE POWER CONNECTOR AND MAKEBOTH SHORE CONNECTORS WATERTIGHT WHEN UNPLUGGED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 November 1993
Resolved 16 November 1993
Fire Fighting
Issued 10 September 1993
Resolved
REPAIR THE RUST HOLE IN THE INBOARD SPRINKLER LINE ON THE AFT END OF ZONE #4._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 September 1993
Resolved 10 September 1993
Unknown
Issued 10 September 1993
Resolved
STENCIL WASHDOWN HOSES "FOR WASHDOWN ONLY" ON THE CAR DECK AND UPPER ACCOMMODATION DECK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 September 1993
Resolved 10 September 1993
Accommodation/Occupational Safety
Issued 10 September 1993
Resolved
REPLACE THE ELECTRIC POWER CORD ON THE JUICE MACHINE IN THE GALLEY
Condition: Unknown
Due 10 September 1993
Resolved 10 September 1993
Lifesaving
Issued 6 May 1993
Resolved
CONDUCT AN UNDERWAY LIFEBOAT DRILL ON THE #2 LIFEBOAT TO THE SATISFACTION OF THE ATTENDING INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 June 1993
Resolved 7 June 1993
Engineering
Issued 6 May 1993
Resolved
PRIOR TO USING THE WAYWOLF BOILER, CONDUCT TESTS IN ACCORDANCE WITH 46CFR61.35 TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 May 1993
Resolved 6 May 1993
Lifesaving
Issued 9 February 1993
Resolved
PROVIDE AN OPERATIONAL TEST (LIFEBOAT DRILL) OF THE MOTORIZED LIFEBOAT. UNABLE TO CONDUCT DRILL DUE TO POSITION OF THE VESSEL AT THE PIER._x001C_ CORRECT PRIOR TO CARRYING PASSENGERS FOR HIRE._x001C_ _x001C_
Condition: Unknown
Due 9 February 1993
Resolved 9 February 1993
Lifesaving
Issued 9 February 1993
Resolved
PROVIDE 4 ADDITIONAL INFLATIBLE LIFERAFTS ON BOARD. RAFTS WERE REMOVED FOR THE IMPENDING TRIP TO THE YARD IN NORFOLK, VA. CORRECT PRIOR TO CARRYING PASSENGERS FOR HIRE._x001C_ _x001C_
Condition: Unknown
Due 9 February 1993
Resolved 9 February 1993
Navigation
Issued 19 November 1992
Resolved
REPAIR HYDRAULIC LEAKS ON THE PORT AND STARBOARD HYDRAULIC STEERING PUMPS. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 December 1992
Resolved 7 December 1992
Fire Fighting
Issued 19 November 1992
Resolved
UNCLOG OR RENEW THE SPRINKLER HEAD ON THE STARBOARD FORWARD SIDE OF ZONE #1. DEMONSTRATE PROPER OPERATION._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 7 December 1992
Resolved 7 December 1992
Fire Fighting
Issued 19 November 1992
Resolved
REPAIR OR REPLACE THE HANDLE ON #1 EXHAUST DAMPER IN THE EMERGENCY GENERATOR ROOM AND PROVIDE TEST FOR THE ATTENDING MARINE INSPECTOR. THE CURRENT HANDLE IS TOO LONG TO ALLOW PROPER OPERATION._x001C_ _x001C_
Condition: Unknown
Due 7 December 1992
Resolved 7 December 1992
Fire Fighting
Issued 19 November 1992
Resolved
REPAIR THE HANDLE ON THE #2 EXHAUST DAMPER IN THE EMERGENCY GENERATOR ROOM AND PROVIDE A TEST FOR THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 7 December 1992
Resolved 7 December 1992
Engineering
Issued 18 August 1992
Resolved
REPAIR FUEL LEAKS ON THE DAY TANK FOR THE EMERGENCY GENERATOR.
Condition: Unknown
Due 21 September 1992
Resolved 21 September 1992
Fire Fighting
Issued 18 August 1992
Resolved
OPEN AND FLUSH CAR DECK SPRINKLER SYSTEM, MARK ALL DRAIN HOLES.
Condition: Unknown
Due 21 September 1992
Resolved 21 September 1992
Electrical
Issued 18 May 1992
Resolved
PROVIDE PROPER ELECTRICAL INSTALLATION FOR HEAT STRIP FOR SEWAGE LINE ON PORT SIDE ON MAIN DECK.
Condition: Unknown
Due 18 June 1992
Resolved 8 July 1992
Fire Fighting
Issued 19 February 1992
Resolved
PROVIDE AN OPERATIONAL TEST OF THE CAR DECK SPRINKLER SYTEM TO THE SATISFACTION OF THE ATTENDING INSPECTOR. AFT STBD PIPE LAST 10' WASTED REQUIRES RENEWAL.
Condition: Unknown
Due 2 March 1992
Resolved 2 March 1992
Lifesaving
Issued 19 February 1992
Resolved
PROVIDE FOUR (4) ADDITIONAL COAST GUARD APPROVED LIFERAFTS ON BOARD.
Condition: Unknown
Due 1 May 1992
Resolved 27 May 1992
Electrical
Issued 19 February 1992
Resolved
PROVIDE APPROVED PLANS FOR INSTALLATION OF THE SOFT STARTS FOR BOW THRUSTERPRIOR TO USE WHEN PASSENGERS ARE ONBOARD.
Condition: Unknown
Due 19 February 1992
Resolved 19 February 1992
Construction/Loadline
Issued 19 February 1992
Resolved
PROVIDE OPERATIONAL TEST OF THE INSTALLED BILGE SYSTEM.
Condition: Unknown
Due 24 February 1992
Resolved 24 February 1992
Engineering
Issued 19 February 1992
Resolved
Repair or replace the lens cover on the control air pressure gauge on the starboard bridge wing.
Condition: Unknown
Due 2 March 1992
Resolved 2 March 1992
Engineering
Issued 11 December 1991
Resolved
READJUST AND RETEST SAFETY VALVES FOR THE WAYWOLF AND CLEAVER BROOKS BOILERS.
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Electrical
Issued 11 December 1991
Resolved
REPAIR REPLACE LOW OIL SHUTDOWN ON THE NUMBER 1 S/S GENERATOR.
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Engineering
Issued 11 December 1991
Resolved
INSTALL REMOTE STOP FOR WAYWOLF BOILER THAT CAUSES A SAFETY LOCK OUT INSTEAD OF THE ONE THAT HAS TO BE HELD IN TO SECURE BOILER.
Condition: Unknown
Due 11 January 1992
Resolved 20 December 1991
Lifesaving
Issued 11 December 1991
Resolved
CROP AND RENEW WASTED METAL IN AREA OF FWD DATA PLATE, FWD GUNWALE, DRAIN PLUG MID-HULL, AND AT SEA SUCTION FOR ENGINE ON LIFEBOAT 2367.
Condition: Unknown
Due 11 December 1991
Resolved 11 December 1991
Electrical
Issued 11 December 1991
Resolved
MARK EMERGENCY LIGHTING IN THE ENGINE CONTROL BOOTH, BEHIND EMERGENCY SWITCHBOARD, AND IN THE GALLEY.
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Fire Fighting
Issued 11 December 1991
Resolved
REPAIR FIRE DAMPER FOR STARBOARD CENTER VENT FOR ENGINERO0M.
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Lifesaving
Issued 11 December 1991
Resolved
CROP AND RENEW WASTED METAL IN AREA OF FWD GUNWALE AND GUNWALE AREA OF STARBOARD AFT PLATE WHICH IS HOLED IN 4 AREAS.
Condition: Unknown
Due 11 December 1991
Resolved 11 December 1991
Engineering
Issued 11 December 1991
Resolved
MAKE REPAIRS TO WAYWOLF BOILER TO PREVENT FLAME AFTER SHUTDOWN. INSURE CARBON DEPOSITS ARE REMOVED FROM COMBUSTION CHAMBER AND BURNER GUN ASSEMBLYDOES NOT LEAK AFTER SHUTDOWN.
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Lifesaving
Issued 2 December 1991
Resolved
PROVIDE PROPOSED PLAN FOR REPAIRS TO THE #1 STARBOARD LIFEBOAT (#2350) PRIOR TO MAKING REPAIRS.
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Lifesaving
Issued 27 November 1991
Resolved
PROVIDE PROPOSED PLAN FOR REPAIRS TO STARBOARD BOAT DAVIT ARMS, DECKING, AND ASSOCIATED EQUIPMENT._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Lifesaving
Issued 27 November 1991
Resolved
REPAIR OR REPLACE IN KIND THE FORWARD DAVIT ARM ON THE STARBOARD LIFEBOAT._x001C__x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Lifesaving
Issued 27 November 1991
Resolved
CROP OUT AND RENEW ALL DAMAGED AREA OF THE DECK BY WAY OF THE FORWARD DAVITON THE STARBOARD LIFERAFT._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Lifesaving
Issued 27 November 1991
Resolved
PROVIDE DOCUMENTATION CONCERNING INSTALLATION OF ALL BOAT DAVIT WIRES, THIMBLES, AND WEIGHT TESTS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 January 1992
Resolved 17 January 1992
Lifesaving
Issued 23 October 1991
Resolved
REPLACE BOLTS ON PORT AND STBD DAVIT BASES AS FOLLOWES: PRT SIDE OUTBOARD BOLTS AFT BOLT ON FWD BASE AND FWD BOLT ON AFT BASE, STBD SIDE OUTBOARD BOLTS AFT ON FWD BASE AND FWD AND AFT ON AFT BASE.
Condition: Unknown
Due 23 November 1991
Resolved 14 November 1991
Lifesaving
Issued 23 October 1991
Resolved
CROP AND RENEW WASTED METAL IN AREA OF FWD DATA PLATE, FWD GUNWALE, DRAIN PLUG MID SHIP, AND AT SEA SUCTION FOR ENGINE. PLANS FOR REPAIR ARE TO SUBMITTED TO COGNIZANT OCMI FOR APPROVAL PRIOR TO REPAIRS BEING MADE. LIFEBOAT IS TO BE SWAPPED OUT WITH TEMP SRIAL #2350 NLT 30NOV91
Condition: Unknown
Due 30 January 1992
Resolved 14 November 1991
Lifesaving
Issued 23 October 1991
Resolved
CROP AND RENEW WASTED METAL IN AREA OF FWD GUNWALE AND GUNWALE AREA OF STBDAFT PLATE WHICH IS HOLED IN FOUR AREAS. PLANS FOR REPAIR ARE TO BE SUBMITTED TO COGNIZANT OCMI FOR APPROVAL PRIOR TO REPAIRS BEING MADE. BOAT IS TO BE SWAPPED OUT WITH SPARE LIFEBOAT SER. #2385 NLT 30NOV91
Condition: Unknown
Due 30 January 1992
Resolved 14 November 1991
Navigation
Issued 3 January 1991
Resolved
ADJUST OR REPAIR THE PORT RUDDER LIMIT SWITCH PRESENTLY INOPERABLE.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Engineering
Issued 3 January 1991
Resolved
PROVIDE A OPERATIONAL TEST OF THE STEERING FLAT BILGE SYSTEM,PRESENTLY_x001C_ INOPERABLE.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Engineering
Issued 3 January 1991
Resolved
REPAIR OR REPLACE FUEL OIL VALVE ON BOILER INLET WHERE LEAKING.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Engineering
Issued 3 January 1991
Resolved
REMOVE CARBON BUILD UP ON AUX. HEATING BOILER,POSSIBLE FIRE HAZARD.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Construction/Loadline
Issued 3 January 1991
Resolved
REPAIR SCUTTLE FROM ENGINE ROOM TO MAIN DECK PRESENTLY NOT WATERTIGHT.
Condition: Unknown
Due 3 January 1991
Resolved 3 January 1991
Engineering
Issued 14 September 1990
Resolved
E1-REPAIR/REPLACE 3INCH SWEAT RETURN VALVE ON AFT BOILER, CONDUCT HYDRO TEST ON AFT BOILER.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Accommodation/Occupational Safety
Issued 14 September 1990
Resolved
E2-CONDUCT OPERATION TEST OF FWD AND AFT BOILER.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Accommodation/Occupational Safety
Issued 14 September 1990
Resolved
E3-PROVE PROPER OPERATION OF FWD AND AFT BOILER SAFETY VALVES.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Accommodation/Occupational Safety
Issued 14 September 1990
Resolved
E3-REPAIR/REPLACE SEWAGE VALVES AT SEWAGE HOLDING TANK.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Navigation
Issued 14 September 1990
Resolved
E1-REPLACE TEMPORLY LOCKING WIRE WITH PROPER COTTER KEY ON STBD. SIDE STEERING RUDDER POST. THE STEERING GEAR TO BE INSPECTION BY [name withheld] PRIOR TO DEPARTING.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Accommodation/Occupational Safety
Issued 14 September 1990
Resolved
E2-REPAIR/REPLACE CRACKED SANITARY LINES (3) ON SEWAGE HOLDING TANK.
Condition: Unknown
Due 14 September 1990
Resolved 14 September 1990
Electrical
Issued 16 March 1990
Resolved
MARK OR STENCIL THE ELECT. CONTROLLER BOX AT THE GALLEY ENTRANCE,WHERE MISSING.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Lifesaving
Issued 16 March 1990
Resolved
REPLACE ROLLERS ON FALLS RUNNING BLOCKS PORT & STBD. LIFEBOAT AFT WHERE MISSING.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Navigation
Issued 16 March 1990
Resolved
REPAIR OR REPLACE RUDDER ANGLE INDICATOR ON BRIDGE,WHICH PRESENTLY READS 5 DEGREES FROM INDICATOR AT STEERING STATION.TO BE COMPLETED PRIOR TO CARRY- ING PASSENGER
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Navigation
Issued 16 March 1990
Resolved
REPLACE , REPAIR GLASS OR REMOVE BUBBLES IN RUDDER ANGLE INDICATOR ON PORT BRIDGE WING, WHERE BUBBLES ARE OBUSTUCTING GAUGE.TO BE COMPLETED PRIOR TO CARRYING OF PASSENGERS.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Electrical
Issued 16 March 1990
Resolved
CLEAN OIL RESIDUE IN THE EMG.GENERATOR ROOM AND DOP A GENERAL HOUSE CLEAN- ING.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Fire Fighting
Issued 16 March 1990
Resolved
PROVIDE & INSURE INSTRUCTION ON THE USE OF THE GAYLORE VENT. SYSTEM AND THERANGE GUARD FIRE PROTECTION SYSTEM ,TO ALL CREW MEMBERS AND GALLEY WORKERS.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Lifesaving
Issued 4 January 1990
Resolved
REAPIR AS ORIGINAL THE WASTED SHEER PLATE AT THE GUNWHALE IN WAY OF THE STEM AND STERN POSTS.
Condition: Unknown
Due 4 January 1990
Resolved 4 January 1990
Lifesaving
Issued 4 January 1990
Resolved
REPAIR AS ORIGINAL THE WASTED HULL PLATE IN WAY OF THE BOAT PLUG.
Condition: Unknown
Due 4 January 1990
Resolved 4 January 1990
Fire Fighting
Issued 14 December 1989
Resolved
INSTALL CHECK VALVE IN THE FIRE MAIN SUCTION LINE TO FLUSHING WATER TANK.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Unknown
Issued 14 December 1989
Resolved
PROVIDE APPROVED PLANS FOR CHARTROOM, BRIDGE WING ADDITION AND OILY WATER SEPARATOR.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Navigation
Issued 14 December 1989
Resolved
MAKE PROPER REPAIRS TO RUDDER ANGLE INDICATOR ON BRIDGE AND ON STBD BRIDGE WING.
Condition: Unknown
Due 14 December 1989
Resolved 14 December 1989
Accommodation/Occupational Safety
Issued 20 June 1989
Resolved
CLEAN OUT GALLEY VENT SYSTEM.
Condition: Unknown
Due 20 June 1989
Resolved 20 June 1989
Accommodation/Occupational Safety
Issued 20 June 1989
Resolved
INSTALL COMPRESSOR COVERS ON REEFER UNIT IN GALLEY.
Condition: Unknown
Due 20 June 1989
Resolved 20 June 1989
Accommodation/Occupational Safety
Issued 20 June 1989
Resolved
INSTALL COMPRESSOR COVERS ON ICE MACHINE IN GALLEY.
Condition: Unknown
Due 20 June 1989
Resolved 20 June 1989
Accommodation/Occupational Safety
Issued 20 June 1989
Resolved
REPLACE CORD ON ICE CREAM FREEZER IN GALLEY.
Condition: Unknown
Due 20 June 1989
Resolved 20 June 1989
Accommodation/Occupational Safety
Issued 20 June 1989
Resolved
MOUNT TOASTER IN GALLEY.
Condition: Unknown
Due 20 June 1989
Resolved 20 June 1989
Lifesaving
Issued 20 December 1988
Resolved
REPAIR OR REPLACE IN KIND STARBOARD LIFEBOAT, STARBOARD SIDE FORWARD AT THESTEM AND TOP OF GUNWALE, WASTED METAL 3/4 INCH HOLE UNDER THE GUNWALE AND TOP OF SHEAR PLATE. TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 20 December 1988
Resolved 20 December 1988
Electrical
Issued 26 September 1988
Resolved
MAKE PROPER CONNECTIONS AND INSTALL COVER PLACE ON GIFT SHOP COUNTER RECEPTACLE.
Condition: Unknown
Due 26 September 1988
Resolved 26 September 1988
Accommodation/Occupational Safety
Issued 26 September 1988
Resolved
REPAIR FIRE DAMPER ON PORT SIDE FORWARD ON SALOON DECK.
Condition: Unknown
Due 26 September 1988
Resolved 26 September 1988
Accommodation/Occupational Safety
Issued 26 September 1988
Resolved
REPAIR FIRE DAMPER ON EMERGENCY GENERATOR ROOM ROOF STARBOARD SIDE.
Condition: Unknown
Due 26 September 1988
Resolved 26 September 1988
Accommodation/Occupational Safety
Issued 26 September 1988
Resolved
CLEAN GALLEY HOOD VENT SYSTEM AND REPLACE FUSIBLE LINK ON FIRE DAMPER IN VENT SYSTEM.
Condition: Unknown
Due 26 September 1988
Resolved 26 September 1988
Engineering
Issued 26 September 1988
Resolved
PERFORM OPERATIONAL TEST ON BOTH BOILERS PRIOR TO THEIR OPERATION WHEN CARRYING PASSENGERS.
Condition: Unknown
Due 26 September 1988
Resolved 26 September 1988
Navigation
Issued 26 September 1988
Resolved
PROPERLY INSTALL STARBOARD RUDDER POST PACKING GLAND BOLTS PRIOR TO CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 26 September 1988
Resolved 26 September 1988
Fire Fighting
Issued 16 March 1988
Resolved
PROVIDE COMPLETE OPERATING INSTRUCTIONS FOR THE TWO CO2 CONTROL STATIONS.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Navigation
Issued 16 March 1988
Resolved
PROVIDE A CURRENT DEVIATION TABLE FOR NEW MAGNETIC COMPASS.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Engineering
Issued 16 March 1988
Resolved
REPLACE OR REPAIR THE ELECTRIC BILGE PUMP AND PROVE OPERATION BY TAKING SUCTION FROM A VOID.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Engineering
Issued 16 March 1988
Resolved
REMOVE OR REPAIR THE PORT AND STARBOARD MAIN ENGINE REMOTE START SYSTEM. STARTING BUTTON LOCATED IN ENGINE CONTROL ROOM.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Fire Fighting
Issued 16 March 1988
Resolved
TEST CO2 VENT SHUT DOWNS, SIRENS AND TIME DELAYS IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Lifesaving
Issued 16 March 1988
Resolved
RE-ROUTE FUEL LINES FOR THE MOTOR LIFEBOAT UNDERNEATH THE SIDE THWARTS.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Lifesaving
Issued 16 March 1988
Resolved
PAINT RELEASE LEVERS ON BOTH LIFEBOATS.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Fire Fighting
Issued 16 March 1988
Resolved
PROVIDE AND INSTALL COMPLETE BUT SIMPLE INSTRUCTION FOR THE CO2 SYSTEM AS REQUIRED BY 46 CFR 76.15-10(B).
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Fire Fighting
Issued 16 March 1988
Resolved
NUMBER AND STENCIL FIRE EXTINGUISHERS AND THE EXTINGUISHER STATIONS.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Fire Fighting
Issued 16 March 1988
Resolved
PROVIDE FIRE SERVICING REPORT.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Engineering
Issued 16 March 1988
Resolved
RECHASE THREADS FOR GENERATOR OIL FILL.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Construction/Loadline
Issued 16 March 1988
Resolved
REPLACE MISSING DOG ON STARBOARD AFT VENT FOR BOW THRUSTER ROOM.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Electrical
Issued 6 January 1988
Resolved
REMOVE WIRE NUTS AND INSTALL SUITABLE INSUALTED PRESSURE WIRE CONNECTORS ONTHE FORWARD ICE MACHINE AND THE STARBOARD REEFER UNIT IN THE GALLEY.
Condition: Unknown
Due 6 January 1988
Resolved 6 January 1988
Navigation
Issued 6 January 1988
Resolved
REPAIR AND INSTALL MAGNETIC COMPASS PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 6 January 1988
Resolved 6 January 1988
Navigation
Issued 6 January 1988
Resolved
PROCURE AND PLACE ABOARD 1988 CURRENT TABLES.
Condition: Unknown
Due 6 January 1988
Resolved 6 January 1988
Navigation
Issued 6 January 1988
Resolved
DEMONSTRATE PROPER OPERATION OF STEERING GEAR AND RUDDER ANGLE INDICATORS IN ALL MODES PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 6 January 1988
Resolved 6 January 1988
Accommodation/Occupational Safety
Issued 6 January 1988
Resolved
PROVIDE 3 VALVE HANDLES FOR THE ZONE VALVES ON THE MARINE SANITATION DEVICE.
Condition: Unknown
Due 6 January 1988
Resolved 6 January 1988
Lifesaving
Issued 6 November 1987
Resolved
PROVIDE TWO ADDITIONAL HAND HELD RED ROCKET PROPELLED PARACHUTE FLARES PRIOR TO DEPARTURE ON COASTWISE TRIP TO NORFOLK, VA.
Condition: Unknown
Due 6 November 1987
Resolved 6 November 1987
Lifesaving
Issued 6 November 1987
Resolved
CONDUCT FIRE AND BOAT DRILL WITH THE CREW THAT WILL MAN THE VESSEL ON ITS VOYAGE TO NORFOLK, VA PRIOR TO DEPARTURE FOR THIS VOYAGE AND PROPERLY LOG THIS DRILL.
Condition: Unknown
Due 6 November 1987
Resolved 6 November 1987
Electrical
Issued 8 September 1987
Resolved
REMOVE THE WIRE NUTS AND MAKE PERMANENT CONNECTIONS IN THE GALLEY ICE MAKER COMPRESSOR.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Electrical
Issued 8 September 1987
Resolved
INSTALL COVERS ON THE GALLEY ICE MAKER COMPRESSOR.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Engineering
Issued 8 September 1987
Resolved
PROVIDE THE MISSING COVER FOR THE PORT STACK EXHAUST LOUVER.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Navigation
Issued 8 September 1987
Resolved
REPAIR THE WIRE CONNECTOR IN WAY OF THE CORD TO PHONE SET CONNECTION OF THEAFT SOUND POWERED PHONE.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Accommodation/Occupational Safety
Issued 8 September 1987
Resolved
RENEW THE VERTICAL FOREPEAK LADDER AT NEXT DRYDOCK.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Electrical
Issued 8 September 1987
Resolved
REPAIR OR REPLACE WATTMETER FOR #2 GENERATOR.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Navigation
Issued 8 September 1987
Resolved
REPAIR RUDDER ANGLE INDICATOR SO THAT THE READINGS AGREE IN THE PILOTHOUSE AND IN THE AFTER STEERING SPACE.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Engineering
Issued 8 September 1987
Resolved
MAKE BOILER MOUNTINGS AVAILABLE FOR INSPECTION ON BOTH BOILERS.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Electrical
Issued 8 September 1987
Resolved
MAKE PROPER REPAIRS TO REVERSE POWER RELAX ON THE #2 GENERATOR.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987
Navigation
Issued 29 June 1987
Resolved
DEMONSTRATE OPERATION OF THE STARBOARD BRIDGE WING RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Electrical
Issued 29 June 1987
Resolved
RENEW DIELECTRIC MATTING BEHIND MAIN SWITCHBOARD.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Fire Fighting
Issued 29 June 1987
Resolved
PROVE PROPER OPERATION OF THE FORWARD FIRE PUMP RELIEF VALVE.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Lifesaving
Issued 29 June 1987
Resolved
RENEW THE WIRES TO THE STARBOARD FORWARD AND PORT AFT BOAT DECK EMBARKATION LIGHTS.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Electrical
Issued 29 June 1987
Resolved
PROPERLY SUPPORT THE WIRES UNDER THE STARBOARD BRIDGE WING.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Navigation
Issued 29 June 1987
Resolved
PROVIDE A SAFETY LOCKING DEVICE ON EACH JOCKEY BAR CLEVIS PIN NUT, ON BOTH STEERING MOTOR.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Construction/Loadline
Issued 29 June 1987
Resolved
DEMONSTRATE THE WATERTIGHT INTEGRITY OF THE ENGINE ROOM WATERTIGHT DOOR.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Navigation
Issued 29 June 1987
Resolved
PROVIDE MECHANICAL RUDDER ANGLE INDICATORS ON STEERING MOTORS.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Navigation
Issued 29 June 1987
Resolved
PROVIDE A PROPERLY MARKED LEAD LINE.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Accommodation/Occupational Safety
Issued 10 March 1987
Resolved
PERMANENTLY MOUNT THE NOISE FILTER SURGE SUPPRESSOR, CASH REGISTER POWER SUPPLY, PRETZEL BOX AND POPCORN MAKER PRIOR TO OPERATING THE SNACK BAR ON UNDERWAY RUNS.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Engineering
Issued 10 March 1987
Resolved
MAKE BOTH AUXILLARY BOILERS AVAILABLE FOR FIRE AND WATERSIDE INSPECTION, AND HYDROSTATIC TESTING PRIOR TO USING FOR THE 1987-88 HEATING SEASON.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Construction/Loadline
Issued 10 March 1987
Resolved
RENEW THE HINGE FOR THE SCUTTLE AT #7 VOID.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Fire Fighting
Issued 10 March 1987
Resolved
RENEW THE CRIMPED UP FLEX LINES FOR THE FIXED CO2 SYSTEM PRIOR TO PLACING THE VESSEL IN SERVICE.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Lifesaving
Issued 10 March 1987
Resolved
CONDUCT A FIRE AND BOAT DRILL WITH RIDING CREW IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Fire Fighting
Issued 10 March 1987
Resolved
CONDUCT A TEST OF THE SPRINKLER SYSTEM IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Electrical
Issued 10 March 1987
Resolved
PROVIDE A CAP FOR THE 440 LINE SHORE TIE, STBD SIDE.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Construction/Loadline
Issued 10 March 1987
Resolved
PROVIDE A DOG FOR THE PORT VENT TRUNK.
Condition: Unknown
Due 10 March 1987
Resolved 10 March 1987
Accommodation/Occupational Safety
Issued 9 January 1987
Resolved
RENEW THE COVER, DOGS AND GASKET FOR THE CREW'S HEAD VENT.
Condition: Unknown
Due 9 January 1987
Resolved 9 January 1987
Accommodation/Occupational Safety
Issued 9 January 1987
Resolved
RENEW THE DOGS AND GASKET AND MAKE OPERABLE THE COVER FOR THE OWNER'S HEAD VENT.
Condition: Unknown
Due 9 January 1987
Resolved 9 January 1987
Electrical
Issued 9 January 1987
Resolved
RENEW THE KICK PIPES, (CONDUITS), FWD AND AFT AT BOTH LIFEBOAT STATIONS. (FOUR PIPES FWD AND ONE AFT AT EACH STATION INCLUDING STRAPS AND CLAMPS, TOTAL OF 10 KICK PIPES).
Condition: Unknown
Due 9 January 1987
Resolved 9 January 1987
Lifesaving
Issued 9 January 1987
Resolved
RENEW THE DAVIT FALLS FOR THE #1 AND #2 LIFEBOATS.
Condition: Unknown
Due 9 January 1987
Resolved 9 January 1987
Lifesaving
Issued 9 January 1987
Resolved
FREE UP THE PIVOT ARM FOR THE PORT AFT LIFEBOAT EMBARKATION LIGHT.
Condition: Unknown
Due 9 January 1987
Resolved 9 January 1987
Lifesaving
Issued 22 September 1986
Resolved
PROVIDE A VENT COVER FOR THE MLB FUEL TANK VENT.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Lifesaving
Issued 22 September 1986
Resolved
PROVIDE A FIRE EXT. WITH A CURRENT INSPECTION TAG FOR THE MLB.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Lifesaving
Issued 22 September 1986
Resolved
FREE UP THE SEA VALVE FOR THE MLB.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Navigation
Issued 22 September 1986
Resolved
MAKE OPERATIONAL THE STEERING GEAR ALARMS ON THE MAIN ALARM PANEL (LOW OIL LEVEL, AUX MAIN PUMP PWR FAILURE.)
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Fire Fighting
Issued 22 September 1986
Resolved
PROVIDE A CURRENTLY SERVICED BII DC EXT. FOR THE GALLEY.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Electrical
Issued 22 September 1986
Resolved
PROPERLY WIRE IAW THE N.E.C. THE CASH REGISTER PWR SUPPLY IN WAY OF THE GALLEY SINK.
Condition: Unknown
Due 22 September 1986
Resolved 22 September 1986
Construction/Loadline
Issued 10 March 1986
Resolved
MAKE PERMANENT REPAIRS TO HOLES IN PASSENGER DECK IN WAY OF VIDEO GAME MACHINES THAT ACHIEVE "A-O" FIRE SAFETY STANDARDS.
Condition: Unknown
Due 10 March 1986
Resolved 10 March 1986
Construction/Loadline
Issued 10 March 1986
Resolved
REPAIR, PROVE PROPER OPERATION AND WATERTIGHTNESS OF WATERTIGHT DOORS TO ENGINE ROOM.
Condition: Unknown
Due 10 March 1986
Resolved 10 March 1986
Engineering
Issued 10 March 1986
Resolved
PROVIDE MECHANICAL GUARDS FOR SIGHT GLASSES ON HYDRAULIC, RED GEAR AND LUBEOIL TANKS.
Condition: Unknown
Due 10 March 1986
Resolved 10 March 1986
Construction/Loadline
Issued 10 March 1986
Resolved
CROP OUT AND RENEW THE FITTING STBD SIDE AFT OF THE CAR GATE. THIS DECK MUST BE MADE WATERTIGHT. DEMONSTRATE WATERTIGHT INTEGRITY OF THIS REPAIR IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 10 March 1986
Resolved 10 March 1986
Lifesaving
Issued 4 October 1985
Resolved
REPAIR BROKEN HINGES ON THE FOLLOWING LIFE JACK LOCKERS: A. BOAT DECK, PORT SIDE, AFTER LOCKER; B. PROMINANDE DECK, PORT SIDE, SMALL AFTER LOCKER.
Condition: Unknown
Due 4 October 1985
Resolved 4 October 1985
Accommodation/Occupational Safety
Issued 4 October 1985
Resolved
RENEW VENTILATION FIRE DAMPER HAND CLOSURE ON AFTER AIR SUPPLY DUCT, STBD SIDE, BOAT DECK.
Condition: Unknown
Due 4 October 1985
Resolved 4 October 1985
Electrical
Issued 4 October 1985
Resolved
REPLACE NON-WATER TIGHT PENETRATION THRU SWITCHBOARD DRIP COVER.
Condition: Unknown
Due 4 October 1985
Resolved 4 October 1985
Engineering
Issued 30 July 1985
Resolved
PERFORM ANNUAL HYDROSTATIC & OPERATIONAL TESTS OF BOTH HEATING BOILERS. (46 CFR 61.05-10)
Condition: Unknown
Due 30 July 1985
Resolved 30 July 1985
Deck/Cargo
Issued 25 June 1985
Resolved
INSTALL SOUNDING TUBES IN OUTBOARD BILGE POCKETS OF VOID UNDER STEERING ENGINE VOID, AND PERMANENTLY OPEN STEERING ENGINE VOID DRAINS TO VOID UNDERIT. INSTALLATION TO BE COMPLETED BY NEXT D/D. (46 CFR 56.50-90)
Condition: Unknown
Due 25 June 1985
Resolved 25 June 1985
Construction/Loadline
Issued 26 April 1985
Resolved
RENEW BOX SURROUNDING HYDRAULIC LINES TO PORT BRIDGE WING CONSOLE ON UNDERSIDE OF PORT BRIDGE WING.
Condition: Unknown
Due 26 April 1985
Resolved 26 April 1985
Construction/Loadline
Issued 26 April 1985
Resolved
EFFECT PERMANENT REPAIRS TO OUTER HULL PLATE WELDMENT, PORT SIDE IN WAY OF THE FORWARD BULKHEAD OF THE BOW THRUSTER. TO BE INSPECTED BY THE OPERATOR MONTHLY UNTIL PERMANENT REPAIRS ARE COMPLETED AT NEXT DRYDOCKING.
Condition: Unknown
Due 26 April 1985
Resolved 26 April 1985
Construction/Loadline
Issued 26 April 1985
Resolved
REPAIR AND REWELD THE MAIN DECK TO THIRD UNDER DECK TRANSVERSE FROM STERN (PORT SIDE) AND PORT LONGITUDINAL UNDER DECK BEAM IN STERN COMPARTMENT AT NEXT DRYDOCK EXAMINATION.
Condition: Unknown
Due 26 April 1985
Resolved 26 April 1985
Fire Fighting
Issued 26 April 1985
Resolved
MOUNT OPERATING INSTRUCTIONS ON ENGINEROOM REMOTE CO2 CONTROL STATION.
Condition: Unknown
Due 26 April 1985
Resolved 26 April 1985
Engineering
Issued 26 April 1985
Resolved
SECURE DECK PLATES IN ENGINE ROOM.
Condition: Unknown
Due 26 April 1985
Resolved 26 April 1985
Electrical
Issued 26 April 1985
Resolved
BLANK OPEN HOLES IN FORWARD BOILER ROOM CIRCUIT PANEL.
Condition: Unknown
Due 26 April 1985
Resolved 26 April 1985
Fire Fighting
Issued 26 April 1985
Resolved
MOUNT FIRE EXTINGUISHER BRACKET IN BOILER ROOM.
Condition: Unknown
Due 26 April 1985
Resolved 26 April 1985
Accommodation/Occupational Safety
Issued 15 February 1985
Resolved
MAKE NECESSARY REPAIRS TO OR RENEW LATCH ON FWD PORT DOOR ON PASSENGER DECK.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Electrical
Issued 15 February 1985
Resolved
RENEW EXPLOSION PROOF LIGHT FIXTURE ON VEHICLE DECK FWD PORT SIDE.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Navigation
Issued 15 February 1985
Resolved
MAKE NECESSARY REPAIRS TO AND PROVE PROPER OPERATION OF RUDDER ANGLE INDICATOR ON EMERGENCY STEERING STATION.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985