Records from 1983 to 2009. Most recent: inspection, 21 July 2009.
Inspection history · 115
21 July 2009
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3541395
6 August 2008
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3290803
7 April 2008
Examination of Repairs · COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3176722
8 November 2007
Administrative Inspection · Permit to Proceed
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3095501
27 September 2007
Annual Inspection · Permit to Proceed · Damage Survey
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3066594
4 November 2006
Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2815356
3 November 2006
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2826917
25 September 2006
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2802219
19 September 2006
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 2769156
23 May 2006
Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2656537
28 April 2006
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 2657835
15 November 2005
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2534999
29 July 2005
Deficiency Check
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2444253
21 July 2005
Administrative Inspection
Administrative · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2434152
7 June 2005
COI Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2382995
5 November 2004
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 2250578
20 October 2004
MTSA Verification · Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2224936
22 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978883
17 October 2003
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1925556
10 March 2003
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1755289
1 March 2003
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1755176
27 September 2002
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1678189
25 October 2001
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1456032
25 July 2001
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1070053
22 February 2001
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 43194
14 September 2000
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 491619
29 August 2000
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1054163
28 July 2000
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1426453
3 June 2000
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1049535
26 May 2000
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1049447
24 May 2000
Damage Survey
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 818131
30 March 2000
Hull Examination · COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1361381
29 April 1999
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1365230
5 December 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 537972
1 June 1998
Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1461060
24 May 1998
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 437706
27 March 1998
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1467043
6 March 1998
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 784335
26 November 1997
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 656732
20 November 1997
Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1425999
2 September 1997
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 460776
2 May 1997
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 456530
23 April 1997
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1455492
16 December 1996
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1092324
21 August 1996
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 524342
12 June 1996
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 485076
29 March 1996
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1363557
31 July 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 642473
30 June 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 478488
30 June 1995
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1452058
29 June 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 61478
29 June 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 120276
20 July 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1176858
7 July 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1444860
20 May 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1403628
3 February 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 960423
6 January 1993
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 533233
9 October 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 945273
28 September 1992
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 474006
11 September 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 642453
11 September 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1255926
10 September 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1253465
2 September 1992
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1453987
31 August 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 176249
16 July 1992
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 945770
24 March 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 15449
16 September 1991
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 504473
14 August 1991
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 491002
11 July 1991
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1247262
7 June 1991
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1241378
5 March 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1216066
2 February 1991
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 996283
17 January 1991
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 520196
20 September 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1211696
24 August 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 904545
27 May 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 467503
25 May 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1233568
25 May 1990
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1243080
29 April 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 437210
21 November 1989
Drydock Extension
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1222282
29 September 1989
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 486739
11 August 1989
Deficiency Check · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1038697
13 February 1989
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1342167
26 January 1989
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 895032
21 November 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 439851
19 November 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 473694
21 August 1988
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 474523
10 August 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 518683
15 June 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 474817
6 June 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 460944
2 June 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 323770
2 June 1988
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1198377
10 March 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 471110
21 January 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 460738
11 January 1988
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 459446
24 September 1987
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1010660
31 August 1987
MARPOL Annex II Examination · Deficiency Check · Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1001192
13 August 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 436812
12 July 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 508773
1 May 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 516837
30 April 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 540158
29 April 1987
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 450415
9 January 1987
Examination of Repairs · Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1313724
4 December 1986
Damage Survey · Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1332764
13 June 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1303803
2 January 1986
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 991334
27 December 1985
Damage Survey
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 998006
22 August 1985
Credit Drydock · Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297221
12 April 1985
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1289019
9 February 1985
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 489595
14 November 1984
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 520213
7 August 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972763
21 March 1984
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1280770
13 March 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 970919
6 December 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972393
Electrical › Electric Generation Source (service) › Generator
Issued 27 September 2007
Resolved
Prove proper operation of generator, thermal fluid heater and all emergency shutdowns prior to operating thermal fluid heater system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2007
Resolved 23 April 2008
Resolution: Thermal Fluid Heater, and Generator tested sat.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 27 September 2007
Resolved
Provide inspected fire extinguishers prior to conducting cargo transfer operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2007
Resolved 23 April 2008
Resolution: Extinguisher has been tested and tagged.
Construction/Loadline › Structures › Deck Plating
Issued 27 September 2007
Resolved
Properly reapi cat walk in way of the #1 cargo tank.
Condition: Unknown
Due 27 October 2007
Resolved 23 April 2008
Resolution: Catwalk has been welded to deck and is no longer an obstruction.
Engineering › Fuel Oil Service System › Tank
Issued 27 September 2007
Resolved
Properly install bolt in diesel tank access plate.
Condition: Improper/Lack of Maintenance
Due 27 October 2007
Resolved 23 April 2008
Resolution: Bolt has been replaced.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 27 September 2007
No resolution recorded
Properly mark diesel fuel tanks with " Diesel Fuel".
Due 27 October 2007 — due date passed with no resolution recorded
Resolution: Tank has been marked
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 27 September 2007
Resolved
Properly secure fuel lines from diesel fuel tank to cargo pump prime mover engine.
Due 27 October 2007
Resolved 23 April 2008
Resolution: Lines secured
Construction/Loadline › Structures › Trunk
Issued 27 September 2007
Resolved
Properly repair metal wastage on the #2 cargo expansion trunk.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 October 2007
Resolved 10 April 2008
Resolution: An approx 5'' by 200'' insert had been inserted into the port and starboard side cargo tank tops.Inserts run the full length of the vessel cargo tanks.
Construction/Loadline › Hull › Hull Plating
Issued 4 November 2006
Resolved
Make fwd. rake available for inspection. Barge can not load cargo until repairs are made to the satisfaction of the attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 9 November 2006
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 19 September 2006
Resolved
Vessel response plan approval letter not on board vessel.
Action required: 705 - Other - as specified
Due 5 October 2006
Resolved 25 September 2006
Documentation › Manuals/Policy Documentation › Operations Manual (Incinerator)
Issued 19 September 2006
Resolved
Thermal Fluid Heater Operations Manual not carried on board vessel.
Action required: 705 - Other - as specified
Due 5 October 2006
Resolved 23 April 2008
Resolution: Manual on-board.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 19 September 2006
Resolved
Record of tests for cargo piping, pressure gauge, and relief valve not on board vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 October 2006
Resolved 25 September 2006
Documentation › Markings/Placards › Warning Signs
Issued 19 September 2006
Resolved
Cargo warning sign severely faded.
Action required: 705 - Other - as specified
Due 5 October 2006
Resolved 25 September 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Electric Bonding
Issued 21 July 2005
Resolved
This CG-835 is written in Activity case - 2434152 Narrative section since it's to long for this field.
Action required: 705 - Other - as specified
Due 7 August 2005
Resolved 29 July 2005
Resolution: Found correct.
Construction/Loadline › Hull › Hull Plating
Issued 21 July 2005
Resolved
30 Year midbody gauging and PE analysis in accordance with 46CFR31.10-21a(b)(1). Due date 21SEP05.
Action required: 705 - Other - as specified
Due 21 September 2005
Resolved 15 November 2005
Resolution: Owner / Operator successfully appealed requirements. See narrative and attached documents for details.
Electrical › Electric Generation Source (service) › Number of Sources
Issued 24 June 2005
Resolved
This CG-835 is written in the narrative since it's to long for this field. It's in the narrative section for activity #2382995.
Action required: 705 - Other - as specified
Due 24 July 2005
Resolved 21 July 2005
Resolution: Cleared CG-835 and re-issued new CG-835 to extend the allowed correction time to 14AUG05. The new 835 better reflects the requirement is for the Cargo pump engine components. CG-835 is written in the narritive field in case number -
Deck/Cargo › Cargo Heating › General
Issued 5 November 2004
Resolved
Remove all tamper devices and prove proper operation of all safety devices on the Thermal Fluid heater in accordance with 46 CFR 61.30-20
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 November 2004
Resolution: Received proof of proper operation from Mech service inc. rep, invoice #2940 [phone withheld]. Cleared requirement.
Deck/Cargo › Holds/Tanks
Issued 13 January 2003
Resolved
WASTAGE IS ISSOLATED TO CENTER TANK SIDES JUST BELOW WELD WHERE THE TANK TOP IS WELDED ON. APPEARS TO BE CAUSED BY MOISTURE THAT ACCUMILATED UNDER INSULATION AND UNABLE TO DRY OUT. LEGACY COMPONENT DESC: Bulkhead
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 January 2003
Resolved 14 February 2003
Resolution: WITNESSED SATISFACTORY AIR TEST OF REPAIRS MADE TO TANK SIDES.
Construction/Loadline › Structures
Issued 27 September 2002
Resolved
16 of the 24 external transverse web frames in way of cenerline gussets are fractured. Gave requirement to crop and renew prior. LEGACY COMPONENT DESC: Superstructure
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 17 January 2003
Resolved 14 February 2003
Resolution: Inspector witnessed satisfactory repairs of all web frames.
Construction/Loadline
Issued 26 May 2000
Resolved
Prior to commencing repairs, make/submit proposal for permanent repairs in way of lower aft port corner bilge knuckle in box stern compartment, to thesatisfaction of the attending marine inspector and cognizant OCMI.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Construction/Loadline
Issued 26 May 2000
Resolved
Prior to loading next cargo, make permanent repairs in way of lower aft port corner bilge knuckle of stern box, as addressed in proposal from item #1, to the satisfaction of attending marine inspector and cognizant OCMI.
Condition: Unknown
Due 26 May 2000
Resolved 26 May 2000
Construction/Loadline
Issued 24 May 2000
Resolved
Provide proposal for temp repairs to the stern void prior to departing Indiana Harbor or offload and proceed to drydock to effect repairs. If temprepairs are approved and completed, EMC 501 may proceed and offload product; however, permanent repairs shall be completed prior to loading cargo.
Condition: Unknown
Due 5 June 2000
Resolved 30 May 2000
Fire Fighting
Issued 24 May 2000
Resolved
Provide approved portable fire extinguisher mounting brackets for all portable fire extinguishers aboard or remove all portable fire extinguishers form barge.
Condition: Unknown
Due 24 May 2000
Resolved 24 May 2000
Deck/Cargo
Issued 29 April 1999
Resolved
Replace #1 cargo tank PV valve flame screen with new prior to the loading of cargo and to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 3 May 1999
Deck/Cargo
Issued 29 April 1999
Resolved
Remove or correct cargo piping MAWP stencile date with correct date to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 3 May 1999
Documentation
Issued 29 April 1999
Resolved
Provide proof of valid and current Certificate of Financial Responsibility prior to the loading of cargo and to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 3 May 1999
Documentation
Issued 29 April 1999
Resolved
Provide proof of valid and current Certificate of Documentation for vessel prior to the loading of cargo and to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 3 May 1999
Engineering
Issued 29 April 1999
Resolved
Re-attach or replace thermal fluid heater boiler exhaust stack cover with new to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 3 May 1999
Documentation
Issued 29 April 1999
Resolved
Provide proof of valid and current ABS annual load line certificate survey prior to the loading of cargo and to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 3 May 1999
Deck/Cargo
Issued 29 April 1999
Resolved
Replace #1 cargo tank hatch cover gasket with proper and new material priorto the loading of cargo and to the satisfaction of the attending marine inspector.
Condition: Unknown
Due 7 May 1999
Resolved 3 May 1999
Documentation
Issued 20 November 1997
Resolved
Internal Structural Exam due on 16JUL97.
Condition: Unknown
Due 26 November 1997
Resolved 26 November 1997
Construction/Loadline
Issued 23 April 1997
Resolved
Replace missing caps on gooseneck vents for No.3 port wing tank and bow rake voids.
Condition: Unknown
Due 23 May 1997
Resolved 12 June 1997
Construction/Loadline
Issued 23 April 1997
Resolved
Make permanent repairs, to the satisfaction of the cognizant OCMI, to fractured weld at the deckline in way of the stbd/fwd kevel.
Condition: Unknown
Due 23 May 1997
Resolved 12 June 1997
Construction/Loadline
Issued 29 March 1996
Resolved
Make repairs to old pipe collar in deck above #1S wing void at fwd end where wasted.
Condition: Unknown
Due 3 April 1996
Resolved 3 April 1996
Construction/Loadline
Issued 29 March 1996
Resolved
Crop and insert tank tops where wasted at three locations as indicated by inspector.
Condition: Unknown
Due 3 April 1996
Resolved 3 April 1996
Deck/Cargo
Issued 30 June 1995
Resolved
OFFLOAD CARGO WHERE DOCKED; MURPHY OIL CHALMETTE. AFTER OFFLOAD, PROCEED EMPTY TO NEAREST AVAILABLE CLEANING PLANT FOR CLEANING AND GAS FREEING. WHEN GAS FREE, CONTACT LOCAL COAST GUARD OCMI FOR ATTENDANCE BY COAST GUARDMARINE INSPECTOR.
Condition: Unknown
Due 30 June 1995
Resolved 30 June 1995
Deck/Cargo
Issued 7 July 1994
Resolved
MAKE P/V VALVES AVAILABLE FOR INTERNAL EXAMINATION BY A USCG MARINE INSPECTOR.
Condition: Unknown
Due 7 July 1994
Resolved 7 July 1994
Deck/Cargo
Issued 7 July 1994
Resolved
PROVE PROPER OPERATION OF THERMAL FLUID HEATER INCLUDING ALARMS AND SHUTDOWNS IN ACCORDANCE WITH THE APPROVED TEST PROCEDURES. TEST TO BE CONDUCTED IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 7 July 1994
Resolved 7 July 1994
Deck/Cargo
Issued 20 May 1993
Resolved
GOUGE AND REWELD FRACTURED WELDS ON TANK TOP TRANSVERSE FRAMES ON SIDES WHERE ATTACH TO MAIN DECK.
Condition: Unknown
Due 20 June 1993
Resolved 21 May 1993
Deck/Cargo
Issued 10 September 1992
Resolved
PROVIDE UPDATED (WITHIN 1 YEAR) CARGO TANK TOP GAUGE READINGS.
Condition: Unknown
Due 10 September 1992
Resolved 10 September 1992
Deck/Cargo
Issued 10 September 1992
Resolved
EFFECT PERMENANT REPAIRS TO #3 CARGO TANK. REPAIR CRACKS AT BRACKETS #2, 6AND 9 OUTBOARD OF PORT RAISED TANK TOP. BRACKETS AT #6 AND #9 TO BE WELDEDWHERE CRACKED. AIR TEST IN THE PRESENCE OF CG INSPECTOR. NO CARGO IS TO BE LOADED UNTIL CG INSPECTOR ACCEPTS REPAIRS.
Condition: Unknown
Due 11 September 1992
Resolved 11 September 1992
Construction/Loadline
Issued 2 September 1992
Resolved
PROCEED TO NEW ORLEANS IN ORDER TO EFFECT PERMANANT REPAIRS TO FRAMING_x001C_ LOCATED IN STBD BOW RAKE FRAMING AND CRACKING LOCATED ON TOP OF #1 CENTER _x001C_CARGO TANK AND ANY OTHER DAMAGE RESULTING IN THE GROUNDING ON 31AUG92. NO_x001C_ CARGO IS TO BE LOADED UNTIL CG INSPECTS AND ACCEPTS REPAIRS.
Condition: Unknown
Due 2 September 1992
Resolved 2 September 1992
Construction/Loadline
Issued 2 February 1991
Resolved
DISCHARGE PRESENT CARGO AND EFFECT REPAIRS TO DAMAGE AT STBD BOW PRIOR TO LOADING NEXT CARGO.
Condition: Unknown
Due 2 February 1991
Resolved 2 February 1991
Deck/Cargo
Issued 25 May 1990
Resolved
DETERMINE SOURCE OF PRODUCT IN THE #2 P&S AND #3 P&S WING VOIDS TO THE SATISFACTION OF THE COGNIZANT OCMI IN ACCORDANCE WITH 46 USC 3313(A).
Condition: Unknown
Due 25 May 1990
Resolved 25 May 1990
Construction/Loadline
Issued 25 May 1990
Resolved
MAKE PERMANENT REPAIRS TO APPROXIMATELY 6" LONG FRACTURE AT THE GUNWAL, PORTSIDE IN WAY OF THE BOW VOID IN ACCORDANCE WITH 46 USC 3313(A).
Condition: Unknown
Due 25 May 1990
Resolved 25 May 1990
Engineering
Issued 25 May 1990
Resolved
PROVE PROPER OPERATION OF VOLCANIC THERMAL FLUID HEATER SAFETIES AND ALARMSPRIOR TO LOADING ANY CARGO REQUIRING USE OF THE THERMAL FLUID HEATER IN ACCORDANCE WITH 46 USC 3313(A).
Condition: Unknown
Due 25 May 1990
Resolved 25 May 1990
Deck/Cargo
Issued 13 February 1989
Resolved
PRIOR TO LOADING NEXT CARGO REMOVE CARGO RESIDUE FROM VOIDS 1, 2, 3, PORT AND STBD AND FROM #4 PORT VOID.
Condition: Unknown
Due 13 February 1989
Resolved 13 February 1989
Deck/Cargo
Issued 26 January 1989
Resolved
RENEW/CLEAN ALL ULLAGE FLAME SCREENS.
Condition: Unknown
Due 26 January 1989
Resolved 26 January 1989
Construction/Loadline
Issued 26 January 1989
Resolved
PRIOR TO LOADING NEXT CARGO MAKE PERMANENT REPAIRS TO NUMEROUS FRACTURES INRAISED CARGO TANK TOP UPPER CORNERS PORT STBD AND STERN. GAS FREE TANKS AND WELD INSIDE AND OUT. FRACTURES LOCATED AT TOP WELD OF RAISED CARGO TANK SIDE SUPPORT FRAMES.
Condition: Unknown
Due 26 January 1989
Resolved 26 January 1989
Deck/Cargo
Issued 26 January 1989
Resolved
DETERMINE CAUSE FOR CARGO SMELL AND CARGO IN VOIDS #1,2,3 PORT AND STBD. GAS FREE AND PRESENT FOR INTERNAL EXAM PRIOR TO LOADING NEXT CARGO.
Condition: Unknown
Due 26 January 1989
Resolved 26 January 1989
Construction/Loadline
Issued 26 January 1989
Resolved
RENEW DRAFT MARKS AND HOMEPORT ON STERN.
Condition: Unknown
Due 26 January 1989
Resolved 26 January 1989
Construction/Loadline
Issued 26 January 1989
Resolved
MAKE PERMANENT REPAIRS TO PORT AFT CAVAL AND DECK BUTTON.
Condition: Unknown
Due 26 January 1989
Resolved 26 January 1989
Deck/Cargo
Issued 26 January 1989
Resolved
MAKE PERMANENT REPAIRS TO ON DECK CONTAINMENT WHERE BROKEN BOTH PORT & STBD SIDE PRIOR TO LOADING NEXT CARGO.
Condition: Unknown
Due 26 January 1989
Resolved 26 January 1989
Deck/Cargo
Issued 31 August 1987
Resolved
GAS FREE AND PRESENT FOR INSPECTION ALL CARGO TANKS NO LATER THAN 30SEP87
Condition: Unknown
Due 31 August 1987
Resolved 31 August 1987
Construction/Loadline
Issued 4 December 1986
Resolved
CROP AND RENEW APPROX. 4' OF STARBOARD BOW WRAPPER PLATE. ABOVE REPAIRS TO BE COMPLETED PRIOR TO 4 JAN. 87 TO THE SATIFFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 4 December 1986
Resolved 4 December 1986
Construction/Loadline
Issued 27 December 1985
Resolved
PERMANENT REPAIRS TO HULL SHELL PLATING IN WAY OF NO 6 STBD AFT WING VOID.
Condition: Unknown
Due 27 December 1985
Resolved 27 December 1985
Deck/Cargo
Issued 13 March 1984
Resolved
TEST LIQUID THERMAL HEATER COMPLETLY IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Construction/Loadline
Issued 13 March 1984
Resolved
MAKE PERMANENT REPAIR TO THE TORN BUTTON IN WAY OF THE STBD BOW.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Construction/Loadline
Issued 13 March 1984
Resolved
MAKE PERMANENT REPAIR TO THE FRACTURES IN THE SIDE SHELL IN WAY OF THE STERN PLATE ACROSS THE STERN OF THE BARGE.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Construction/Loadline
Issued 13 March 1984
Resolved
MAKE PERMANENT REPAIRS TO THE SIDESHELL/DECK WELDMENTS AND PLATE WHERE TORNAND FRACTURED IN WAY OF BOTH BOW RAKE CORNERS.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Construction/Loadline
Issued 13 March 1984
Resolved
MAKE PERMANENT REPAIR TO THE 6 FOOT FRACTURE IN THE SIDESHELL/DECK WELDMENTIN WAY OF #2 WING TANK STARBOARD.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984
Construction/Loadline
Issued 13 March 1984
Resolved
MAKE PERMANENT REPAIRS TO THE PUSH KNEES PORT AND STBD. PORT KNEE WELDMENTSTORN FROM RAKE PLATE, STBD KNEE WELDMENTS TORN FROM RAKE PLATE AND HOLED.
Condition: Unknown
Due 13 March 1984
Resolved 13 March 1984