Records from 2007 to 2026. Most recent: inspection, 7 August 2026.
Inspection history · 157
7 August 2026
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8457603
30 July 2026
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8450294
24 July 2026
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8445849
18 July 2026
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8441127
16 July 2026
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8439409
11 July 2026
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8435381
7 July 2026
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8432203
6 July 2026
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8430364
19 May 2026
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8376616
29 April 2026
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8357938
31 March 2026
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8338684
31 March 2026
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8344735
2 February 2026
Deficiency Check · Vessel Attendance · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8309659
5 January 2026
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8290420
16 December 2025
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8284743
9 December 2025
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8281538
3 December 2025
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8277543
27 October 2025
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8259214
14 October 2025
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8251956
10 September 2025
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8231610
22 August 2025
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8215757
30 July 2025
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8198570
18 June 2025
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8162202
25 May 2025
Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8143657
22 May 2025
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8141587
25 April 2025
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8120142
10 April 2025
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8109730
8 April 2025
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8107994
6 April 2025
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8105806
1 April 2025
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8103092
27 January 2025
Annual Inspection · Annual Survey · Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8070309
8 January 2025
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 8059967
6 January 2025
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 8059005
20 November 2024
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8037852
17 November 2024
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8035797
10 November 2024
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8033172
7 November 2024
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8032197
6 November 2024
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8032022
4 November 2024
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8029531
27 September 2024
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 8011278
23 September 2024
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 8007751
17 August 2024
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7983472
12 August 2024
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7980899
4 August 2024
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7974148
25 July 2024
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7967212
22 July 2024
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7964669
21 July 2024
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7963612
19 July 2024
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7962155
14 July 2024
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7957852
8 July 2024
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7952929
6 July 2024
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7950458
28 June 2024
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7944922
11 June 2024
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7932373
29 May 2024
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7922773
28 May 2024
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7922011
13 May 2024
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 7911232
6 May 2024
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7907330
22 April 2024
Administrative Inspection
Administrative · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7899391
24 March 2024
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7884094
24 March 2024
Type not recorded
No type recorded · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7885199
5 February 2024
In-Service Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7861138
16 January 2024
Administrative Inspection · Damage Survey
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7849600
16 January 2024
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7849936
20 December 2023
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7840972
7 December 2023
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7836704
6 December 2023
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7836148
5 December 2023
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7834135
21 November 2023
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7828063
2 November 2023
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7819386
23 October 2023
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7813168
6 October 2023
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7805048
24 August 2023
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7775584
23 August 2023
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7774968
23 August 2023
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7775989
10 August 2023
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7764800
10 August 2023
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7770366
8 August 2023
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7762948
8 August 2023
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7763660
6 August 2023
Damage Survey
Physical examination · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7761460
6 August 2023
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7762322
27 July 2023
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7753417
24 July 2023
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7751463
10 July 2023
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7738332
14 June 2023
Deficiency Check
Physical examination · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7715348
17 May 2023
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7690963
23 January 2023
In-Service Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7637942
11 January 2023
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7639538
11 January 2023
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7639540
2 January 2023
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7615741
17 October 2022
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7579204
2 September 2022
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7549432
29 August 2022
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7546274
17 August 2022
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7536239
5 August 2022
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7525245
5 August 2022
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7525304
1 August 2022
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7522199
30 July 2022
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7521950
29 July 2022
Administrative Inspection
Administrative · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7519806
11 April 2022
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7428486
16 February 2022
In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7402105
11 February 2022
Administrative Inspection · Drydock Extension
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7400660
17 January 2022
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7381905
14 January 2022
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 7380410
12 January 2022
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7379879
24 December 2021
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7372548
30 November 2021
Special · Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7360273
9 November 2021
Administrative Inspection · Special · Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7348693
5 November 2021
Administrative Inspection
Administrative · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7346316
5 October 2021
Administrative Inspection
Administrative · Sector Lake Michigan · USCG Great Lakes District (CGD-GL) · Activity 7327227
30 September 2021
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7323639
15 September 2021
Administrative Inspection · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7328425
5 September 2021
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7306259
20 August 2021
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7292306
13 July 2021
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7254807
7 July 2021
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7248526
6 June 2021
Administrative Inspection
Administrative · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7218732
18 January 2021
COI Inspection · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7126201
1 December 2020
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 7105542
21 September 2020
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 7062059
8 September 2020
Deficiency Check
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 7052908
17 May 2020
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6956655
16 May 2020
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6954365
13 May 2020
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6955122
7 April 2020
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6937413
31 March 2020
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6933530
12 February 2020
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6911532
30 January 2020
In-Service Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6911790
7 January 2020
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6884025
4 January 2020
Administrative Inspection
Administrative · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6883182
13 December 2019
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6878259
25 September 2019
Type not recorded
No type recorded · Station Sault Ste Marie · USCG Great Lakes District (CGD-GL) · Activity 6821174
11 September 2019
Damage Survey
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6809091
18 July 2019
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6754322
12 July 2019
Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6747480
1 May 2019
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 6674390
27 March 2019
MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6652444
25 January 2019
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6622264
29 November 2018
In-Service Inspection
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6589032
19 August 2018
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6517900
24 July 2018
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6491199
23 June 2018
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6453129
13 June 2018
Type not recorded
No type recorded · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6463892
21 May 2018
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6420319
22 March 2018
Annual Inspection · In-Service Inspection · MTSA Verification · Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6376009
2 February 2018
Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 6349573
22 January 2018
In-Service Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6377133
28 September 2017
Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6277177
23 August 2017
Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Duluth · USCG Great Lakes District (CGD-GL) · Activity 6249767
7 August 2017
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6233003
5 August 2017
Damage Survey
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6230889
24 January 2017
Internal Structural Exam · Annual Inspection · COI Inspection · Drydock Exam · Deficiency Check · Examination of Repairs · MTSA Verification
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 6144262
12 October 2016
Administrative Inspection
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 6020719
11 April 2016
In-Service Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5851691
6 April 2016
Deficiency Check · COI Inspection · Examination of Repairs · MTSA Verification
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5826347
4 March 2016
Administrative Inspection
Administrative · USCG Great Lakes District (dp) · USCG Great Lakes District (CGD-GL) · Activity 5826944
1 February 2016
Liferaft Servicing
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5807136
7 January 2016
Drydock Extension
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 5792959
01 - Certificates & Documentation › 012 - Crew Certificates › Manning specified by the minimum safe manning doc
Issued 7 July 2026
Resolved
Vessel Master made notification to MSU Chicago extension of crew shortage due to the consent based discharge of an Able Seaman at Sault Sainte Marie, MI. A replacement has been found but is awaiting medical clearance to join the vessel. Master shall ensure 3-watch system is maintained, work/rest requirements are met, and all maintenance is performed in accordance with SMS. Master attests to be sufficiently manned and that work/rest requirements will be met for the voyage between Gary, IN and Two Harbors, MI. Prior to departing Two Harbors, MI a replacement with the same or greater credential shall be found for the vacancy.
If no replacement is found, the master/operator must provide a new request to the cognizant OCMI with a new Temporary Manning Requests Checklist (D9-WI-DOM-009(01)-F(01)).
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 11 July 2026
Resolution: Vessel master confirmed replacement AB reported aboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 February 2026
Resolved
Non metallic fleixble hose must be in accordance with SAE J1942. The type of flexible fuel hoses used on E-GEN and other machinery must have fire sleeve IAW SAE J1942 (incorporated by reference).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2026
Resolved 29 April 2026
Resolution: Verified approved fuel hose installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 February 2026
Resolved
Where fire extinguishing systems or equipment are
installed but not required, the systems or equipment
must meet the requirements of this part. The SCBAs
malfunctioned during the fire drill. SCBAs must be
replaced or inspected by certified 3rd party prior to
departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 27 February 2026
Resolved 27 March 2026
Resolution: Captain provided evidence that the SCBAs were replaced and tested by a 3rd party.
01 - Certificates & Documentation › 012 - Crew Certificates › Manning specified by the minimum safe manning doc
Issued 30 July 2025
Resolved
Vessel Master notified Sector Eastern Great Lakes OCMI of a non-consensual crew shortage of the 1st assistant engineer. Master shall ensure a 3-watch system is maintained and work/rest requirements are met. Master attests to be sufficiently manned, that a 3-watch system will be maintained, and that work/rest requirements will be met. Prior to 8/01/2025 departure from Conneaut, OH with a tentative port schedule of Superior, WI a replacement with the same or greater credential of a 1st assistant engineer shall be found for the vacancy.
If no replacement is found prior to departure from Conneaut, the master must provide notification to the cognizant OCMI and resubmit the District 09, Temporary Manning Request Checklist: D9-WI-DOM-009(01)-F(01).
46 CFR 15.515(a)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 August 2025
Resolved 8 August 2025
Resolution: The ship is in compliance with the manning required on its COI. The deficiency is cleared.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 May 2025
Resolved
All piping, valves, and fittings shall meet the applicable requirements of subchapter "F" (Marine Engineering) of this chapter. The fire main piping on starboard side forward weather deck has a temporary flexible repair joint installed. Vessel shall have origional expansion joint repaired and installed removing the current temporary repair. The permanent repaired installation of rebuilt expansion joints shall be hydrostatic tested at 1 1/2 times the designed max allowable working pressure of the vessel fire main piping system prior to departure from next port in Superior, WI / Duluth, MN area. Testing shall be witnessed by the local OCMI.
46 CFR 95.10-15(a)
46 CFR 56.97-40(a)(7)
Action required: 705 - Other - as specified
Resolved 25 May 2025
Resolution: Final repair made, fire main at 120 psi, no leaks
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 6 April 2025
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 10 April 2025
Resolution: Received notification from vessel Master that the AB position was filled on 4/9/25.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 March 2025
Resolved
Each safety valve for a boiler must be tested at the interval specified by table 1 to § 61.05-10. The Safety Valve on the inboard boiler is not functioning properly. Inboard boiler is not to be used until USCG witnesses a successful test of the safety valve.
46CFR61.05-20
Action required: 705 - Other - as specified
Due 24 March 2025
Resolved 25 April 2025
Resolution: CG witnessed proper test of valve.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 24 March 2025
Resolved
All rotating machinery capable of injuring personnel must be provided with adequate covers or guards. Guards on the front of the main engines have been removed for ease of adjusting the stretch of the new belts.
46CFR58.01-20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 25 April 2025
Resolution: Guards were baclk in place.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 March 2025
Resolved
Exhaust systems must be suitably insulated or cooled, by means of lagging. The STB Inboard M/E lagging on the exhaust system is removed for ease of torquing down the new bolts.
46CFR58.10-15(c)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 25 April 2025
Resolution: Lagging put back in place.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 24 March 2025
Resolved
The inspection shall be such as to insure that the vessel, as regards lifesaving appliances is in satisfactory condition and fit for the service for which it is intended. Unable to lower the lifeboat, or conduct a MOB drill on the vessel due to ice in the water.
46CFR91.25-10
46CFR97.15-35
46CFR199.45(b)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 25 April 2025
Resolution: Conducted MOB drill and manuvered lifeboat in the water.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 March 2025
Resolved
All piping, valves, and fittings shall meet the applicable requirements of subchapter F. The Fire main on deck, both port and STB side had a leak from an installed expansion joint.
46 CFR 95.10-15(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 April 2025
Resolved 22 May 2025
Resolution: MSU Chicago visited vessel, cleared this deficiency, issued new deficiency to correct temp repairs and test.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 March 2025
Resolved
Firehose must be connected to the outlets at all times. Fire houses throughout the house and engine room were not hooked up.
46 CFR 95.10-10(h)
Action required: 10 - Deficiency Rectified
Due 24 March 2025
Resolved 24 March 2025
Resolution: Connected hoses
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 24 March 2025
Resolved
Each section of firehose must be lined commercial firehose that conforms to Underwriters' Laboratories, Inc. Standard 19 or Federal Specification ZZ-H-451E. Two fire hoses were leaking and must be replaced.
46 CFR 95.10-10(n)(3)
Action required: 10 - Deficiency Rectified
Due 24 March 2025
Resolved 24 March 2025
Resolution: Replaced hoses.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 March 2025
Resolved
Each vessel must carry a lifejacket for each person on board. Vessel's COI requires 44 lifejackets, and the vessel only had 26 ready.
46 CFR 96.06-1
46 CFR 199.70(b)
Action required: 10 - Deficiency Rectified
Due 24 March 2025
Resolved 24 March 2025
Resolution: Vessel added required number of lifejackets to service.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 24 March 2025
Resolved
Each cargo vessel must carry an immersion suit approved under approval series 160.171 of an appropriate size for each person on board. Vessel's COI requires 44 immersion suits, and the vessel only had 34 ready.
46 CFR 96.06-1
46 CFR 199.273(a)
Action required: 10 - Deficiency Rectified
Due 24 March 2025
Resolved 24 March 2025
Resolution: Vessel added required number of immersion suits to service.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 March 2025
Resolved
lifebuoys on the vessel must each be fitted with a self-igniting light approved under approval series 161.010. The lights attached to the life rings listed battery type to be used as Lithium, and that Alkaline batteries must not be used. All batteries found in the lights were Alkaline batteries.
46 CFR 199.70(a)(3)(ii)
Action required: 10 - Deficiency Rectified
Due 24 March 2025
Resolved 24 March 2025
Resolution: Vessel replaced all alkaline batteries with lithium batteries.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 24 March 2025
Resolved
Lifeboat in Great Lakes Service must carry at a minimum 6 hand flares, and 4 rocket parachute flares. Vessel only had 6 had flares in their lifeboat.
46CFR199.175
46CFR199.620(j)
Action required: 10 - Deficiency Rectified
Due 24 March 2025
Resolved 24 March 2025
Resolution: Vessel added 4 rocket flares to their lifeboat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 January 2025
Resolved
A Survey, either general or partial, according to the circumstances shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of the lifesaving appliances, firefighting or other equipment, or whenever any important repairs of renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this sub-chapter. The vessel self reported that both of the STBD main engines de-clutched from the reduction gear for an unknown reason resulting in a reduction of propulsion. Vessel may be required tug escort when transiting through restricted or congested waterways/ports and is to provide class report attesting to repair that was completed by ships crew.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2025
Resolution: rcvd email from master attesting to repair.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 May 2024
Resolved
All engine installations shall be suitable for the intended service, and designed and constructed in conformance with subchapter F. Vessel Master made notification of starboard inboard engine clutch de-clutching and having issues. Vessel allowed to proceed directly to next port of call in Conneaut, OH and shall rectify prior to departure from Conneaut, OH.
46 CFR 58.10-5(a)
46 CFR 58.10-10(a)
Action required: 705 - Other - as specified
Resolved 29 May 2024
Resolution: The test of the inboard STBD MDE's clutch was satisfactory and the deficiency is cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 March 2024
Resolved
In addition to the emergency power source required under part 112 of this chapter, each self-propelled vessel must have at least two electric generating sources. Vessels reported the Port generator malfunctioned and is not currently operational.
46CFR90.25-1
46CFR111.10-3
17a, c
Action required: 17 - Rectify deficiencies prior to departure
Due 24 March 2024
Resolved 29 March 2024
Resolution: Received report from class attesting to proper repair of the generator.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 March 2024
Resolved
All fire main piping, valves, and fittings shall meet the applicable requirements of Subchapter F (Marine Engineering). While conducting a pressurized test of the fire main, several major leaks were identified throughout the system: on the main deck port side at the expansion joint and port side unloading tunnel.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 20 March 2024
Resolved 21 March 2024
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 20 March 2024
Resolved
Each cargo vessel must carry an immersion suit approved under approval series 160.171 of an appropriate size for each person on board and enough immersion suits stowed at the watch stations, work stations, or work sites to equal the number of persons normally on watch in, or assigned to, those locations at any time. Found immersion suits throughout the vessel to be wasted and out of service; condemned 11 immersion suits.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 20 March 2024
Resolved 21 March 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 March 2024
Resolved
Each cargo vessel must carry the number of lifebuoys associated with the prescribed table. 02 lifebuoys were wasted and condemned.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 20 March 2024
Resolved 20 March 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 March 2024
Resolved
Each vessel shall have an installed fire main, hoses, and hose accessories that shall be capable of delivering an adequate supply of water to all portions of the vessel. During pressure test of the fire hoses, 02 fire hoses ruptured and were condemned.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 20 March 2024
Resolved 20 March 2024
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 20 March 2024
Resolved
All fire main piping, valves, and fittings shall meet the applicable requirements of Subchapter F (Marine Engineering). While conducting a pressurized test of the fire main, several minor leaks were identified throughout the system: on the main deck in various locations at hydrant valves and expansion joints, and in the accommodation space at the hydrants.
List of valves the need to be repaired or replaced:
Location: Fire Station
Engine Room: 21, 22
Accommodations: Galley STBD, Captain's Office STBD, Pilot [name withheld] Port: Valve IVO of CH #24, Expansion joint IVO of CH #24 aft
Main Deck Stbd: Expansion joint IVO of CH #5, Valve IVO of CH #6 & 7, Valve IVO of CH #9 & 10, valve IVO of CH #24, and Valve IVO of CH #30.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2024
Resolved 2 May 2024
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 20 March 2024
Resolved
There are a significant amount of improper or damaged cable penetrations in class A structural fire boundaries. Areas include stair towers, machinery space to accommodation boundaries, decks, overheads, etc. Cable penetrations in class A boundaries shall be of an approved type and meet class A standard. Many of the multi-cable transits have had the blocks drilled out and improperly modified. This vessel is to be fully survey for these failures. ALL cable penetrations are to be corrected with approved material IAW their manufactures instructions. Penetration seals must meet testing in FTP Code under approval series 164.138, or ASTM E-814. To be completed no later than 18MAY2024.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 May 2024
Resolved 12 June 2024
Resolution: All openings were satisfactorily closed w/ASTM E-814 approved sealant. The deficiency is closed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 20 March 2024
Resolved
The stern thruster was found to have significant hydraulic leakage coming from the shaft seal. This creates numerous hazards and indicates that the system is not operating as designed. The cause and proper repair are to be identified and then corrected. The stern thruster may not be used until repairs are made. To be completed no later than 18MAY2024.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 May 2024
Resolved 29 May 2024
Resolution: The stern thruster is not in use until the seal is replaced. Since the unit is INOP, there is no leak, or hazard present. As an unregulated piece of equipment, this deficiency is cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 March 2024
Resolved
Each lifejacket must have a lifejacket light securely attached to the front shoulder area of the lifejacket. Numerous lights were found damaged and expired batteries. Renew.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2024
Resolved 20 March 2024
Resolution: Lifejacket lights were corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 20 March 2024
Resolved
Each immersion suit must have a lifejacket light securely attached to the front shoulder area of the immersion suit. Numerous lights were found with broken lights or wasted batteries. Renew.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2024
Resolved 21 March 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 March 2024
Resolved
Retroreflective material must be capable of being attached to lifesaving equipment either by mechanical fasteners or by an adhesive. Numerous lifebuoys throughout the vessel were found with wasted, torn, or missing retroreflective tape.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2024
Resolved 21 March 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 March 2024
Resolved
A sufficient number of lifejackets must be carried for persons on watch and for use at remotely located survival craft stations. Storage for the forward lifejacket and immersion suit was used as a waste receptacle.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 20 March 2024
Resolved 21 March 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 March 2024
Resolved
The engine room exhaust fan stbd 15 amp breaker's toggle is broken off. Replace the toggle in kind and demonstrate proper operations.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 21 March 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 March 2024
Resolved
Alterations and modifications, such as re-engining, re-powering, or replacing extensive amounts of cabling, must comply with the regulations in this subchapter. Forward anchoring space has modifications made to distribution panel with no preventions made to prevent hazards to personnel.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2024
Resolved 21 March 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 March 2024
Resolved
All electrical equipment must be designed and installed to operate for the particular location and environment in which it is to be used. Deck lighting was found with broken covers, missing lights, and broken stanchions. Make permanent repairs to the deck lighting system.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 21 March 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 20 March 2024
Resolved
Each lifeboat must be plainly marked with Type II retro-reflective, and placed on the boat to meet the arrangement requirements in IMO Resolution A.658(16). Retroreflective tape on lifeboat was wasted. Renew.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 2 May 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 March 2024
Resolved
Each lifejacket and immersion suit container must be marked in block capital letters and numbers with the quantity, identity, and size of the equipment stowed inside the container. Containers were not marked with quantity.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 2 May 2024
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 20 March 2024
Resolved
Detectors and other notifying devices must be of approved types. Smoke detectors were not equipped with approved batteries per the manufacturer's instructions.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 21 March 2024
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 20 March 2024
Resolved
Closures for hull openings at or below the freeboard deck must be as strong as the structure to which they are attached and must be watertight. Gaskets on closure devices in the forward anchoring compartment were found wasted, soiled, and missing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 2 May 2024
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 20 March 2024
Resolved
Manholes and flush scuttles within any superstructure other than an enclosed superstructure must have permanently attached covers. Forward entrance to the anchoring space is missing the gasket on the dead cover.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 21 March 2024
08 - Alarms › N/A - No Subsystem › General alarm
Issued 20 March 2024
Resolved
In the engine room near the changing room on the port side, the rotating general alarm beacon is not functionly correctly. Replace the beacon with a properly functioning rotating or flashing red light.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 April 2024
Resolved 2 May 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 March 2024
Resolved
All electrical equipment must be designed and installed to operate for the particular location and environment in which it is to be used. Exposed wiring was found on the stbd side of main deck IVO cargo hold #21.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 April 2024
Resolved 2 May 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 20 March 2024
Resolved
The life boat is due for weight testing. To include light weight, full weight, and a 1.1x B weight dynamic test of the davits and release mechanisms. At the conclusion of the testing, the life boat is to be lowered and operated by the crew to demonstrate a man overboard drill.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 April 2024
Resolved 2 May 2024
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 20 March 2024
Resolved
Each lifesaving appliance, including lifeboat equipment, must be inspected monthly using the checklists to make sure the appliance and the equipment are complete and in good working order. A report of the inspection, including a statement as to the condition of the equipment, must be recorded in the vessel's official logbook. As evidence by the above deficiencies, owner/operator shall ensure the implementation of monthly inspection program with associated records.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 April 2024
Resolved 2 May 2024
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 20 March 2024
Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel's firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced. As evidence by the above deficiencies, owner/operator shall ensure the implementation of an inspection program with associated records.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 April 2024
Resolved 2 May 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 January 2024
Resolved
Vessel reported a partial loss of propulsion to both port side main engines. Both starboard main engines remain fully operational. The port main engines would not go above "idle" level RPMs causing their inability to provide additional propulsion. It is suspected/reported that the selector valve (pneumatic) for CPP pitch to shaft RPM integrator failed allowing CPP to pitch as commanded but RPMs not to increase. Air leakage from the valve is suspected. Correct prior to departure from Indiana Harbor, IN.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 January 2024
Resolved 17 January 2024
Resolution: Vessel has made repairs and had ABS surveyor oversight over repair examination and testing. See ABS report. This was to the satisfaction of local OCMI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 November 2023
Resolved
Inboard auxiliary boiler #76-81 failed hydrostatic test as indicated by a leak in the lower inboard tube at the aft end of the boiler. Vessel to complete permanent repair (tube-replacement) and demonstrate satisfactory post-repair hydrostatic test. Inboard boiler to remain out of service until these conditions are met and approved by the USCG.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 27 November 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 November 2023
Resolved
Both auxiliary boilers are overdue for safety relief valve testing. Complete above tests in the presence of a USCG Marine Inspector prior to bringing both boilers back into normal service.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 13 March 2024
Resolution: Outboard boiler safety tested 15DEC in activty # 7834135. Inboard safety valve tested 13MAR2024.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 November 2023
Resolved
Both auxiliary boilers are overdue for annual automation testing. Complete above tests in the presence of a USCG Marine Inspector prior to bringing both boilers back into normal service.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 December 2023
Resolved 15 December 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 August 2023
Resolved
A survey, either general or partial, according to the circumstances, shall be made every time a defect is discovered which affects the efficacy of its equipment. [name withheld], was notified of a reduction in propulsion due to the loss of the turbo on the port inboard main diesel engine, resulting in the shut down of the inboard shaft generator. Vessel shall submit class report to [name withheld] prior to departing Superior, WI.
Vessel authorized to move to CN Dock in Duluth, MN for completion of repairs with tug assistance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 August 2023
Resolved 22 August 2023
Resolution: Turbo Replaced.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 July 2023
Resolved
Fire hazards are to be minimized insofar as is reasonable. The turbo chargers on the STBD Outboard MDE is missing the insulation. Must install new, fitted insulation within 90 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 October 2023
Resolved 22 August 2023
Resolution: Lagging replace.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 July 2023
Resolved
All marine engineering details such as piping, valves, fittings, boilers, pressure vessels, etc., and their appurtenances installed on the vessel, shall be designed, constructed, and installed in accordance with the provisions of sub chapter F (Marine Engineering) of this chapter. The starboard shaft generator overheated due to a faulty cooling pump and was shut down rendering the bow and stern thrusters inoperable. Effect permanent repairs prior to departing Conneaut, OH and ensure the bow is manned during transit in case of emergency anchor deployment. Utilize tug assist while conducting mooring evolution at next port of call.
Action required: 705 - Other - as specified
Due 24 July 2023
Resolved 28 July 2023
Resolution: MSU [name withheld] cleared deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 July 2023
Resolved
Port shaft generator (generator side) apparently has suffered catastrophic ground failure. Effect permanent repairs or replace as necessary.
Action required: 705 - Other - as specified
Due 22 January 2024
Resolved 20 March 2024
Resolution: Vessel has been in lay-up since the due date of 835. Verified new port shaft gen install and proper operation while taking loads from the bow thruster. No issues noted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 June 2023
Resolved
Vessel reported cylinder head defect/malfunction for port outboard main diesel engine (POMDE). Initial diagnosis and repair by engineering crew unsuccessful. Vessel intends to have shoreside maintenance facility effect repairs upon arrival in [name withheld].
Make necessary repairs to POMDE and provide objective evidence to [name withheld] that the POMDE is fully functional.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2023
Resolved 15 June 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 January 2023
Resolved
Due to issues encountered during attempted hydro testing and time constraints the operator of the vessel has asked to defer all required auxiliary boiler inspections until 1NOV23. Both aux boilers are due for fireside, waterside, hydro, automation testing, safety relief valve testing, and all boiler mounts (first off valves) must have their bonnets removed/opened for valve inspection. A fireside inspection was conducted during this lay-up period but credit was not given. The boilers may not be placed into service or operated in ANY way until all required inspections are completed for credit to the satisfaction of an attending CG Marine Inspector. The required inspections must also be completed NO LATER THAN 1NOV23.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 November 2023
Resolved 2 November 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 January 2023
Resolved
Due to issues encountered during attempted hydro testing and time constraints the operator of the vessel has asked to defer all required auxiliary boiler inspections until 1NOV23. Both aux boilers are due for fireside, waterside, hydro, automation testing, safety relief valve testing, and all boiler mounts (first off valves) must have their bonnets removed/opened for valve inspection. A fireside inspection was conducted during this lay-up period but credit was not given. The boilers may not be placed into service or operated in ANY way until all required inspections are completed for credit to the satisfaction of an attending CG Marine Inspector. The required inspections must also be completed NO LATER THAN 01NOV23. Failure to complete the required inspections by the due date or placing the boilers into service or using them in any way prior to the required inspections will subject the operator to enforcement action.
46 CFR 61.05
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 November 2023
Resolved 2 November 2023
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 11 January 2023
Resolved
The EPIRB must be stowed in its float-free bracket with controls set for automatic activation. Proper servicing of hydrostatic release is required. Replace 2 EPIRB hydrostatic releases as they are expired.
46 CFR 199.510
46 CFR 199.45(b)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2023
Resolved 30 April 2023
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 11 January 2023
Resolved
Due to the mooring arrangement at the time of annual inspection the rescue boat could not be lowered, released or get underway. The crew is to conduct a full MOB drill and take video of the lowering, releasing and running of the rescue boat within 30 days.
46 CFR 199.160
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2023
Resolved 11 May 2023
Resolution: vessel capt submitted pictures showing the drill being completed.
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 11 January 2023
Resolved
Each vessel must have suitable pilot boarding equipment available on each side of the vessel. Repair the bottom step of the port side pilot's ladder.
46 CFR 96.40(b)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 April 2023
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 11 January 2023
Resolved
Each embarkation ladder must be approved under approval series 160.117 or be a rope ladder approved under 160.017. Repair the broken rung on the starboard side embarkation ladder.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 12 April 2023
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 January 2023
Resolved
All piping for firemain system shall meet the requirements of subchapter F. The firemain near fire station #5 on the port side main deck had a fracture. Repair the affected piping.
46 CFR 95.10-15(a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 April 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 January 2023
Resolved
Each fire hydrant must have at least one length of fire house, a spanner wrench, and a hose rack or other device for stowing the hose. 3 hoses were unserviceable during COI inspection, replace in kind.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 April 2023
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 11 January 2023
Resolved
The EPIRB must be stowed in its float-free bracket with controls set for automatic activation. Proper servicing of hydrostatic release is required. Replace 2 EPIRB hydrostatic releases as they are expired.
46 CFR 199.510
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2023
Resolved 14 May 2023
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 January 2023
Resolved
Due to the mooring arrangement at the time of annual inspection the rescue boat could not be lowered, released or get underway. The crew is to conduct a full MOB drill and take video of the lowering, releasing and running of the rescue boat within 30 days.
46 CFR 199.160
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2023
Resolved 9 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Shore - Ship
Issued 11 January 2023
Resolved
Each vessel must have suitable pilot boarding equipment available on each side of the vessel. Repair the bottom step of the port side pilot's ladder.
46 CFR 96.40
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 April 2023
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 11 January 2023
Resolved
Each embarkation ladder must be approved under approval series 160.117 or be a rope ladder approved under 160.017. Repair the broken rung on the starboard side embarkation ladder.
46 CFR 199.110
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 April 2023
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 January 2023
Resolved
All piping for firemain system shall meet the requirements of subchapter F. The firemain near fire station #5 on the port side main deck had a fracture. Repair the affected piping.
46 CFR 95.10-15
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 April 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 January 2023
Resolved
Each fire hydrant must have at least one length of fire house, a spanner wrench, and a hose rack or other device for stowing the hose. 3 hoses were unserviceable during COI inspection, replace in kind.
46 CFR 95.10-10
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 April 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 August 2022
Resolved
A survey shall be conducted every time a defect is discovered affecting the safety of the vessel and whenever important repairs are made. A raw water belt drive sheave bracket was found broken and leaking which caused the crew to shutdown the vessel's outboard STBD ENG. Complete troubleshooting and make permanent repairs. Provide either Class or technician's report attesting to satisfactory repairs and outboard STBD ENG operation.
Action required: 15 - Rectify deficiencies by next port
Resolved 6 August 2022
Resolution: Vessel engineers were able to weld repairs to mounting plate and alignment of the sheaves was checked and made. A new belt installed and tension adjusted. The engine was test ran to check repairs.Guard was reinstalled with SME back in service.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 November 2021
Resolved
Discovered a corroded pit in the upper surface of a boiler tube in the outboard auxiliary boiler, uppermost tube bank on left side (located in the upper waterside chamber approx 12" in from the access cover). Pit is approx 1/4" in diameter and approx 1/32" deep. Replace tube prior to 2022 op-season.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 November 2022
Resolved 7 April 2022
Resolution: CG MI verified installation of new boiler tube. Witnessed documentary evidence of the crew hydro testing to 1.5x MAWP.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 November 2021
Resolved
Noted cracked/loose refractory throughout the outboard auxiliary boiler (end doors, combustion chamber). Repair refractory prior to 2022 op-season.
Action required: 705 - Other - as specified
Due 1 November 2022
Resolved 7 April 2022
Resolution: CGMI verified repairs to refractory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 November 2021
Resolved
There is a 3-4" long through-crack in the protective drip plate above the outboard auxiliary boiler control unit. Repair or replace drip plate prior to the 2022 op-season.
Action required: 705 - Other - as specified
Due 1 November 2022
Resolved 7 April 2022
Resolution: CGMI verifed repair to crack IVO drip plate.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 September 2021
Resolved
Vessel lost port SSDG (vessel has only 2 SSDGs) due to unknown mechanical failure. Vessel is required to have 2 generating sources for primary service electrical loads. Repair port SSDG and demonstrate full functionaliy via test IAW the approved PSTPs. Repairs/tests must be completed prior to departure from port of Duluth/Superior.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 September 2021
Resolved 19 September 2021
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 22 March 2021
Resolved
Attending CG Marine Inspector was unable to witness and verify a light load weight test on the vessel life boat (LB). Crew to conduct a light load weight test of the LB in the presence of a CG Marine Inspector iaw 46 CFR 199.45
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2021
Resolved 24 May 2021
Resolution: Master provided an e-mail with a statement and photos reflecting the lifeboat was lowered, released, operated and raised. Requirement cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 22 March 2021
Resolved
Attending CG marine Inspector was unable to observe crew life boat drill due to vessel moored against another vessel. In the presence of a CG Marine Inspector crew required to lower, release, operate and retrieve the vessels LB iaw 46 CFR 199.40
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2021
Resolved 24 May 2021
Resolution: Master provided an e-mail with a statement and photos reflecting the lifeboat was lowered, released, operated and raised. Requirement cleared.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 March 2021
Resolved
Small fracture with water observed leaking in #2 Cargo hold stbd side fwd slope plate at frame 21 in vicinity of unloading tunnel/ballast tank/slope plate intersection. Temporary weld repairs made in slope plating. Temporary weld repair shall be cut and crop out, with fractured area of slope plating renewed. Permanent repairs shall be to the satisfaction of attending ABS Class Surveyor. Company shall notified attending CG Marine Inspector when permanent repairs are complete and accepted as required by 46 CFR 92.01-10
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2022
Resolved 11 April 2022
Resolution: Witnessed sat NDT of repair.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 March 2021
Resolved
Small fracture with water observed leaking into the stbd unloading tunnel, at frame 21 in way of ballast tank longitudinal bulkhead at slope plating. Existing weld excavated, and re-welded. Attended CG MI believes repairs are temporary, and affected area steel plate needs to be cut and crop out renewed. Company required to make permanents repairs to the satisfaction of attending ABS Class Surveyor. Company shall notified attending CG Marine Inspector when permanent repairs are complete and accepted as required by 46 CFR 92.01-10
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2022
Resolved 11 April 2022
Resolution: Witnessed sat NDT of repair.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 22 March 2021
Resolved
Emergency Diesel Generator (EDG) was unable to start and supply electrical power upon loss of the normal power. Make Repairs and demonstrate proper operation of the emergency generator in the presence of a CG Marine Inspector iaw 46 CFR 112.05-5 & 112.25-10
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 March 2021
Resolved 23 March 2021
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 March 2021
Resolved
Observed excessive water leaking from the fwd stbd side main deck fireman piping expansion joint. Crew required to adjust. When corrected Master to provide a statement and photo to attending CG Marine inspector to reflecting expansion joint properly adjusted iaw 46 CFR 95.10-90
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 April 2021
Resolved 5 April 2021
Resolution: Received e-mail from master stated def corrected
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 March 2021
Resolved
Observed several life ring buoys reflective tape was worn. Where required renew worn reflective tape. When corrected Master to provide a statement and photo to attending CG Marine inspector stating all worn reflective tape on ring buoy where noted were renewed iaw 46 CFR 199.176
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 April 2021
Resolved 5 April 2021
Resolution: Received e-mail with statement & photo from Master stating & reflecting defs corrected
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 22 March 2021
Resolved
Observed one electrical cable nylon stuffing tube, penetrating through an A-0 bulkhead; located above stbd side upper engine room entry door. Cable penetrations thru A boundary’s are required to be steel stuffing tubes or approved A Class boundary cable transits. Remove nylon stuffing tube and renew with a steel or approved penetration iaw 46 CFR 92.01-10 on or before 31MAR2022
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2022
Resolved 9 November 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 22 March 2021
Resolved
Observed stbd side upper engine room entry door would not automatically close; closing mechanism removed and missing. Locate, renew, and or reattach the automatic closure mechanism iaw 46 CFR 92.07-10(d)(4).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 March 2021
Resolved 23 March 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 March 2021
Resolved
Both Aux Boilers due for Credit Fire & water side examinations. Crew unable to make ready for examination during CG MI’s attendance. Prior to placing either boiler into service, CG Marine Inspector must attend and complete credit Fire & Water side examinations iaw 46 CFR 61.05 on or before 30NOV2021
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2021
Resolved 30 November 2021
Resolution: Completed in Superior, WI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 March 2021
Resolved
Unable to verify the proper operation of either aux boilers controls during CG MI attendance. Prior to operating aux boiler CG MI must attend and verify all periodic safety tests (PSTP) and operation of each aux boiler iaw 46 CFR 61.35 on or before 30NOV2021
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2021
Resolved 9 November 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 December 2020
Resolved
During testing of the outboard auxiliary boiler (S-4106) safety relief valve (SRV), it was discovered that the boiler's pressure could not be pressed high enough to pop the SRV due to an inoperable fuel solenoid (1 of 4). New solenoid has been ordered and will be replaced upon reciept. Re-test SRV upon replacement of solenoid and subsequent restoration of normal system pressure. Test to be witnessed by a USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 1 April 2021
Resolved 9 November 2021
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 16 May 2020
Resolved
Vessel has a small weep hole with water entering the engine room, coming from the hull side shell on the port side just forward of the sea chest. Effect repairs to the satisfaction of the Coast Guard Marine Inspector once the vessel arrives in Silver Bay, MN.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2020
Resolved 21 May 2020
Resolution: Company rep emailed SEC SSM class report from repairs effected on 5/17/2020.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 31 March 2020
Resolved
Did not conduct drills to maintain social distancing practice (COVID-19) during inspection. Fire and abandon ship drill to be conducted in presence of Coast Guard at a future date.
Action required: 705 - Other - as specified
Due 1 July 2020
Resolved 8 September 2020
Resolution: Drills were completed and found to be satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 January 2020
Resolved
Make repairs to the Port Outboard Main Engine Turbo afer suffering damage from a fire. Submit technician report to marine inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 January 2020
Resolved 5 January 2020
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 11 September 2019
Resolved
Vessel experienced steering motor failure on stbd inboard motor. Ensure proper operation of steering gear, provide a description of what caused the loss of steering, how it was corrected, and conduct follow up steering testing to the satisfaction of the attending marine inspector.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 11 September 2019
Resolved 11 September 2019
Resolution: Sec SSM Marine Inspectors attended vessel while at anchor and conducted steering test in follow up mode and non follow up mode, from the bridge and locally. Test were satisfactory and email with statement from Chief Engineer were recieved by the Sector.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 12 July 2019
Resolved
While witnessing an abandon ship drill and launching of the open lifeboat, MI's witnessed unsatisfactory performance by crew, including lack of familiarity of equipment and disorganization.
Vessel shall demonstrate a complete abandon ship drill to the satisfaction of the attending marine inspector; to include mustering crew, operating davit, launching and maneuvering lifeboat no later than 19 July 2019.
Action required: 705 - Other - as specified
Due 19 July 2019
Resolved 18 July 2019
Resolution: Witnessed satisfactory drill, updated training plans.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 27 March 2019
Resolved
Vessel was unable to get the Lifeboat underway during the annual COI inspection due to the location at the dock. Vessel is required to lower the Lifeboat into the water and have the crew maneuver the lifeboat in the water.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2019
Resolved 12 July 2019
Resolution: Cleared current deficency and re-issued 7 day requirement.
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 March 2018
Resolved
Vessel has cut/exposed/dead-end wires and cables on various places throughout the vessel (i.e. stbd-side of steering stand, chart table radio, all throughout crawl-space under the pilot-house, under stbd-side aft bridge-wing grating outside, etc.). All such wires and cables shall either be properly capped and enclosed or removed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 24 July 2018
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 22 March 2018
Resolved
Vessel's lifeboat must be launched and operated by the crew / maneuvered in the water and recovered at least once every three months during abandon ship drill; at the time of inspection, the lifeboat was dock-side to. Vessel to get the lifeboat launched, maneuvered in the water with oars and recovered to the satisfaction of an attended USCG Marine Inspector (per D9 direction).
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 21 May 2018
Resolution: Witnessed satisfactory launching, maneuvering, and recovery of lifeboat.
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 22 March 2018
Resolved
Vessel's auxiliary boilers were open for inspection and not able to be operated to test their safety relief valves. Proper operation of both auxiliary boilers safety relief valves shall be witnessed to the satisfaction of an attending USCG Marine Inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 30 November 2018
Resolution: All boiler automation and relief tests conducted satisfactorly.
Engineering › Lubricating Oil Storage/Transfer System › Gauge
Issued 22 March 2018
Resolved
Pressure indicating devices on the port-side fuel oil day tank were missing covers. Repairs shall be made to the satisfaction of an attending USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 23 June 2018
Resolution: New gauges installed and functiong.
Communications › Alarms/Indicators › General Alarm
Issued 22 March 2018
Resolved
General alarm markings to identify the alarm system in the cargo tunnel are either missing or painted-over in multiple locations. Markings to identify the alarm system shall be installed or re-painted.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 23 June 2018
Resolution: Verified GA markings in cargo tunnel.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 22 March 2018
Resolved
Emergency lighting in the cargo tunnel was not indicated as such in several areas. Emergency lighting in the tunnel space shall be marked or re-painted to indicate the locations of all emergency lighting.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 23 June 2018
Resolution: Verified markings to identify E lighting fixtures.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 22 March 2018
Resolved
Emergency generator fuel supply tank level indicator was not functioning properly. Indicator shall be made to function to the satisfaction of an attending USCG Marine Inspector.
Condition: Invalid
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 23 June 2018
Resolution: Verified functionality of E GEN fuel tank level indicating gauge.
Electrical › Electric Generation Source (service) › Generator
Issued 22 March 2018
Resolved
Vessel's starboard ship's service diesel generator was not operational at the conclusion of the inspection, as it would not start. Prove proper operation of the generator prior to departure, to the satisfaction of the attending USCG Marine Inspector.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2018
Resolved 23 March 2018
Resolution: Generator engine block was apparently cold, vessel crew heated the generators jacket water and was able to start the generator, test, shut-down and re-start satisfactory.
Engineering › Steam Boiler (auxiliary/waste heat) › Firewall Tube
Issued 23 August 2017
Resolved
During post-repair hydrostatic test of inboard auxiliary boiler discovered 3 leaking fire tubes. Replace failed fire tubes and conduct satisfactory hydrostatic test in presence of a USCG Marine Inspector, prior to operationally using boiler. Repairs shall be performed by an ASME certified company holding an "R" stamp. All repairs shall be IAW Section IV of the ASME Boiler and Pressure Vessel Code.
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 28 September 2017
Resolution: Examined satisfactory repairs and witnessed satisfactory hydro-test.
Engineering › Steam Boiler (auxiliary/waste heat) › Shell
Issued 18 April 2017
Resolved
Make weld repairs to the inboard auxiliary boiler to repair shell fracture under and in way of the burner. Repairs shall be preformed by an ASME certified company holding an "R" stamp and by and by ASME Certified welder(s). All repairs shall be IAW section IV of the ASME Boiler & Pressure Vessel Code and as modified by 46 CFR Part 53.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 23 August 2017
Engineering › Steam Boiler (auxiliary/waste heat) › Firewall Tube
Issued 18 April 2017
Resolved
Make repairs to the outboard auxiliary boiler to remove and renew the two leaking fire tubes. Repairs shall be preformed by an ASME certified company holding an "R" stamp and by and by ASME Certified welder(s). All repairs shall be IAW section IV of the ASME Boiler & Pressure Vessel Code and as modified by 46 CFR Part 53.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 23 August 2017
Engineering › Steam Boiler (auxiliary/waste heat) › Shell
Issued 18 April 2017
Resolved
Upon completing repairs on both aux boilers, CG Marine Inspector shall attended and verify repairs and witness hydrostatic tests on each boiler before placed into service.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 October 2017
Resolved 23 August 2017
Lifesaving › Launching Appliances › Release Mechanism
Issued 18 April 2017
Resolved
In the presence of a CG Marine Inspector Lower, Releases, Operate, Retrieve and Stowage the Lifeboat.
Condition: Invalid
Action required: 705 - Other - as specified
Due 18 May 2017
Resolved 11 May 2017
Resolution: [name withheld], MSU Toledo stating last night he attended & witnessed release, operate, recover and stowage of their Lifeboat.
Lifesaving › Launching Appliances › Winch Brake
Issued 6 April 2016
Resolved
Vessel could not conduct lifeboat weight tests due to mooring arrangements. Vessel must conduct lifeboat light/full weight test within 14 days.
Action required: 705 - Other - as specified
Due 20 April 2016
Resolved 11 April 2016
Resolution: See narrative.
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 6 April 2016
Resolved
Vessel was unable to demonstrate boiler automation and operation of safety relief valve on both aux boilers. Prove proper operation of boiler automation and demonstrate satisfactory operation of safety relief valves on both Aux boilers prior to putting them back into service.
Action required: 705 - Other - as specified
Resolved 13 December 2019
Construction/Loadline › Hull › Bottom Plating
Issued 7 January 2016
Resolved
While cropping high-floor connections in the #5P ballast tank a welder inadvertently cut too far into the bottom shell, resulting in a minor, but controllable, leak. The hole was filled with weld and ground smooth. A steel frame of approximately 17x29x10 was constructed around the temp repair. The frame will be filled with concrete and capped with a steel plate.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 April 2017
Resolved 6 February 2017
Resolution: cropped and affected hull plating renewed.