Records from 2005 to 2025. Most recent: inspection, 3 December 2025.
Documentation record
Registered dimensions (L × B × D)575.7 ft × 105.6 ft × 62.8 ft
Registered tonnagegross 30,415 / net 11,125
ITC dimensions (L × B × D)575.7 ft × 105.6 ft × 62.8 ft
ITC tonnagegross 30,415 / net 11,125
BuilderNEWPORT NEWS SHIPBUILDING · NEWPORT NEWS, VA, UNITED STATES · built 1998
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPORT EVEGLADES, FL
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 17 October 2025 · expires 30 November 2026
Service, as the file records itTank Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it30415 - Convention (Subpart B), Gross Ton
11125 - Convention (Subpart B), Net Ton
46069 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 28
3 December 2025
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8276722
16 March 2025
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8094632
9 March 2025
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8092127
21 January 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8066772
7 January 2025
ACP Annual Oversight · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8059163
28 October 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8025754
16 September 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8003257
1 August 2024
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7967152
1 February 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7859280
9 January 2024
Deficiency Check · MTSA/ISPS Verification · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7847348
11 October 2023
ACP COI Oversight · Re-Inspection · MTSA/ISPS Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7807137
8 September 2023
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7787941
7 June 2023
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7710777
20 January 2023
Annual Inspection · ACP Annual Oversight
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7624776
16 December 2021
Annual Inspection · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7369114
3 August 2021
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7318519
13 January 2021
Periodic Inspection · ACP Annual Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7123601
11 November 2020
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7094874
12 August 2020
Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7031550
24 July 2020
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7015465
14 January 2020
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6889618
7 November 2018
ACP COI Oversight · Periodic Inspection · MTSA/ISPS Verification · ACP Drydock Oversight
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6564198
29 November 2017
Annual Inspection · Deficiency Check · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6315199
10 January 2017
Annual Inspection · MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6069214
20 December 2016
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6061004
31 October 2016
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6032836
19 February 2016
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5832428
10 February 2016
ACP Annual Oversight · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5813669
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 7 January 2025
Resolved
Where cables which are installed in hazardous areas introduce the risk of fire or explosion in the event of an electrical fault in such areas, special precautions against such risks shall be taken to the satisfaction of the Administration. Marine inspector observed intrinsically safe electrical cable connectors for bulkhead fixtures adjacent to oxygen/acetylene bottle storage, and paint locker heavily deteriorated. 74SOLAS(04)II-1/45.5.4
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 7 January 2025
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Marine Inspector observed multiple deteriorated valve stems and handles for auxiliary boilers in machinery space and cargo steam piping on deck. 74SOLAS(04)II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 January 2025
Resolved
Maintenance, testing and inspections shall be carried out ...in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. Control valve handles on the ships foam system found deteriorated at the system piping at the aft port corner of the house and at various foam monitors.74SOLAS(20)II-2/14.2.2.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil fuel tank protection
Issued 7 January 2025
Resolved
Provision shall be made to prevent overpressure in any oil tank or in any part of the oil fuel system, including the filling pipes. Any relief valves and air or overflow pipes shall discharge to a position which, in the opinion of the Administration, is safe. Marine inspector observed wasted tank vent piping for starboard HFO aft storage on weather deck. 74SOLAS(01) II-2/15.2.7
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 7 January 2025
Resolved
Maintenance, testing and inspections of life-saving appliances shall be carried out in a manner having due regard to ensuring reliability of such appliances. Marine Inspector observed that the starboard lifeboat remote lowering cable was rusted and twisted around the spool drum. 74SOLAS(20)III/20.3.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 7 January 2025
Resolved
Maintenance, testing and inspections of life-saving appliances shall be carried out in a manner having due regard to ensuring reliability of such appliances. Release clips for the bulwark opening for the STBD Jacobs ladder were seized closed and unable to be removed in an emergency.74SOLAS(20) III/20.3.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 7 January 2025
Resolved
Fire doors in main vertical zone bulkheads, galley boundaries and stairway closures other than power-operated watertight doors and those which are normally locked shall satisfy the follow requirements:
the doors shall be self-closing and be capable of closing with an angle of inclination of up to 3.5° opposing closure. Marine Inspector observed that the C-Deck stairway door was not capable of closing and latching properly without manual intervention.74SOLAS(20) II-2/9.4.1.1.5.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil fuel tank protection
Issued 7 January 2025
Resolved
A ship of 300 gross tons or more constructed after June 30, 1974 must have a fixed container or enclosed deck area under or around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe. Marine Inspector observed items being stowed in the containment of the port side scavenge air vent, inhibiting the containment from being able to meet its capacity requirement. 33CFR155.320
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Sanitary Facilities
Issued 7 January 2025
Resolved
Sanitary accommodation should be provided for the exclusive use of the occupants of the hospital accommodation, either as part of the accommodation or in close proximity thereto. Such sanitary accommodation should comprise of a minimum on one toilet, one washbasin and one tub or shower. Marine inspector found hospital space without working water supply for the tub. MLC(06)B.3.1.8.4
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 January 2025
Resolution: Accepted by RO.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 7 January 2025
Resolved
In each washing space in a visible location there shall be information regarding procedures and resources to report crimes upon the vessel, including sexual assault and sexual harassment, and vessel owner or company policies prohibiting sexual assault and sexual harassment, retaliation, and drug and alcohol usage. Required signage missing from vessel common washrooms. 46U.S.C.11011(d)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 7 January 2025
Resolution: Signs were printed and properly placed.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 11 October 2023
Resolved
Onboard a seagoing vessel of 500 GT or more, driven by main propulsion machinery of 1,000 HP/750 kW propulsion power or more or on an international voyage beyond the boundary line as described in part 7 of this chapter, no person may employ or engage any person to serve, and no person may serve, in a position requiring a person to hold an STCW endorsement, including master, chief mate, chief engineer officer, second engineer officer, officer of the navigational or engineering watch, or GMDSS radio operator, unless the person serving holds an appropriate, valid STCW endorsement issued in accordance with part 11 of this subchapter. Third assistant engineer onboard found without STCW endorsement for Office in Charge of an Engineering Watch (OCIEW) as required. Records provided by the company indicate he had been employed as an OCIEW for nearly 2 years.
Action required: 10 - Deficiency Rectified
Resolved 30 January 2024
Resolution: Mariner was signed off as an OCIEW and signed back on as a RFPEW. MI verified current watch officers were properly credited.
10 - Safety of Navigation › N/A - No Subsystem › Speed and distance indicator
Issued 8 September 2023
Resolved
Each vessel required to be fitted with an Automatic Radar Plotting Aid (ARPA) under § 164.38 of this part must be fitted with a device to indicate speed and distance of the vessel either through the water or over the ground. During inbound transit vessel found their speed log to be inoperable. Make proper repairs to satisfaction of RO.
33CFR164.40(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 September 2023
Resolved 13 September 2023
Resolution: Received class report for install/testing.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 January 2020
Resolved
Each vapor control flange shall have a pernamently attached stud. Stud missing from port manifold VCS flange. 46 CFR 39.2001(j)
Action required: 10 - Deficiency Rectified
Due 14 January 2020
Resolved 14 January 2020
Resolution: Pernamently installed pin
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 14 January 2020
Resolved
Manually operated valves in connection with the bilge pumping arrangements shall be in positions which are accessible under ordinary circumstances. T-handle for operating bilge suction valves in cargo pump room missing and valve was frozen. 74 SOLAS (97 CONSL) II-1/21.1.5
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 14 January 2020
Resolved 14 January 2020
Resolution: Replaced T-handle and maintenanced the valve to operate properly.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 20 December 2016
Resolved
Replace Starboard lifeboat electric starting motor to the satisfaction of attending marine inspector no later than 01/10/2016. Vessel is allowed to proceed while carrying inflatable life-rafts of sufficient capacity in an arrangement approved by ABS until lifeboat is fully operational and tested by ABS and or Coast Guard.
Action required: 705 - Other - as specified
Due 10 January 2017
Resolved 28 December 2016
Resolution: stbd lifeboat starter is properly operating and was verified by ABS.