Inspection history · 19
24 June 2026
Internal Structural Exam · Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8412858
16 December 2025
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8291606
17 December 2024
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 8049641
20 June 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7936546
16 January 2024
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7850019
20 December 2022
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7616472
8 June 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7470684
7 December 2021
Deficiency Check · COI Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7351040
1 March 2021
Type not recorded
No type recorded · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7324450
15 December 2020
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 7100738
24 June 2020
Drydock Exam · Deficiency Check
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6953019
3 December 2019
Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6866051
19 December 2018
Deficiency Check · Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6586641
15 June 2018
Administrative Inspection · Construction Oversight · Plan Review "T" Boat
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6456429
12 June 2018
Drydock Exam · Deficiency Check · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6441817
16 January 2018
Administrative Inspection · Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6345728
13 December 2016
DAPI Audit · Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6057010
9 June 2016
Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5901942
27 January 2016
Annual Inspection · Administrative Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5802651
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 December 2021
Resolved
Lifering is worn; replace as discussed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 December 2021
Resolved 21 December 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2021
Resolved
Electrical equipment on a vessel must be installed and maintained to protect crew from electrical hazards. Wiring exposed on bow thruster.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2021
Resolved 21 December 2021
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 7 December 2021
Resolved
A vessel must carry up-to-date U. S. Coast Pilot and Coast Guard Light List. Current editions on baord are from 2019.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 December 2021
Resolved 21 December 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 December 2021
Resolved
Provide panoramic mirror as required by COI for manning reduction prior to operating only with master.
Action required: 705 - Other - as specified
Due 7 December 2021
Resolved 21 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 3 December 2019
Resolved
Replace light cover on light fixture in forward compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2019
Resolution: replaced light
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 December 2019
Resolved
Replace worn/missing chaffing gear on wires on engine.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2019
Resolution: replaced chaffing gear on wires
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 December 2019
Resolved
Remove or cap off all dead end wires.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 4 December 2019
Resolution: capped dead end wire
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 December 2018
Resolved
Demonstrate proper operation of engine room ventilation closure devices (space protected by an fixed gas extinguishing system). Port ventilation was seized in the open position and would be unable to contain fire extinguishing agent in the event of an engine room fire.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 December 2018
Resolved 20 December 2018
Resolution: Corrected
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 19 December 2018
Resolved
Demonstrate operation of magnetic compass light. Vessel limited to daylight operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 3 January 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 December 2018
Resolved
Provide permanent type connectors to battery terminals, wing nuts are currently installed on 03 of 04 terminals.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 3 January 2019
01 - Certificates & Documentation › 013 - Documents › AIS test report
Issued 19 December 2018
Resolved
Post emergency instructions that address the following situations as per 46 CFR 185.510: Rough weather at sea, Man overboard, and Fire.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 3 January 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 December 2018
Resolved
Provide manufacture date for Fireboy cylinder, if manufacture date is past 12 years old then cylinder must be hydrostatic tested or replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2019
Resolved 3 January 2019
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 12 June 2018
Resolved
Make fuel tanks ready to visually inspect. Remove FRP casing.
Prior to credit dry dock.
Action required: 705 - Other - as specified
Resolved 19 July 2018
Resolution: New fuel tanks installed.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 12 June 2018
Resolved
Replace manual activation cable for fixed gas fire extinguishing system. Demonstrate proper operation for attending marine inspector. Prior to credit drydock.
Action required: 705 - Other - as specified
Resolved 27 July 2018
Resolution: New cable installed.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 16 January 2018
Resolved
Prove proper operation of Fireboy shutdown and override function.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 January 2018
Resolution: Installed new override switch and successfully tested override function.
Communications › Alarms/Indicators › Bilge Alarm
Issued 16 January 2018
Resolved
Provide audible and visual indicators for each high level high-water alarm.
Action required: 705 - Other - as specified
Due 1 February 2018
Resolved 19 February 2018
Resolution: Installed audible and visual indicators for each high level alarm and conducted tests of each.
Construction/Loadline › Structures › Deck Plating
Issued 16 January 2018
Resolved
Make repairs to damaged areas on port side above the rub rail.
Action required: 705 - Other - as specified
Due 9 June 2018
Resolved 12 June 2018
Engineering › Bilge Water Management System › Pump
Issued 16 January 2018
Resolved
Renew submersible bilge pumps with pumps meeting the requirements of UL113.
Action required: 705 - Other - as specified
Due 23 January 2018
Resolved 19 February 2018
Resolution: Installed bilge pumps meeting the requirements of UL113.
Engineering › Steering Gear System › Actuator
Issued 13 December 2016
Resolved
Prove proper operation of emergency steering
Action required: 705 - Other - as specified
Due 21 December 2016
Resolved 21 December 2016
Resolution: Proved proper operation of emergency steering.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 13 December 2016
Resolved
Remove locking mechanism from hatch where PFDs are stowed
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 December 2016
Resolution: Removed locking mechanism
Communications › Alarms/Indicators › High Water Alarm
Issued 13 December 2016
Resolved
Properly label high level and automatic bilge pump indicators
Action required: 705 - Other - as specified
Due 13 January 2017
Resolved 21 December 2016
Resolution: Labeled all indicators
Engineering › Fuel Oil Service System › Piping
Issued 13 December 2016
Resolved
Renew flexible fuel hose from selector valve to strainer with approved hose
Action required: 705 - Other - as specified
Due 13 January 2017
Resolved 21 December 2016
Resolution: Renewed with copper tubing
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 13 December 2016
Resolved
Properly label stowage of portable fire extinguisher in forward compartment
Action required: 705 - Other - as specified
Due 13 January 2017
Resolved 21 December 2016
Resolution: Installed label to indicate portable extinguisher in compartment
Fire Fighting › Fire Bucket › Availability
Issued 13 December 2016
Resolved
Provide 03 fire buckets
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 December 2016
Resolution: Provieded additional fire bucket
Documentation › Certificates/Documents › Certificate of Inspection
Issued 27 January 2016
Resolved
Post Certificate of Inspection.
Action required: 705 - Other - as specified
Due 27 February 2016
Resolved 16 February 2016
Resolution: Vessel posted all pages of the COI.
Documentation › Certificates/Documents › Stability Letter
Issued 27 January 2016
Resolved
Post Stability Letter.
Action required: 705 - Other - as specified
Due 27 February 2016
Resolved 16 February 2016
Resolution: Vessel posted all pages of the Stability Letter.
Engineering › Bilge Water Management System › Valve
Issued 27 January 2016
Resolved
Install positive shutoff valve at the submersible bilge hull penetration.
Action required: 705 - Other - as specified
Due 27 February 2016
Resolved 16 February 2016
Resolution: Vessel installed positive shutoff valves on all submersible bilge pump discharge lines. Vessel was not able to install the valves at the through hull due to inaccessability. Recommend vessel move valves and install access ports at next drydock.