Records from 1982 to 2025. Most recent: inspection, 25 September 2025.
Inspection history · 81
25 September 2025
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8241344
12 March 2025
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8092407
21 November 2023
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7827994
23 August 2021
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7284048
27 April 2021
Internal Structural Exam · Hull Examination · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7183405
21 August 2020
Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7039239
24 July 2020
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7015278
20 May 2019
Administrative Inspection · COI Inspection · Deficiency Check · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6688976
22 April 2019
Hull Examination · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6667359
11 January 2018
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6336169
8 August 2017
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6234461
2 March 2017
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6097729
5 October 2016
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6016739
6 June 2016
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5899173
31 May 2016
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5892719
6 June 2014
Hull Examination · Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4887652
1 August 2011
Administrative Inspection · Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4101555
2 March 2010
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3688583
30 July 2009
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3550541
29 July 2009
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3561639
15 April 2009
Construction Oversight · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3465493
10 February 2009
Hull Examination · Administrative Inspection · Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3423981
31 January 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2864638
26 September 2006
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2786980
23 May 2006
MTSA Verification · Internal Structural Exam · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2652792
24 August 2005
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2435546
21 July 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2140274
20 July 2004
MTSA Verification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2139440
20 July 2004
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2139753
27 February 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2014423
13 February 2004
Security Plan Review - VSP
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2006341
30 January 2004
Hull Examination · Internal Structural Exam
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1997553
15 September 2003
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1905159
11 March 2003
Re-Inspection · Inclining Experiment · Administrative Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1740749
8 July 2002
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1640271
30 July 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1069569
13 June 2001
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1066161
17 May 2001
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1443187
18 October 2000
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 227211
6 October 2000
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1465600
30 September 1999
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1426276
28 June 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 795503
23 June 1998
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2730
13 April 1998
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1461032
12 June 1997
Deficiency Check · Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1421346
28 May 1997
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1368239
11 May 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 61328
22 August 1996
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1086580
20 August 1996
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1086687
10 May 1996
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1357619
25 February 1996
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 36909
5 February 1996
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 691271
13 December 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 6860
27 October 1995
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 188975
29 June 1995
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1419472
11 June 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1176620
3 June 1994
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1440802
25 March 1993
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1146364
10 July 1992
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 944755
5 May 1992
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1414057
17 April 1991
COI Inspection · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 998703
6 June 1990
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1215927
3 May 1990
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 915153
28 January 1990
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1231212
18 April 1989
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 446091
4 April 1989
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1343456
8 November 1988
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1203950
29 July 1988
MARPOL Annex II Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1038383
29 July 1988
Examination of Repairs · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1344336
29 July 1988
MARPOL Annex II Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1345280
4 November 1987
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1026589
29 October 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1016439
6 August 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1014859
5 May 1986
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 993085
5 May 1986
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1306173
8 November 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 986106
2 August 1985
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1292674
10 August 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1286818
10 August 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1281542
31 March 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 969599
12 August 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272371
01 - Certificates & Documentation › 013 - Documents › Certificate or documentary evidence of financial security relating to shipowners liability
Issued 21 November 2023
No resolution recorded
Any vessel over 300 GRT using the navigable waters of the United States must establish and maintain evidence of financial responsibility by obtaining a certificate of financial responsibility.
Action required: 60 - Rectify deficiencies prior to movement
01 - Certificates & Documentation › 011 - Ships Certificates › Continuous synopsis record
Issued 21 November 2023
No resolution recorded
For ships constructed before July 1, 2004 the Continous Synopsis Record (CSR) shall provide an on-board record of the history of the ship.
SOLAS 20 XI-1/5.2.2
Action required: 17 - Rectify deficiencies prior to departure
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 21 November 2023
No resolution recorded
Medical fitness examinations of seafarers shall be conducted the current master of vessel could not provide a valid medical fitness certificate.
Action required: 17 - Rectify deficiencies prior to departure
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2023
No resolution recorded
Non-tank vessels subject to operating upon the navigable waters of the United States must operate with an approved vessel response plan.
Action required: 17 - Rectify deficiencies prior to departure
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 November 2023
No resolution recorded
A ship which undergoes repairs, alterations, modifications, and outfitting related thereto shall continue to compy with at least the requirements previously applicable to the ship. The vessel was issued a conditional ILLC on 13Nov23 by Panama Shipping Registrar Inc. in accordance with Article 14 of the Convention. However noted multiple watertight integrity issues as follows:
- port watertight door leading to the engine room did not close
- watertight door between engine room and steering compartment wasted
- forepeak hatch unable to close
- forward stbd accommodation door unable to close
- wasted stbd ballast vent
Action required: 17 - Rectify deficiencies prior to departure
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 23 August 2021
Resolved
Launching appliances must be thoroughly examined at intervals not exceeding 5 years and, upon completion of the examination, the launching appliance must be subjected to a dynamic test of the winch brake. There is no record or a dynamic brake test being conducted since 2014 on the rescue boat davit winch brake.
46 CFR 199.190(i)(2)
Action required: 17 - Rectify deficiencies prior to departure
Due 2 September 2021
Resolved 2 September 2021
Resolution: A break test was witnessed.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 23 August 2021
Resolved
The proper condition and operation of the survival craft and rescue boat launching appliances shall be demonstrated at loads ranging from light load to 10 percent overload whenever a wire fall for a launching appliance is replaced or turned end-for-end. The wire fall for the rescue boat davit was replaced in 2018 with no record of a weight test being conducted. The vessel also did not test the release gear at 1.1 times the total mass once every five years as required by 46 CFR 199.190(i)(5).
46 CFR 199.45(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: A weight test was witnessed.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 23 August 2021
Resolved
Lifeboat and rescue boat release gear must be subjected to a thorough examination by properly trained personnel familiar with the system at each inspection for certification. No record or examination of the rescue boat davit release gear was found on board.
46 CFR 199.190(i)(4)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 23 August 2021
Resolved
There shall be at least two means of escape from all general areas accessible to the passengers, if carried, or where the crew may be quartered or normally employed. At least one of the two means of escape shall be independent of watertight doors. The secondary means of escape from the engine room is a vertical hatch that exits onto the aft main deck. The scuttle was found seized and hard to open. When opened the watertight gasket was not properly seated.
46 CFR 92.10-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: Work was completed on the hatch to allow for opening internally.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 23 August 2021
Resolved
General emergency alarm signal must be audible in the spaces identified in paragraph (a) of this section with all normally closed doors and accesses closed. The following general alarms were missing or inoperable: The aft deck outside of the galley; Starboard crew mess; Crew lounge area aft of pilothouse on the top deck.
46 CFR 113.25-9(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: General alarm emergency batteries and charger was replaced. General alarms bells were replaced.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 August 2021
Resolved
On vessels required by §112.05-5(a) to have a temporary emergency power source, the following emergency lighting and power loads must be arranged so that they can be energized from the temporary emergency power source: Lighting sufficient to allow passengers and crew to find their way to open decks; Lighting for survival craft launching, including muster stations. There were three engine room emergency lights with inoperable bulbs. Additionally, there was no emergency lighting at the muster station located on the top deck aft of the pilot house.
46 CFR 112.15-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: Emergency lights were repaired with new bulbs or ballasts.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 23 August 2021
Resolved
As appropriate for the intended voyage, all vessels must carry adequate and up-to-date: Charts; Sailing Directions; Coast Pilots, Light list; Notice to mariners; Tide tables; current tables, and all other nautical publications necessary. There was no up to date coast pilot, Light list, Tide tables, or charts. The last updates were from 2017 and 2018.
46 CFR 97.05-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: New charts and manuals were on board.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 23 August 2021
Resolved
Each vessel must have a line-throwing appliance approved under approval series 160.040 which requires an impulse-projected rocket type line-throwing appliance to have four rocket projectiles in 46 CFR 160.040-4(a). There were five line throwing devices on board, however only three of the rocket projectiles were within their expiration date.
46 CFR 199.170(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: New projectiles were purchased.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 August 2021
Resolved
At least two lifebuoys, each with attached self-activating smoke signals, must be stowed where they can be quickly released from the navigating bridge and should, when released, fall directly into the water without striking any part of the vessel. The port and starboard lifebuoy containers which allow for quick release were seized and corroded at the bottom hinges and releasing pins, making them inoperable for the intended service.
46 CFR 199.70(a)(1)(v)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: Pivot points were cleaned and greased.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 23 August 2021
Resolved
The hull, superstructure, structural bulkheads, decks, and deckhouses shall be constructed of steel. Temp repair was found in the steering gear aft bulkhead.
46 CFR 92.07-10(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 September 2021
Resolution: Temp. repair was cut out and new steel was welded in. A Dye test was completed.
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 23 August 2021
Resolved
The employer shall not permit employees to board or leave any vessel, except a barge or river towboat, until the following requirements have been met: Each side of the gangway shall have a railing with a minimum height of approximately 33 inches. The gang way provided for the inspection was inadequate and did not meet 29 CFR 1915.74. Provide proper gangway meeting all requirements in 29 CFR 1915.
29 CFR 1915.74
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2021
Resolved 2 September 2021
Resolution: A new Gangway was installed.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 23 August 2021
Resolved
Medical Certificates issued to all other mariners will be issued for a maximum period of 5 years. The on-board oiler is missing their medical record showing they are fit for service under their current credential. Correct prior to individual preforming duties associated with their credential.
46 CFR 10.301(b)(3)
Action required: 705 - Other - as specified
Due 23 August 2021
Resolved 2 September 2021
Resolution: Member was excess crew. Member departed ship.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 August 2021
Resolved
The grab line shall be 3/8 -inch diameter polyethylene, polypropylene, or other suitable buoyant type synthetic material having a minimum breaking strength of 1,350 pounds. The grab line for the port life ring located on the bridge wing is deteriorated and unserviceable.
46 CFR 199.70
46 CFR 160.050-3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2021
Resolved 2 September 2021
Resolution: Line was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 23 August 2021
Resolved
Interior stairs, including stringers and threads, shall be made of steel. The bottom rung of the stairs leading to the engine room from the galley was found wasted and in need of repair.
46 CFR 92.07-10(d)(5)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2021
Resolved 2 September 2021
Resolution: Ladder step was replaced.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 August 2021
Resolved
Fire detection, if installed, must meet the applicable requirements of 46 CFR, part 76 of subchapter H. The single station smoke detector in the accommodation space, forward of the galley was found inoperable.
46 CFR 95.05-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2021
Resolved 2 September 2021
Resolution: Batteries were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 August 2021
Resolved
Each lifejacket must have a lifejacket light approved under approval series 161.112 securely attached to the front shoulder area of the lifejacket. One of the two lifejackets in the engine room for watchstanders werer found to be missing a required light.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2021
Resolved 2 September 2021
Resolution: PFD light was added.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 23 August 2021
Resolved
Each life raft or group of life rafts must be arranged for float-free launching. The port side life raft’s hydrostatic releases were installed upside down, not allowing for automatic activation of the painter line. The crew fixed the hydrostatic release in the presence of attending marine inspector.
46 CFR 199.130(c)(7)
Action required: 10 - Deficiency Rectified
Resolved 23 August 2021
Resolution: Corrected on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 July 2020
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this subchapter.
When main and auxiliary machinery is to be installed without classification society review, the builder shall submit in quadruplicate to the cognizant Officer in Charge, Marine Inspection, such drawings and particulars of the installation as are required by the American Bureau of Shipping Rules for Building and Classing Steel Vessels, Part 4 Vessel Systems and Machinery (2003) for similar installations on classed vessels.
Vessel is required to make repairs to the fresh water piping outboard side of the stbd main engine fwd IWO the temporary patch.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 August 2020
Resolved 21 August 2020
Resolution: Received photo of freshwater piping repair completed on stbd engine.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 24 July 2020
Resolved
Each vessel must carry not less than 12 rocket parachute flares approved under approval series 160.136; and stow the flares on or near the vessel's navigating bridge.
Vessel was missing 6 rocket parachute flares and is required to have them onboard prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: additonal flares provide
01 - Certificates & Documentation › 012 - Crew Certificates › Manning specified by the minimum safe manning doc
Issued 24 July 2020
Resolved
There must be an individual holding an MMC or license endorsed as chief engineer or other credential authorizing service as chief engineer employed onboard a mechanically propelled inspected vessels of seagoing or Great Lakes 200 GRT and over.
Vessel had a Chief Engineer only allowed to serve on Offshore Supply Vessels. Vessel needs to have a Chief Engineer onboard to serve on vessel type and service.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: new chief engieer was brought onboard with the proper credential
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 24 July 2020
Resolved
Each vessel must have a line-throwing appliance approved under approval series 160.040.
Vessel was missing 2 bouyant projectiles to comply with approval series 160.040. Vessel needs to have all required equipment onboard prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: 2 bouyant projectiles were onboard
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 24 July 2020
Resolved
Each liferaft or group of liferafts must be arranged for float-free launching. The arrangement must ensure that the liferaft or liferafts, when released and inflated, are not dragged under by the sinking vessel. A hydrostatic release unit used in a float-free arrangement must be approved under approval series 160.162.
Vessels liferaft hydrostatic release mechanisms were not marked with installation date. Vessel is required to mark hydrostatic release dates with proper installation date once attached to liferaft.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: hydorstatic releases were replaced
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 24 July 2020
Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. All required inspections and test as per regulatory requirements must be kept up and recorded.
Vessels lifesaving systems and equipment was found unsatisfactory and lacked proper maintenance. Vessel is required to record and inspect all equipment and show proof of proper maintenance.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2020
Resolved 21 August 2020
Resolution: Received email showing that the vessel is currently maintaining lifesaving maintenance and records.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 July 2020
Resolved
Efficient guard rails or bulwarks must be fitted on all exposed parts of the freeboard and superstructure decks as follows:
The height of the bulwarks or guard rails must be at least 391/2 inches from the deck, provided that where this height would interfere with the normal operation of the vessel, a lesser height may be approved if the Commandant and the assigning authority are satisfied that adequate protection is provided.
Vessel had chains on embarkation area which did not meet the load line criteria. Vessel is to have rail courses that meet load line requirements. The lower rail must be 9 inches from deck and the upper two courses must be 15 inches apart to a minimum of 39 total inches.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: rails (chains) were installed across the back and IWO the bulwarks port and stbd side
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 24 July 2020
Resolved
Vessels shall be provided with an efficient means of communication between the wheelhouse and the engine room. Vessel’s sound powered telephone was not proven effective over the machinery space noise.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2020
Resolved 27 July 2020
Resolution: sound power phone was repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 July 2020
Resolved
All pressure vessels other than unfired steam boilers shall be protected by pressure-relieving devices that will prevent the pressure from rising more than 10 percent above the maximum allowable working pressure. Upon inspections MI discovered two pressure vessels for dive equipment in the vessel’s sewage room with the relief valve set at %25 which is well above the 10 percent limit required.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 24 August 2020
Resolved 27 July 2020
Resolution: proper relief valves were installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 July 2020
Resolved
Each life preserver and each exposure suit carried on a vessel engaged in ocean, coastwise, or Great Lakes service, must have a personal flotation device light that is approved under subpart 161.012 of this chapter.
Vessel had several life jackets with missing or expired
lights. 46 CFR 94.42-1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: lights were installed on life jackets missing lights
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 July 2020
Resolved
Lighting for passageways, stairways, and escape trunks in passenger quarters, crew quarters, public spaces, machinery spaces and work spaces, adequate to permit passengers and crew readily to find their way to open decks and to lifeboat embarkation and assembly points with all watertight doors and fire screen doors closed.
Upon inspection of emergency lighting after going “dark ship” MI identified several emergency lights not operable throughout the machinery space as well as in the Portable Accommodation Modules on board.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: E-lighting was tested with no issues
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 July 2020
Resolved
Each non-pressure-containing steering-gear component and each rudder stock must be of sound and reliable construction.
During inspection of the aft steering gear compartment it was discovered that both packing glands around the rudder stock were not adequate allowing water to pass through at an excessive rate.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2020
Resolved 27 July 2020
Resolution: new bolts were installed in the packing gland and the packing was adjusted to stop the leaking
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 July 2020
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03-1), except as otherwise provided by this subchapter.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 August 2020
Resolved 27 July 2020
Resolution: automation alarms were tested by third party and witnessed by Coast Guard
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 May 2019
Resolved
A means to extinguish a fire in the STBD PVHO is missing, The fire blanket in the PORT PVHO is unserviceable.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2019
Resolved 28 May 2019
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 24 May 2019
Resolved
The STBD life raft hydrostatic release attachment to the main deck was found severely corroded. 46CFR 94.10
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2019
Resolved 28 May 2019
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 24 May 2019
Resolved
The rescue boat radar reflector, bow light, battery, and search light were inoperative.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2019
Resolved 28 May 2019
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 24 May 2019
Resolved
The impulse projected line throwing device approved under 160.040 was missing the two required buoyant rockets and auxiliary line. 46CFR 94.45-15
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2019
Resolved 28 May 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 May 2019
Resolved
Both PVHO's are missing the required pressure gage to be located within the chamber.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 7 June 2019
Resolved 28 May 2019
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 11 January 2018
Resolved
Vessel is missing automation test proocedures. Must submit to MSC and complete DVTP
Action required: 705 - Other - as specified
Due 11 April 2018
Resolved 20 August 2019
Communications › Visual Communication › Red Warning Signal
Issued 11 January 2018
Resolved
All water tight door indicators need to be repaired or adjusted and proper operation demonstrated.
Action required: 705 - Other - as specified
Due 11 February 2018
Resolved 18 January 2018
Resolution: Fixed indicators and visually seen them work.
Engineering › Pressure Vessel › Relief Valve
Issued 11 January 2018
Resolved
Relief valves in sewage space has 250 psi releif valves installed on pressure vessels with a MAWP of 200 psi. Remove and replave with proper relief valves.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 February 2018
Resolved 18 January 2018
Resolution: The ships engineer installed the correct relief valves.
Communications › Internal Communications System › Sound-powered Telephone
Issued 11 January 2018
Resolved
Sound powered phones in both PVHO's did not work. Repair and demonstrate operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 February 2018
Resolved 18 January 2018
Resolution: Vessels Dive Sup came and fix the comms issue with both PVHO units
Documentation › Certificates/Documents › Certificate of Inspection
Issued 5 October 2016
Resolved
Vessel must conduct annual inspection in accordance with 46CFR91.27-01(a) prior to operations.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 October 2016
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 5 October 2016
Resolved
Liferaft servicing not completed on starboard life rafts
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 October 2016
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 5 October 2016
Resolved
starboard main engine clutch pressure switch not operating in accordance with automation
Condition: Improper/Lack of Maintenance
Due 4 November 2016
Resolved 31 October 2016
Electrical › Lighting (emergency) › Lighting Fixture
Issued 5 October 2016
Resolved
emergancy light located in accomadations was not properly working
Condition: Improper Installation
Due 4 November 2016
Resolved 31 October 2016
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 6 June 2014
Resolved
Rudder angle indicator not functioning properly, required to be fixed/replaced.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 June 2014
Resolution: Rudder angle indicator replaced and now functions properly
Stability › Watertight Integrity › General
Issued 15 April 2009
Resolved
WTD installed is a 4 dog type. Needs to be replaced with a QAWT door.
Due 26 July 2009
Resolved 6 August 2009
Resolution: QAWT INSTALLED AND TESTED.
Navigation › Piloting/Steering › Notices to Navigation
Issued 15 April 2009
Resolved
Need a NAVTEX installed
Due 11 August 2009
Resolved 4 November 2009
Resolution: Vessel had installed appropriate NAVTEX receiver. Reciever did not have print capability but retains reports in memory.
Communications › Radio Communications › VHF Radiotelephone
Issued 15 April 2009
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Due 19 June 2009
Resolved 5 July 2009
Resolution: STATION LICENSE AND FCC CERT VERIFIED.
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 23 May 2006
Resolved
Provide proper amount of rafts.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 June 2006
Stability › Watertight Integrity › Weathertight Enclosure
Issued 23 May 2006
Resolved
Adjust all w/t doors in engine room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 June 2006
Documentation › Certificates/Documents
Issued 7 February 2003
Resolved
Safety radio certificate expired. LEGACY COMPONENT DESC: Cargo Ship Safety Radio Certificate
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2003
Resolution: New certificate issued.
Documentation › Certificates/Documents
Issued 7 February 2003
Resolved
COD expired. LEGACY COMPONENT DESC: Certificate of Documentation (CG-1270)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2003
Resolution: New COD shown to inspector.
Accommodation/Occupational Safety › Medical/First Aid
Issued 7 February 2003
Resolved
No first aid kit onboard. LEGACY COMPONENT DESC: Medicine Chest
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2003
Resolution: New kits installed.
Fire Fighting › Miscellaneous Items
Issued 7 February 2003
Resolved
No fire safety plans that reflect recent additions to vsl. LEGACY COMPONENT DESC: Fire safety plans
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2003
Resolution: New, revised plans placed on board and approved by inspector.
Engineering › Lubricating Oil Service System
Issued 7 February 2003
Resolved
Oil pressure gauge at operation station not working. LEGACY COMPONENT DESC: Gauge
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2003
Resolution: Gauges working.
Engineering › Bilge Water Management System
Issued 7 February 2003
Resolved
Ballast pump contacts not operating to shut of ballast pump operation. LEGACY COMPONENT DESC: Ballast pump
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2003
Resolution: Ballast pump working.
Unknown
Issued 17 May 2001
Resolved
Install shaft tachometers IAW 46 CFR 113.37-10
Condition: Unknown
Due 17 May 2001
Resolved 17 May 2001
Electrical
Issued 6 October 2000
Resolved
REPLACE OR REPAIR ELECTRICAL PANEL IWO PORT STOWAGE LOCKER.
Condition: Unknown
Due 6 November 2000
Resolved 9 November 2000
Lifesaving
Issued 6 October 2000
Resolved
PROVIDE SAFETY HARNESS FOR MAN-OVERBOARD RESCUE DRILL.
Condition: Unknown
Due 10 October 2000
Resolved 9 November 2000
Engineering
Issued 6 October 2000
Resolved
PROVE PROPEROPERATION OF AIR RECEIVER SAFETIES.
Condition: Unknown
Due 15 October 2000
Resolved 9 November 2000
Engineering
Issued 6 October 2000
Resolved
PROPERLY MARK EMERGENCY FUEL OIL SHUT OFF VALVES IWO DECK ACCESS.
Condition: Unknown
Due 10 October 2000
Resolved 9 November 2000
Deck/Cargo
Issued 12 June 1997
Resolved
01. REPAIR BOW THRUSTER AND TEST NEW HYDRAULIC PIPEING TO SATISFACTION OF ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 10 July 1997
Resolved 23 June 1997
Engineering
Issued 12 June 1997
Resolved
03. RENEW FUEL OIL SUPPLY PIPEING BETWEEN SHIPSERVICE GENERATORS.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Engineering
Issued 12 June 1997
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 12 June 1997
Resolved 12 June 1997
Engineering
Issued 12 June 1997
Resolved
02. TEST MAIN DIESEL ENGINES OVERSPEED TRIPS TO THE SATISFACTION OF ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 10 July 1997
Resolved 23 June 1997
Documentation
Issued 28 May 1997
Resolved
PROCEED DIRECTLY TO A AND M DOCK IN MORGAN CITY, LA TO ARRIVE NLT 02MAY97. PASSENGERS AND/OR CARGO NOT PERMITTED. TRANSIT THE ICW ONLY. UPON ARRIVALAND PRIOR TO EFFECTING REPAIRS CONTACT THE MARINE INSPECTION OFFICE AT MORGAN CITY TO RESCHEDULE INSPECTION.
Condition: Unknown
Due 12 June 1997
Resolved 23 June 1997
Lifesaving
Issued 10 May 1996
Resolved
POST ALL REQUIRED EMERGENCY INSTRUCTIONS AS REQUIRED BY 46 CFR 131.340.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Construction/Loadline
Issued 10 May 1996
Resolved
PROVIDE COPY OF ORIGINAL SCANTLINGS FOR COMPARISON WITH UT GAGING REPORT.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Navigation
Issued 10 May 1996
Resolved
REPLACE GASKET ON ACCESS PLATE TO HYDRAULIC OIL TANK FOR STEERING GEAR IN ENGINE ROOM.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Electrical
Issued 10 May 1996
Resolved
MARK ALL EMERGENCY LIGHTING WITH "E" THOUGHOUT VESSEL.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Electrical
Issued 10 May 1996
Resolved
INSTALL WOODEN RAIL ON SWITCHBOARD IN ENGINE ROOM.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Engineering
Issued 10 May 1996
Resolved
REPLACE MISSING BOLTS ON ACCESS COVER TO STBD FUEL OIL TANK IN ENGINE ROOM.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Construction/Loadline
Issued 10 May 1996
Resolved
REWELD CRACKED TRANSVERSE STIFFENERS IN ENGINE ROOM ABOVE MAIN DIESEL ENGINES.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Navigation
Issued 10 May 1996
Resolved
PROVIDE COPY OF CURRENT CG APPROVED LIGHT LIST.
Condition: Unknown
Due 10 May 1996
Resolved 10 May 1996
Electrical
Issued 3 June 1994
Resolved
PROVIDE BLANKS AND COVERS FOR DISTRIBUTION PANNELS LOCATED ON AFT BULKHEAD OF VESSEL'S ENGINE ROOM.
Condition: Unknown
Due 3 June 1994
Resolved 3 June 1994
Unknown
Issued 28 January 1990
Resolved
MAKE REPAIRS TO THE VESSEL'S HULL AND STACK.
Condition: Unknown
Due 28 January 1990
Resolved 28 January 1990
Deck/Cargo
Issued 6 August 1986
Resolved
PROVIDE AND PROVIDE OPERATION OF FOUR (4) SAFETY RELIEF VALVES FOR VESSEL'SDRY BULK MUD TANKS.
Condition: Unknown
Due 6 August 1986
Resolved 6 August 1986
Unknown
Issued 2 August 1985
Resolved
THE FOLLOWING DEFICIENCY PERTAINS TO THE VESSEL CHERAMIE BO-TRUC NO. 25 O.N.DN576020.
Condition: Unknown
Due 2 August 1985
Resolved 2 August 1985
Lifesaving
Issued 2 August 1985
Resolved
PROVIDE LINE THROWING GUN ON OR BEFORE 02 SEPTEMBER 1985. THIS REQUIREMENTIS TO BE COMPLETED TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR ASINDICATED.
Condition: Unknown
Due 2 August 1985
Resolved 2 August 1985