Records from 1986 to 2007. Most recent: operational control imposed, 16 March 2007.
Inspection history · 48
16 March 2007
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2889322
5 July 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2702306
28 March 2005
Re-Inspection · MTSA Verification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2318010
29 July 2004
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2148794
23 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1972157
6 January 2003
COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1725035
19 December 2002
Permit to Proceed
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1720736
30 November 2001
Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 773187
5 November 2001
Administrative
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1445895
5 June 2001
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 113982
1 April 2001
COI Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1408722
29 March 2001
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1456041
28 April 2000
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1389066
12 March 2000
Examination of Repairs
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1434998
28 February 2000
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 815686
10 February 2000
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1046541
9 February 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 711836
7 January 2000
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1410222
21 December 1999
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 814829
10 December 1999
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 205264
1 July 1999
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1085580
23 June 1999
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 881545
31 January 1999
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 186182
8 January 1999
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1426160
2 April 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 39355
10 March 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1120694
17 February 1998
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 683011
3 February 1998
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 89151
3 February 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 228104
29 January 1998
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 787978
10 January 1998
Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1461831
26 September 1997
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1411535
22 September 1997
Permit to Proceed
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 777867
2 September 1997
Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1398818
25 August 1997
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 683012
28 July 1997
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 131113
9 January 1997
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1413100
12 August 1996
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1459254
19 May 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 50784
19 May 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 218561
19 May 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 231387
15 August 1995
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1440968
28 March 1995
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1141614
27 March 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 176671
12 August 1994
Hull Examination · Inclining Experiment · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1398097
28 March 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 699183
25 March 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 497710
15 May 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1299926
Accommodation/Occupational Safety › Refrigeration (air conditioning)
Issued 4 February 2003
Resolved
Prove proper operation of ship's A/C & heating system. LEGACY COMPONENT DESC: Heating & A/C
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Construction/Loadline › Hull
Issued 4 February 2003
Resolved
Provide written report on double bottom (stbd) fuel tank being full of water. LEGACY COMPONENT DESC: Double Bottom Fuel Tanks
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Resolution: Leaking valve was properly tightened and line was air tested. Sat. Report in case file.
Documentation › Certificates/Documents
Issued 3 February 2003
Resolved
Provide valid cert. of class & loadline cert. LEGACY COMPONENT DESC: Coastwise Load Line Certificate
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Documentation › Logs/Records › Drug Test Records
Issued 3 February 2003
Resolved
Provide doc. of annual drug & alcohol testing audit by the USCG.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 4 February 2003
Navigation › Piloting/Steering › Marine Charts
Issued 3 February 2003
Resolved
Provide up to date marine charts.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Pollution Prevention/Response › Prevention Equipment
Issued 3 February 2003
Resolved
Provide piping diagram for OTPs. LEGACY COMPONENT DESC: Oil Transfer Procedures
Action required: 705 - Other - as specified
Resolved 4 February 2003
Navigation › Collision/Grounding Avoidance
Issued 3 February 2003
Resolved
Provide propoer ship's bell. Bell has 9" fracture. LEGACY COMPONENT DESC: Ship''s Bell
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 4 February 2003
Accommodation/Occupational Safety › Refrigeration (stores)
Issued 3 February 2003
Resolved
Prove proper operation of freezer & reefer distress buzzers. LEGACY COMPONENT DESC: Distress Buzzer
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 4 February 2003
Fire Fighting › Fixed Fire Detection System
Issued 3 February 2003
Resolved
Prove proper operation of fixed fire detection system. LEGACY COMPONENT DESC: Whole Thing
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Fire Fighting › Portable CO2 Fire Extinguisher › Location
Issued 3 February 2003
Resolved
Provide portable CO2 extinguisher for aft steering stand. Current extinguisher out of service date.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 4 February 2003
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 February 2003
Resolved
Fan room/Void space - provide cover for junction box in ovrhead and provide proper junction box for spliced 12 gauge wires.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 4 February 2003
Electrical › Electrical Distribution System (service) › Junction Box
Issued 3 February 2003
Resolved
Aft steering stand - provide cover for breaker box.
Action required: 705 - Other - as specified
Due 4 March 2003
Resolved 28 March 2005
Resolution: Installed.
Fire Fighting › Fire Hoses › Length
Issued 3 February 2003
Resolved
Provide one 50' section of UL approved fire hose, to meet COI requirements.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 4 February 2003
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 3 February 2003
Resolved
Secure leak to washing machine.
Action required: 705 - Other - as specified
Resolved 4 February 2003
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 3 February 2003
Resolved
Remove excess lint from dryer vent. LEGACY COMPONENT DESC: Dryer vent
Action required: 705 - Other - as specified
Resolved 4 February 2003
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 3 February 2003
Resolved
Adjust stbd E/R vent closure and renew bottom right hinge to stbd vent closure. LEGACY COMPONENT DESC: Ventilation CLosure
Action required: 705 - Other - as specified
Resolved 4 February 2003
Electrical › Electrical Distribution System (emergency)
Issued 3 February 2003
Resolved
Renew Electrical conduit (wasted) to all three feeds to emergency batteries aft of wheelhouse. LEGACY COMPONENT DESC: Battery Cable Feeds
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 4 February 2003
Lifesaving › Liferaft Equipment
Issued 3 February 2003
Resolved
Renew liferaft supports, port and stbd side. LEGACY COMPONENT DESC: Foundation Supports
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Stability › Watertight Integrity
Issued 3 February 2003
Resolved
Plug three bulkhead penetrations in watertight deck locker. LEGACY COMPONENT DESC: Watertight Bulkhead Penetrations
Action required: 705 - Other - as specified
Resolved 4 February 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 3 February 2003
Resolved
Renew/Remove wasted metal in on-deck hose rack. LEGACY COMPONENT DESC: Wasted Metal/Jagged Edge
Action required: 705 - Other - as specified
Resolved 4 February 2003
Electrical › Electrical Distribution System (service)
Issued 3 February 2003
Resolved
Re-label galley range disconnect. LEGACY COMPONENT DESC: Galley Range Disconnect
Action required: 705 - Other - as specified
Resolved 4 February 2003
Electrical › Lighting (service)
Issued 3 February 2003
Resolved
Provide suitable cover for old light opening in galley pantry. LEGACY COMPONENT DESC: Cover
Action required: 705 - Other - as specified
Resolved 4 February 2003
Electrical › Lighting (emergency)
Issued 3 February 2003
Resolved
Secure dangling wire to "E" light in Galley. LEGACY COMPONENT DESC: Wiring
Action required: 705 - Other - as specified
Resolved 4 February 2003
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 3 February 2003
Resolved
Prove proper operation of OWS.
Action required: 705 - Other - as specified
Resolved 4 February 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 3 February 2003
Resolved
Ensure E/R deck plates are secure. LEGACY COMPONENT DESC: E/R Deck Plates
Action required: 705 - Other - as specified
Resolved 4 February 2003
Electrical › Electrical Distribution System (service) › Wiring
Issued 3 February 2003
Resolved
Remove dead end wires in stack.
Action required: 705 - Other - as specified
Resolved 4 February 2003
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type 1
Issued 3 February 2003
Resolved
Proved acceptable method of securing MSD overboard.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 3 February 2003
Resolved
Conduct Fire & Boat Drills.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Engineering › Bilge Water Management System
Issued 3 February 2003
Resolved
Pump out water from all bilge spaces and prove proper operation of bow thruster high level bilge alarm. LEGACY COMPONENT DESC: Alarms
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 February 2003
Accommodation/Occupational Safety › Washroom/Toilet
Issued 3 February 2003
Resolved
Repair port side toilet on accom. and galley deck. Also thoroughly clean both heads. LEGACY COMPONENT DESC: Toilet
Action required: 705 - Other - as specified
Resolved 3 February 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 3 February 2003
Resolved
Remove/renew jagged edge to dogging wheel for stbd bridge watertight door. LEGACY COMPONENT DESC: Jagged Dogging Wheel
Action required: 705 - Other - as specified
Resolved 4 February 2003
Engineering › Pressure Vessel › Relief Valve
Issued 3 February 2003
Resolved
Properly install 100 psi or less relief valve on aft hot water heater, or have water heater inspected as a pressure vessel.
Action required: 705 - Other - as specified
Resolved 4 February 2003
Construction/Loadline › Structures › Machinery Space Opening
Issued 3 February 2003
Resolved
Repair as original design the structural underdeck members in E/R, or provide profesional engineer's report certifying structural acceptability of existing design of the E/R soft patch. LEGACY COMPONENT DESC: Deck Plating
Action required: 705 - Other - as specified
Due 28 March 2005
Resolved 28 March 2005
Resolution: Installed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 3 February 2003
Resolved
Secure fire monitor pump coupling guard.
Action required: 705 - Other - as specified
Resolved 4 February 2003
Construction/Loadline › Structures › Machinery Space Opening
Issued 3 February 2003
Resolved
Crop & renew wasted steel in walkway space in between E/R walkway and hot water heater space.
Action required: 705 - Other - as specified
Resolved 4 February 2003
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 6 January 2003
Resolved
Provide updated Fire Control Plan to cognizant OCMI for review and approval.
Action required: 705 - Other - as specified
Due 4 March 2003
Resolved 28 March 2005
Resolution: Reviewed and approved.
Unknown
Issued 1 April 2001
Resolved
Fasten deck plates in tunnel way, engineroom and steering gear room.
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Provide stability information to MSC by 9Apr01 for the carriage of the_x001C_ present cargo. Vessel is restricted to no more than 350 LT of cargo until_x001C_stability letter is amended by MSC._x001C_
Condition: Unknown
Due 1 April 2001
Resolved 1 April 2001
Unknown
Issued 1 April 2001
Resolved
Properly mount inboard light on STBD MDE, repair all broken defusers and _x001C_missing or extinguished bulbs. _x001C_
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Submit a repair proposal and make repairs to exhaust hangers in tunnel way that are broken. _x001C_
Condition: Unknown
Due 18 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Main switchboard: Install bus-tie bar, repair indicating lights and _x001C_ determine if plant is able to be paralleled._x001C_
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Repair anchor motor controller door.
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of liferaft and rescue boat lighting and ensure theyare wired IAW 46 CFR 111.75-16._x001C_
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of pressure relief valves on start air, bow thrusterand P-tanks._x001C_
Condition: Unknown
Due 18 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of remote shutdown valve to service tanks (3) on each side._x001C_
Condition: Unknown
Due 18 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Change documentation to reflect new service as a freight vessel or a letterfrom the documentation center stating it does not require the change._x001C_
Condition: Unknown
Due 1 April 2001
Resolved 1 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of paint locker fire protection system to the _x001C_ satisfaction of the attending marine inspector. Vessel is restricted from carrying flammable material in paint locker. _x001C_
Condition: Unknown
Due 18 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Conduct man overboard, abandon ship and fire drill to the satisfaction of_x001C_ the attending marine inspector._x001C_
Condition: Unknown
Due 11 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Provide drip pans for fuel strainers IAW 46 CFR 56.50-75(a)(1) on STBD MDE.
Condition: Unknown
Due 11 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Replace missing watertight door dog on portside deck locker.
Condition: Unknown
Due 11 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of all Lube oil, J/W and overspeeds on generators and MDE to the satisfaction of the attending marine inspector._x001C_
Condition: Unknown
Due 11 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Repair compass light.
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Stow and clean up all loose wires under helm.
Condition: Unknown
Due 11 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of sound powered phones in engineroom and steering _x001C_gear room._x001C_
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of fire detection system.
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Provide loading manual, diagram and stability booklet.
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Make proper repairs to lube oil transfer pump.
Condition: Unknown
Due 18 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Replace electrical matting by engineroom switchboard panel.
Condition: Unknown
Due 14 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Make proper repairs to QAWTD leading to steering gear room.
Condition: Unknown
Due 4 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Prove proper operation of rescue boat launching davit.
Condition: Unknown
Due 11 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Survey exhaust and repair leaks.
Condition: Unknown
Due 18 April 2001
Resolved 30 April 2001
Unknown
Issued 1 April 2001
Resolved
Repair exhaust lagging on STBD engine, wiring to pressure switch inboard, loose wiring on top of engine and start air valve._x001C_
Condition: Unknown
Due 11 April 2001
Resolved 30 April 2001
Deck/Cargo
Issued 29 March 2001
Resolved
Prove to the satisfaction of the Cognizant OCMI that the vessels satbility is sufficient to carry tractor trailers & other vehicles taller than 12 feet and with a VCG over 3 feet.
Condition: Unknown
Due 29 March 2001
Resolved 1 November 2001
Engineering
Issued 29 March 2001
Resolved
Survey the main engine exhaust system and repair leaks to the satisfaction of the Cognizant OCMI.
Condition: Unknown
Due 29 April 2001
Resolved 1 November 2001
Construction/Loadline
Issued 29 March 2001
Resolved
Ensure gauging shots 3, 60, 167, 274, 277, 280, 300, 316, 317, 414, 438, 439, 519, 545, 581, 899, 940, 1344, 1399, 1402, 1403, 1405 are shown on thereport drawings or detail their locations by frame number and location on the structural member.
Condition: Unknown
Due 29 April 2001
Resolved 31 January 2003
Construction/Loadline
Issued 29 March 2001
Resolved
Address all indications from gauging report dated winter 2001 where indications are 25% or greater.
Condition: Unknown
Due 31 October 2001
Resolved 31 January 2003
Construction/Loadline
Issued 29 March 2001
Resolved
Provide written plan to cognizant marine OCMI that details how all indications in the winter 2001 gauging report over 25% will be addressed.
Condition: Unknown
Due 29 April 2001
Resolved 31 January 2003
Engineering
Issued 12 March 2000
Resolved
PERFORM PERMANENT REPAIRS TO "NICKEL" SIZE PERFORATION IWO #3 STARBOARD FUEL TANK-TOP ON MAIN DECK.
Condition: Unknown
Due 12 March 2000
Resolved 12 March 2000
Lifesaving
Issued 7 January 2000
Resolved
DEMONSTRATE COMPLIANCE WITH THE USCG 8TH DISTRICT POLICY LETTER, RESCUE BOAT REQUIREMENTS ON OFFSHORE SUPPLY VESSELS DATED 12NOV98.
Condition: Unknown
Due 7 January 2000
Resolved 7 January 2000
Lifesaving
Issued 10 January 1998
Resolved
Install and demonstrate proper operation of rescue boat and associated necessary rigging to the satisfaction of the cognizant OCMI.
Condition: Unknown
Due 10 February 1998
Resolved 29 January 1998
Navigation
Issued 10 January 1998
Resolved
Establish and post magnetic compass deviation table.
Condition: Unknown
Due 10 January 1998
Resolved 10 January 1998
Engineering
Issued 10 January 1998
Resolved
Repair as required and prove proper operation of aft generator overspeed trip mechanism.
Condition: Unknown
Due 10 January 1998
Resolved 10 January 1998
Engineering
Issued 10 January 1998
Resolved
Properly stencil and pressure test all fuel oil and cargo transfer hoses prior to placing intoi service.
Condition: Unknown
Due 10 January 1998
Resolved 10 January 1998
Lifesaving
Issued 10 January 1998
Resolved
Augment existing General Alarm visual/audible alarm notification in Engine Room.
Condition: Unknown
Due 10 January 1998
Resolved 10 January 1998
Engineering
Issued 2 September 1997
Resolved
Repair/replace and satisfactorily test port main engine alarms.
Condition: Unknown
Due 2 September 1997
Resolved 5 January 1998
Engineering
Issued 2 September 1997
Resolved
Install fuel line brackets on port main engine to prevent fuel lines from rubbing against each other.charger casing the fire. Fuel line, elec. cable, and eng sensors replaced.
Condition: Unknown
Due 28 October 1997
Resolved 28 October 1997
Electrical
Issued 2 September 1997
Resolved
Replace damaged/burned six feet of electrical cable directly above port main engine.
Condition: Unknown
Due 2 September 1997
Resolved 5 January 1998
Engineering
Issued 12 August 1996
Resolved
PROVIDE PYREX SIGHT GLASS TO PORT D/O TANK.
Condition: Unknown
Due 12 August 1996
Resolved 12 August 1996
Lifesaving
Issued 12 August 1996
Resolved
PROVIDE PELICAN HOOKS ON BOTH LIFERAFTS.
Condition: Unknown
Due 12 August 1996
Resolved 12 August 1996
Engineering
Issued 12 August 1996
Resolved
PROVIDE INDIVIDUAL PRESSURE GUAGES TO PORT AND STBD AIR RECEIVERS.
Condition: Unknown
Due 12 August 1996
Resolved 12 August 1996
Electrical
Issued 12 August 1996
Resolved
REPLACE EMERGENCY LIGHT ENGINEROOM NEAR SWITCHBOARD.
Condition: Unknown
Due 12 August 1996
Resolved 12 August 1996
Navigation
Issued 12 August 1996
Resolved
RENEW OR INSERT STBD RUDDER POST INBOARD FLANGE BRACKET.
Condition: Unknown
Due 12 August 1996
Resolved 12 August 1996
Engineering
Issued 12 August 1996
Resolved
CLEAN OR REPLACE ALL MAINDECK VENT FLAMESCREENS.
Condition: Unknown
Due 12 August 1996
Resolved 12 August 1996