Inspection history · 102
30 June 2017
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6191822
20 June 2017
In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6169293
14 March 2017
Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6104110
30 August 2016
Deficiency Check · Examination of Repairs · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5987248
23 December 2015
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5803009
28 September 2015
Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5730788
28 September 2015
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5738503
26 September 2015
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5733621
23 September 2015
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5738618
5 June 2015
Internal Structural Exam · Deficiency Check · Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5131438
31 July 2014
Ballast Water Examination · MTSA/ISPS Verification · MARPOL Annex VI Survey · Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4936662
9 June 2014
Administrative Inspection · Examination of Repairs · Damage Survey · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4885977
17 October 2013
Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4736236
19 June 2013
Internal Structural Exam · MARPOL Annex I Examination · Damage Survey · Deficiency Check · Examination of Repairs · Periodic Inspection · Drydock Exam · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4655493
17 September 2012
Administrative Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4443958
24 July 2012
Administrative Inspection · DAPI Audit · MTSA Verification · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4388733
15 May 2012
Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4313325
25 April 2012
Deficiency Check · Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4295567
17 August 2011
MARPOL Annex VI Survey · Annual Inspection · MARPOL Annex I Examination · Deficiency Check · MTSA/ISPS Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4104419
14 September 2010
MARPOL Annex VI Survey · MARPOL Annex I Examination · COI Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3849468
10 May 2010
Examination of Repairs · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3737843
6 August 2009
Examination of Repairs · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3564154
30 July 2009
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3551000
8 July 2009
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3535670
13 November 2008
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3362463
2 July 2008
Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3268547
1 July 2008
Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3254052
24 May 2008
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3218729
5 March 2008
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3158812
1 August 2007
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3016284
15 May 2007
Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2931105
11 May 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2927912
18 July 2006
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2716723
22 November 2005
Damage Survey · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2538952
21 November 2005
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2565048
6 June 2005
MTSA Verification · COI Inspection · Internal Structural Exam · Cargo Tank Internal · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2427827
28 March 2005
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2320992
18 March 2005
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2386444
4 June 2004
Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2088723
21 January 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1989660
27 October 2003
Deficiency Check
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1936599
8 September 2003
MARPOL Annex I Examination · In-Service Inspection · Administrative Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1899712
28 August 2003
Deficiency Check
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1889114
20 August 2003
Administrative Inspection
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1881806
24 July 2003
Hull Examination · Internal Structural Exam · Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1789777
30 June 2003
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1832540
5 September 2002
Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1671367
23 July 2002
In-Service Inspection · Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1626223
2 July 2001
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1068688
9 May 2001
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1387064
19 May 2000
Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1418706
2 February 2000
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 148495
17 August 1999
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1406547
26 August 1998
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1472604
11 May 1998
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1452415
16 December 1997
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 780527
22 September 1997
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1115305
22 August 1997
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1398740
21 August 1997
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 111764
21 August 1997
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1453418
12 March 1997
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 151043
12 March 1997
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1464012
2 October 1996
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1468398
18 August 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 87338
23 July 1996
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 764179
21 July 1996
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 196561
30 October 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 196566
30 October 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 764081
4 October 1995
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 885812
4 October 1995
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1184643
26 September 1995
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 880966
2 September 1995
COI Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1427082
17 January 1995
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1173709
16 September 1994
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 867916
19 August 1994
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1177808
5 July 1994
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1327316
12 September 1993
Type not recorded
No type recorded · MSD QUAD CITIES · USCG Heartland District (CGD-H) · Activity 174884
17 August 1993
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 6800
5 August 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1359621
8 February 1993
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 839093
30 October 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1269592
15 October 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 950046
11 October 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 942732
6 November 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1235513
2 June 1990
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 934889
7 December 1989
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1227385
29 November 1989
Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1215057
24 October 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 893631
12 December 1988
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1209478
30 November 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 898502
15 July 1988
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1031444
25 November 1987
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 896809
25 November 1987
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1043535
8 April 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1021864
29 January 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1010787
3 August 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 986448
22 May 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 983942
5 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 980851
26 December 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1278673
24 May 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970165
29 January 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1272700
14 January 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1276039
Deck/Cargo › Ballast › Piping
Issued 14 March 2017
Resolved
Hole found on bottom of 16" ballast piping stbd side between frames 64 and 65. Soft patch in place until permanent repairs are made. Repairs to be made as original and to good material both fwd and aft of holed 16" piping. CG to verify good material fwd and aft prior to replacement of piping. Repairs required prior to loading ballast on stbd side after ballast is removed to the affected areas.
Action required: 705 - Other - as specified
Resolved 18 March 2017
Resolution: Satisfactory repairs were made to the ballast piping.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 17 October 2016
Resolved
Determine source of leak on cargo tank #3 and submit repair proposal for corrective action IAW 46 CFR 91.15-1.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 October 2016
Resolution: O/O identified and conducted approved repairs to the satisfactorion of the attending MI.
Engineering › Fuel Oil Service System › Piping
Issued 28 September 2015
Resolved
Vessel is restricted from transferring fuel. Make repairs to the satisfaction of the Coast Guard.
Action required: 705 - Other - as specified
Resolved 28 September 2015
Resolution: Owner repaired pipe by replacing it with new.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 31 July 2015
Resolved
Provide records or tests and inspections of cargo handling crane to include articulating arm, bucket cranes, and hatch cover crane. 46 CFR 107.259
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 August 2015
Resolution: Received inspection report from ICGB verifying that the cranes were inspected in accordance with API RP 2D.
Construction/Loadline › Structures › Machinery Space Opening
Issued 31 July 2015
Resolved
Watertight doors not available for testing during inspection. Provide loadline certificate and survey report from class (ABS) attesting to the watertight condition of the vessel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 August 2015
Resolution: Received load line certificate and email confirmation from ABS stating all watertight doors have been tested and verified watertight.
Communications › Alarms/Indicators › General Alarm
Issued 31 July 2015
Resolved
General alarm needs additional rotating red light in generator space and required placards. 46 CFR 113.25-10 & 46 CFR 113.25-20.
Action required: 705 - Other - as specified
Due 8 September 2015
Resolved 1 September 2015
Resolution: Verified additonal red rotating light has been installed with required placards.
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 31 July 2015
Resolved
All generators show signs of oily/dirty windings. Clean and determine/rectify source of oil. 46 CFR 90.251
Action required: 705 - Other - as specified
Due 31 August 2015
Resolved 1 September 2015
Resolution: Verified cleaning of generators. Generators were cleaned and test run by contractors who did not find additional sources of oil/leakage.
Construction/Loadline › Structures › Deck Plating
Issued 31 July 2015
Resolved
Replace wasted grating on catwalks on the weatherdeck. 46 CFR 92.01-5
Action required: 705 - Other - as specified
Due 31 August 2015
Resolved 1 September 2015
Resolution: Verified replacement of grating.
Construction/Loadline › Hull › Side Shell
Issued 11 June 2014
Resolved
vessel had 3 cracks on the port side ballast tanks #1, 2 and 3. The cracks were found when the vessel was attempting to ballast their tanks. Vessel has cut out 3 portions of their ballast tanks when noticing another crack on their starboard ballast tank #1. Attending inspector must assess damage and approve prior to conducting cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 June 2014
Resolution: Attended vessel and verified all cracks on both port and starboard side had been repaired.
Fire Fighting › Fixed Halon Fire Extinguishing System › Piping
Issued 19 June 2013
Resolved
Repair or replace 2 kinked halon bottle discharge hoses. 46CFR97.15-60
Due 21 October 2013
Resolved 7 October 2013
Resolution: Received pictures confirming hose replacement.
Lifesaving › Lifebuoys › Immediately Available
Issued 19 June 2013
Resolved
Replace both 4kg liferings on the bridgewings. In the interim have one 2.5kg lifering with smokefloat on standby at each bridgewing. 46CFR95.01-5
Due 21 October 2013
Resolved 17 October 2013
Resolution: Replaced both bridewing lifering buoys.
Fire Fighting › Fire Pumps › Arrangement
Issued 19 June 2013
Resolved
Prove operation of main fire pump located in the generator room. 46CFR95.01-5
Due 21 October 2013
Resolved 17 October 2013
Resolution: Witnessed proper operation of pump.
Stability › Watertight Integrity › General
Issued 19 June 2013
Resolved
Prior to departure from Veracruz, MX provide class report attesting to the vessel's stability and fitness to transit from Veracruz, MX to Tampa FL. 46CFR97.15-7
Due 21 October 2013
Resolved 27 September 2013
Resolution: Received class report attesting to vessel''s stability.
Deck/Cargo › Ballast › Pumps
Issued 19 June 2013
Resolved
Prior to departing Tampa provide class report stating the vessel's ballast system is operating as designed. 46CFR97.15-7
Due 21 October 2013
Resolved 27 September 2013
Resolution: Class report was provided and the vessel''''s ballast system is operating as designed.
Fire Fighting › Fire Hoses › Number
Issued 19 June 2013
Resolved
Pressure test and stencil fire hoses per NFPA 1962. 46CFR97.15-60
Due 21 October 2013
Resolved 17 October 2013
Resolution: Replaced all fire hoses and stenciled with pressure and date.
Construction/Loadline › Structures › Deck Plating
Issued 24 July 2012
Resolved
Show recent gauging report of barge deck plate iwo port side after most plate. 46 CFR 31.10-5
Due 31 July 2013
Resolved 21 September 2013
Resolution: Recieved gauging report and confirmed appropriate thickness.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 24 July 2012
Resolved
Replace\ Repair and maintain damaged fairleads appurtenances throughout the barge. 46 CFR 32.15-15
Due 31 July 2013
Resolved 21 September 2013
Resolution: Fairleads were either repaired or replace throughout the barge.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 24 July 2012
Resolved
Submit proposal to reinforce foundation/ fix portside aft, port bow, and starboard bow ground tackle winches. 46 CFR 32-15-15
Condition: Improper/Lack of Maintenance
Due 24 August 2012
Resolved 17 September 2012
Resolution: Repairs made to satisfaction of attending MI.
Pollution Prevention/Response › Prevention Equipment › Coamings
Issued 24 July 2012
Resolved
Replace/ repair bow coaming were holed and cut to fix stairways. 33 CFR 155.370
Condition: Improper/Lack of Maintenance
Due 25 July 2013
Resolved 21 September 2013
Resolution: Bow coaming was repaired/ replaced.
Construction/Loadline › Hull › Hull Plating
Issued 24 July 2012
Resolved
Submit worklist to repair damaged external cargo stiffener, fuel supply line were wasted, replace conduit, vent closures, wasted hatches doors and fracture welds of bulwark stiffeners
Condition: Improper/Lack of Maintenance
Due 31 July 2013
Resolved 21 September 2013
Resolution: Confirmed repair of damaged external cargo stiffeners, wasted parts of the fuel supply line, conduit, vent closures, wasted hatches and doors, and fracture welds of bulwark stiffeners.
Stability › Watertight Integrity › General
Issued 24 July 2012
Resolved
Replace/ fixe the hatch door iwo starboard bow. 46 CFR 39.20-3
Condition: Improper/Lack of Maintenance
Due 24 August 2012
Resolved 17 September 2012
Resolution: Repairs made to the satisfaction of the attending MI.
Construction/Loadline › Hull › Hull Plating
Issued 25 April 2012
Resolved
Vessel is suspected of having a crack in the #1 port ballast tank. Vessel is restricted from the onload of cargo or proceeding to another port until inspection by ABS has been made, repair proposal accepted by ABS and CG and witness of repairs by CG Marine Inspector. 46 CFR 30.01-10
Action required: 705 - Other - as specified
Resolved 26 April 2012
Resolution: Drill stop, vee and weld, SAT NDT.
Fire Fighting › Fire Pumps › Pressure
Issued 17 August 2011
Resolved
Prove proper operation of two fire pumps.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2011
Resolution: Email rec''d attesting to operation of port (75psi) and stbd (54psi) fire pumps - Mstr Lic#192783 - [name withheld]
Electrical › Electric Generation Source (service) › Ground Detection
Issued 17 August 2011
Resolved
Isolate and repair ground on 110 volt switchboard in generator room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2011
Resolution: Tech Report rec''d - Coastwise electric isolated ground and repaired on 8/17.
Fire Fighting › Fire Pumps › Pumpshaft
Issued 14 September 2010
Resolved
Repair/replace end fire & ballast pump shaft covers on ballast and fire pump motors.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: Shaft covers were replaced.
Electrical › Lighting (service) › Lighting Fixture
Issued 14 September 2010
Resolved
Repair or replace port deck light on conveyor belt at hold #5.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: New deck light hanger plate was installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 September 2010
Resolved
Repair electrical wire coupling on the Zemite system in port aft pump room.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: Electrical coupling was replaced.
Construction/Loadline › Structures › Door
Issued 14 September 2010
Resolved
Conduct maintenance on pipe tunnel dogs to allow free movement, replace all missing dogging wrenches. Ensure that pipe tunnel doors and sluice valve are closed unless in use.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: All maintanenace of dogs has been conducted, doors and sluice valves were secured upon return visit.
Construction/Loadline › Penetrations › Weld
Issued 14 September 2010
Resolved
Make repairs to electrical stuffing tube through bulkhead penetration in port lower cargo pump room.
Due 14 October 2010
Resolved 22 September 2010
Resolution: Bulkhead was welded and new stuffing tube was replaced.
Construction/Loadline › Structures › Door
Issued 14 September 2010
Resolved
Ensure all dogging wrenches are in place on all required WTD's throughout vessel.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: All replaced.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 14 September 2010
Resolved
Remove or properly stow all propane/acetylene tanks onboard.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: The majority of the tanks have been removed, a tank stand was constructed for the remaining tanks that were not secured.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 14 September 2010
Resolved
Replace oil saturated exhaust lagging on #2 diesel generator.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: Replaced with new.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 14 September 2010
Resolved
Remove old explosive light above #2 generator.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: Light and wiring removed.
Electrical › Electric Generation Source (service) › Panelboard
Issued 14 September 2010
Resolved
Extend or repalce dielectric matting in front of main switchboard to cover full length.
Due 14 October 2010
Resolved 22 September 2010
Resolution: New matting installed covering required area.
Engineering › Compressed Air System (start air) › Valve
Issued 14 September 2010
Resolved
Bench test or renew #3 air receiver relief valve.
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: Relief valve replaced with new 200 lb valve.
Fire Fighting › Fire Main › Valves
Issued 14 September 2010
Resolved
Repair/replace port aft fire pump (globe) isolation valve.
Due 14 October 2010
Resolved 22 September 2010
Resolution: Valve replaced with new in kind.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 14 September 2010
Resolved
Prove proper operation of all three (3) generator alarm shutdowns (over speed, low lube oil & high temp).
Action required: 705 - Other - as specified
Resolved 22 September 2010
Resolution: Shutdowns tested SAT.
Construction/Loadline › Hull › Longitudinal Frame
Issued 7 August 2009
Resolved
See Activity # 3564154 narrative description and ABS Survey Report in Vsl's Documents for specifics regarding deficiency and repairs effected.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 10 August 2009
Resolution: Repairs made to the satisfaction of attending USCG Marine Inspector and ABS Class Surveyor [name withheld] # 3564154 narrative description and ABS Survey Report in Vsl''s Documents for specifics regarding deficiency and repairs effected.
Electrical › Electric Supply System (service) › Cable
Issued 2 July 2008
Resolved
Prove proper operation of new electrical shore tie installation, as per 10-92 approved plans.
Action required: 705 - Other - as specified
Due 31 October 2008
Resolved 23 October 2008
Resolution: Shore power installation tested under load at Mosaic facility in Uncle Sam, LA.
Construction/Loadline › Structures › Deck Plating
Issued 2 July 2008
Resolved
Prove completion of repairs to lower level cat walk in the port and starboard pump room.
Action required: 705 - Other - as specified
Due 31 October 2008
Resolved 13 November 2008
Electrical › Electric Supply System (service) › Cable
Issued 2 July 2008
Resolved
Modify shore power cable entry box on bow to address the likeliness of damage to cable in event of the lid following.
Action required: 705 - Other - as specified
Due 23 November 2008
Resolved 13 November 2008
Resolution: Mechanism fabricated to prop lid partially open, preventing damage to electrical cable.
Fire Fighting › Fire Hydrants › Condition
Issued 1 August 2007
Resolved
Renew the flange bolts and nuts on (2) fire stations, the forepeak and the stbd side aft.
Action required: 705 - Other - as specified
Due 1 September 2007
Resolved 15 August 2007
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 1 August 2007
Resolved
Renew the air receiver on the open deck aft, there is an unauthorized repair to a hole in the receiver.
Action required: 705 - Other - as specified
Due 1 September 2007
Resolved 15 August 2007
Fire Fighting › Fire Main › Pressure
Issued 1 August 2007
Resolved
Prove proper fire main pressure in accordance with 46 CFR 95.10-5 (50 p.s.i. @ 2 hoses).
Action required: 705 - Other - as specified
Due 1 September 2007
Resolved 15 August 2007
Construction/Loadline › Hull › Side Shell
Issued 1 August 2007
Resolved
Unauthorized temporary repairs by way of a doubler plate were made to the port side shell IWO frame 26-27 and the 11th side long from the top. Permanent repairs to be made at next dry dock (ABS or CG) to the satisfaction of the attending Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Due 16 September 2010
Resolved 16 September 2008
Resolution: Doubler plate removed and damaged area inserted.
Construction/Loadline › Hull › Hull Plating
Issued 15 May 2007
Resolved
30 inch fracture with a 4 inch gap in the #6 port ballast tank.
Action required: 705 - Other - as specified
Resolved 18 May 2007
Engineering › Compressed Air System (control) › Piping
Issued 18 July 2006
Resolved
Repair broken pipes IWO the aft bhd of the pump room.
Action required: 705 - Other - as specified
Due 18 August 2006
Resolved 28 July 2006
Electrical › Electric Supply System (service) › Cable
Issued 18 July 2006
Resolved
Properly hang cable to the outboard ballast pump controller.
Action required: 705 - Other - as specified
Due 18 August 2006
Resolved 28 July 2006
Fire Fighting › Ventilation Systems › Operating Controls
Issued 18 July 2006
Resolved
Repair emergency ventilation shut down in the forward machinery space.
Action required: 705 - Other - as specified
Due 28 July 2006
Resolved 28 July 2006
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 18 July 2006
Resolved
Repair the ball vent port side forward on the forepeak.
Action required: 705 - Other - as specified
Due 28 July 2006
Resolved 28 July 2006
Deck/Cargo › Holds/Tanks › Ventilation Air Intake
Issued 18 July 2006
Resolved
Repair the hole in the vent pipe stbd side aft by the deep sink.
Action required: 705 - Other - as specified
Due 28 July 2006
Resolved 28 July 2006
Engineering › Compressed Air System (control) › Piping
Issued 18 July 2006
Resolved
Make proper repairs the the piping for the anchor windlass controls port and stbd.
Action required: 705 - Other - as specified
Due 18 August 2006
Resolved 28 July 2006
Construction/Loadline › Hull › Double Hull
Issued 22 November 2005
Resolved
Prior to operation under vessel's COI, make vessel available for internal damage survey by CG marine inspectors. Survey in forepeak and #1-3 portside ballast tanks.
Action required: 705 - Other - as specified
Resolved 7 December 2005
Construction/Loadline › Hull › Hull Plating
Issued 22 November 2005
Resolved
Prior to operation under vessel's COI, and after completion of internal damage survey, complete repairs outlined in approved repair procedure. Repairs to be completed to the satisfaction of attending CG marine inspector.
Action required: 705 - Other - as specified
Resolved 7 December 2005
Communications › Alarms/Indicators › General Alarm
Issued 21 October 2005
Resolved
Repair the general alarm in the barge, it does not sound when activated from the pilothouse contactor.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2005
Resolved 22 October 2005
Electrical › Electrical Distribution System (service) › Panelboard
Issued 29 September 2005
Resolved
Repair or replace the elec. pnl. cover on the ditribution pnl. in the pump room.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Electrical › Lighting (emergency) › Lighting Fixture
Issued 29 September 2005
Resolved
Repair the emergency light in the pump room.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Electrical › Lighting (service) › Lighting Fixture
Issued 29 September 2005
Resolved
Provide a light covers for fixtures as necessary to include the fixtures in the pump room and forepeak.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Electrical › Electrical Distribution System (service) › Junction Box
Issued 29 September 2005
Resolved
Mount the junction box to the bulkhead in the stairway to the pump room on the port side.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 29 September 2005
Resolved
Provide a cover for the exterior receptical on the weather deck port side IWO #6 cargo hold.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 29 September 2005
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 29 September 2005
Resolved
Replace the bracket at sta. #18 in the pump room and sta. in the forepeak.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Fire Fighting › Fire Hydrants › Material
Issued 29 September 2005
Resolved
Provide spanner wrenches at fire station as needed.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Condition
Issued 29 September 2005
Resolved
Provide a fire extinguisher for sta. on the stbd weather deck IWO #1 cargo hold.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Lifesaving › Lifebuoys › Stowage
Issued 29 September 2005
Resolved
Repair the stowage containers as needed, severl with broken latches that are tied closed.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 29 September 2005
Resolved
Repair water light on the lifebuoy on the stbd side IWO #3 cargo hold.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Communications › Internal Communications System › Sound-powered Telephone
Issued 29 September 2005
Resolved
Repair the call light in the machinery space.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Stability › Watertight Integrity › General
Issued 29 September 2005
Resolved
Replace the watertight manhole covers to the wire way when work is complete.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 October 2005
Resolved 31 October 2005
Fire Fighting › Fire Pumps › Capacity
Issued 29 September 2005
Resolved
Repair the fire pumps to provide a minimum of 50 PSI to two fire hoses simultaneously, pumps are operating with an effective stream of water, however does not meet CFR requirement.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Resolution: Engineers found that the sea chest bolts were not completely tightened after last dry docking, once tightened the pumps put out more than enough pressure.
Engineering › Fuel Oil Service System › Filter
Issued 29 September 2005
Resolved
Repair the F/O leak on the Raycor filter for the #1 generator.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 October 2005
Resolved 31 October 2005
Documentation › Markings/Placards › Oil Discharge Placard
Issued 29 September 2005
Resolved
Provide the vessel with an oil discharge placard.
Action required: 705 - Other - as specified
Due 29 October 2005
Resolved 21 October 2005
Electrical
Issued 28 August 2003
Resolved
Properly secure electrical cables on A & B cranes in accordance with IEEE Stnd 45. In particular, secure vertical cable runs with metal banding with chaffing gear to protect rubber wire insulation, and properly secure dead ended wire or remove.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 October 2003
Resolved 27 October 2003
Electrical › Lighting (service)
Issued 9 May 2003
Resolved
Provide protective globes for lighting fixture in bow thruster compartment.
Due 3 September 2003
Resolved 28 August 2003
Engineering
Issued 9 May 2003
Resolved
Provide shaft guards for generator cooling pumps #1and #2.
Due 3 September 2003
Resolved 28 August 2003
Engineering
Issued 9 May 2003
Resolved
Replace non-metallic expansion joint, #1 generator cooling system and re-align fixed piping as to remove excessive deflection on joint.
Action required: 705 - Other - as specified
Due 3 September 2003
Resolved 28 August 2003
Electrical
Issued 9 May 2003
Resolved
Marl all ventilation cicuit breakers on main aux panel "IN CASE OF FIRE- SECURE VENTILATION"
Due 3 September 2003
Resolved 28 August 2003
Fire Fighting › Fire Pumps
Issued 9 May 2003
Resolved
Install machinery guard on port fire pump.
Due 3 September 2003
Resolved 28 August 2003
Electrical
Issued 9 May 2003
Resolved
Secure all exposed electrical cables on A & B crane in suitable enclosure or remove (old electric Break cables).
Due 3 September 2003
Resolved 28 August 2003
Resolution: Horizontal cable runs were properly secured. Vertical runs and behind upper crane power panels needed further attention. Cleared item and reissued another.
Electrical
Issued 9 May 2001
Resolved
REMOVE OR REPLACE THE ELECTICAL CABLE PASSING THROUGH THE DECK AT THE FOWARD LOOKOUT BOX ON THE FOREPEAK AND MAKE THE STUFFING TUBE WATERTIGHT.
Condition: Unknown
Due 9 June 2001
Resolved 18 May 2001
Deck/Cargo
Issued 9 May 2001
Resolved
PROVIDE SAFETY CARGO GEAR CERTIFICATE FOR THE 2 CRANES. THE CRANES ARE NOTTO BE USED FOR CARGO UNLESS A VALID CARGO GEAT CERTIFICATE IS OBTAINDED ANDPROVIDED TO THE INSPECTOR.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Deck/Cargo
Issued 9 May 2001
Resolved
CROP AND RENEW THE VERTICAL STIFFENER ON THE STBD AFT WINCH BRAKE HANDLE.
Condition: Unknown
Due 9 June 2001
Resolved 18 May 2001
Construction/Loadline
Issued 17 August 1999
Resolved
MAKE PERMANENT REPAIRS TO SUCTION LINE OF STARBOARD BALLAST PUMP AT NEXT DRYDOCKING.
Condition: Unknown
Due 17 August 1999
Resolved 17 August 1999
Construction/Loadline
Issued 17 August 1999
Resolved
PAINT LOADLINE MARKS WITH A COLOR CONTRASTING THE SHIP'S HULL.
Condition: Unknown
Due 26 August 1999
Resolved 26 August 1999
Electrical
Issued 17 August 1999
Resolved
PROVE PROPER OPERATION OF REVERSE POWER RELAY TRIPS ON #1, #2, AND #3 SSDG'S.
Condition: Unknown
Due 26 August 1999
Resolved 26 August 1999
Electrical
Issued 17 August 1999
Resolved
PROVE THE ABILITY TO PARALLEL #1, #2, AND #3 SSDG'S IN ALL COMBINATIONS.
Condition: Unknown
Due 26 August 1999
Resolved 26 August 1999
Lifesaving
Issued 22 August 1997
Resolved
PROVIDE WRITTEN PROPOSALS TO RELOCATE THE HALON SYSTEM ACTUATION HANDLES, GENERATOR REMOTE SHUTDOWNS AND EMERGENCY FUEL CUT-OFF VALVE HANDLE TO ELIMINATE THE NEED FOR PERSONNEL TO GO BELOW DECKS TO ACTUATE THOSE SYSTEMS.
Condition: Unknown
Due 22 August 1997
Resolved 22 August 1997
Electrical
Issued 22 August 1997
Resolved
REPLACE/REPAIR DAMAGED LIGHTING IN WAY OF THE #3 GENERATOR.
Condition: Unknown
Due 22 August 1997
Resolved 22 August 1997
Engineering
Issued 22 August 1997
Resolved
REPLACE DAMAGED LAGGING ON EXHAUST STACK SILENCER FOR #3 GENERATOR.
Condition: Unknown
Due 22 August 1997
Resolved 22 August 1997
Electrical
Issued 22 August 1997
Resolved
UPON COMPLETION OF REPAIRS TO THE #3 GENERATOR, CONDUCT FULL FUNCTION TESTSOF THE GENERATOR TO INCLUDE LOAD TESTS, PARALLEL AND REVERSE CURRENT RELAY TESTS.
Condition: Unknown
Due 22 August 1997
Resolved 22 August 1997
Fire Fighting
Issued 22 August 1997
Resolved
PROVIDE SERVICING REPORT FOR EXPENDED FIXED HALON SYSTEM TO GENERATOR SPACEAND SCBA (SCOTT PAK) BOTTLE.
Condition: Unknown
Due 29 August 1997
Resolved 2 September 1997
Electrical
Issued 22 August 1997
Resolved
CONDUCT TESTS AND REPLACE DAMAGED ELECTRICAL WIRING IN WAY OF #3 GENERATOR.
Condition: Unknown
Due 22 August 1997
Resolved 22 August 1997
Engineering
Issued 21 August 1997
Resolved
Properly support electrical wires thru-out machinery, storage space with metal straps vice plastic wire ties.
Condition: Unknown
Due 22 September 1997
Resolved 28 October 1997
Electrical
Issued 21 August 1997
Resolved
Prove operation of port service generator overspeed trip.
Condition: Unknown
Due 22 September 1997
Resolved 28 October 1997
Electrical
Issued 2 September 1995
Resolved
PROVIDE PROPER COVER FOR POWER PANEL LOCATED INSIDE FOREPEAK STORAGE AREA ON PORT SIDE.
Condition: Unknown
Due 2 September 1995
Resolved 2 September 1995
Engineering
Issued 2 September 1995
Resolved
PROVE PROPER OPERATION OF PORT VENTILATION REMOTE SHUTDOWN FOR MACHINERY SPACE.
Condition: Unknown
Due 2 September 1995
Resolved 2 September 1995
Electrical
Issued 2 September 1995
Resolved
REPAIR AND TEST OVERSPEED REVERSE POWER RELAY, LOW LUBE OIL SHUTDOWN, AND HIGH WATER TEMPERATURE ALARM/SHUTDOWN ON #3 GENERATOR.
Condition: Unknown
Due 2 September 1995
Resolved 2 September 1995
Fire Fighting
Issued 2 September 1995
Resolved
PROVE OPERATION OF EMERGENCY FIRE PUMP LOCATD IN BOW MACHINERY SPACE.
Condition: Unknown
Due 2 September 1995
Resolved 2 September 1995
Fire Fighting
Issued 15 October 1992
Resolved
PROVE PROPER OPERATION OF DIESEL ENGINE SHUTDOWN WHEN THE FIXED HALON SYSTEM IS ACTIVATED.
Condition: Unknown
Due 15 October 1992
Resolved 15 October 1992
Electrical
Issued 24 October 1989
Resolved
PROPERLY LINE THE GENERAL ALARM BATTERY BOX WITH LEAD OR CORROSIVE- RESISTANT MATERIAL IN ACCORDANCE WITH 46 CFR 111.15-5(H).
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Accommodation/Occupational Safety
Issued 24 October 1989
Resolved
MAKE OPERATIONAL THE PORT AND STARBOARD CHAIN LOCKER BILGE SUCTION REACH RODS.
Condition: Unknown
Due 24 October 1989
Resolved 24 October 1989
Electrical
Issued 30 November 1988
Resolved
PROVE PROPER OERATION OF #3 BARGE GERNERATOR OVERSPEED TRIP AND REVERSE POWER RELAY IN ACCORDANCE WITH 46 CFR 111.12-11(F) AND 46 CFR 111.12-1(B) RESPECTIVELY.
Condition: Unknown
Due 30 November 1988
Resolved 30 November 1988
Electrical
Issued 30 November 1988
Resolved
LOCATE AND CORRECT GROUND IN BARGE ELECTRICAL SYSTEM.
Condition: Unknown
Due 30 November 1988
Resolved 30 November 1988
Electrical
Issued 25 November 1987
Resolved
#3 DIESEL/GENERATOR: TROUBLE SHOOT FAULT IN SHUT-DOWN CIRCUIT & PROVE SATISFACTORY OPERATION OF REVERSE POWER RELAY IN ACCORDANCE WITH 46 CFR 111.12(F).
Condition: Unknown
Due 25 November 1987
Resolved 25 November 1987
Construction/Loadline
Issued 3 August 1986
Resolved
MAKE PERMANENT REPAIRS TO SET IN PORT BOW (6" X 12' X 15') INCLUDING VERTICAL CHORDS (5) AND BULKHEAD (15'X 6") CROP AND RENEW.
Condition: Unknown
Due 3 August 1986
Resolved 3 August 1986