Records from 2000 to 2025. Most recent: inspection, 20 May 2025.
Documentation record
Registered dimensions (L × B × D)200.0 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,088 / net 1,088
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNEWPARK SHIPBUILDING · GALVESTON, TX, UNITED STATES · built 2000
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 16 September 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1088 - Simplified, Gross Ton
1088 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 51
20 May 2025
Examination of Repairs · COI Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8137280
4 December 2023
Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7833488
8 March 2023
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7645236
2 June 2022
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7465414
9 April 2020
Cargo Tank Internal · Administrative Inspection · MTSA Verification · COI Inspection · Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6937443
4 June 2019
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6703830
14 February 2019
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6621201
18 January 2019
Permit to Proceed · Damage Survey
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6616022
4 June 2018
Periodic Inspection · Examination of Repairs · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6429502
20 July 2017
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6216061
8 April 2016
Examination of Repairs · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5853156
8 March 2016
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5829627
30 July 2015
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5200607
12 May 2015
Internal Structural Exam · Examination of Repairs · MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5122719
26 January 2015
Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5059661
15 January 2015
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5053806
28 October 2014
Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 5013513
24 March 2014
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4822122
13 August 2013
Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4684136
30 April 2012
Examination of Repairs · Periodic Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4298718
29 March 2012
Damage Survey
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4278152
11 August 2011
Type not recorded
No type recorded · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 4112561
12 July 2011
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4133735
13 April 2010
COI Inspection · MTSA Verification · Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3715890
4 February 2009
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3412735
27 January 2009
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3412119
29 December 2008
Examination of Repairs
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 3386408
20 November 2008
Damage Survey · Permit to Proceed
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3367575
21 May 2008
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3212897
9 May 2008
Damage Survey · Permit to Proceed
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3202973
4 December 2006
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2833644
7 February 2006
Annual Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2580646
19 January 2006
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2564210
6 January 2005
Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2269816
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1997051
2 April 2003
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1767121
18 March 2003
Damage Survey · Examination of Repairs
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1759610
21 February 2003
Type not recorded
No type recorded · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 1747786
21 February 2003
Damage Survey
Physical examination · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 1749959
4 February 2003
Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1739821
18 September 2002
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1677061
18 June 2002
Examination of Repairs
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1633895
16 May 2002
Damage Survey
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1617746
16 May 2002
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1617962
17 April 2002
Examination of Repairs
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1606104
25 March 2002
Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 1597096
3 May 2001
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1465648
13 February 2001
Administrative
Administrative · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1058062
5 February 2001
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 55678
12 September 2000
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1053748
1 March 2000
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1467218
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other cargo/timber/deck/construction
Issued 18 January 2019
Resolved
Vessel developed a leak in the #1 cargo tank, causing approx 750 gallons of cargo into the #1 void. Authorized to transit to Port Arthur on a PTP for repair.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 19 February 2019
Resolution: Conducted satisfactory repairs, tested sat.
Construction/Loadline › Hull › Weld
Issued 8 March 2016
Resolved
1' crack along the weld seam in the port bow rake, 4' above the waterline.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 April 2016
Resolution: Repairs completed, weld visually inspected and air test of forward rake completed.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 30 July 2015
Resolved
Repair and replace forward middle cavel
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 April 2016
Resolution: Middle cavel repair was already complete and verified by Marine Inspector prior to this inspection. The MISLE casework was not completed.
Construction/Loadline › Hull › Double Hull
Issued 15 January 2015
Resolved
Stern has a 3" fracture on deck required to be repaired. 46cfr32
Action required: 705 - Other - as specified
Resolved 26 January 2015
Resolution: Fracture welded and tested sat.
Construction/Loadline › Hull › Double Hull
Issued 20 November 2008
Resolved
3" X 3/4" hole in the #1 stbd wing void.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 30 December 2008
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2008
Resolved
1 ft x 3in fractue in the # 3 port wing void
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2008
Resolved 24 May 2008
Resolution: Witnessed satisfactory repair of fracture. COI returned.
Deck/Cargo › Vapor Control Systems › Manual Isolation Valve
Issued 24 January 2006
Resolved
Prior to carrying cargo provide approved plans for the newly installed vapor control system, conduct testing of the VCS pipiing and provide new transfer procedures including the new VCS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 February 2006
Resolution: Transfer procedures onboard, and witnessed vapor tightness test.
Construction/Loadline › Hull
Issued 16 May 2002
Resolved
Prior to reloading, make permanent repairs to damaged deck knuckle IWO #3 port wing void. Repairs to be completed to the satisfaction of the attending CG marine inspector. LEGACY COMPONENT DESC: Side Shell
Due 16 June 2002
Resolved 19 June 2002
Resolution: Yard personnel renewed side shell, deck knuckle and conducted satisfactory air test.