MAURY USCG vessel records
← All vessels

COLUMBIA NEW YORK

COLUMBIA NEW YORK is a 1978 freight barge. The Coast Guard has recorded 78 inspections since 1982, most recently in August 2024, along with 158 deficiencies.

Records from 1982 to 2024. Most recent: inspection, 2 August 2024.

Built
1978
Last inspected
2 August 2024
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the tow units and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 2 August 2024
…with no type recorded10
Operational controls None recorded without a removal date
Years with a record 37 calendar years (1982–2024)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8639326
WCY2356
Flag
UNITED STATES
Maury page id
psix-49686

Documentation record

Registered dimensions (L × B × D)250.0 ft × 72.0 ft × 14.5 ft
Registered tonnagegross 2,322 / net 2,322
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMISENER INDUSTRIES INC · TAMPA, FL, UNITED STATES · built 1978
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 14 November 2025 · expires 30 November 2026
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2322 - Regulatory (Subpart C or D), Gross Ton
2322 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

78 inspections, each with its date, unit and type; 158 deficiencies with the resolution recorded against each; 5 vessels inspected with it, by name and date; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 5

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

TINA Towing Vessel · MISLE 147622 · 17 December 2008 · activity 3397210DUPLICATE OF MEAGAN ANN (ON 567631) Towing Vessel · MISLE 995283 · 17 December 2008 · activity 3397210MARY ALICE Towing Vessel · MISLE 128905 · 5 April 2001 · activity 75949WITTE 101 Freight Barge · MISLE 344715 · 5 February 1999 · activity 81240JOHN MARSHALL Towing Vessel · MISLE 116179 · 16 May 1994 · activity 175223

Inspection history · 78

2 August 2024 Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7971887
29 March 2024 Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7886827
4 May 2023 Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7680788
28 July 2022 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7518620
27 April 2021 MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7184089
29 March 2021 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7164534
10 February 2020 MTSA Verification · Periodic Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6905921
8 April 2019 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6657859
2 August 2018 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6499157
2 April 2018 MARPOL Annex VI Survey · MARPOL Annex I Examination · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6383176
9 November 2016 COI Inspection · Internal Structural Exam · MTSA/ISPS Verification · Drydock Exam · MARPOL Annex VI Survey · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6038323
18 May 2016 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5880454
7 April 2016 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5848943
30 March 2015 MTSA Verification · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5092773
14 November 2014 Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5023410
22 January 2014 MARPOL Annex VI Survey · MTSA Verification · Annual Inspection · Deficiency Check · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4786174
18 January 2012 COI Inspection · MARPOL Annex I Examination · MTSA Verification · MARPOL Annex VI Survey · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4225982
18 October 2011 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4170519
31 March 2010 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3705667
29 January 2010 Damage Survey · Periodic Inspection · Administrative Inspection · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3672381
4 June 2009 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3494936
29 January 2009 MTSA Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3401879
17 December 2008 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3397210
28 March 2008 Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3172821
29 January 2008 MARPOL Annex I Examination · MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3137414
31 October 2006 MARPOL Annex I Examination · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2811231
31 January 2006 MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2575821
6 July 2005 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2416618
23 May 2005 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 2366178
1 July 2004 MTSA Verification · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2117167
29 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1977765
28 March 2003 Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1764275
3 January 2003 MARPOL Annex V Examination · Annual Inspection · MARPOL Annex I Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1725378
10 January 2002 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1477514
30 October 2001 COI Inspection · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1376782
5 April 2001 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 75949
16 November 2000 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 823135
29 September 2000 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1397512
29 April 2000 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1403124
20 September 1999 Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1348679
25 August 1999 Re-Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1372765
19 May 1999 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1365217
17 May 1999 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1454675
5 February 1999 Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 81240
10 November 1998 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 804962
10 June 1998 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 801529
3 March 1998 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1409861
23 September 1996 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1135229
6 September 1996 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 945725
20 July 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1087557
25 August 1995 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 882009
21 July 1994 Hull Examination
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 861959
10 June 1994 Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1151795
19 May 1994 Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1151794
16 May 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 175223
12 May 1994 COI Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1355165
4 August 1993 Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 843497
15 June 1993 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 843868
22 May 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1266197
16 May 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1237700
3 May 1990 Damage Survey · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1225199
5 December 1989 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1243101
14 June 1989 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1033909
9 June 1989 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1033908
12 November 1988 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1030732
20 October 1988 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1203269
16 May 1988 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1349233
2 May 1988 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1343154
28 October 1987 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1325281
23 September 1987 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1007676
27 August 1987 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1030630
14 August 1987 Re-Inspection · Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1030627
25 March 1987 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1330323
1 May 1986 COI Inspection · Credit Drydock · MARPOL Annex I Examination
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1294649
16 October 1985 COI Inspection · Credit Drydock
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1000729
25 September 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 987309
4 November 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972279
13 July 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972332

Deficiency record · 158

02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 March 2024 Resolved
If, during an internal structural exam (ISE), cargo tank internal examination (CTIE), or underwater survey, damage or deterioration to the hull plating, structural members, or cargo tanks is discovered, the Officer in Charge, Marine Inspection, may require the vessel to be dry-docked or otherwise taken out of service to further assess the extent of the damage and to effect permanent repairs... The following items were discovered during the internal structural exam.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Forward Starboard rake side shell, In between frame 2 & 3, 1st longitudinal from bottom, wastage including holes throughout frame. Provide ultrasonic soundings to determine the extent of wastage.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 March 2024 Resolved
Forward Starboard rake side shell, In between frame 3 & 4, 1st longitudinal from bottom, wastage throughout frame. Provide ultrasonic soundings to determine the extent of wastage.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Forward Starboard rake side shell, Frame 3, cracked weld at 45 degree, at water line. Crop and renew.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 29 March 2024 Resolved
Forward Starboard rake Crop and renew 2nd and 3rd tripping brackets counting from bottom.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 29 March 2024 Resolved
Crop and renew all damage on the 2nd side shell longitudinal from the bottom, located between the 1st and 2nd vertical frame counting from aft.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Crop and renew 2nd, 3rd, and 4rth bottom tripping brackets at the turn of the bilge counting from aft.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Forward rake port side, Replace bottom ladder rung.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Forward rake port side, Crop and renew bottom longitudinal side shell chord wastage where it meets the bottom plating.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Forward rake port side, Crop and renew vertical side chord wastage located next to 3rd vertical frame counting from aft.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Forward rake starboard side, Crop and renew 5th and 6th side shell longitudinal damage where they meet the 1st side shell vertical.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Forward rake starboard side, Crop and renew the 3rd and 4rth forward tripping brackets counting from bottom.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Void 3 Port side, Crop and renew 4rth forward tripping bracket from bottom.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Void 3 Port side, V&W bad weld on 1st vertical frame from forward where it meets the 4rth horizontal up from bottom.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Aft starboard void ladder wasted, crop and renew lower ladder supports.
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Aft starboard void chord 1 wastage, Provide ultrasonic soundings to determine the extent of wastage.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Aft starboard void, Crop and renew. chord 1 wastage leading to hole.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Aft starboard void chord 3 cracked weld, V/W.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Void 3 Starboard side, 5th longitudinal from bottom has wastage. Provide ultrasonic soundings to determine the extent of wastage.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Void 1 port side, crop and renew cracked weld at 1st side shell longitudinal from deck, aft of ladder in same bay.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Void 1 port side, crop and renew cracked weld between 1st horizontal stiffener and 4th side shell longitudinal from bottom, same bay as ladder.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Aft port side rake, Pitting in chord 1 and 2 between 1,2, and 3 side frames from top. Provide ultrasonic soundings to determine the extent of wastage.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Aft port side rake, Chord 1- crack weld on number 1 side frame.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 29 March 2024 Resolved
Aft port side rake, scaling between bottom frames. Provide ultrasonic soundings to determine the extent of wastage.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 April 2024
Resolved 4 April 2024
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 29 March 2024 Resolved
Aft port side rake, No. 1 deck longitudinal crack/wasted. Provide ultrasonic soundings to determine the extent of wastage.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2026
Resolved 4 April 2024
Resolution: Prior to credit drydock
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 May 2023 Resolved
Nonmetallic flexible hose may be used in lube oil, fuel oil and fluid power systems only where flexibility is required and in lengths not exceeding 30 inches Fuel supply line going to the generator supplying crane engines exceeds 30 inch. 46CFR56.60-25(b)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator installed satisfactory annealed copper fuel supply line.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 May 2023 Resolved
Shutoff valves of a suitable type shall be installed in the fuel supply lines, one as close to each tank as practicable, and one as close to each carburetor as practicable. There is no fuel shut off valve for the fuel supply going at the generator supplying crane engines. 46CFR56.50-75(b)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator installed fuel shutoff valve.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 May 2023 Resolved
The requirements of § 58.10–5 (a), (c), and (d) shall apply to diesel engine installations. Engine exhaust in crane machinery space requires lagging from turbine to exhaust bulkhead penetration. 46CFR58.10-10(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator installed satisfactory lagging.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 May 2023 Resolved
The requirements of § 58.10–5 (a), (c), and (d) shall apply to diesel engine installations. Remove wooden block used as spacer from exhaust on fwd mooring deck engine and resecure pipe. 46CFR58.10-10(a
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator installed proper bracket for the exhaust.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2023 Resolved
Outlet boxes and junction boxes; general.(c) Each outlet or junction box must have a cover unless a fixture canopy, switch cover, receptacle cover, or other cover is used. Covers multiple open electrical junction boxes in the crane machinery space.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator replaced all unsatisfactory j boxes with satisfactory j boxes.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 May 2023 Resolved
(1) Nonmetallic flexible hose must be in accordance with SAE J1942 (incorporated by reference; see 46 CFR 56.01-2) and may be installed only in vital and nonvital fresh and salt water systems, nonvital pneumatic systems, lube oil and fuel systems, and fluid power systems. Replace two crane hydraulic lines for crane operation that have chafing on exterior material and remove nylon rope supporting hydraulic line in machinery space. 46CFR56.60-25 b
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator installed new hoses, chafing gear at chafe points, and properly secured all hydraulic hoses.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2023 Resolved
(a) Each panelboard switching unit must be numbered. (b) Each panelboard must have: (1) A circuit directory cardholder; and (2) A circuit directory that has: (i) The circuit designation of each circuit; (ii) A description of the load of each circuit; and (iii) The rating or setting of the overcurrent protective device for each circuit. Distribution panel on port side crane machinery space requires labeling. 46CFR111.40-11
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator replaces breaker panel and properly labeled all breakers.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 4 May 2023 Resolved
All enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators. Crane machinery ventilation damper is wedged open and open/close mechanism is broken.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator repaired the closing mechanism and damper functions properly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 May 2023 Resolved
Electrical installations on vessels must ensure the protection of passengers, crew, other persons, and the vessel from electrical hazards. Dead end wires on engine and in machinery space. 46 CFR 111.01-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator removed or secured all dead end wires.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 4 May 2023 Resolved
The construction of each lighting fixture for a nonhazardous location must meet UL 1598A. No Fixture may be used as a connection box for a circuit other than the branch circuit supplying the fixture. Each pendent-type fixture must be suspended by and supplied through a threaded, rigid conduit stem. Drop lights used as primary lighting in machinery space. 46 CFR 111.75-20
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 June 2023
Resolution: Operator installed satisfactory fixed lighting.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 10 February 2020 Resolved
Liferafts with an aggregate capacity sufficient to accomodate the total number of persons onboard. Loaner liferaft onboard has a capacity of 8 instead of the required 10 on COI. Provide proof of 10 person liferaft on board.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 February 2020
Resolved 12 February 2020
Resolution: Liferaft certification sent and cleared.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 10 February 2020 Resolved
It shall be the duty of the owner, master, or person in charge to require and have performed at least once in every twelve months the tests and inspections of all hand portable fire extinguishers. Crew could not produce logs or tags verifying tests and inspections of 04 portable fire extinguishers. Educated crew on requirements, cleared on site.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 11 March 2020
Resolved 10 February 2020
Resolution: educated crew on regulation and proper tracking of maintenance monthly.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 10 February 2020 Resolved
All relief valves for pressure vessels shall be set to relieve at a pressure which does not exceed the maximum allowable working pressure. Crew could not test relief valve on pressure vessel. Operator stated they were purchasing a new relief valve. provide proof of purchase/install.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 March 2020
Resolved 4 March 2020
Resolution: Operator purchased/installed new relief valve in presence of inspectors.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 10 February 2020 Resolved
During an ISE damage to the hull plating/structural members were discovered. Submit repair proposal and provide proof of adequate deck thickness throughout deck. Effect permanent repairs. C/R Tank #1P, 2nd bay from aft topside deck pin hole with light intrusion. C/R Tank #2P, Fwd bay topside deck pin hole with light intrusion. C/R Tank #4P, Fwd bay topside deck pin hole with light intrusion.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 March 2020
Resolved 4 March 2020
Resolution: deficiencies rectified with the exception of "C/R Tank #2P, Fwd bay topside deck pin hole with light intrusion." Inspectors could not locate pin hole that was found on initial inpsection. Operator stated it was never in that tank and was mislabeled.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 10 February 2020 Resolved
During an ISE damage to the hull plating/structural members were discovered. Submit repair proposal for review and approval prior to effecting permanent repairs. C/R Tank #5 Center, area marked located on the centerline I-Beam.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 March 2020
Resolved 4 March 2020
Resolution: Deficiencies rectified and verified by inspectors.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 April 2019 Resolved
OPERATINOAL READINESS. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. The lifebuoys (04) were not in operational condition.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2019
Resolved 23 April 2019
Resolution: New lifebouys were installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 8 April 2019 Resolved
OPERATINOAL READINESS. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. The light attached to the Port bow lifebuoy was inop.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 April 2019
Resolved 23 April 2019
Resolution: New float light was installed.
Engineering › Pressure Vessel › Relief Valve
Issued 7 April 2016 Resolved
The pressure vessel identified on board has not been inspected and is not equipped with a suitable pressure relief valve. Make the vessel available for internal inspection and attach a pressure relief valve, which will be tested in the presence of a USCG Marine Inspector.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 21 April 2016
Resolved 18 May 2016
Resolution: Conducted satisfactory internal inspection and witnessed satisfactory test of the pressure relief valve.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 14 November 2014 Resolved
06 Work list items generated from the ISE conducted on 14Nov14. These items will get rectified during the vessel's upcoming dry dock in Oct 2016. Vessel rep is informed that either USCG rep or ABS survey will have to verify the proper repair before dry dock is credited.
Due 31 October 2016
Resolved 22 December 2016
Resolution: Cleared items during drydock/ISE on 22DEC2016.
Communications › Radio Communications › EPIRB
Issued 22 January 2014 Resolved
Vessel must ensure that the EPIRB hudrostatic release is replaced and properly functioning before operating outside the line of demarcation. 46CFR199-510a
Due 30 January 2014
Resolved 28 January 2014
Resolution: Received picture of new hydrostatic release.
Construction/Loadline › Hull › Longitudinal Frame
Issued 31 March 2010 Resolved
1 STBD - C/R bottom SSL IWO Ladder.
Action required: 705 - Other - as specified
Due 31 October 2011
Resolved 14 December 2011
Resolution: Repaired to satisfaction of CG.
Construction/Loadline › Hull › Bracket
Issued 31 March 2010 Resolved
1 STBD - C/R side shell barckets in Fwd Port Corner.
Action required: 705 - Other - as specified
Due 31 October 2011
Resolved 14 December 2011
Resolution: Repaired to satisfaction of CG.
Construction/Loadline › Hull › Transverse Frame
Issued 31 March 2010 Resolved
1 STBD - Between bay 4 & 5 and between bottom longs 2 & 3, C/R transverse frame.
Action required: 705 - Other - as specified
Due 31 October 2011
Resolved 14 December 2011
Resolution: Repaired to satisfaction of CG.
Construction/Loadline › Hull › Longitudinal Frame
Issued 31 March 2010 Resolved
3 Port - Bay 4 & 5, C/R bottoms longs 1 & 2
Action required: 705 - Other - as specified
Due 31 October 2011
Resolved 14 December 2011
Resolution: Repaired to satisfaction of CG.
Construction/Loadline › Hull › Hull Plating
Issued 29 January 2010 Resolved
Affix temporary repairs to crack in #1 starboard rake in way of side shell frame #3 to the satisfaction of ABS/USCG.
Action required: 705 - Other - as specified
Resolved 18 February 2010
Resolution: ABS surveyed vessel and endorsed Certificate of Class and Load Line Certificate on 12 Feb 2010. Def cleared.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 29 January 2010 Resolved
Repair containment plate on main deck to satisfaction of ABS/USCG.
Action required: 705 - Other - as specified
Resolved 17 February 2010
Resolution: Containment not part of original ship structure. It was added prior to last overseas salvage job as an additional protection measure for the specific contract. There are no fill connections, tank vents or tanks in the area of the containment. Def Cleard
Construction/Loadline › Markings › Fresh Water Load Line
Issued 29 January 2008 Resolved
Repaint Loadline IAW International Load Line Certificate.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2008
Resolved 12 February 2008
Electrical › Electric Supply System (service) › Battery Installation
Issued 29 January 2008 Resolved
PROPERLY SECURE BATTERY BOX FOR ALL GENERATORS.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2008
Resolved 12 February 2008
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 29 January 2008 Resolved
Install engine casing/cover for engine on winch stand.
Condition: Unknown
Action required: 705 - Other - as specified
Due 28 February 2008
Resolved 12 February 2008
Engineering › Generator (propulsion/auxiliary-electric) › Cable
Issued 29 January 2008 Resolved
Replace worn fuel hose for deck generator.
Action required: 705 - Other - as specified
Due 28 February 2008
Resolved 12 February 2008
Engineering › Fuel Oil Service System › Hose
Issued 31 October 2006 Resolved
Install USCG approved fuel hoses on all machinery as discussed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 November 2006
Resolved 30 November 2006
Resolution: Vessel Rep replaced fuel hoses on machinery.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 31 October 2006 Resolved
Install protective guards IWO pulleys for house, crane, and winch generators.
Action required: 705 - Other - as specified
Due 30 November 2006
Resolved 30 November 2006
Resolution: Vessel Rep installed protective guards IWO pulleys for house, crane and winch generators.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 31 October 2006 Resolved
Install lagging on exhaust piping for house and crane generators as discussed.
Action required: 705 - Other - as specified
Due 30 November 2006
Resolved 30 November 2006
Resolution: Vessel Rep installed lagging on exhaust piping on generators.
Lifesaving › Immersion Suits › General
Issued 31 October 2006 Resolved
Provide proof of emergency lights for Immersion Suits.
Action required: 705 - Other - as specified
Due 30 November 2006
Resolved 30 November 2006
Resolution: Vessel Rep bought emergency lights for Immersion Suits.
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 23 May 2005 Resolved
Vessel found operating without a dry-dock inspection as required by 46CFR91.40. Vessel may not operate outside the boundry line until the vessel receives a credit dry-dock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2005
Resolved 8 September 2005
Resolution: Vessel completed satisfactory drydock/ISE inspections (activity #2416618).
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 July 2004 Resolved
C/R port side nav light frame.
Due 8 July 2004
Resolved 8 July 2004
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 July 2004 Resolved
C/R stern light frame.
Due 8 July 2004
Resolved 8 July 2004
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 July 2004 Resolved
Repaint navigation light screens matte black.
Due 8 July 2004
Resolved 8 July 2004
Lifesaving › Inflatable Liferafts › Painter
Issued 1 July 2004 Resolved
Properly refasten painter to liferaft.
Due 8 July 2004
Resolved 8 July 2004
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 1 July 2004 Resolved
Replace gaskets on deck opening covers as needed.
Due 8 July 2004
Resolved 8 July 2004
Stability › Watertight Integrity › General
Issued 1 July 2004 Resolved
Pump out water in starboard aft void, gas-free and make ready for inspection.
Due 8 July 2004
Resolved 8 July 2004
Resolution: Inspected void, no ingress of water. All sat.
Electrical › Electrical Distribution System (service)
Issued 3 January 2003 Resolved
Replace wires on receptacle (electrical) outside of workshop. LEGACY COMPONENT DESC: Wiring
Due 3 February 2003
Resolved 10 February 2003
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 3 January 2003 Resolved
Replace reflective tape on aft lifebuoys.
Due 3 February 2003
Resolved 10 February 2003
Resolution: Corrected.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 3 January 2003 Resolved
Replace light on aft lifebuoy.
Due 3 February 2003
Resolved 10 February 2003
Resolution: Replaced.
Construction/Loadline › Structures
Issued 3 January 2003 Resolved
Verify and reattach courses to stanchions as needed. No sail item.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2003
Resolution: Repaired all around.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 3 January 2003 Resolved
Re-mark forward port side lifering.
Due 3 February 2003
Resolved 10 February 2003
Resolution: Remarked.
Stability › Watertight Integrity
Issued 3 January 2003 Resolved
Dewater compartment forward stbd side void tank. No sail item.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2003
Resolution: Later proof indicated that tank was being used for crane counter-weight ballast. No need to dewater. Cover reinstalled.
Accommodation/Occupational Safety › Occupational Safety
Issued 3 January 2003 Resolved
Remove loose battery on deck forward of deck generator. LEGACY COMPONENT DESC: Portable Electric Equipment/Appliances
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2003
Resolution: Removed.
Pollution Prevention/Response › Prevention Equipment
Issued 3 January 2003 Resolved
Provide containment around all existing deck fuel tanks. LEGACY COMPONENT DESC: Coamings
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2003
Resolution: Containment installed.
Fire Fighting › Combustible Materials
Issued 3 January 2003 Resolved
Remove 5 gal fuel container (diesel) IWO mooring equipment. LEGACY COMPONENT DESC: Open fuel container
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2003
Resolution: Removed.
Deck/Cargo › Mooring/Anchoring
Issued 3 January 2003 Resolved
Provide guard for cable reel extensions on stbd cable reel. LEGACY COMPONENT DESC: Anchor Cable
Due 3 February 2003
Resolved 10 February 2003
Resolution: Equipment removed.
Pollution Prevention/Response › Prevention Equipment
Issued 3 January 2003 Resolved
Remove standing oil 5 gal bucket near workshop. LEGACY COMPONENT DESC: Open container (standing oil)
Due 3 February 2003
Resolved 10 February 2003
Resolution: Removed.
Navigation › Collision/Grounding Avoidance
Issued 3 January 2003 Resolved
Provide anchor light and day shape for same. LEGACY COMPONENT DESC: Day Shapes
Due 3 February 2003
Resolved 10 February 2003
Resolution: Fabricated and installed.
Electrical › Electrical Distribution System (service)
Issued 3 January 2003 Resolved
Repair or remove wiring from workshop. If replaced, must be a marine type. LEGACY COMPONENT DESC: Wiring
Due 3 February 2003
Resolved 10 February 2003
Resolution: Replaced with marine type.
Engineering › Generator (propulsion/auxiliary-electric)
Issued 3 January 2003 Resolved
Extend exhaust pipe from deck generator to height equivalent above accom. space.
Due 3 February 2003
Resolved 10 February 2003
Resolution: New extended pipe installed.
Electrical › Lighting (service)
Issued 3 January 2003 Resolved
Replace holed and missing light covers.
Due 3 February 2003
Resolved 7 March 2003
Resolution: Replaced.
Electrical › Lighting (service)
Issued 3 January 2003 Resolved
Replace or remove inoperable light in head.
Due 3 February 2003
Resolved 10 February 2003
Resolution: Removed.
Fire Fighting › Fixed Fire Detection System
Issued 3 January 2003 Resolved
Make fire detection system operational. LEGACY COMPONENT DESC: Smoke Detectors
Due 3 February 2003
Resolved 10 February 2003
Resolution: New Batteries installed.
Electrical › Electrical Distribution System (service)
Issued 3 January 2003 Resolved
Remove dead end wiring from overhead abandoned vent. LEGACY COMPONENT DESC: Wiring
Due 3 February 2003
Resolved 10 February 2003
Resolution: Removed.
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 3 January 2003 Resolved
Service expired fire extinguisher in accom. space. LEGACY COMPONENT DESC: Service
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2003
Resolution: Serviced.
Accommodation/Occupational Safety › Washroom/Toilet
Issued 3 January 2003 Resolved
Provide physical means to secure toilet if not in service. LEGACY COMPONENT DESC: Toilet
Due 3 February 2003
Resolved 10 February 2003
Resolution: Space secured and posted.
Accommodation/Occupational Safety › Potable Water System
Issued 3 January 2003 Resolved
Secure water tank.
Due 3 February 2003
Resolved 10 February 2003
Resolution: Water tank now secured and not able to move.
Accommodation/Occupational Safety › Messroom
Issued 3 January 2003 Resolved
Remove "fire extinguisher storage box" in galley.
Due 3 February 2003
Resolved 10 February 2003
Resolution: They covered up the words "fire extinguisher storage box" with duct tape.
Electrical › Lighting (service)
Issued 3 January 2003 Resolved
Replace inoperable deck light port side of crane.
Due 3 February 2003
Resolved 10 February 2003
Resolution: Repaired.
Deck/Cargo › Mooring/Anchoring
Issued 3 January 2003 Resolved
Make anchor available for inspection. Be able to demonstrate deployment. LEGACY COMPONENT DESC: Anchor
Due 3 February 2003
Resolved 10 February 2003
Resolution: Anchor deployed. All sat.
Documentation › Certificates/Documents
Issued 3 January 2003 Resolved
Provide valid load line certificate prior to use of crane. Provide valid cargo gear certificate prior to use of the crane. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2003
Resolution: Cargo gear certificate provided.
Lifesaving
Issued 3 January 2003 Resolved
Vsl not permitted to sail without fire extinguishers, liferaft, railing course repair, and proof of grey water pumped from fwd tank/discharged to a reception facility. No sail item.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 February 2003
Resolution: Items serviced or repaired as req''''d.
Deck/Cargo › Cargo Transfer (solid)
Issued 3 January 2003 Resolved
Make all crane machinery spaces available for CG inspection including air receivers where applicable.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2003
Resolution: Per [name withheld] on 10FEB03, we do not need to inspect this space. Vessel has a current cargo gear certificate issued by NCB.
Documentation › Certificates/Documents
Issued 3 January 2003 Resolved
Do not operate crane without valid cargo gear certificate O/B.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 February 2003
Resolution: Cargo gear certificate provided.
Navigation › Collision/Grounding Avoidance
Issued 3 January 2003 Resolved
Provide navigation lights as required. LEGACY COMPONENT DESC: Navigation Lights
Due 3 February 2003
Resolved 10 February 2003
Resolution: Lights mounted as required.
Lifesaving
Issued 30 October 2001 Resolved
Galley stove and refrigerator are secured witha rope. Properly secured.
Condition: Unknown
Due 13 November 2001
Resolved 10 December 2001
Lifesaving
Issued 30 October 2001 Resolved
Properly stow all gear and equipment on deck. General housekeeping badly needed.
Condition: Unknown
Due 5 November 2001
Resolved 10 December 2001
Resolution: Deck is orderly and cleared of excess equipment.
Documentation
Issued 30 October 2001 Resolved
Valid sticker for Documentation certificate not onboard.
Condition: Unknown
Due 5 November 2001
Resolved 10 December 2001
Resolution: Valid sticker presented onboard.
Lifesaving
Issued 30 October 2001 Resolved
Ring bouy light inop.
Condition: Unknown
Due 5 November 2001
Resolved 10 December 2001
Resolution: Light replaced with operational one.
Construction/Loadline
Issued 30 October 2001 Resolved
Gaskets on watertight enclosures worn excessively. Renew and replace.
Condition: Unknown
Due 13 November 2001
Resolved 10 December 2001
Resolution: Replaced gaskets with new.
Electrical
Issued 30 October 2001 Resolved
Metal cover for deck light on portside of crane mounting missing.
Condition: Unknown
Due 13 November 2001
Resolved 10 December 2001
Resolution: Replaced deck light cover.
Fire Fighting
Issued 30 October 2001 Resolved
Fire extinguisher bracket missing. Extinguishers is being secured with a rope.
Condition: Unknown
Due 13 November 2001
Resolved 17 December 2001
Resolution: New extinguisher brack mounted.
Lifesaving
Issued 30 October 2001 Resolved
Epirb hydro release date expired.
Condition: Unknown
Due 5 November 2001
Resolved 10 January 2002
Electrical
Issued 30 October 2001 Resolved
Battery for generator not secured.
Condition: Unknown
Due 13 November 2001
Resolved 10 December 2001
Resolution: Battery properly secured.
Electrical
Issued 30 October 2001 Resolved
Breaker panel cover missing and circuit breakers missing inside panel.
Condition: Unknown
Due 13 November 2001
Resolved 10 December 2001
Resolution: Pannel replaced and blanks put inside the pannel.
Electrical
Issued 30 October 2001 Resolved
lighting fixtures in engine space and outlets in engine space not marine grade or explosion proof.
Condition: Unknown
Due 30 November 2001
Resolved 10 December 2001
Resolution: Lights replaced with explosion proof lights and outlets are approved for machine space.
Navigation
Issued 29 September 2000 Resolved
Paint all nav light brackets flat black.
Condition: Unknown
Due 16 November 2000
Resolved 17 November 2000
Navigation
Issued 29 September 2000 Resolved
Make stern light bracket aspect 135 degrees iaw COLREGS.
Condition: Unknown
Due 16 November 2000
Resolved 17 November 2000
Navigation
Issued 29 September 2000 Resolved
Fill in holes/repair nav light brackets.
Condition: Unknown
Due 16 November 2000
Resolved 17 November 2000
Accommodation/Occupational Safety
Issued 29 September 2000 Resolved
Repair/replace lifelines and stantions on stbd side and stern.
Condition: Unknown
Due 16 November 2000
Resolved 17 November 2000
Construction/Loadline
Issued 29 September 2000 Resolved
Permanently affix load line and paint.
Condition: Unknown
Due 16 November 2000
Resolved 17 November 2000
Lifesaving
Issued 29 September 2000 Resolved
Replace/service hydro-static release.
Condition: Unknown
Due 16 November 2000
Resolved 17 November 2000
Lifesaving
Issued 29 September 2000 Resolved
Stencil full name on all PFD's and immersion suits.
Condition: Unknown
Due 16 November 2000
Resolved 17 November 2000
Documentation
Issued 29 April 2000 Resolved
ISSUED CG-835 TO COMPLETE ALL WORKLIST ITEMS PRIOR TO 01MAY00 OR COI WILL BE DEACTIVATED. VESSEL SHALL NOT OPERATE PIOR TO ALL WORKLIST ITEMS CLEAREDBY THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 9 May 2000
Resolved 9 May 2000
Navigation
Issued 6 September 1996 Resolved
PROVIDE STBD SIDELIGHT TO INT COLREG STANDARD. BARGE IS RESTRICTED TO DAYLIGHT OPERATION ONLY.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Documentation
Issued 6 September 1996 Resolved
PROVIDE PROOF OF VALID USCG DOCUMENTATION CERTIFICATE TO [name withheld] & PLACEORIGINAL VALID USCG DOCUMENTATION CERTIFICATE ON BOARD.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Electrical
Issued 6 September 1996 Resolved
REMOVE DEAD ENDED WIRING FROM STERN OF VESSEL.
Condition: Unknown
Due 7 October 1996
Resolved 6 September 1996
Navigation
Issued 6 September 1996 Resolved
PROVIDE AFT STERNLIGHT TO INT COLREG STANDARD. BARGE IS RESTRICTED TO DAYLIGHT OPERATION ONLY.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Construction/Loadline
Issued 6 September 1996 Resolved
PAINT DRAFT MARKS STBD SIDE AFT.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Construction/Loadline
Issued 6 September 1996 Resolved
REPLACE MANHOLE COVERS FOR HATCH 4 PORT, HATCH 2 STBD & HATCH 3 STBD.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Navigation
Issued 6 September 1996 Resolved
REPAIR/REPLACE PORT SIDELIGHT TO INT COLREG STANDARD.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Navigation
Issued 6 September 1996 Resolved
REPAIR/REPLACE DAYSHAPE STRUCTURE TO INT COLREG STANDARD.
Condition: Unknown
Due 6 September 1996
Resolved 6 September 1996
Construction/Loadline
Issued 12 May 1994 Resolved
REPLACE #2 SIDE LONGITUDINAL AFT PORT RAKE.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Construction/Loadline
Issued 12 May 1994 Resolved
REPAIR LONGITUDINAL BULKHEAD AT INBOARD END #2 FRAME, STBD FORWARD RAKE.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Construction/Loadline
Issued 12 May 1994 Resolved
CROP AND RENEW SIDE FRAME STBD AFT RAKE.
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Construction/Loadline
Issued 12 May 1994 Resolved
REPAIR CRACKED WELD IN #2 FRAME STBD SIDE, FORWARD RAKE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 April 1995
Resolved 6 April 1995
Construction/Loadline
Issued 15 June 1993 Resolved
RENEW AS ORIGINAL #6 STARBOARD (AFTERMOST) MOORING CLEAT.
Condition: Unknown
Due 15 June 1993
Resolved 15 June 1993
Construction/Loadline
Issued 16 May 1990 Resolved
CLEAN AND RENEW GASKETS AS REQUIRED ON ALL WATERTIGHT HATCH COVERS. MUST COMPLETE BY 15 JUN 90 FOR INTERNAL EXAM CREDIT.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
REPAINT DRAFT MARKS, LOAD LINES AND VESSEL'S NAME. MUST COMPLETE PRIOR TO 15 JUN 90 TO RECEIVE DRYDOCK CREDIT.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
IN BUOYANCY TANK #1C, PICK UP WELDS ON # 3 AND #4 TRANSVERSE FROM FORWARD IN WAY OF FRACTURES THROUGHOUT LENGTH. MUST COMPLETE BY 15 JU 90 FOR INTERNAL EXAM CREDIT.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
IN BUOYANCY TANK 5S,PICK UP WELD ON 1ST WEB FRAME AFT FROM FORWARD BULKHEADIN WAY OF 2ND SIDE LONG FROM BILGE WRAPPER.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
IN BUOYANCY TANK 5S,PICK UP WELD ON 1ST WEB FRAME AFT FROM FORWARD BULKHEADIN WAY OF 2ND SIDE LONG FROM BILGE WRAPPER.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
REMOVE EXCESS WATER FROM ALL COMPARTMENTS .
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Navigation
Issued 16 May 1990 Resolved
REPAIR STERN LIGHT. VESSEL MUST CARRY ACCEPTABLE TEMPORARY STERN LIGHT UNTIL THIS REQUIREMENT IS COMPLETE.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
COMPLETE REPAIRS TO BUOYANCY TANK SP SIDE SHELL AND INTERNALS AND 5P/6P BULKHEAD A PER SURVEYORS REPORT.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
REWELD LONGS 2 AND 3 FROM SIDE SHELL TO TRANSVERSE FLOORS WHERE BROKEN LOOSE IN BUOYANCY TANK. MUST COMPLETE PRIOR TO 15 JUN 90 TO RECEIVE INTERNAL EXAM CREDIT.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
INSTALL RETAINER CHAINS ON 2S,5P,5C, AND 7P HATCH COVERS. MUST COMPLETE BY15 JUN 90 FOR INTERNAL EXAM CREDIT.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
MAKE BUOYANCY TANK 7S AVAILABLE FOR INTERNAL INSPECTION NEXT ARRIVAL PORT OF NEW YORK BUT NO LATER THAN 21 MAY 90 TO CONFIRM THIS TANK IS NOT TAKING IN WATER.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 16 May 1990 Resolved
IN BUOYANCY TANK 1P, RENEW TRANSVERSE FLOORS AS MARKED, PICK UP WELDS AS MARKED, RENEW BOTTOM 4FT AND BRACKETS OF OUTBOARD 5 AFT BULKHEAD STIFFENERS. MUST BE COMPLETE BY 15 JUN 90 FOR INTERNAL EXAM CREDIT.
Condition: Unknown
Due 16 May 1990
Resolved 16 May 1990
Construction/Loadline
Issued 3 May 1990 Resolved
IN BOSTON AND PRIOR TO RETURN TO NEW YORK OWNER'S REPRESENTATIVE SHALL INSPECT TEMPORARY REPAIRS AND REPORT ANY LEAKAGE, DAMAGE OR PROBLEMS TO THECOGNIZANT OCMI.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Electrical
Issued 3 May 1990 Resolved
SHIM ALL THREE LEAD ACID BATTERIES TO PREVENT SHIFTING UNDERWAY.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Construction/Loadline
Issued 3 May 1990 Resolved
VSL MAY MAKE 1 ROUND TRIP NEW YORK-BOSTON-NEW YORK. VSL SHALL BE DRYDOCKED ON RETURN TO NEW YORK BUT NO LATER THAN 15MAY90 FOR PERMANENT REPAIRS TO 5P SIDESHELL AND INTERNALS AND 5P/6P BULKHEAD.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Construction/Loadline
Issued 3 May 1990 Resolved
PROVIDE DIVERS REPORT OF DAMAGE TO BUOYANCY TANK 5P TO A MARINE INSPECTOR NO LATER THAN 02MAY90.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Construction/Loadline
Issued 3 May 1990 Resolved
PROVIDE A REPAIR PROPOSAL FOR 5P TO A MARINE INSPECTOR NO LATER THAN 02MAY90.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Construction/Loadline
Issued 3 May 1990 Resolved
CONFIRM THAT AIR HISSING FROM 1P, 1C, 1S, 5S & 7C IS NOT DUE TO TAKING ON WATER.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Navigation
Issued 3 May 1990 Resolved
REPAIR STERN LIGHT OR PROVIDE TEMPORARY USCG APPROVED STERN LIGHT PRIOR TO SAILING.
Condition: Unknown
Due 3 May 1990
Resolved 3 May 1990
Navigation
Issued 9 June 1989 Resolved
PROVIDE CG APPROVED NAVIGATION LIGHTS (PORT, STBD AND STERN) PRIOR TO LEAVING PORT.
Condition: Unknown
Due 9 June 1989
Resolved 9 June 1989
Construction/Loadline
Issued 20 October 1988 Resolved
CROP AND RENEW HEAVY SET-IN SIDE SHELLS AND WRAPPER PLATES 9'X16'X1/2" RESPECTIVELY INCLUDING 2 WEB FRAMES AND BRACKETS ON STBD FWD RAKE.
Condition: Unknown
Due 20 October 1988
Resolved 20 October 1988
Accommodation/Occupational Safety
Issued 2 May 1988 Resolved
INSTALL LIFELINES ALONG THE PERIMETER OF THE ENTIRE BARGE.
Condition: Unknown
Due 2 May 1988
Resolved 2 May 1988
Construction/Loadline
Issued 2 May 1988 Resolved
RENEW WASTED DECK MOORING CLEAT LOCATED PORT SIDE AFT.
Condition: Unknown
Due 2 May 1988
Resolved 2 May 1988
Construction/Loadline
Issued 2 May 1988 Resolved
REPLACE OR REPAIR BOTTOM CORNER BRACKET AT THE CORNERS IN WAY OF VOIDS 7WS AND 7WP AT THE OCTOBER DRYDOCKING.
Condition: Unknown
Due 2 May 1988
Resolved 2 May 1988
Construction/Loadline
Issued 2 May 1988 Resolved
PERMANENTLY MARK LOADLINE REFERENCE MARK (PORT AND STARBOARD).
Condition: Unknown
Due 2 May 1988
Resolved 2 May 1988
Navigation
Issued 2 May 1988 Resolved
REWIRE SPLICED ELECTRICAL CABLE TO ALL THREE NAVIGATION LIGHTS
Condition: Unknown
Due 2 May 1988
Resolved 2 May 1988
Documentation
Issued 14 August 1987 Resolved
PRIOR TO MOVING BARGE, PROVIDE THE FOLLOWING DOCUMENTS TO THE OCMI: COI, IOPP CERT AND COD. DOCUMENTS MUST BE ON BOARD VESSEL BEFORE MOVING THE BARGE.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Navigation
Issued 14 August 1987 Resolved
PRIOR TO GETTING UNDERWAY, MAKE THE PORT RUNNING LIGHT OPERATIONAL.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Construction/Loadline
Issued 14 August 1987 Resolved
CROP AND RENEW THE #4 AND #5 SIDE FRAMES IN WAY OF THE TURN OF THE BILGE INTHE FORWARD STARBOARD RAKE.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Construction/Loadline
Issued 14 August 1987 Resolved
CROP AND RENEW THE STERN LOG VERTICAL STIFFENER AND ASSOCIATED BRACKET AND UNDERDECK BEAM IN THE STARBOARD AFT RAKE.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987
Construction/Loadline
Issued 14 August 1987 Resolved
CROP AND RENEW THE PORT CORNER BRACKET AND REWELD THE UNDERDECK BEAM IN THEPORT AFT RAKE.
Condition: Unknown
Due 14 August 1987
Resolved 14 August 1987

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.