Inspection history · 57
29 June 2026
Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8418821
1 May 2025
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 8106826
17 December 2024
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 8052993
30 October 2024
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8034399
1 August 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7971850
29 May 2024
Deficiency Check · Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7922179
30 April 2024
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7903580
28 February 2024
In-Service Inspection
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7872424
10 October 2023
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7806013
8 August 2023
Administrative Inspection
Administrative · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7763539
27 July 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7752134
20 April 2023
In-Service Inspection · Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7672594
10 January 2023
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7619487
3 August 2022
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7524365
28 December 2021
Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Kodiak · USCG Arctic District (CGD-A) · Activity 7384944
17 May 2021
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7199414
17 May 2021
Damage Survey
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7199472
4 May 2021
Administrative Inspection · Deficiency Check · Initial Certification
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7186330
19 January 2021
Examination of Repairs · In-Service Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7127201
10 August 2017
Administration · Spot Check (Safety)
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6365072
3 August 2017
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6230185
20 November 2009
Industry Initiated Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3638196
29 July 2009
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3561639
20 May 2009
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3487707
28 March 2007
MTSA/ISPS Verification · Uninspected Other
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2896964
20 March 2006
MTSA/ISPS Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2605787
1 February 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2577334
21 December 2005
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2554891
21 December 2005
Uninspected Other
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2554976
8 November 2005
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2530943
2 November 2005
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2530686
4 October 2005
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2507632
28 April 2005
MTSA Verification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2344129
3 March 2005
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2316389
11 May 2004
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2064999
14 July 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1846340
2 July 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1846285
30 May 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1805528
24 April 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1804378
19 February 2002
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1492201
24 March 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 657215
22 January 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 195540
11 November 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 195544
11 November 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 771336
11 November 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 19584
4 November 1995
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 166040
7 February 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 677263
3 February 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 155974
3 February 1994
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 231963
16 December 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 141030
18 March 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 674615
16 March 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 674618
13 March 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 80456
4 March 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 674617
28 February 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 674616
24 February 1992
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 79190
9 February 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 84809
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 1 May 2025
Resolved
Vessels AIS System was non-operational at the time of inspection. Repair system and make ready for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2025
Resolution: Verified Operation/Functionality of System.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 1 May 2025
Resolved
Vessels Radar was not operational at the time of inspection. Repair system and make ready for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2025
Resolution: Verified Repair and Function of system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 May 2025
Resolved
Machinery and electrical systems must be designed and maintained for intended use. Port main not ready for inspection. Make repairs and make ready for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 May 2025
Resolution: Ran Main engine and verified operational capacity.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 1 May 2025
Resolved
Machinery and electrical systems must be designed and maintained for intended use. A pressure gauge was not properly fitted to an approved bracketing. Install adequate support bracket for the gauge.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 May 2025
Resolution: Verified installation of Guage mount. All Sat.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 1 May 2025
Resolved
Existing vessels must be maintained to conform to the rules of a recognized classification society. MSD piping was found supported by wiring. Remove wiring and install adequate brackets for piping.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 May 2025
Resolution: Inspected installed fixed bracket supports. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 May 2025
Resolved
Managing owner or operator must make their vessel ready for inspection. Vessel did not have list of employees for drug consortium enrollment. Produce list for vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 May 2025
Resolution: Verified Crew list and recent Testing Results. All Negative and on Record.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 1 August 2024
Resolved
Make temporary repair to hole cut in water tight bulkhead from engine room to shaft alley and provide a written repair plan within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 24 February 2025
Resolution: Crop and Renewed.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 1 August 2024
Resolved
Replace broken flame screen on the #7 fuel tank vent.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 4 September 2024
Resolution: New fuel tank vent installed on #7 fuel tank goose neck.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 August 2024
Resolved
Remove or correctly terminate dead end wiring in the overhead of the engine room above the port main.
Action required: 10 - Deficiency Rectified
Due 1 August 2024
Resolved 1 August 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 1 August 2024
Resolved
Repair/ replace water tight door gaskets on the following doors: Engine room to shaft alley and door to MSD room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 30 September 2024
Resolution: Gaskets replaced on both WTDs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 August 2024
Resolved
Find and repair exhaust leak on both main engines in the area the turbos to exhaust pipes.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 30 September 2024
Resolution: Exhaust outlet Below on Port M/E was replaced. Starboard Marine Engine exhaust manifold gasket replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 August 2024
Resolved
Install check/foot valve strainer on the following bilge pick ups Shaft alley, port side engine room and fwd machinery space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 30 September 2024
Resolution: Check foot valves installed on bilge piping pick-ups in shaft alley, port side engine room and FWD machinery space.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 August 2024
Resolved
Replace both life ring Buoy light batteries with approve lithium batteries
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 4 September 2024
Resolution: New lithium batteries installed in the ring buoy light.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 1 August 2024
Resolved
repair/replace broken tubing going from the governor to the intake manifold on the port main.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 4 September 2024
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 1 August 2024
Resolved
Vessel mates need to provide proof of an FCC radio operator license.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 4 September 2024
Resolution: The Mate onboard received a FCC Marine Radio Operator's Permit.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 1 August 2024
Resolved
Install lagging on winch motor engine exhaust pipping to prevent crew from coming in contact with hot surfaces.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 4 September 2024
Resolution: Exhaust lagging installed on the winch motor engine.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 1 August 2024
Resolved
Prove proper operation of battle lantern in engine room on starboard side by generator.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 4 September 2024
Resolution: Received photographs of battle lantern in operation.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 1 August 2024
Resolved
Install high bilge level alarm for shaft alley.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2024
Resolved 30 September 2024
Resolution: Bilge high level alarm installed in shaft alley.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 August 2024
Resolved
Repair leaking fuel oil on #7 fuel tank between the flange and valve.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 August 2024
Resolved 1 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 May 2024
Resolved
Prove proper operation of port engine to USCG inspector attending and provide Tech report for cause to the runaway engine
Action required: 17 - Rectify deficiencies prior to departure
Due 29 May 2024
Resolved 3 June 2024
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 1 May 2024
Resolved
Vessels subject to initial and periodic surveys shall have their annual surveys within 3 months either way of the certificate anniversary date. Vessel missed the annual window for ABS to complete required survey. Complete annual load line survey with ABS. 46 CFR 42.09-15
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2024
Resolution: Vessel provided evidence of signed Load Line certificate.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 1 May 2024
Resolved
Discovered additional cracked weld in the overhead of the laundry room (port side), directly above the penetration running into the kitchen area. The crack is in an existing repair that was made improperly. Vessel is authorized to grind out cracked weld and renew for temporary repair. Permanent repairs shall be made at the next dry dock (2025). 46 CFR 137.120
Action required: 705 - Other - as specified
Resolved 24 February 2025
Resolution: Crop and Renewed.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 28 July 2023
Resolved
Each towing vessel must be fitted with a general alarm that can notify persons on board in the event of an emergency and is identified with a sign that reads: “Attention General Alarm—When Alarm Sounds or Flashes Go to Your Station”. The general alarm is not capable of being activated if the vessel losses power from the generators and there is not signage in the machinery space. Install general alarm that is capable of being activated if the vessel losses power.
46 CFR 143.235(b)
30AUG2023: Temporary repair to be completed by September 4 and permenant repair to be completed by September 29.
04SEP2023: Temporary repair installed and operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2023
Resolved 10 October 2023
Resolution: Permanent battery backup arrangements have been installed for the general alarm and satisfactorily tested.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 July 2023
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. The safety inter-lock for the main switch board generators and shore power breaker was not installed, install safety interlock.
46 CFR 143.400 (a)
30AUG2023: Temporary repair authorized with permenant repair to be completed by September 29.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2023
Resolved 10 October 2023
Resolution: Safety interlock permanently installed on switchboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 July 2023
Resolved
Electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Non-conductive electrical matting was not located at the switchboard location, install non-conductive electrical matting.
46 CFR 143.400 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 August 2023
Resolved 30 August 2023
Resolution: non-conductive electrical matting placed under switchboard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 July 2023
Resolved
Extension cords must not be used as a permanent connection to a source of electrical power. The electrical connection from the water heater recirculation pump was made to a power strip and then to an outlet, make this electrical connection a permentate connection.
46 CFR 143.575(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 August 2023
Resolved 30 August 2023
Resolution: recirculation pump removed from hot water tank.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 June 2023
Resolved
The owner or managing operator must ensure that the towing vessel is in compliance with this subchapter and other applicable laws and regulations at all times. 3-4 foot section of fuel piping above ladder well leaving engine room to galley has "splash zone"/ epoxy covering it. Remove epoxy and make piping available for inspection. 46 CFR 137.120
46 CFR 143.255
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2023
Resolution: Permanent repairs were made. New 4' section of 3" seamless pipe was installed.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 21 April 2023
Resolved
No person may operate an oceangoing ship of 100 gross tons and above but less than 400 gross tons that is fitted with main or auxiliary machinery spaces unless The ship has a pump installed to discharge oily mixtures through a fixed piping system to a reception facility. Vessel does not have the required pumping arrangements as described. System shall not be used until vessel can meet requirements of 33 CFR 155.420.
Action required: 705 - Other - as specified
Resolved 1 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 August 2022
Resolved
Repair fuel oil leak for fuel transfer pump on starboard side of engine room. Vessel must maintain a watch on pump during transfer and remove all rags and absorption pads that have been used to clean up fuel leaked during transfer until leak is repaired.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 26 April 2023
Resolution: Vessel repaired fuel leak.
16 - International Ship & Port Facility Security (ISPS) › N/A - No Subsystem › Security drills
Issued 3 August 2022
Resolved
Vessel must conduct Secure drills onboard every 3 months.
Action required: 10 - Deficiency Rectified
Due 3 September 2022
Resolved 3 August 2022
Resolution: vessel completed drill.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 3 August 2022
Resolved
Replace all expired items in all first aid kits onboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 20 April 2023
Resolution: expired items were replaced.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 August 2022
Resolved
Vessel needs to prove proper operation of all installed Emergency lighting and must install emergency light in all crew living and working space to provide sufficient lighting to facilitate egress
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 26 April 2023
Resolution: Vessel installed emergency lighting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 August 2022
Resolved
Install guard over sight glass on fuel tank for winch engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 25 August 2022
Resolution: all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 August 2022
Resolved
Vessel needs to renew dry rotted/cracked fuel hose on both main engines coming off the fuel filter on the port side fwd of both main engines
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 25 August 2022
Resolution: all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 August 2022
Resolved
Find and repair exhaust leak on starboard main engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 25 August 2022
Resolution: all sat
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 August 2022
Resolved
Vessel must repair leaking fuel injector line on port main #7 outboard cylinder where fuel line attaches to the fuel pump block before using.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 August 2022
Resolved 3 August 2022
Resolution: Leaking fuel injector was repaired and engine operated leak free.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 August 2022
Resolved
Repair jacket water leak on starboard main inboard side fwd.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 25 August 2022
Resolution: all sat
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 3 August 2022
Resolved
Vessel must install permanent to prevent hot water circulating pump electrical ord from being crushed in door.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 25 August 2022
Resolution: vessel has removed pump.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 August 2022
Resolved
remove or properly terminate dead end wires. 1. starboard main engine in center v. 2. port main overhead by control box.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 September 2022
Resolved 20 April 2023
Resolution: wires were removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 June 2022
Resolved
Propulsion systems must be maintained to ensure proper operation. Vessel's propellers and tail shafts are near the end of their service life and require replacement. Company has ordered new propellers and tail shafts. Propellers and tail shafts shall be replaced no later than September 30, 2022. 46 CFR 143.205(c) 46 CFR 137.200(d)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2022
Resolved 8 August 2023
Resolution: Vessel provided PE stamped documents proving blue fit of props and shafts. See multiple documents and multiple activities for history of this CG835.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 May 2021
Resolved
A towing vessel that is certificated for limited coastwise, coastwise, oceans or waters beyond 3 nautical miles from shore on the Great Lakes, whose contract for construction was executed prior to August 27, 2003 must have either an approved 160-B semi-portable fire-extinguishing system to protect the engine room; or
a fixed fire-extinguishing system installed to protect the engine room. Vessel's engine room is protected by two 20-B:C CO2 fire extinguishers.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 May 2021
Resolved 13 September 2021
Resolution: Vessel has 160B semi-portable.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for rating for watchkeeping
Issued 4 May 2021
Resolved
At least 65 percent of the deck crew of these vessels, excluding individuals serving as officers, must be able seamen. Vessel has (02) ordinary seaman and (01) able seaman on board.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 4 May 2021
Resolved 7 May 2021
Resolution: Received information regarding the replacement AB.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 4 May 2021
Resolved
Each vessel subject to load line requirements shall carry on board a valid certificate attesting to compliance with such requirements. Vessel did not have the current Load Line Certificate on board.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 4 May 2021
Resolved 7 May 2021
Resolution: Received Load Line paperwork from ABS, which was issued to the vessel.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 May 2021
Resolved
Each towing vessel must be equipped with at least one fire axe that is readily accessible for use from the exterior of the vessel. Fire axe mounted within the space containing tow winch.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 6 May 2021
Resolution: Fire axe relocated to stern of vessel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2021
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Overhead wiring was not secured to installed cable runs with any retention devices.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 13 September 2021
Resolution: Overhead wiring is secured to installed cable runs with retention devices.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2021
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards.
Main switchboard did not have an interlock that would prevent the operator from simultaneously energizing the two generating sets or shore power.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 13 September 2021
Resolution: Vessel has appropriate interlock.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 May 2021
Resolved
Each towing vessel must be maintained and operated so as to minimize fire hazards. Fuel filters on board the vessel are not installed with flame impingement bowls as specified by the manufacturer for indoor use.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 13 September 2021
Resolution: Vessel installed flame impingement bowls.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 4 May 2021
Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford protection against hazards to life, property, and the environment. Overhead sewage piping in marine sanitation device (MSD) room has a sizable temporary repair to prevent of raw sewage.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 25 August 2022
Resolution: all sat
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 4 May 2021
Resolved
Each towing vessel operating in oceans and coastwise service must have a line throwing appliance approved under approval series 160.040 and auxiliary line as defined in 141.375(b)(2). Vessel does not have the line throwing appliance (4 lines w/ 4 charges) or the auxiliary line.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 13 September 2021
Resolution: Vessel has appropriate line devices and messenger line.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 4 May 2021
Resolved
The following alarms must be provided on each towing vessel: Main engine low lubricating oil pressure; Main engine high cooling water temperature; Auxiliary generator engine low lubricating oil pressure; and Auxiliary generator engine high cooling water temperature. Low Lube Oil Pressure alarms for both generators was malfunctioning. Other alarms were unable to be tested at the time of inspection.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 4 May 2021
Resolved 13 September 2021
Resolution: Vessel tested alarms, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 May 2021
Resolved
The design of the installed fire detection system and its installation on the towing vessel must be certified and inspected by a registered professional engineer with experience in fire-detection system design, by a technician with qualifications as a National Institute for Certification in Engineering Technologies (NICET) level IV fire alarm engineering technician, or by an authorized classification society with equivalent experience, to comply with paragraphs (a)(1) through (6) of this section. Fire detection system has not been certified and inspected by one of the above individuals.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 30 August 2021
Resolution: Rcvd Certified letter from C&T Fire stating Fire control panel verified by NICET IV.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 4 May 2021
Resolved
No person may operate an oceangoing ship of 100 gross tons and above but less than 400 gross tons that is fitted with main or auxiliary machinery spaces unless The ship has at least one pump installed to discharge oily mixtures through a fixed piping system to a reception facility. Vessel does not have the required pumping arrangements as described.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 10 May 2023
Resolution: Re-issued CG835 as a 705. Vessel shall not utilize system until it meets the requirments of 33 CFR 155.420.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 4 May 2021
Resolved
Each towing vessel must be fitted with an industrial type first aid cabinet/kit appropriate for the size of the crew and operating conditions. First aid kit on board the vessel contained all expired equipment.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 13 September 2021
Resolution: Vessel has current medication on board in a first aid cabinet.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 May 2021
Resolved
Vessel must be fitted with the appropriate day shapes that will be needed for all possible situations (3 balls and 1 diamond). Vessel does not have 3 balls and 1 diamond.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 13 September 2021
Resolution: Vessel has day shapes on board.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 4 May 2021
Resolved
For vessels over 79 feet in length that are under 300 GRT and do not have 8 cubic meters of ballast, a Permit Authorization and Record of Inspection (PARI) form will be filled out and kept on board the vessel. Vessel did not have a PARI form filled out.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 6 May 2021
Resolution: Master familiarized himself with the VGP requirements and filled out the PARI form.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 4 May 2021
Resolved
Operation in polar waters shall be taken into account, as appropriate, in the Garbage Record Book, Garbage Management Plan and the placards as required by
MARPOL Annex V. Vessel operates in polar waters but did not appear to have such regulations reflected in the Garbage Management Plan or Placards.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2021
Resolved 14 September 2021
Resolution: Vessel has arctic garbage management placards on board the vessel.
Fire Fighting › Combustible Materials › Grounds
Issued 21 December 2005
Resolved
Vessel had excessive oil in bilge.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2005
Resolution: Vessel had bilge pumped out and cleaned
Fire Fighting › Fixed Gas Fire Extinguishing System › Control Valve
Issued 21 December 2005
Resolved
Vessel had no fire detection system.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2005
Resolution: Vessel provided paperwork to prove successful installation of fire detection equipment in the engine room.