Documentation record
Registered dimensions (L × B × D)78.7 ft × 27.0 ft × 11.5 ft
Registered tonnagegross 95 / net 77
ITC dimensions (L × B × D)78.7 ft × 27.0 ft × 11.5 ft
ITC tonnagegross 178 / net 53
BuilderR & S FABRICATION INC · LOCKPORT, LA, UNITED STATES · built 1999
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 16 September 2025 · expires 31 October 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it95 - Regulatory (Subpart C or D), Gross Ton
178 - Convention (Subpart B), Gross Ton
77 - Regulatory (Subpart C or D), Net Ton
53 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 26
21 December 2025
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8286135
18 July 2024
Drydock Extension · Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7961195
3 July 2024
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7941396
10 June 2024
TPO Audit
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7958706
7 July 2023
Administrative Inspection
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7736176
8 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7329097
7 September 2021
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7306680
29 April 2021
Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7185324
18 July 2019
Administrative Inspection · Initial Certification
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6750440
9 July 2019
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6743180
19 January 2017
Administration · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6073316
3 January 2017
Industry Initiated Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6063933
19 February 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5824154
11 July 2014
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4918697
20 August 2013
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4697928
17 November 2008
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3365574
29 May 2008
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3365939
16 May 2008
Uninspected Other
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3208554
16 November 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2822157
5 April 2005
Administrative Inspection
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2332531
28 March 2005
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2323038
27 July 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2146512
30 January 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1998653
18 October 2002
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1692433
18 October 2002
Type not recorded
No type recorded · Station Little Creek · USCG East District (CGD-E) · Activity 1692438
18 October 2002
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1719415
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 December 2025
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems must: be maintained to ensure proper operation. Starboard shaft/propeller not operational. Vessel required assist tug(s) of sufficient size and power for transit inbound St. Johns river. Once tow is released, vessel may proceed to Stevens Towing Company in SC to conduct repairs to the satisfaction of TPO or Coast Guard.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 January 2026
Resolution: TVIB submitted report for repairs.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 April 2021
Resolved
Stbd Kort nozzle has been removed during non-credit dry-dock. Company did not inform CG of major repair. Company did not notify TPO in accordance with CVC-WI-029 (1). Re-install nozzle. Required attendance by CG and RO
46 CFR 137.315 46 CFR 137.325
Action required: 705 - Other - as specified
Due 31 July 2021
Resolved 14 May 2021
Resolution: TVIB recommended to complete repair and re-install kort nozzle at next DD.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 April 2021
Resolved
Noticed crack in weld on hull with water seeping from crack. Provide repair proposal. To be cleared by CG and TPO
46 CFR 137.330
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: Crack repaired and tested.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 29 April 2021
Resolved
Structural member located in stbd side lazarette was found rotted. Provide repair proposal to crop and renew. To be cleared by CG and RO
46 CFR 137.330
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: Vessel cropped and renewed structural member in stbd side lazarette.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 29 April 2021
Resolved
Found bilge piping leading to sea chest holed. Provide repair proposal to crop and renew pipe. To be cleared by CG and RO
46 CFR 143.270
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: bilge piping was replaced.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 29 April 2021
Resolved
Found fire main piping in engine room leading to hydrant riser and overboard holed. Provide repair proposal to crop and renew pipe. To be cleared by CG and RO
46 CFR 143.270
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: fire main piping was replaced and tested on pump working suction pressure.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 April 2021
Resolved
Potable water pipe above stbd generator leaking and creating an electrical hazard. Provide repair proposal to crop and renew pipe. To be cleared by CG and TPO
46 CFR 143.270
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: Potable water pipe above stbd generator was replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 29 April 2021
Resolved
Bilge pick up in stbd side lazarette has rotted through and is no longer attached. Bilge will not work properly in this space. Provide repair proposal to crop and renew pipe. To be cleared by CG and RO
46 CFR 143.270 46 CFR 143.275
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: Port and stbd bilge pick up piping cropped and renewed with check valve installed.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 April 2021
Resolved
If the cognizant OCMI has reasonable cause to believe that a vessel's survey program is deficient, that OCMI may require an audit or survey of the vessel in the presence of a representative of the cognizant [name withheld] on the overall materiel condition of the vessel as substantiated by the objective evidence cited, an additional external verification is required. Company is required to complete a vessel survey. Based on the vessel survey it will be determined by the OCMI to require a complete or partial vessel audit.
46 CFR 137.212
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: Completed survey
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 April 2021
Resolved
The TPO and the owner or managing operator may be required to explain or otherwise demonstrate areas of the TSMS to the Coast Guard if there is evidence that a TSMS, for which a TSMS certificate was issued, is not in compliance with the provisions of this part. The cognizant OCMI is requiring the TPO's attendance to complete an external vessel survey. Based on the vessel survey it will be determined by the OCMI to require a complete or partial vessel audit.
46 CFR 138.510
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 May 2021
Resolution: TPO completed vessel survey
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 31 July 2019
Resolved
Conduct targeted external audit as per CG-835V. CG-835V uploaded into documents.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 August 2019
Resolved 8 October 2019
Resolution: Received and review audit provided by TVIB.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 18 July 2019
Resolved
Fire servicing for panel is expired. provide current inspection.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: Provided objective evidence iwo servicing report.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 July 2019
Resolved
Provide drug consortsum (last approved on board was 2014)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: Provided current Drug and Alchol Consortsum.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 July 2019
Resolved
Flam storage locker is constructed of aluminum as found during survey 10 Jan 2019. install steel locker
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: New locker installed
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 July 2019
Resolved
Port handrail cracked located outside of handrail.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: Handrail welded by crew
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 18 July 2019
Resolved
Upper pilot house (crows nest) grating not properly supported and missing fasteners throughout.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: New fasteners installed
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 18 July 2019
Resolved
life raft tied to mounting brakcet and mounting bracket was not bolted to deck.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: Corrected on the spot, and properly installed/mounted.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 July 2019
Resolved
CO2 ext. flam locker mounting bracket wasted in half.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: new mounting bracket installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 July 2019
Resolved
Steering mounting bracked LAZ wasted.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: New bracket installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 July 2019
Resolved
Shafts missing lock nuts
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: new lock nuts installed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 18 July 2019
Resolved
fwd port WTD missing securing pins and missing gsk at top
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: New gsk installed and pins installed
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 18 July 2019
Resolved
EPIRB mounting bracket loose
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2019
Resolved 16 August 2019
Resolution: New mounting hardware installed